INSPECTION CHECKLIST

CEMENT STUCCO – EXTERIOR APPLICATION


Project Title : CONSTRUCTION OF FACILITIES AND INFRASTRACTURE TO SUPPORT MH‐60R AIRCRAFT Page No.: 1 of 1
Contract No. : W912ER18C0015 Revision No.: 01
Sub-Contractor : NABA INTERNATIONAL COMMERCIAL ENTERPRISES LTD.

Description :
Location :
Inspection Date :
RFI No. :

Item SUB-CONTRACTOR CONTRACTOR


ITEMS OF INSPECTION DATE REMARKS
No. YES NO N/A YES NO N/A

1.0 Approvals

1.1 Shop Drawings

1.2 Materials

2.0 Surface Preparation


Surface shall be free of dust, dirt, grease, oil,
laitance, efflorescence, biological residue,
existing paint or coatings, curing
2.1
compounds, form release agents or any
other contaminants which might affect the
bond.
2.2 Reference mark are provided for verticality

2.3 Repair Tie rod holes, pinholes, honeycombs


Check corner beads, horizontal reveal joints
2.4 other accessories carefully for alignment
before starting work
3.0 Application of Stucco Base
Apply stucco base 10mm to 15mm
3.1
completely embedding the lath
Stucco base shall be applied base of
3.2
manufacturer recommendation.
4.0 Application of Primer
The base coat substrate must be dry clean,
4.1 sound and free of releasing agents, paint or
other residue or coatings.
Primer shall be dry to the touch before
4.2
proceeding to the Finish Coat application.
5.0 Application of Finish Coat
Allow Tinted Primer to dry before applying
5.1
Finish Coat
Finish Coat shall be applied base of
5.2
manufacturer recommendation.

Form No.: NABA-IC-F008 Rev01


Notes / Comments

Sub-Contractor (Al-Naba) Contractor (Al Ayuni) Client


Construction Representative Construction Representative Client Representative
Name, Initials Name, Initials Name, Initials
& Date: & Date: & Date:
QC Engineer QC Engineer
Name, Initials Name, Initials
& Date: & Date:
Site QC Manager Site QC Manager
Name, Initials Name, Initials
& Date: & Date:

Form No.: NABA-IC-F008 Rev01