You are on page 1of 18
MENYRDT PROJECT EIGHTEEN PRINCIPAL Im DOCUMENT SUBMITTAL FORM. Work Package: (Contract No: | [Submission of Quantification of finishing materials for 2-Kanal Mock-Up Villa Type-B, Procured by the Client. TO: — Meinhardt Pakistan Pvt. Ltd SUBMITTAL NO: PCL-P18-DS-323, REVISION NO. | | FROM: Engr. Syed Rizwan ur Rahim DATE: Jan 22, 2020 SUBMITTAL PACKAGE: ‘ATTN: Engr. Irfan Ullah Khattak PRE aes ‘Submitted for: ov Approval a Information = Coordination Category: ‘Specification: Discipline: CIVIL / MEP BOQ Ref. No. Phase No.. Drawing Ref. ‘We certify that the above submited documents have been reviewed in deta and are correct and in stick conformity with the carvact ‘drawings and specfteations except atherwsse stated For the Contractor: Name: Syed Rizwan ur ~ pate: Jan 22, Rahim CES Signature: Name: Signature: Date: ACTION CODE Ac Approved Bc Approved As Noted © 0 Revise — Resubmit Dc Rejeced~ Resubmit. Ec Receipt Acknowledged CINE ee Name: Signature: Date: | eprova shat ave ne Certara olga nd abites ude Contact corde autoraton of any care 10 Cerra Saree aco st nino oy econ wetoerre noah eo cao he Contac Engineer Received For: Consutant Owner Contractor i S E Date [701 EIGHTEEN VILLAS - ISLAMABAD DOCUMENT TRANSMITTAL Contract No: Work Package: Eighteen MPPL-PNPL-P18-TM-0067 20-01-2020 FROM: Meinhardt Islamabad DATE: : “CIREF; E-EG-TE-MHP-LET-3816 ATTN: Director - Principal TRANSMITTED FOR: (For Review & Comment formation Only Your Use No. Doc Type Date Description 7 _No. of Quantification of finishing materials for2 1 Client Letter inal mock-up villa, type B by proc on i the client ‘Transmitted by: Infanullah Khan Khattak Job Title RE (Project Eighteet ‘Company Meinhardh (Islamabad) Pvt. Ltd Received by: Name & Signature above im > Ret: E-EG-TE-MHP-LET-03916 Date: January 20, 2019 ‘Mi, Irfanullah Khan Resident Engineer Meinhardt Pakistan (Pvt) Ltd Project Eighteen Islernabad Subject Quantification of finishing materials for 2 Kanai Mock-up Villa, Type B py procured by the Client. vact —VO-1 - Construction of Pavilion 8 ar Dear Mr. trfanullah, ‘Subject to our letter reference E-EG-TE-MHP-LET-02650, shared on 13 December 2019, where Senior Management's decision to procure 11 finishing item directly, for the 2 Kanal Mock-up, Type B was communicated, and transmittal number: E-EG-TE-MHP-TRA-00203, where revised 2 Kanal Mock-up, Type B, IFC drawings were shared, kindly instruct the Contractor to provide us with the final quantities against these finishing materials, maximum by Thursday, 23 January 2020, to initiate the procurement process for finishing items. Please do ensure thet factors such as wastage are incorporated in the quaniificaiion, 88 per engineering norms, for these finishing materials. Additionally, kindly instruct the Contractor i an for the 2 Kanal Mock-up Type 8, bearing in mind, the decision to procure 11 of the Finishing items, by the Client, including delery pian, specifying dates by y te target dates. Furthiermore, as requested in the aforementioned letter, please direct the Contractor eter paces. locate plang an station of thes 1 Fishing tes, ‘Ahmed Wael Project Director ‘ay Sera in, oh Avs ie re Pen ‘ToptsrTi tts ana oer rapa pen i te The Project Manager Principal Constructors (Pvt.) Ltd Pavilion 687, Project Eighteen Islamabad Ref # MPPL/PNP/IK-55 Date: 17" of December 2019 (© Attachment: - E-EG-TE-MHP-LET-03650 livery of Finishing materials for 2 Kanal Mock-up Villa, Type B by the Client Subject: Fw Dear Sir, This refers to the attached letter; Ref E-EG-TE-MHP-LET-03650, dated 13" of December 2029, from the Employer on the subject cited above. The attached Employers letter is setf-explanatory and m/s.Principal is hereby inStructed to submit their variation for the installation of finishing materials, mentioned in the Employers aforementioned letter. Your prompt response shall be appreciated please. Sincerely, Resident Engineer Meinhar {Irfanullah K. Khattak) CC: Project Director- Employer ‘Abu Dhabi Adelaide Babaia + Banghok + Being «Brisbane « Chennai Dstang + Doba« Hanoi + Ho Chi Minh City « Hang Kons © Islamabad «Jakarta «Jeddah e Karachi» Lahore + London » Macau + Mani *Metboue « Muscat» Muzzaffrabad » New Delhi Peshawar © Riyach « Shanghal » Shenzhen «Sydney» Trip eras Ref E-EG-TE-MHP-LET-03650 Date: December 13, 2019 Mr. Ifanuliah Khan Resident Engineer Meinhardt Pakistan (Pvt) Ltd Project Eighteen Islamabad Subject: Delivery of finishing materials for 2 Kanal Mock-up Villa, Type B by the Client. Contract: 0-1 - Construction of Pavilion 6 and 7 Dear Mr. Irfanullah, {tis intimated, that as per senior management decision, the following list of finishing materials will be procured and delivered by our Procurement department, for the 2 Kanal Mock-up, Type B: Kitchen maf white malamine, granite top, cp fixture & fitings Wardrobes moister proof mdf with melamine Doors solid wood (main door), engineered wood, oak/ash cp brass ironmongery Aluminium works Kitchen appliances stove, microwave, hood, cooker Sanitary sets white viterous Faucets chrome plated fixtures air conditioners conventional split a/c (cold & hot) marble flooring (Ariston white) 0. engineered wooden floor 4. plumbing fixtures S@eNOnaoNa Kindly, instruct the contractor to submit their variation for the installation of these materials, at the earliest, to finalise the same. Sincerely, Ahmet Wael 43 DEC 2018 Project Director te x 221 rik eens man ann “9g oO it PRINCIPAL PABINYRDT PORCH ohn (tama vesano, RG nO. Dave “ime Mockup Va Secoagen av Ais 0G Terns Whie Avalon Marble —T— luwingyDining Master Both living Mummy laa 20% on above Qty ragenof PRINCIPAL PABINYRDT PROJECT Eighteen (Islamabad) Tew No. ORG NO. MIS AIS one ime. Mockup Vila PREPARED BY: MANS Stair Slabs stoirt steps steps Landing lLanding Landing Jade 20% on above QW. Page Lott PRINCIPAL PABINYARDT OR Eaten onnat ae moe eo loving room Iwaiter 803 fac laec Room [aed Room [sec Room lovesing JFamiy Room |Aaa 20% on above Gy PRINCIPAL MINYRDT omen omens) ‘aigel Tannen er DESCRIPTION vo propo sf «| «| an | ow mera [20x30.CM Carpe Tes oring _ lar [cinema Room ' sees 1285 [son ‘Ass 20% on above 45 [sar ‘te pager PRINCIPAL PAXRINYRDT PROJECT Highteen (ktamebod) eM NO, RG NO. Oat: PREPARED gr: MA age tof PRINCIPAL PABINAFARDT Eighteen (Islamabad) TEM NO. PREPARED 8Y:_MLAnis "MEASUREMENT SHEET TEM | DescriPTiON No. t [8] # | am [unm] tomans BOG Hter| Aluminium Windows cwi 1 0 200} 7.60 sem wi 1 575 2.050] 1439 | sem wo 1 se 2550| 1396 sam ws 4a aar| | 2850] 11.03] sam | Wa 1 428 aco} 698 Som — wa 1 az] | 1925 416] sam | | ws 1 250| | 21c0| 525/sam] WwsA 1 | 2m] | veo] sc0fsom| 1 “| 240| 400] aeefsonf 1 | 200| 1400] 2z0|samf “|e TP | Pvsof | vam f 195] sam | wit 1 ios] | 1200] 127|sam| wi TP | evs} | zee) 221/sam| wis Tit - [ors] | vam] ose] sam] fw 1 090 700] 081 | sem| || v2 1 oso] | 0900] 054] sam] _ | | vs 1 “| oss] | osc] 0.0] scm - Total ty 28.95 | Sam Page 10f1 PRINCIPAL proc figheen (mato) eno) DRONO. one Hines Mockoe Vil paepazeD er Mans Wor] OescRIFTION | WO. Intchen Cabinets lsase Unit 1 1 Bos6/ Wall Units on an oo land Snow kichen Jsose unit2 1 \erenen nt 4 a Inoue lease units 1 lease unit 1 [wot unit 1 2 wat unit 2 2 |Add 20% on above Qty PRINCIPAL PABINYRDT Eighteen (Kamebod) PREPARED BY: __ Manis "MEASUREMENT SHEET — EMT oor] DESCRIPTION | NO. t 2 [ary | unm] Remarks 240 | 0.4600 156 | sam t2r| 0600 076| sam 118] 0400 on| sam 4s) 0400 039 sam 088 | som ‘410 Page tof PRINCIPAL PAZINVARDT Prosect Eighteen (slamabad) No. ATE PREPARED By ‘MEASUREMENT SHEET Sink Double Bow! Sink Mixer Bolle Trap Sel Doube Bowl sink Waste Strainer PRINCIPAL mous Sigheen (omaad) sen, agent PRINCIPAL sro Eteen (tmabos) ore TE Mcp io TT pow | oescnirrion | nO [80a tems: |kitchen Appliances ISiove fixed in Granite hop. IMicrowave Oven | 1 Cooker Electiic/ Gas | 1 Retreigrator 1.00 1.00 100 100 Total ay. Page tof ‘5.00 sam PRINCIPAL , PARINYARDT Eighteen (somabad) reMNo, TUE Mockup Vila : I TEN Teor] DESCRIPTION Page Loft PRINCIPAL PAZINYARDT Mockup Villa Sanitary Items [58 Frcscrntion tae ay Santry iting and Fture lw. ein Ficures W.c “Omnia Architectura Wall Mounted ARTHV8-5684200% (Villrory& BOCH)" With __|eover No 6.00 VENTICELLO Wall Mounted W.C With Seat Cover “ARTH VB-8611800% & ARTAVE x479si0x"Vileroy & Boch No 1.00 —|sauat we tindian we) No 00 W.C stern & Flush Plate €-200 "Viconnect Concealed ARTH VB-522478008 ARTAVE- sz2esoes" No 800 I METais Muslim Shower (ovcet)" With Angle Valve ARTAHG 32128000 & ART #HG- : 13903000 Hansgrohe" No 8.00 [Wash Basin With Mixture - 7 T 7 Loop & Friends Surface Mounted Wash Basin (Rectangular) ART# VB-51540001 Villeroy | = —_ |eceoch No __ 6.00 Wash Basin for Master Bath(Design | to bes decided) ae aa No _ 2.00 - lOutLine Oval Wash Basin ART# 59958403 VITRA _ No 1.00 wash Basin Mintre "Logis Wal Mounted ARTH HG-71220000" No 9.00) - Wash Basin Bottle Trap" HANSGROHE" 7 | No ~~ 3.00 waste strainer for Wash Basin as No 9.00 ~~ shower with Shower Tray ~ —=aeeeeeae i _ ana shower" Croma Select including Hose & Hook AAT# HG-26812400 Hansgrohe” | No 00 — d ith Arm ART #ng-26238000" | No 700 : — No | 400 [Shower infinity Tray " Squaro ART# UDQ 1290 SQ) 2V-XX,ART# UDO 1280 SQ 2V-xx" | | \iteroy & Boch No 1.00 oath tub = Ss 7 ____|Tub "Dream Free Standing " ART#S1970051000" BY Vitra e a No 1.00 —}Hand shower *CROMA 100Hose Connector “ARTY HG-274i4000" Hansgrohe No 1.00 taming Fit cleanin _ Free stop Cocks oS ne - i dN 40.00 | fooube Bis cock — SS No | "600 a ) _____ |Connection Pipes oO | Ne 40.00 Page 1 of

You might also like