3 Aug04 Aug05 Aug06 Aug07 Aug08 Aug09 Aug10 Aug11 Aug12 Aug13 Aug14 Aug15 Aug16 Aug17 Aug18 Aug19 Aug20 Aug21 Aug22 Aug23 Aug24 Aug25 Aug26 Aug27 Aug28 Aug29 Aug30 Aug31 Aug01 Sep02 Sep03 Sep04 Sep05 Sep06 Sep07 Sep08 Sep09 Sep10 Sep11 Sep12 Sep13 Sep14 Sep15 Sep16 Sep17 Sep18 Sep19 Sep20 Sep21 Sep22 Sep23 Sep24 Sep25 Sep26 Sep27 Sep28 Sep29 Sep30 Sep01 Oct02 Oct03 Oct04 Oct05 Oct06 Oct07 Oct08 Oct09 Oct10 Oct11 Oct12 Oct13 Oct14 Oct15 Oct16 Oct17 Oct18 Oct19 Oct20 Oct21 Oct22 Oct23 Oct24 Oct25 Oct26 Oct27 Oct28 Oct29 Oct30 Oct31 Oct01 Nov02 Nov03 Nov04 Nov05 Nov0 6 Nov07 Nov08 Nov09 Nov10 Nov11 Nov12 Nov13 Nov1 4 Nov15 Nov16 Nov17 Nov18 Nov19 Nov20 Nov21 Nov2 2 Nov23 Nov24 Nov25 Nov26 Nov27 Nov28 Nov29 Nov30 Nov01 Dec02 Dec03 Dec04 Dec05 Dec06 Dec07 Dec08 Dec09 Dec10 Dec11 Dec12 Dec13 Dec14 Dec15 Dec16 Dec
-2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134
1 Disassembly
2 Generator
3 Drain Lub. Oil, Drain C. Water, Dis. Wiring, Dis C. Bar, etc. 05/08 05/08

4 Dis. Gen. Floor, Slipring H., Mech. Speed Ry., PMG, C. Shaft, etc. 05/08 05/08

5 Dis. U. Oil Guard, U. Bearing, U. Shaft, UBB, etc. 06/08 06/08

6 Prep. Pull out Rotor, etc. 07/08 07/08

7 Pull out Rotor, Dis. A. Cooler, etc. 07/08 07/08

8 Dis. Brake, L. Coil-end Cover, L. Oil Guard, L. Oil Basin, etc. 08/08 08/08

9 Dis. L. Bearing, L. Shaft, etc. 08/08 08/08

10 Dis. L.B. Support, LCT, LBB, L. Air Seal, etc. 09/08 09/08

11 Turbine-Generator
12 Opening Ceremony 05/08 05/08

13 Shutdown and Locking 05/08 05/08

14 Dis. Coupling Bolt 05/08 07/08

15 Turbine
16 Close Mech. Lock Inlet Valve, Draft Gate, Dewatering, etc. 05/08 05/08

17 Dis. Walkway, Drain Control Oil, etc. 05/08 05/08

18 Check W.G. Gap, Runner Gap & Height, etc. 06/08 06/08

19 Drain Lub. Oil, Dis. T.G.B. Cover, Tb. Bearing, etc. 07/08 07/08

20 Temp. Hanging Tb. B. Support, TCT, W.G. Servomotor pin, etc. 08/08 08/08

21 Dis. W.G. Ecc. Pin, W.G. Key, W.G. Arm, Tb. Oil Basin & Dam, etc. 09/08 09/08

22 Dis. W.G. Mech, W.G. Th. Bearing, Tb. B. Support, W.G. Op. Ring, etc. 10/08 10/08

23 Dis. W.G. Mech, Tb. Oil Dam, W.G. Servomotor, W.G. Gland, etc. 12/08 12/08

24 Dis. W.G. Equipment, Shaft Sealing Box, Head Cover, etc. 13/08 13/08

25 Pull out Runner, W. Gate (20 pcs), etc. 14/08 14/08

26 Cleaning, Inspection, and Repair


27 Generator Parts
28 Cleaning Air Cooler 09/08 15/08

29 Pressure Test of Air Cooler 16/08 21/08

30 Cleaning Cooling Tubes 09/08 15/08

31 Pressure Test of Cooling Tubes 13/08 13/08


16/08 16/08

34 Dis. Oil Lift Piping, Th. Bearing, Base, Check Valve, Adj. Bolt, etc. 10/08 10/08

35 Cleaning LBB 12/08 16/08

36 Dis. U. Oil. Basin, UCT, Adj. Bolt, Support Gen Floor, etc. 10/08 10/08

37 Cleaning UBB 12/08 19/08

38 Cleaning L. B. Support 12/08 15/08

39 Others (Dis. Parts, Bearings, Oil Basin, Oil Guard, Shafts, etc.) 09/08 20/08 30/10 14/11

42 Insp. Rotor 30/10 12/11

43 Set Adj. Bolt, Check Valve, Th. Bearing, Base, Oil Lift piping, etc. 09/11 13/11

44 Set Support Gen Floor, Adj. Bolt, UCT, U. Oil Basin, etc. 14/11 14/11

45 Generator Auxiliaries
46 Insp. MTR Fan 30/10 05/11

47 Insp. 11kV Cub and Exc. Transformer 06/11 06/11

48 Insp. MBB 0523, No. 3 HT, ACB 0923, T923 07/11 07/11

49 Insp. MBB T423, T424, 0526, 0525, and 6.6kV Bus C 08/11 08/11

50 Insp. Excitation Cubicle 09/11 09/11

51 Insp. MCC 11/11 11/11

52 Insp. 11kV SPB 06/12 06/12

53 Cleaning MTR Body and Radiator 07/12 07/12

54 Insp. Oil Lift Pump, Oil Mist Collector, NGR 09/12 09/12

55 Project RKAP
56 Renewal Stator Coil 21/08 29/10

57 Renewal Air Cooler 30/11 04/12

58 Replacement Slipring 25/11 28/11

59 Overhaul MTR 06/11 09/12

60 Temporary Assembly
61 Ass. Temporary Parts
62 Set W.Gate (8 pcs), Head Cover, Tb. B. Support, W.G. Stem 30/10 30/10

63 Set LBB, L.B. Support, UBB, Piano Wire 31/10 31/10

64 Centering and Adjusting 01/11 04/11

65 Drilling and Making New Pin 05/11 07/11

66 Dis. Temporary Parts


67 Dis. Piano Wire, UBB, L.B. Support, LBB 07/11 08/11

68 Dis. W.G. Stem, Tb. B. Support, Head Cover, etc. 08/11 09/11

69 Assembly
70 Turbine
71 Set W. Gate, Put in Runner, etc. 09/11 09/11

72 Set H. Cover, W.G. Gland, Shaft Sealing Box, W.G. Servomotor, etc. 11/11 11/11

73 Set Tb. B. Support, W. G. Op. Ring, etc. 12/11 12/11

74 Set W.G. Key, etc. 13/11 14/11

75 Adj. W.G. Side Gap, etc. 13/11 16/11

76 Adj. Level W.G. Servomotor to W.G. Op. Ring, etc. 16/11 16/11

77 Set. Shim W.G. Gland, etc. 18/11 20/11

78 Set. W.G. Key, W.G. Ecc. Pin, etc 20/11 20/11

79 Set W.G. Zero Position, etc. 20/11 23/11

80 Set W.G. Servomotor Squeeze, W.G. Ecc. Pin Lock, etc. 22/11 22/11

81 Check W.G. Shutter Face Gap, etc. 23/11 25/11

82 Check Runner Height and Gap, Distance Facing Plate, etc. 25/11 25/11

83 Temp. Hanging Tb. B. Support, Set Shaft Sealing Box, W. Deflector, etc. 25/11 25/11

84 Set Shaft Sealing Box, W. Deflector, Piping, Tb. Oil Basin, TCT, etc. 26/11 27/11

85 Set Tb. B. Support, Tb. Bearing and Adj., etc. 28/11 29/11

86 Lub. Oil Make up, Set Water Protector at Head Cover, etc. 30/11 30/11

87 Set Walkway, etc. 02/12 02/12

88 Draft Gate Open, etc. 03/12 03/12

89 Turbine-Generator
90 Tightening Coupling Bolt 19/11 19/11

91 Load Balancing and Shaft Position Check 20/11 20/1123/11 25/11

94 Generator
95 Set L. Air Seal, Put in L. Oil Basin, LBB, Temp. B. Support, L. Shaft, etc. 15/11 15/11

96 Set. L. Oil Basin, Flange Adj. Bolt, Leakage Test, Level L. Shaft, etc. 16/11 16/11

97 Temp. Oil Make up, Flushing Oil Lift Piping, Set Turning Dev., etc. 18/11 18/11

98 Dis. Temp. B. Support, Drain Oil, Lock Stopper Th. Bearing, etc. 21/11 21/11

99 Set LCT, L. B. Support, L. Bearing, Put in L. Oil Guard, etc. 21/11 21/11

100 Set L. Coil-end Cover, Brake, etc. 22/11 22/11

101 Prep. Put in Rotor, etc. 22/11 22/11

102 Put in Rotor, Set UBB, etc. 23/11 23/11

103 Set U. Shaft, Run-out Check and Adj., Lock Bolt UBB and LBB, etc. 25/11 26/11

104 Lock Bolt U. Shaft, Th. Bearing Adj. Bolt, Coupling Bolt, etc. 26/11 27/11

105 Set U. Bearing and Adj. Gap, Set. U. Oil Guard, etc. 27/11 28/11

106 Set C. Shaft, Run-out Check and Adj. (*) 28/11 28/11

107 Set PMG, Mech. Speed Ry., Slipring H., Gen. Floor, etc. 28/11 29/11

108 Lub. Oil Make up to UBB, Connect and Insulating C. Bar, etc. 29/11 30/11

109 Adj. Gap L. Bearing 28/11 30/11

110 Adj. Brush Holder, Set L. Oil Guard, Lub. Oil Make up to LBB, etc. 30/11 02/12

111 Leakage Test of C. Water Piping by Air and Water 03/12 04/12

112 Test

113 8A, 8D On, Load-Unload Press. Oil Pump, Intermitten Test of A. Comp. 05/12 05/12

114 Announciator and Interlock Test 06/12 06/12

115 Insp. Governor


116 Watering
117 Initial Running, Bearing Heat Run Test 11/12 11/12

118 Synchronizing and Automatic Start-Stop Test, Trip Test, Shaft Output Test 12/12 12/12

119 Load Rejection Test, Full-Load Test 13/12 13/12

120 Technical Advisor

121 TA ELCID Test 16/09 17/09

122 TA Assembly Stator Coil 16/09 29/10

123 TA Test MTR 06/11 07/11 07/12 09/12

126 TA Overhaul MTR 06/11 09/12

127 TA Inside Work MTR 11/11 12/11 21/11 22/11