You are on page 1of 1

BOLDING DISTANCE SHALL BE MENTIONED.

FOUNDATION DISTANCE SHALL BE MENTIONED FROM


CENTER.
1726MM ROLLER C/C.
1676MM.RAIL CAUGE.
REF DWG NO: TJ-02/T/05881/3-
MARSHALLING BOX.
BE PROVIDED FOR
100MM HUME PIPE SHALL

REV_1
DIMENSION
SHALL BE
MENTIONED.
SECTION- D DETAILS
SHALL BE PROVIDED.
DIMESNSION SHALL
BE MENTIONED FROM SECTION- D DETAILS
RAIL CENTER. SHALL BE PROVIDED.
DIMESNSION SHALL
BE MENTIONED FROM
RAIL CENTER.
OIL PUMP LOCATION SHALL BE CHANGED
ACCORDINGLY TO CONNECT WITH THE
EXISTING BURNT OIL PIT.
* OPTION-2 (MRSS SIDE) LOCATION IS FINALIZED.

You might also like