Project : proposed Building at no 104 Chithra Lane,
Colombo RFIN No LHP/RFIN/ Date Engineer LCMC To RE - LCMC From PM - LHP From Description of work
Location of Inspection
Date of Inspection Time if Inspection :
Type of Inspection Site Inspection or testing Examination/Measurements before covering Reinforcement Concrete pouring Factory Inspection or Testing Other [Specify]
Response Requred on or before :
RFIN Issued/ Contractor RFIN Received / Consultant