You are on page 1of 3

Plastics Injection

Moulding Technology:
Theory & Practice
Short Course at Smithers Rapra, Shawbury, UK
23-24 April 2013
8-9 October 2013

Organised by:

IOM3
www.smithersrapra.com
www.rapratraining.com
PD
APPROVED
Plastics Injection Moulding Technology - Theory & Practice
2-day training course
23-24 April 2013
8-9 October 2013

Overview Conditions of Registration


This course offers a thorough appreciation of the injection moulding process for Payment must be received prior to
anyone involved with the design, development or production of products manufactured attending the event and can be paid in £
in this way and for those involved with the purchase or utilisation of injection moulded Sterling, € Euro or US $. NB: Credit card
components. A practical session is included to introduce participants to the injection payments can only be taken in £ Sterling,
unless payment is made online via our secure
moulding machine.
payment system.
The Course/Seminar Fee includes training
Who will benefit? course/seminar lecture notes, lunches and
refreshments. Accommodation is not
Production/Process Quality Managers, personnel involved with the design, included in the fee.
development or purchase and utilisation of injection moulded products or components; Joining instructions i.e. a letter of
Technical Sales personnel. confirmation, directions and hotel
information will be sent upon receipt of your
registration. Please contact the training
Objectives Contents administrator if you have not received these
At the end of this course participants will: n Injection Moulding Machine within 7 days of registration.
Practical introduction to injection Cancellations
n Understand the operation of the
moulding machine cycle and 1. Cancellation terms for Courses/
injection moulding machine. Seminars held at Shawbury:
functions.
n Have practical experience of the • Cancellations made up to 14 days
process and know how the machine n Moulds or more before the requested course/
functions and it’s controls. Types of moulds - Their uses and seminar date will be refunded, less a
benefits; 20% administration fee.
n Be aware of the different mould types • Cancellations made within 14 days
- hot runner; 3 plate; stack moulds Construction - Gates, runners,

of the course/seminar date will be
etc. ejection and cooling systems; subject to the FULL course fee and no
Design - Objectives and quality.
refund will be given.
n Be aware of the dependence of
quality on machine setting. 2. Smithers Rapra cannot be held
n Computer Based Assistance responsible for delegate cancellations
n Recognise common moulding faults Material selection, flow analysis and and ‘no-shows’ arising from situations
and how they are caused. C.A.D. beyond its control, e.g. failures to
travel or attend owing to cancelled
n Recognise good moulding practice. n Materials flights, missed connections, weather
n Be aware of different plastics Suppliers codes, interpreting data, conditions, strikes etc., emergency
storage and drying, fillers, relating or illness. Smithers Rapra may, at its
materials, types, fillers, additives - the
test methods to finished products, discretion provide a substitute event, or
reasons for their choice and their alternative date, if available.
effects. industry terminology.
Delegate Substitutions can be made at
n Understand some of the key criteria n Processing any time without incurring extra charge.
affecting part design, mould design Material behaviour during Transfers to later Course/Seminar Dates -
and material selection. processing, the effects of mould this option only applies when more than one
temperature and filling rates etc. date is offered for the same course/seminar.
n Be aware of ‘added value’ techniques
on economics and product quality. o Requests to transfer to a later course/
such as ‘in mould labelling’, two/multi seminar date made up to 14 days
Standard machine controls and new
material moulding, insert and outsert or more before the requested course
control methods.
moulding. date will be accommodated, subject to
n Machine Selection availability of places on the new course/
n Understand the need and use of
Selecting the right machine seminar date.
‘profiles’ for injection, speed etc.
for the product, closed loop, o Requests to transfer to a later course/
n Be aware of the additional capabilities clamp mechanisms, automation, seminar date made within 14 days of
of today’s machines; closed loop, manufacture and machine based Q.C.
the course date will be regarded as a
machine based ‘QC’/SPC and cancellation and subject to the FULL
systems. course fee and no refund will be given.
process control systems.
o The option to transfer can be used only
n Be familiar with the industry’s Presenter once, after which non-attendance will
terminology. be treated as a cancellation and all
John R. Hind, BSc., MSc.
outstanding invoices will be due.
n Be better placed to communicate with
suppliers and technical staff. Amendments to Programmes
Course Fee Smithers Rapra reserves the right to cancel
Numbers will be limited to allow £575.00 + VAT, includes course or modify any event in its programme.
close interaction between tutor In the event of a cancellation where an
manual, lunches & refreshments -
and delegates, particularly during alternative cannot be provided, payment
accommodation not included.
practical sessions. The course is run received in respect of that course will be
in a relatively informal atmosphere and Venue refunded in full. The liability of Smithers
specific problems can be discussed at Smithers Rapra, Shawbury, Shropshire, Rapra is limited to the reimbursement of
the course/seminar fee.
any stage. UK, SY4 4NR.
Fax to
Registration Form +44 (0)1939 251118

Plastics Injection Moulding Technology - Theory & Practice


23-24 Aprily 2013 8-9 October 2013
(please use one form per delegate, photocopies are acceptable)

Surname.......................................................................................................................................................................... Title.........................................

Forename.........................................................................................................................................................................................................................

Job Title/Position..............................................................................................................................................................................................................

Company ........................................................................................................................................................................................................................

Contact Address

Company................................................................................................. Invoice Address (if different)

Company.................................................................................................
Title/Position ............................................................................................

Address....................................................................................................
Address....................................................................................................

................................................................................................................
................................................................................................................

................................................................................................................
................................................................................................................

Telephone (main) ...................................................................................... Telephone.................................................................................................

Fax........................................................................................................... Fax...........................................................................................................

Email........................................................................................................ Email........................................................................................................

Payment Information
Payment Information
Payment must be received prior to attending the course and can be made in £ Sterling, € Euro or $US.

Please indicate in which currency you wish to pay. If no box has been ticked the default currency will be £ Sterling.

£ Sterling

€ Euro (This will be applicable at the prevailing rate)

$US (This will be applicable at the prevailing rate)

Please invoice my company - Purchase Order Number (if required)

Cheque/Bank Transfer

Credit Card Payment: MasterCard Visa American Express (please indicate)

Expiry Date:

Signature

Return to:
Name on Credit Card (in CAPITALS)
Smithers Rapra Technology Limited, Shawbury,
Shrewsbury, Shropshire, SY4 4NR, United
Security Number (as printed in signature box on reverse of card) Kingdom.

Tel: +44(0)1939 250383 Fax: +44(0)1939 251118


Email: gtunnicliffe@smithers.com

Registration Terms: By completing and returning this form delegates are agreeing to be bound by Enrol online at:
conditions of registration. www.rapratraining.com

You might also like