You are on page 1of 4

DEEPAKTIWARI

Mobile: , 9131449243 ~ E-Mail: d.tiwari1986@gmail.com

Seeking challenging assignments in the domain of Power plant Operation & Maintenance with an
organization of high repute

PROFILE & STRENGTH


▪ Highly motivated, dependable and qualified B.E (Mechanical) with experience of 11 years in overall
management of PFC, ,AFBC Boiler operations. Presently spearheading functions as
Assistant Manager (operation) –with T.R.N energy pvt ltd (A subsidiary of A.C.B India power ltd) capacity
2x300MW. From 2015 to till
▪ A strategic planner with expertise in planning, executing and spearheading , Operation, Testing, Boiler
Survey, Shut down and Maintenance
▪ Ensuring strict observance of process parameters to achieve required yield within defined quality norms.
▪ Adept at designing effecting preventive shutdown, breakdown and predictive maintenance schedules of
equipment & components to ensure zero / minimum breakdown; as well as machinery increase up time and
equipment reliability.
▪ Overall responsible in planning and managing the execution of all technical matters pertaining to
personnel, equipment, spares/consumable materials, etc. to provide requisite level of engineering services.
▪ Core competence in application of preventive, planned & predictive maintenance practices ensuring
maximum operational availability with expertise in ensuring adherence to Safety, Environment and Health
standards
▪ Diligent communicator with strong relationship management, leadership skills & multi-tasking abilities
and good team player for achieving aggressive tasks

CORE COMPETENCIES

OPERATIONS & MAINTENANCE


▪ Planning and coordinating the DCS Operation and ensuring proper functioning & maintenance of the power
plant.
▪ Planning & implementing the preventive & breakdown maintenance schedules; conducting failure investigation
analysis to identify gaps & take corrective measures so as to reduce equipment downtime & maximize plant availability.
▪ Monitoring and optimizing processes, troubleshooting problems of Boiler Feed Pumps, Cooling Tower pumps,
Gate Valves & Globe Valves.

ORGANIZATIONAL SCAN
Since June 2014 to October 2015 with R.K.M.Power Gen. Pvt.Limited Uchhpinda Chhattisgarh as Sr
Engineer
Power Plant Capacity : 4x360 MW(PFC Boiler)
ROLES & RESPONSIBILITES
▪ Responsible for smooth cold start-up, hot start-up, normal operation, emergency handling and shutdown of
Boiler/Turbine
▪ Operation & commissioning of Turbine & auxiliaries i.e. CW pumps, ACW pumps, CT Fan, CCCW, OCCW,
Condensers, Cooling towers, Ball cleaning arrangement, De aerator, Clarifiers, Reservoirs, compressor, Ash dumping
sites, etc.
▪ Operation, commissioning & Maintenance of Turbine & auxiliaries i.e. BFP, CEP, Vacuum pump, HPLP
bypass system, DEH, MOP, JOP AOP, EOP,OVEF, Seal oil pump, Stator water system, Dozing Pump, centrifuge etc. all
equipments trial run, interlock check, operation procedure etc.
▪ Operation of power plant equipment BFP,CEP, CWP, ACWP, CT Fan, Centrifuge & ESLC. All equipments
activity of both DCS and Field (startup check, permissive, line up preventive maintenance, lineup)
▪ Evaluating the need for changes in parameters like temperature, pressure or flow, to satisfy varying plant
load situations.
▪ Planning and effecting preventive maintenance/ overhauling schedules of various machineries and equipments .
June 2012- may2014 with Vandana vidhyut ltd , chhori korba ,C.G , as Engineer (DCS)
Power Plant Capacity: 2* 135 MW (PC Fired Boiler)
ROLES & RESPONSIBILITES
▪ Responsible for smooth cold start-up, hot start-up, normal operation, emergency handling and shutdown of
Boiler/Turbine.
▪ Responsible for smooth operation of PC Fired boiler with maintaining proper parameter.
▪ Co-ordinate with maintenance, personnel for ensuring violation, defect identification, work permit, trials and
clearance of jobs prioritized by him.
▪ Coordination with maintenance teams for emergency and for planned and breakdown maintenance
▪ Online Exp. of Blackout, Island mode, Cold Start up, Warm Startup, Normal operation emergency
handling & Safe Shutdown of Unit.
▪ Monitoring & controlling steam/ air/ fuel/ water parameters to achieve maximum efficiency of boiler &
turbines from control room & from field.
▪ Evaluating the need for changes in parameters like temperature, pressure or flow, to satisfy varying plant load
situations.
▪ Coordinating the loading and unloading of turbine generators, starting or shutting down of boilers and general
maintenance and repair operations
▪ Ensuring smooth operation of boiler / turbines during normal and emergency conditions to prevent equipment /
unit tripping/ protect equipment and personnel
▪ Identifying areas of improvement and recommending process modifications and equipment calibrations to
enhance operational efficiencies of machine / equipment
▪ Monitoring activities of personnel towards ensuring adherence to safety norms.
▪ Operation of the plant through DCS control and monitoring facilities.
▪ Proactively identifying areas of obstructions/breakdowns and take steps to rectify the equipments.
▪ Meticulously managing and updating scheduled data for capacity optimization etc and supervising entire
functioning
▪ Formulating plan for inspection, shutdown jobs preparation & execution, breakdown analysis & action plans
and preparation of annual maintenance plans
▪ Handling job scheduling to maintain optimum availability of men and material
▪ Collecting and collating data; generated periodic reports and carried out value added analysis of the reports to
monitor the movement of key indicators

July’2008-June 2012 with Singhal energy pvt ltd, Raigarh, Chhattisgarh, as Trainee-→Asst. Engineer Power
Plant Capacity: 17 MW (AFBC Boiler)

ROLES & RESPONSIBILITES


▪ Responsible for smooth cold start-up, hot start-up, normal operation, emergency handling and shutdown
of Boiler/Turbine.
▪ Operation of the plant through DCS control and monitoring facilities.
▪ Online Exp. of Blackout, Island mode, Cold Start up, Warm Startup, Normal operation emergency
handling & Safe Shutdown of Unit.
▪ Line up of the unit & its auxiliaries, changeover of equipment routine testing of protection system &
annunciation system.
▪ Responsible for normal Running of Ash Handling System.
▪ Planning and effecting preventive maintenance/ overhauling schedules of various machineries and
equipments to increase machine up time and reliability.
▪ Proactively identifying areas of obstructions/breakdowns and take steps to rectify the equipments.
▪ Defining and implementing programs to economically optimize plant operation.
▪ Regular monitoring of equipment status in the unit.
▪ Contributing to the activities directly towards plant performance improvement.
▪ Independently handling a huge steam distribution system for process plant & power plant.
▪ Issue works permits to maintenance department and coordinates with them for equipment isolation and
take trial run of equipments after shutdown work.
▪ Adhering to Safety, Environment and Health standards in all functional areas and developed & implemented
measures for enhancing safety levels

THERMAL POWER PLANT SIMULATOR TRAINING (JINDAL INSTITUTE OF POWER TECHNOLOGY)

Description: It includes: (PF BOILER) total 20 days training programme


⇨ Cold start up , hot start up
⇨ Simulator Training in 4*250 MW unit knowledge of Hot/Cold/Warm Start up of a unit.
⇨ Trouble shooting case studies .
⇨ Class room lectures.
⇨ PC-based 4*250 MW power plants Simulator training designed by Honeywell (Yokogawa make) which is
the replica of the 4*250 MW.
⇨ Undergone scheme tracing at JPL (Jindal Power Ltd) of generating capacity of 4*250 mw for a period of 4
Days.
⇨ Scheme Tracing of Different Power plant scheme likes, feed cycle, cooling water cycle, steam cycle, etc.
ACADEMIC & PROFESSIONAL CREDENTIALS

B.E (Mechanical Engineering) 2008 with 67.85%


Form C.S.I.T College, Durg (Chhattisgarh)

Higher Secondary School (12th) Maths 2004 with 58%


Form Board of Chhattisgarh

High School (10th) 2002 with 53%


Form Board of Chhattisgarh

IT FORTE
Ms-Office, MS-DOS, WINDOWS-98/XP/VISTA/7 and Internet Applications

PERSONAL DOSSIER

Father Name : K.Tiwari


Date of Birth : 3rd September1986
PermanentAddress : Qr no 49, sec-7 type a Balco nagar Korba (C.G), Pin - 495684
Linguistic Skills : English & Hindi
Expected ctc : Negotiable
Mail id : d.tiwari1986@gmail.com

DATE
DEEPAK TIWARI
PLACE

You might also like