You are on page 1of 2

STRESS INPUT DATA

CLIENT:
OWNER:
Project Desc.
Scope Of Work
Date
Rev.
S.No. Description Units
1 Pipe size Inch
2 Wall Thickness Inch
3 Corrosion allowance Inch
4 Fluid density lb/ft^3
5 Design Temp. °F
6 Operating Temp. °F
7 MDMT °F
8 Installation Temp. °F
9 Design Pr. PSIG
10 Operating Pr. PSIG
11 Hydro Test Pr. PSIG
12 Material -
13 Insulation Thk. Inch
14 Insulation Density lb./cu.in
15 Piping Code -
16 Equipment Drawings -
17 Nozzle Displacements -
18 Nozzle Allowable Loads -
Vendor documents
19 (Valve and Sp.Comp.) -
20 Wind Details -
21 Seismic Details -
22 PSV,Surge Forces Etc. -
23 Flange leakage Data -
24 Foundation Settlement -
25 Pipe Support standards -
26 Spring vendor name -
27 Review file -
28 P&ID -
29
30
31
32
33
34
35
Remarks