ACTIVITY ACTIVITY

NUMBER

EARTHWORKS
1 EXCAVATE, COLUMN & WALL FOOTING
2 EXCAVATE, DRAIN PIPES & CATCH BASINS
3 INSTALL REBARS & FORMS, COLUMN FOOTING
4 INSTALL REBARS & FORMS, WALL FOOTING
5 BACKFILL AND DRAINAGE EXCAVATION
CONCRETE WORKS
6 INSTALL FORMS IN FOOTING
7 POUR CONCRETE, COLUMN FOOTING
8 POUR CONCRETE, WALL FOOTING
9 POUR CONCRETE, COLUMNS
10 LAYERING OF CHB AND WALL WORKS
11 BACKFILL, GRADE AND COMPACT GROUND
12 INSTALL FORMS AND REBARS, SLAB
13 POUR CONCRETE SLAB
STEEL/ROOFING WORKS
14 STEEL ROOF TRUSS WORK/WELDING
15 ERECT TRUSSES AND CROSS FRAMES
16 INSTALL RAFTERS AND PURLINS
17 INSTALL GJ. ROOF SHEETS AND GUTTERS
18 INSTALL CEILINGS
19 INSTALL DOORS AND WINDOWS
20 PAINT ROOF
MISC. WORKS
21 WALL PLASTERING
22 INSTALL PVC DOWNSPROUTS
23 PAINT INTERIOR/EXTERIOR
24 TILES
TOTAL
VOLUME OF
ACTIVITY CONCRETE HOLLOWB
(cubic m.) LOCKS
(pcs.)

FOOTING 3.5
COLUMN(from footing to N.G) 4.005
SLAB 108.91
ROOF BEAM 3.606
WALL FRONT 156
WALL REAR 332
WALL LEFT 240
WALL RIGHT 332
INTERIOR WALLS 1200

PLANE AREAS

CHB 12.5
W1 2.4
W2 6.3
W3 2.85
W4 1.2
W5 0.3
W6 0.42
W7 4.41
W8 1.2
D1 3.15
D2 1.68
D3 1.26
D4 1.26
FOOTING 1
COLUMN 0.09
LR 2.25
CR 10.515
BR1 4.4
BR2 5.4
BR3 5.4
MASTERS BR 11.84
STUDY ROOM 3.065
HALLWAY 4.41
LOADS BREAKER
CIRCUIT LOADS TOTAL AMPERE # POLE
L.O C.O ACU PROTECTION
C1 8 220V 2 15AT-2P
C2 15 220V 2 15AT-2P
C3 8 220V 2 15AT-2P
C4 11 220V 2 15AT-2P
C5 8 220V 2 15AT-2P
C6 7 220V 2 20AT-2P
C7 12 220V 2 20AT-2P
C8 1 220V 2 30AT-2P
C9 1 220V 2 30AT-2P
C10 1 220V 2 30AT-2P
C11 1 220V 2 30AT-2P
C12 1 RANGE 220V 2 30AT-2P
C13 1 REF 220V 2 30AT-2P
C14 SPARE 220V 2 30AT-2P
C15 SPARE 220V 2 30AT-2P
TOTAL 50 21 4
SIZE OF WIRE AND PIPES