Project Title : CONSTRUCTION OF FACILITIES AND INFRASTRACTURE TO SUPPORT MH‐60R AIRCRAFT Page No.: 1 of 1 Contract No. : W912ER18C0015 Revision No.: 01 Sub-Contractor : NABA INTERNATIONAL COMMERCIAL ENTERPRISES LTD.
Description : Location : Inspection Date : RFI No. :
Item SUB-CONTRACTOR CONTRACTOR
ITEMS OF INSPECTION DATE REMARKS No. YES NO N/A YES NO N/A
1.0 Approvals
1.1 Shop Drawings
1.2 Materials
2.0 Surface Preparation
Surface shall be free of dust, dirt, grease, oil, laitance, efflorescence, biological residue, existing paint or coatings, curing 2.1 compounds, form release agents or any other contaminants which might affect the bond. 2.2 Reference mark are provided for verticality
2.3 Repair Tie rod holes, pinholes, honeycombs
Check corner beads, horizontal reveal joints 2.4 other accessories carefully for alignment before starting work 3.0 Application of Stucco Base Apply stucco base 10mm to 15mm 3.1 completely embedding the lath Stucco base shall be applied base of 3.2 manufacturer recommendation. 4.0 Application of Primer The base coat substrate must be dry clean, 4.1 sound and free of releasing agents, paint or other residue or coatings. Primer shall be dry to the touch before 4.2 proceeding to the Finish Coat application. 5.0 Application of Finish Coat Allow Tinted Primer to dry before applying 5.1 Finish Coat Finish Coat shall be applied base of 5.2 manufacturer recommendation.