You are on page 1of 7

CURRICULUM VITAE

PERSONAL DATA

Name : IPAN PURNAMA


Birthplace and date : Bandung, June 21,1990
Residence : JL.Kolonel Masturi Rt.01/Rw.11
Ds.Jambudipa Cisarua ,
Bandung barat, Jawa barat - 40551
Marital status : Married
Nationality : Indonesia
Second language : English
Mobile : 082116766478
E-mail : ipan.purnama@gmail.com / purnama_ipan@yahoo.com

SUMMARY OF QUALIFICATIONS

a. Experience in operating, maintenance and troubleshooting control system on


Coal Fired Power Plan.
b. Experince DCS Operation on Coal fired power plan.
c. Familiar with with test equipment for instrument device such as Pressure
calibrator (Druck, Ametek), Temperature calibrator (Yokogawa decade
resistant, temperature bed), and Field comunicator (BT200, 375, 475)
d. Familiar and experienced in installation, maintenance, troubleshooting,
reconditions and calibration of Control Valve, SDV,BDV,Transmitter, Controller,
gauges and switches.
e. Familiar with P&ID, Isometric drawing, Hook Up drawing, Instrument Loop
Drawing, Wiring diagrams.
f. Experience Hook up tubing for Well head control panel, Process control panel
and Instrument device on Remote platform.

Resume of Ipan Purnama Page 1 of 7


WORK HISTORY

1. PT. IMECO SARANA INTER


Contractor for BP Tangguh LNG. West Papua , Indonesia
As Instrument Technician ( March 2019 ~ April 2019 )
Job Description:
 Successful for Implementation Turn Around Project (TAR 9) at Gas Turbine
Compressor.
 Maintenance, inspection, and calibration Instrument Device at Gas turbine
compressor area.

2. PT. INDOKOMAS BUANA PERKASA


As E/I Technician (April 2018 – Augst 2018)
Job Description:
 Support Fire and Gas Project Foxtrot F/S at PHE ONWJ.
 Termination and Glanding Cable
 Support Comissioning for Fire and Gas sistem

3. PT. CV Ismaya Teknik


As Instrument Technician (March 2018 – April 2018)
Job Description:
 Support Project shutdown for PT. Cikarang Listrindo power Plan
 Calibration Instrument device
 Calibration, Function Test and Loop test Instrument System
 Trouble shoot for instrument system

4. PT. INDOKOMAS BUANA PERKASA


As Instrument Technician (Sept 2017 – January 2018)
Job Description:
 Support Turn Around Project Papa F/S and Foxtrot F/S at PHE ONWJ.
 Perform Emergency Shutdown on platform
 Calibration Instrument device
 Inspection Instrument system for shutdown valve
 Support sustainability project Oyong WHP at Santos Sampang Pty Ltd.
 Termination Cable From Jb to RTU Panel
 Calibration, Function Test and Loop test Instrument System.

Resume of Ipan Purnama Page 2 of 7


 Demolish and install new instrument device
 Assist commissioning for instrument system at Oyong WHP.

5. PT. TRIGUNA SOLUSI CONTROL


Contractor for PT.SOCIMAS PETROCHEMICAL, Medan-South Sumatra
As Instrument Technician ( July - Augst 2017)
Job Description:
 Perform Calibration Instrument Device
 Perform Individual function & loop test for Instrument device
 Perform Overhaul & calibration Control Valve

6. PT. ADI JAYA


Contractor for PT.IWATANI GAS INDUSTRIES, Karawang-West Java
As Instrument Technician ( June - July 2017)
Job Description:
 Perform Calibration Instrument Device
 Perform Individual function & loop test for Instrument device.

7. PT. SHAFTINDO ENERGI


Contractor for PHE ONWJ, Java Sea
As Instrument Technician ( July 2016- Apryl 2017 )
Job Description:
 Install Wellhead Contol Panel and Process Control Panel for Normally
Unnamed Installation Platform
 Hook up tubing for Wellhead Control Panel and Process Control Panel to
Instrument Device
 Perform Countinity and Individual function test from panel to Instrument
device.

8. PT. IMECO SARANA INTER


Contractor for BP Tangguh LNG. West Papua , Indonesia
As Instrument Technician ( April 2016 ~ May 2016 )
Job Description:
 Successful for Implementation Turn Around Project (TAR 7) at Gas Turbine
Compressor.

Resume of Ipan Purnama Page 3 of 7


 Maintenance, inspection, and calibration Instrument Device at Gas turbine
compressor area.
 Perform Linearity check and Function test vibration element.
 Perform interlock test at gas turbine and compressor area.

9. PT.GRAHA USAHA TEKNIK


Contractor PT. Candra Asri Petrochemical , Cilegon - Banten
As Instrument Technician ( Nov 2015 ~ Des 2015)
Job Description:
 Successful for Implementation Turn Around Maintenance Project at Gas
Turbine Generator.
 Maintenance, inspection, and calibration Instrument Device at Gas turbine
Generator area.
 Perform Linearity check and Function test vibration element.

10. PT.INDOKOMAS BUANA PERKASA


Contractor for PHE ONWJ , Java Sea - Indonesia
As Instrument Technician ( Aug 2014 ~ July 2015)
Job Description:
 Maintenance and calibration for pressure transmitter,Barton chart recorder
DP level transmitter, temperature transmitter, gauges and switches.
 Perform Function Test for Well Head Control Panel, Procces Control Panel,
and Instrument Device.
 Inventory Materials Instrument.
 Perform Emergency Shut Down System on Remote Well Platform.
 Perform monthly custody gas meter check.
 PM 8000 hours at gas turbine for instrument device.
 Trouble shoot instrument system.
 Trouble Gas Chromatograf

11. PT.MEG Eka Gemilang


Contractor for PHE ONWJ , Java Sea - Indonesia
As Instrument Technician ( May 2013 ~ May 2014)
Job Description:
 Hook Up Tubing For Well Head Control Panel, Procces Control Panel, and
Instrument Device.
 Perform Calibration Instrument Device
 Perform Function Test for Well Head Control Panel, Procces Control Panel,
and Instrument Device.
Resume of Ipan Purnama Page 4 of 7
 Reactifation remote well platform.
 Perform Emergency Shut Down System on Remote Well Platform.
 Assist Start up join with Operation team PHE ONWJ.
 Successful for Implementation Turn Around Project Bravo Flow Station and
Lima Subsidence Remediation Project

12. PT.Indokomas Buana Perkasa


Contractor for BP Tangguh LNG. West Papua , Indonesia
As Instrument Technician (April 2013 – June 2013 )
Job Description:
 Perform preventive, corrective and maintenance join with team Train 1-2 for
Acid Gas Removal Unit , Dehydration & Mercury Removal Unit, Fractination
& Liquefaction Unit, Propane & Mixed Refrigerant System,Generator , Acid
Gas Incinerator .
 Perform preventive and maintenace join with team Gas Production Facility
& Storage Loading for Onshore Receiving Facility, LNG Storage Tank, Boil
Of Gas.
 Successful for Implementation Turn Around Project (TAR 4) at Gas Turbine
and Compressor Train 2.
 Successful support overhaul Rotork valve for Onshore Receiving Facilities.
 Perform critical function test on instrument and safety devices on process
modules.
 Perform evacuation route drill alarm from work area to Master Point.

13. PT.Bumi Mitra Adi Persada, Jakarta Indonesia


Contractor For PT.PLN Persero and PT. Indonesia Power
As Operator and Instrument Technician (Februari 2011~ Januari 2013)
Job Description:
 Comissioning and start Up CFB Boiler and Steam Turbine generator for
Project Comissioning PLTU 3 NTB 1x25 MW.
 DCS operation and perform synchronization of turbine generator with
PLTD
 Perform stroke test governor valve from word ward 505 controller for steam
turbine generator.
 Perform running test motor 6,4 KV.
 Perform Interlocking test for Boiler and Steam turbine generator area.
Resume of Ipan Purnama Page 5 of 7
 Perform emergency shut down test for system PLTU 3 NTB.
 Troubleshoot instrument system.
 Successful calibration instrument device for project PLTGU Tanjung Priok
740 MW.
 Perform preventive and maintenance join with Comissioning team for Heat
Recovery Steam Generator (HRSG), Mitsubishi Steam and Gas turbine
generator.
 Perform preventive maintenance join with Mitsubishi team for Desalination
plant, Demineralition plant, Chlorination plant.
 Perform Interlock test for Mitsubishi Gas turbine generator.
 Perform Interlock test for Mitsubishi Steam turbine generator.
 Perform Interlock test Join Comissioning team for Atlas Copco Gas
compressor.
 Successful support Comissioning team for Emergency Shut Down ( ESD)
test on Gas Turbine and Heat Recovery Steam Generator (HRSG).
 Successful Calibration and function test for Projet PLTU 1-2 Sulawesi Utara
2x25 MW.
 Perform Function test for electrical control panel.
 Verivication temperature element (RTD&Thermocouple) on CFB Boiler and
Steam Turbine Generator area.
 Pefform stroke test on-off motor valve and motor damfer for boiler area.
 Successful calibration Ultrasonic level transmitter and level switch for Coal
bunker area.
.
14. PT. Fajar Surya Wisesa, Cibitung - Indonesia
As Instrument Technician (May 2010 ~ Feb 2011).
Job Description:
 Perform to support preventive and corrective maintenance join with
instrument department.
 Conduct tool box meeting and distribute daily work order to instrument
member.
 Responsible to prepare instrument data sheets, check list and required
spare part.
 Maintenance, inspection, troubleshooting, modification local control panel
system.
 Maintenance, inspection, repairing, troubleshooting and calibration
pneumatic on-off/control valve.
Resume of Ipan Purnama Page 6 of 7
 Maintenance, inspection, and calibration temperature element, gauges and
switch.
 Maintenance, inspection, and calibration pressure transmitter, gauge, and
switch.
 Perform to support for project paper machine 5 and 7.
 Sucsessful support pulling cable fiber optic for all instrument device.
 Succsessful installing conduit pipe and junction box for paper machine area.
 Successful support conection junction box for all instrument device.
 Successful support commissioning team for stock preparation plant and
paper machine 5.

15. PT. Roda Prima Lancar , Tangerang – Indonesia


As On the Job training (Aug 2009 - Feb 2010)
Job Description

 Perform to Operation welding machine in department welding 2.

FORMAL EDUCATIONS

 2006 ~ 2010 : Technical High School, STMN Pembangunan Bandung


Majoring In Industrial Instrumentation
 2013 ~ 2017 : Universitas Jendral Achmad Yani
Majoring In D3 Electrical Engineering

TRAININGS

 Sea Water Survival Training


(BSS Perkasa-2017)

I certify that the above information is true and correct to the best of mind my
knowledge.

Best regards,

Ipan Purnama
Resume of Ipan Purnama Page 7 of 7

You might also like