EGD - INPUT OF S/N. 1-2 -CHECK/REVIEW OF SPECS/DESIGN DWG & QTY REQ'D EGD SALES/OTHERS
SALES/OTHERS - ALL REQRD. DRAWINGS SUCH AS -CHECK/REVIEW SITE CONDITION(DESIGN & INST'LN
REVIEW
I/O LIST, WIRING DIAGRAM, ECT STANDARD APPLICATION)
SPECIFICATION
-STUDY OF BID DOCUMENTS & DRAWINGS
C
1-4
EGD - INPUT OF S/NO. 1-3 -CHECK/REVIEW QTY & SPECS. BASED ON PROPOSAL EGD
SALES/OTHERS N -SUBMIT DESIGN PROPOSAL & SUPERSEDE ORIGINALS
INQUIRY /
CLARIFICATION SPECS.
? -SYSTEM ENG'G WORK
-IED WORK
Y -PANEL WORK
1-5
VENDOR - INPUT OF S/NO. 1-4 -CHECKING MISSING INFORMATION AT SITE EGD -Q&A SHEET (PEW-IF-115) VENDOR
EGD SITE SURVEY -CHECKING SITE CONDITION
SALES/OTHERS
REMARKS :
1-11
N
C OKAY?
Y
1-12 - INPUT OF S/NO. 1-10
-COMPILATION OF THE PROPOSAL EGD
APPROVAL OF
-APPROVALOF THE PROPOSAL BY EGD HEAD
QUOTATION/
FILING BY PROJECT MANAGER
REMARKS :
REQUESTOR
END
REMARKS :
FOR CONTINUATION OF THIS WORKFLOW AFTER ISSUANCE/RECEIVING OF P.O.
2-3 - INPUT OF 2-1 - TO INFORM SELECTED PJT MEMBERS OF THE JOB IED DM
& PJT ORGANIZATION
N
FORMATION OF
A* PROJECT TEAM
2-4 - INPUT OF 2-1 - TO MAKE A PRELIMINARY STUDY OF THE GIVEN PEW-JC-101: PM/PE
PRELIMINARY DOCUMENT ON: INTERNAL K.O.M. REVIEW
STUDY OF -DEVIATIONS CHECKLIST
INTERNAL K.O.M -CLARIFICATIONS P1 (D)
DOCUMENT (P1)
-MISSING INFORMATION
-PROJECT COST ANALYSIS
-PROJECT SCHEDULE
USING PEW-JC-101 (AS WORKING COPY ONLY)
REMARKS :
*
PANEL DETAILED MANUFACTURING WORKFLOW TO CONDUCT THE INTERNAL K.O.M. PROVIDE ALL SM/IED
INTERNAL K.O.M. DOCUMENT & EXPLAIN THE JOB SCOPE
TO ATTEND THE MEETING & REVIEW RELATED PEW-JC-101: INTERNAL PM/PE - JOB REQUEST FORM
TECHNICAL/COMMERCIAL MATTERS K.O.M. REVIEW CHECKLIST - INTERNAL K.O.M. REVIEW CHECKLIST
N * TRANSFERRED FROM SALES/EPD TO PJT USING P1(D) (PEW-JC-101)
INTERNAL
K.O.M. PEW-JC-101
REVIEW
*: THIS STEP CAN BE BYPASSED IN CASE OF OPD -INTERNAL K.O.M. MINUTES OF MEETING
Y 1) SIMPLE PANEL ORDERS IED (PREPARED BY PM / PE)
2) SALES FROM SOURCES OTHER THAN YEA PMD
SALES SALES
CSC
IN THIS CASE, PEW-JC-101 CHECKLIST SHALL BE
FILLED IN STEP 2-4
REMARKS :
3-2 *
PANEL DETAILED MANUFACTURING WORKFLOW TO ARRANGE THE K.O.M. APPOINTMENT WITH SM/PM - AGENDA FOR K.O.M.
SET UP
APPOINTMENT CUSTOMER
WITH CUSTOMER
3-4 - INPUT OF 3-3 * - TO VERIFY THE CUSTOMER DATA/DOCUMENT PEW-JI-104 : PROJECT PM/PE - MINUTES OF MEETING FOR K.O.M. CUSTOMER/
REVIEWING FOR ANY DISCREPANCIES & DEVIATIONS PROGRESS BOARD SALES
CUSTOMER - TYPICAL FRONT LAYOUT DATA/DOCUMENT GUIDE - ANSWER TO CUSTOMER QUERIES
- CABLE SCHEDULE AFTER K.O.M. - UPDATE PROJECT PROGRESS BOARD USING
- FREE ISSUE ITEM DETAILS PEW-JI-104 - UPDATED PROJECT SCHEDULE PMD
REMARKS :
BASIC
- TO PREPARE BILL OF MATERIALS - PANEL BILL OF MATERIALS
DESIGN
BASIC
DESIGN
- TO CHECK RELEVANT BASIC DESIGN USING DM/PM/PE - BASIC DESIGN REVIEW CHECKSHEET
N BASIC (PEW-JC-102) P2 (D) (PEW-JC-102) P2 (D)
DESIGN
REVIEW (P2)
D F*
REMARKS :
REMARKS :
5 5-1 E
TO INFORM ABOUT JOB MILESTONE FOR THE JOB PM/PE - NOTICE OF JOB MILESTONE MEMO- OPD
SUBMISSION OF INVOLVING PROGRESSIVE PAYMENTS ENCLOSING COVER SHEET OF DOCUMENTS SALES
DRAWINGS / WITH APPROVAL STAMP/SIGNATURE
DOCUMENTS FOR
APPROVAL
5-3
PANEL DETAILED MANUFACTURING WORKFLOW TO CHECK FOR CUSTOMER'S COMMENTS & PM/PE
CUSTOMER - OUTPUT OF 5-2 REVIEW OF DISCREPANCIES & SUBMIT FOR RE-APPROVAL
APPROVED IF NECESSARY
DRAWINGS /
DOCUMENTS
REMARKS :
6-2 - CUSTOMER ORDER (C.O.) WITH CHECKING / TO CHECK C.O. & JOB TAGS & ACKNOWLEDGE PM.PE/PMD - ACKNOWLEGE JOB TAG 'A' OPD
OPD JOB TAG (TRIPLICATE) ACKNOWLEDGE 1ST COPY OF JOB TAGS 'A'
OF ORDE (CHECK PROJECT NAME/NO., ITEM NO., ISSUE NO.,
R ENTRY & JOB AMOUNT ARE CORRECT)
TAG
6-3 - OUTPUT OF 4-1 TO DISCUSS WITH PMD ON MANUFACTURING PM/PE - PANEL MANUFACTURING SCHEDULE SALES
PANEL
- PROJECT SCHEDULE MAUFACTURING SCHEDULE - INFORMATION OF CHANGES TO PRICE
K.O.M. AUTHORIZATION SHEET
REMARKS :
PREPARATION N TO PREPARE PANEL FAT PROCEDURE WITH PEW-JI-102 : SAMPLES OF PE - FAT PROCEDURE DOCUMENT
OF
PROCEDURE REFERNCE TO PEW-JI-102 STANDARD FAT
PROCEDURE
Y
7-2 - CUSTOMER ORDER (C.O.) WITH - TO SUBMIT THE FAT PROCEDURE DOC. FOR - FAT PROCEDURE DOCUMENT CUSTOMER
JOB TAG (TRIPLICATE) SUBMISSION OF CUSTOMER'S APPROVAL PE - CSC REQUEST FORM (INCL. SAT SCHEDULE CSC
FAT PROCEDURE - TO REQUEST FOR CSC ENGINEER USING CSC AND/OR FAT PROCEDURE DOCUMENT)
DOCUMENT
REQUEST FORM
7-3 TO RETURN APPROVED COMMENTS & CUST - APPROVED FAT PROCEDURE OPD
APPROVAL FAT
CUST - APPROVED FAT PROCEDURE DOC. PROCEDURE DISCREPANCIES IF ANY
DOCUMENT
ESC - ALLOCATION OF STAGING AREA
7-4 - OUTPUT 7-3 REVIEW OF TO CHECK FOR CUSTOMER COMMENTS & PM/PE - UPDATED & FINALIZED FAT PROCEDURE PMD
APPROVED FAT DISCREPANCIES DOCUMENT
PROCEDURE
DOCUMENT
7-5 TO CHECK THE PHYSICAL H/W COMPONENTS APPROVED FAT PM/PE/PMD - PUNCH LIST
INTERNAL H/W PROCEDURE
CHECK
7-8
N INTERNAL TO OBTAIN RESULTS OF INTEGRATED TEST FROM APPROVED FAT PM/PE/PMD - (PRE-FAT REPORT)
INSPECTION
(P4) PE PROCEDURE
REMARKS :
TO CONDUCT THE CUSTOMER FAT FOR PANEL PM/PE (CUST FAT REPORT) CUSTOMER
* THIS ACTIVITY CAN BE BYPASSED IF * ACCORDING TO FAT PTOCEDURE
REQUESTED BY CUSTOMER FAT
REMARKS :
9 9-1
I
- TO FILL UP THE SHIPPING REQUEST FORM PM/PE SHIPPING REQUEST FORM OPD
APPLICATION OF
SHIPPING /
DELIVERY
9-2 - H/W
- HANDOVER H/W ( IN ACCORDANCE WITH THE BILL OPD H/W AS PER CONTRACT OPD
SHIPPING /
DELIVERY OF MATERIAL) TO OPD FOR DELIVERY TO CUSTOMER
J
PANEL DETAILED MANUFACTURING WORKFLOW
REMARKS :
10 10-1
J
INFORM ABOUT TO STAMP 'COMPLETED' ON JOB TAG B PEW-JI-104 - ORDER PM/PE - 'NOTICE OF JOB MILESTONE' MEMO OPD
JOB COMPLETION ENTRY GUIDE ENCLOSED 'COMPLETED' JOB TAG SALES
(TO HIGHLIGHT DELIVERY OF H/W AND
ANY OUTSTANDING CSC SCOPE)
OPD
EXTERNAL
INVOICE
10-2
OPD
INTERNAL
INVOICE
K
PANEL DETAILED MANUFACTURING WORKFLOW
REMARKS :
REMARKS :
PANEL DETAILED MANUFACTURING WORKFLOW
4 Drawn. Dwg.No. : PEW-JP-102 Rev. No.
3 by R. Rostrata Jan 10,2000 File No. : 0
2 Checked. Form No.:: Sheet No.
1 by R. Rostrata Jan 10,2000 Title: 15
0 R. Rostrata Jan 10,2000 Draft Issue Approved. PANEL DETAILED WORK FLOW- Cont'd
Rev. Rev. by Date Remarks by C. Beetsma Jan 10,2000 PROJECT TRANSFER STAGE Yokogawa Technical Services Philippines, Inc. 16
12 12-1
L
START-UP/S.A.T. /
COMMISSIONING
STANDBY CSC
TO INFORM ABOUT JOB MILESTONE FOR JOB PM/PE - NOTICE OF JOB MILESTONE MEMO WITH OPD
INFORM ABOUT
INVOLVING PROGRESSIVE PAYMENTS CSC START-UP REPORT & S.A.T. CERTIFICATE SALES
START-UP
COMPLETION
END
REMARKS :