You are on page 1of 20
EXECUTION AND COMPLETION OF MARINE Mens Stet Ke BRIDGE CROSSING THE SEA LINKING JALAN SERITANJUNG PINANS TO S7P2 ISLAND FOR 5 icenjwva] | THE PROPOStD Sent TANJUNG PINANG PHASE ROSE D)GEVELOPNENT 12) PULAUBNANG | Batis | Page 129 42.2020. EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN SERI TANJUNG PINANG TO STP2 ISLAND FOR THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG METHOD STATEMENT OF HAMMERHEAD APPROVAL cy Se a ee ‘Signature ee ‘Signature ‘Signature ‘Signature Name; ARNO Wame = SWaRMsURLZAM ame = Name eee ae eee ee el Dat Ya Joo [owe [peo ate aw: REVISION RECORD xTElssueD | REV. REVISION DESCRIPTION 04-02-2019 | 1 | ISSUE FOR CONSTRUCTION EXECUTION AND COMPLETION OF MARINE Meted Stent or SRIDGE CROSSING THE SEA LINKING JALAN | SERITANJONG PINANG 10 STP2ISLAND FOR, Says] pow? |cemjaval | THE PROPOSED SER! TANJUNG PINANG (PHASE |PROSPEK| 2) DEVELOPMENT (STP2), PULAU PINANG Peenen ‘Page 2 of 20 1.0 Introduction This method statement shall elaborate on the for the project EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN SERI TTANJUNG PINANG TO STP2 ISLAND FOR THE PROPOSED SER! TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG. 4.1 Plant and Equipment The following Plant & Equipment willbe utilized as and when necessary to assist works: Item | Plant & Equipment — Purpose T | Crane 100t To lift and lower Doka materials on site 2 | Genset 250KV To supply the supplementary power source | 3 | Hand Dri To assemble the Doka material @_| Circular Saw to cut the Doka material smoothly _t 4.2 Manpower Item Description Responsibilities 1 | Project Manager Manage overall construction activities, quality, safety & environmental issues. 2_| Site Engineer Coordinate and monitor site acivities, prepare daily report. | 3 | Supervisor ‘Supervise work during Hammerhead activities, maintain proper housekeeping practices & keep record of operational activities 4_| Surveyor/ chainman 5 | HSE personnel/ EO Setting out for Hammerhead point, preparation of as- built drawing. | To control and ensure the safety, health and environmental requirement is adhere at site. Machinery Operator (Operate machineries 7_| Skilled (General workers Rebar installation and concreting EXECUTION AND COMPLETION OF MARINE Method Statement or BRIDGE CROSSING THE SEA LINKING JALAN Harmeread SERI TANJUNG PINANG TO STP2 ISLAND FOR | 5.5 Sena ‘THE PROPOSED SERI TANJUNG PINANG (PHASE | 2) DEVELOPMENT (STP2),PULAUPINANG “Dates: | Page 320 42.20 2A 241 ‘Method Statement/Sequence of Hammerhead Platform Preparation for scaffolding Anchor will be installed at site behind the pilecap for 2" casting. The anchor be installed by drill ig in the pilecap then with platform. (follow standard Hilti) ‘Then, the cantilever bracket and working platform will be installed beside the pile cap access by existing ladder. Brace the cantilever bracket and working platform for additional support and load rating. Wailing U200 will be assemble on the top of bracket. The platform used at site by timber plank. Crane use for materials transfer must be certified with valid PMA and inspected to be in good working condition by Lifting Supervisor and Crane Operator. ‘Tagline to be use during lifting in progress to control load movement & prevent load swing without control. Man-cage lift by crane will be used to lift workers and assist dt ig the anchor/bracket installation at side of the pile cap. Life jacket as additional PPE to be ‘wear by workers. IKERJAYA| [PROSPER EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG. Method Statement or Hanmenead DeeNe. ov, Not Date lseued: | Page of 20, 42.2020, Section B-B | EXECUTION AND COMPLETION OF MARINE Method Statement for Kp) | sewenewesewee, | ken PE ea sanfas| | ERNST panes] | MTR RNS enna Section C-C EXECUTION AND COMPLETION OF MARINE eee K BRIDGE CROSSING THE SEALINKING JALAN SERI TANJUNG PINANG TO STP2ISLAND FOR S55 pecs Icerjaval | THE PROPOSED SERI TANJUNG PINANG (PHASE |_D=ENe.:_| Rew Nest _| pRosPen| 2} DEVELOPMENT (STP2),PULAUPNNANG [Dates | Page Got 20 212 1 cast (Bottom Slab) The wedge fix down by slot in between U head and WS10 wailing based on the adjustment level to fix WS10 and U head. The dB scaffold will be erected on the pilecap to be load bearing tower. Top construction will be assembling on the pilecap by using WS10 and H20 beam. It will be tighten by locking road and super plate. Provision of access shall be in place i.e approved ladder and safe working platform Working near edge which exposed to falling from height shall be install with hard barricade and workers to be equipped with safety hamess and anchored After that, install the side form and bottom slab for reinforcement work. Ready to cast the 1* pour (900mm high) During installation formwork for web wall add hi rib mesh at slope atea during pouring concreting. Plywood formwork to control thickness at slope and avoid to honeycomb on joint. Hirib mesh and plywood | EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG. Method Statement for Hammerneas Dec Ne. Rev. Now Date saved | Page 7 of20 42.2020 Section AA Re KERyAvA| [PROSPEK EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN SERI TANJUNG PINANG TO STP2 ISLAND FOR THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG. Metre Statement or Harmenead oe No ev, Not Date sued: | Page 6 of 20, 42-2020 Section C-C EXECUTION AND COMPLETION OF MARINE Manoa sttonentr SER TAUUNG PNANGTOSTPS ISLAND FOR | aye eect cenjaval | THESROPOSED Se8) TANUNG PHANG PHASE Bean S)BEVELOPUENT(sP8) UAUPRANG | Dap ase | Pa 0t70, 2™ cast (Bottom half Diaphragm) Install the diaphragm base top construction with spindle struts. Spindle struts installed one by one, then hoisting by the crane and will be adjusting by ‘manpower. ‘The formwork will be holding by crane, while the manpower will manually install the spindle struts from start to end. Thea, install the diaphragm rebar and formwork. Box up the internal hole of diaphragm formwork ‘The diaphragm formwork tightly install with struts will be brace by GI pipe. ‘After finished installing formwork, ready to cast the bottom half diaphragm (3250mm high) Inspection of scaffold & formwork must be carried out by designated person ic Professional Engineer and Scaffold Inspector prior to casting to ensure installation is, according to drawing and safe to take the load. Lifting of materials ie rebar and formwork using crane. Crane shall be inspected by Lifting Supervisor & Operator before conduct lifting activities. Crane must be free from any defect of lifting gears and in safe working condition, Storage of materials at working area must be properly stored to prevent obstruction to access and within allowable capacity of platform. Ke IkeRjava [PROSPEK] EXECUTION AND COMPLETION OF MARINE BRIOGE CROSSING THE SEA LINKING JALAN ‘SERI TANJUNG PINANG TO STP2 ISLAND FOR THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG. ethos Statement for Hanmerhess Doe. ev Not | “Date tesued: | Page 100/20 42.2000, ct HIN tt ve ee Section B-B EXECUTION AND COMPLETION OF MARINE Set ana K RIDGE CROSSING THE SEA LINKING JALAN SERI TANJUNG PINANG TO STP2ISLAND FOR | — pa STE saya} | THE PROPOSED SER! TANJUNG PINANG (PHASE prose 2) DEVELOPMENT (STP2),PULAUPINANG | Ose leugs | Page 110120 2.1.4 3% cast (Top half diaphragm) '* Before continue the conereting, clean the concrete surface area then bonding agent will be applied. © Then ready for cast the top half diaphragm (1850mm high) ‘© Proper working platform & access shall be provided at working area and not to be obstructed. Re IKERyava [PROSPER EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN ‘SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG. Method Statement for Harmemead ‘Boe No Rev. Not Date lesued: | Page 12 6f20 42.2020, “- ‘Section A-A Sar Ke KERjAvA| [PROSE] EXECUTION AND COMPLETION OF MARINE RIDGE CROSSING THE SEA LINKING JALAN ‘SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG Metned Statement or Hammeeas Doe.No Date sued | 422000 O° Section C-C ale 07 Ke IKeRyava| PROSPER EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG. Method Statement or Hammerheas Doe.No. Rev. Not ‘ate issued | Page 14 of 20 22000 4" cast (Wall) ‘After finish casting of top half diaphragm, remove the diaphragm formwork and diaphragm base top construction Install the rebar first followed by the formwork. The diaphragm formwork tightly install with struts extemal of diaphragm. Then, ready to cast the wall (430mm high) Inspection for formwork shall be conducted by designated person to ensure all formwork installation are according to design and safe prior casting takes place. Adequate and safe access shall be provided i.e ladder or working platform, KERjava| PROSPEK| EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN 'SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG ethos Statement for Harvmestoas oc No Rev. Not | "Bate esuess [Pane 160720 42.2000 inn, I Hi | execuiow ano COMPLETON OF MARINE Kz ExibGe CROSSING THE SEALING JALAN SEnrrasdune pmanioro errs Suave Fox |cexjiva] | THE PROPOSED SER TANLUNG PINAWG (FASE addr 2) BEVELOPNENT TP) PULA PNSN Method Statement for Hammerresd DoE. Rev. Not ‘Data eswed: | Page 160820 42-2000 2.1.6 5! cast (Utility Box) © After concreted 4" cast. Wall formwork will be removing by part. Assemble the 2 layer of load bearing tower d3 one by one at top construction on the 1* layer bearing tower d3. ‘© Install the utility box formwork in situ, rebar works will be continued. ‘© The strut of wall formwork and tie it by manpower. ‘© Ready to cast the utility box wall and web wall(1 850mm high) Me “Plan view - Step 5 - 5th Cast (Utility Box as ——______—___ BRIDGE CROSSING THE SEA LINKING JALAN SERI TANJUNG PINANG TO STP2 ISLAND FOR IKERJAVA ‘THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG. XK A EXECUTION AND COMPLETION OF MARINE Metrod Statement or Hammemess oc. No. Rev Not Dato esued: | Page 17 of 20 42.2020, Section C-C EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN 'SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE ’2) DEVELOPMENT (STP2), PULAU PINANG Metre Statement or ‘Hammerhead Doce. Rev. Nest | Date lssued | Page 18 0f20 422000 21.7 6 cast (Top Slab) Remove the utility box wall formwork and struts. ‘Assemble the 3" layer of load bearing tower d3 on the 2" layer to support cantilever slab. ‘Assemble the load bearing tower d3 on existing base concrete to support the inner slab. Install the top construction and box up. ‘Top slab rebar also will be install then the rest of slab will be casting until finish ‘After settled the casting, the formwork ean be removed. ‘Any exposed edge shall be installed with proper edge protection and workers shall be provided safety hamess shall working at edge is required Plan view - Step 6- 6th wen = Siep §- 6h Cast (op Sk (Top Slab) Re IKERJAYA PROSPEK| EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN ‘SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE, "2) DEVELOPMENT (STP2), PULAU PINANG Method Statement for Hammertoad Dee No. Rev. Nort Date issued: | Page 19 of 20 42.2020, Re IKERIAYA\ PROSPER) EXECUTION AND COMPLETION OF MARINE BRIDGE CROSSING THE SEA LINKING JALAN SERI TANJUNG PINANG TO STP2 ISLAND FOR ‘THE PROPOSED SERI TANJUNG PINANG (PHASE 2) DEVELOPMENT (STP2), PULAU PINANG Method Statement for Hammerhead Doe No ev Not | Page 20 020 Section C-C

You might also like