You are on page 1of 2

SOME OF THEM ARE

SWITCHES USED IS LEGRAND WHICH IS 30% EXTRA THEN MK


SWITCH & LED DOWN LIGHT USED IS 15 WATT WHICH IS 250
EXTRA THEN 8 WATT LIGHT. 80000

CEILING FAN COST . 15000

CIVIL WORK DONE OUR PERSON INSTEAD OF AC PERSON 5000

FURNITURE CHANGES MADE ON SITE AFTER FINISHING 75000

WALL AND CEILING ENTIRE ONE COAT OF PAINTING AFTER


FINISHEING 22000

CONFERENCE DOOR HANDLE CHANGING 2500

CIVIL WORK REDONE IN TOILET WITH MATERIAL 9500

NUMEN LOGO & GLASS WORK DONE 8 TIMES TO ACHIEVE SHADE 15000

ALUMINUIM REANODIZE OF LIBRARY UNIT & TOILET SHUTTER 5000

KITCHEN FAUCET EXTENSION 250

SHIFTING OF FURNITURE 3 TIMES TO COLABA FLAT RECEIVED


15000/- BUT EXTRA 3000

DUE TO NIGHT WORK TIME LABOUR HAS TO GIVE AMOUNT TO


WATCHMEN SO THAT WORK GOES SMOOTHLY WITH DEBRIS
REMOVING 32000

TOTAL ACCESSORIES WORK 58250

TOTAL 3,22,500

TOTAL AMOUNT RECEIVED 1850000

4,72,500

PROFESSIONAL FEES BALANCE 65000

PAYMENT BALANCE 5,37,500


DELAY IN WORK ( AIR CONDITION DECISION ) & DELAY IN PAYMENT FROM YOUR SIDE
PENALTY AS PER YOUR CONSIDERATION

3000 x 60 180000

BALANCE AMOUNT 3,57,500