Professional Documents
Culture Documents
REV_1
DIMENSION
SHALL BE
MENTIONED.
SECTION- D DETAILS
SHALL BE PROVIDED.
DIMESNSION SHALL
BE MENTIONED FROM SECTION- D DETAILS
RAIL CENTER. SHALL BE PROVIDED.
DIMESNSION SHALL
BE MENTIONED FROM
RAIL CENTER.
OIL PUMP LOCATION SHALL BE CHANGED
ACCORDINGLY TO CONNECT WITH THE
EXISTING BURNT OIL PIT.
* OPTION-2 (MRSS SIDE) LOCATION IS FINALIZED.