You are on page 1of 1

{Nomor Sertifikat}

Date: December 1, 2018


Issuing Office:
Jl. Gatot Subroto No. 161 Pecohraya Bandar Lampung 35228, Indonesia
Phone/Facs: +62 721 474660/0721 474661
Email: cs.bdl@sucofindo.co.id

STOCKPILE QUANTITY SURVEY

PRINCIPAL : PT. PLN (Persero)


Pembangkitan Sumatera Bagian Selatan
Sektor Pembangkitan Sebalang
COMMODITY : Coal

THIS IS TO REPORT, that upon request of principal, we have proceeded to the following location at that
time for purpose of conducting stockpile quantity survey to find out quantity of the above mentioned
commodity.

Inspection Operation : Measurement of Stockpile and Density


Date and Place Intervention : December 1st, 2018 at Pembangkitan Sumatera Bagian Selatan
Sektor Pembangkitan Sebalang, Lampung Selatan (Coalyard).
Equipment : Leica Nova MS60 MultiStation
Program : Leica Infinity 3.0
Finding : Total Stock Coalyard was carried out with result 81,429.879 MT
detail as follow:

Volume Above Bulk


Date / Time Base Level Surface Area Weight
No. Stockpile Base Level Density
(WIB) (meters) (sq m) (MT)
(Cu.meters) (t/m3)
1. Ready Stock
Stock 1 01/12/2018
16.000 12,832.66 37,660.74 0.9 33,894.666
(Panjang) 08.00-12.00
Stock 2 01/12/2018
16.000 14,094.51 39,021.64 0.89 34,729.269
(Bakau) 12.30-17.00
01/12/2018
Dry Coal 16.000 316.63 488.082 0.87 424.631
17.00-17.30
Sub Total 69,048.566
2. Base Stock
Stock 1 01/12/2018
15.500 6,414.38 0.92 5,901.229
(Panjang) 08.00-12.00
Stock 2 01/12/2018
15.500 7,043.57 0.92 6,480.084
(Bakau) 12.30-17.00
Sub Total 12,381.313
Grand Total 90,628.412 81,429.879

This report refers to quantity survey only and does not report any other matter. It reflects our findings at time and
place of intervention only and is issued without prejudice.

This Certificate/report is issued under our General Terms and Conditions, copy of which is available upon request or may be accessed at www.sucofindo.co.id

Dept. of Commercial 3

Kalimo Tomo

BDL201800000xxx

You might also like