Professional Documents
Culture Documents
SYNOPSIS
🗹 Qualified B. E. professional with almost than 14 years of experience in Power plant control system & Instrumentation,
specialization in Electronics & Communication Engineering from NIE GUNTUR, JNTU Andhra Pradesh India
🗹 Currently designated as an Deputy Manager C&I in SEMBCORP ENERGY INDIA LTD
🗹 Extensive knowledge of quality standards as well as their implementation in project operations
🗹 Expertise in Erection, commissioning & Maintenance of Control & Instrumentation
🗹 An effective communicator with demonstrated ease at allocating resources and supervising and guiding teams, etc.
during project till final delivery.
PROFESSIONAL SCAN
Working as Manager (Control and Instrumentation) in Erection, Commissioning and Maintenance of Super critical Thermal
Power Project of 2 * 660 MW at Nellore, Andhra Pradesh, supplied by HBC Company China.
🗹 Implementation of the instrument & termination according to I/O database and PID
🗹 Tapping points checking for all vessels and pipeline
🗹 Calibration of field instruments as per standard procedure
🗹 Instrument inspection with final instrument list and P&ID
🗹 Coordinate with Civil, Electrical and Mechanical departments in working areas
🗹 Performance Testing of the instruments
🗹 Auto loop testing in DCS, Protection Checking etc.
🗹 Knowledge about Electrical System and its interlocks
🗹 Involved in Site Commissioning Activity
🗹 Work planning and execution in erection as per the site requirement
🗹 Handling the site activity as per the project demand
🗹 Familiar with the safety system, work permits, hazardous area classifications necessary for power plants.
🗹 Having Knowledge on various specifications, JB Schedules and Termination Details preparation, I am well conversant
with P&I Diagrams, Electrical Schematics, Hookup drawings, logic Drawings and Loop Diagrams.
🗹 Planning & Supervision of Erection work at site
1. Checking I/O List, PID analysis, loop checking, motor cold run, hot run during commissioning time, termination
2. Erection & testing various temperature measuring, flow measuring, pressure measuring, Differential pressure
measuring, level measuring instruments.
3. Various System installation & commissioning viz. VMS, Tube leakage, SWAS, CPU,
4. BTG & BOP material inspection
5. Attended FAT of various PLC, UPS system as per standards
Key Responsibility:
⮚ Work planning with EPC contractors & Execution regarding the job
⮚ Distribution of work to my colleague as per the planning given by management
⮚ Preparation of Daily progress report, Weekly progress report same will sent to superiors.
⮚ Loop checking and commissioning of the instruments after installation work completed
Achievements:
⮚ UNIT-1 Boiler light up, steam blowing, synchronization and COD (commercial operation declaration)
⮚ UNIT-2 Boiler light up, steam blowing,
Key Deliverables:
🗹 Implementation of the instrument & termination according to I/O database and PID
🗹 Calibration of field instruments as per standard procedure
🗹 Working experience on Invensys Foxboro DCS(FCP 270)
🗹 Knowledge about Electrical System and its interlocks
🗹 Involved in Site Commissioning Activity
🗹 Work planning and execution in erection as per the site requirement
🗹 Handling the site activity as per the project demand
🗹 Planning & Supervision of Erection work at site
Checking I/O List, PID analysis, loop checking, motor cold run, hot run during commissioning time, terminationErection & testing
of instrument like TT, PT, DPT, T/C, RTD, GWR LT, MOV, SOV, VMS SENSOR, VMS SYSTEM ,Gas Analyzer, Key-phasor, SWAS
system ,etc.
Key Responsibility:
⮚ Work planning with clients & Execution regarding the job
⮚ Distribution of work to my colleague as per the planning given by client
⮚ Preparation of Daily progress report
⮚ Loop checking and commissioning of the instruments after installation work completed.
Nov 2005 - APR 2013 Lanco Infratech Ltd (EPC)
2X300 MW, 2X660MW LANCO AMARKANTAK POWER LTD KORBA CG
Achievements:
⮚ UNIT-1 Boiler light up, steam blowing, synchronization and COD (commercial operation declaration)
⮚ UNIT-2 Boiler light up, steam blowing, synchronization and Full Load.
Key Responsibility:
⮚ Work planning with clients & Execution regarding the job
⮚ Distribution of work to my colleague as per the planning given by client
⮚ Preparation of Daily progress report
⮚ Loop checking and commissioning of the instruments after installation work completed
EDUCATIONAL SCAN
🗹 B.E (Electronics & Telecommunication Engineering) from NIE GUNTUR, JNTU in 2005 scoring 59.4 % marks
🗹 H.S.S.C from A.P Board in 2002 scoring 61.4 % marks.
🗹 S.S.C from A.P. Board in 1997 scoring 65 % marks.
INDUSTRIAL TRAINING
Construction Management of Thermal Power Plants at NICMAR Pune
Certification in project management- CIPM
PERSONAL DOSSIER
Place: NELLORE
(K DURGA RAMANJANEYULU)