Date 23-Jan-19
REF: NICE/AY/W912ER1800015/1/006
AL AYUNIINVEST. & CONT.CO
P.O BOX 4727 RIYADH,
Kingdom of Sau Arabia,
Adestion — : Engr: Moharimed Ethussein.
Project Manager.
Project: RSNF MH-6(R FACILITIES AND INFRASTRUCTURE,
Subject: Geotechnical Enginser Resommendation
Dear Si
‘As per visual inspection of Proposed Hanger Flor building and laboratory tests of scve analy
results for excavated material from Fugro-Suhaimi (Ref: SA 127631 dated 17 Jan 2019) for MH
{60 R Facilitates for Naval At Base Project, Bore hole logs of SB-45.02, SB-45-03, SB-45-04,
‘and TPA-!'3 located in side froposed msintenance hangar composite foundation plan (Ref: SA~
|454518F-S-101PN) terms assatisnctory material (Ref Section 31.00, item 1.2.2),
Laboratory results classified existing subgrade excavated material as GC (Gravely lean clay
with and) complied with MH 60 R Facilitates, Package I, Division 31, section 31,0000, item
122,
1s recommended ta: 150mm to 200mm excavated material from the construction level
shall be backfilled as per Section 31.00, 3.9 with satistactory material
Retr fo the attached aboratery tests of seve analysis results.
vr
Geologist Geoexpert
[Naval air base project.