You are on page 1of 4

K DURGA RAMANJANEYULU

E-Mail: kannegantidurgaramanjaneyulu@gmail.com~ Mobile: +91 – 7093980334


Seeking Challenging post in the field of Control System & instrument engineering with a growth-oriented organization

SYNOPSIS

🗹 Qualified B. E. professional with almost than 14 years of experience in Power plant control system & Instrumentation,
specialization in Electronics & Communication Engineering from NIE GUNTUR, JNTU Andhra Pradesh India
🗹 Currently designated as an Deputy Manager C&I in SEMBCORP ENERGY INDIA LTD
🗹 Extensive knowledge of quality standards as well as their implementation in project operations
🗹 Expertise in Erection, commissioning & Maintenance of Control & Instrumentation
🗹 An effective communicator with demonstrated ease at allocating resources and supervising and guiding teams, etc.
during project till final delivery.
PROFESSIONAL SCAN

Since ‘June 14’ with SEMBCORP Energy India LTD


2x660 MW SEMBCORP GAYATRI POWER, Nellore (AP)

Working as Manager (Control and Instrumentation) in Erection, Commissioning and Maintenance of Super critical Thermal
Power Project of 2 * 660 MW at Nellore, Andhra Pradesh, supplied by HBC Company China.

Erection, Commissioning and maintenance of Instrumentation systems of Boiler and Auxiliaries.

Key Responsibilities: BTG C&I

🗹 Erection , Commissioning and maintenance of Instrumentation of Boiler )which


includes FSSS (Furnace Safeguard Supervisory System)
🗹 BMS (Burner Management System)
🗹 Feed Water system
🗹 Mills & Coal Feeders
🗹 Air & gas system (Induced draft fans, High pressure fluidizing fans, Primary and
secondary air fans)
🗹 Soot blowing system
🗹 Boiler Protections, Sequence checks and Loop checks based on the Pre comm. / Commissioning schedule for Boiler
and various auxiliaries, with the field devices to control system in CCR, MCC etc.
🗹 Erection , Commissioning and maintenance of Instrumentation systems of BOP ( Balance of Plant ) which
includes DM plant, AUX Boiler, FOPH
🗹 Installation & commissioning of field instruments like pressure transmitters, flow transmitters, level
transmitters, RTDs, Thermocouples, Vibration Sensors, Speed sensors.
🗹 Implementation of the instrument & termination according to I/O database and PID
🗹 Tapping points checking for all vessels and pipeline
🗹 Calibration of field instruments as per standard procedure
🗹 Instrument inspection with final instrument list and P&ID
🗹 Coordinate with Civil, Electrical and Mechanical departments in working areas
🗹 Work planning and execution in erection as per the site requirement
🗹 Handling the site activity as per the project demand
🗹 Familiar with the safety system, work permits, hazardous area classifications necessary for power plants.
🗹 Having Knowledge on various specifications, JB Schedules and Termination Details preparation, I am well conversant
with P&I Diagrams, Electrical Schematics, Hookup drawings, logic Drawings and Loop Diagrams.

Since ‘June 14-June15 Lanco Infratech Ltd (EPC)


2x600 MW Moser bear Power plant, Anuppur (MP)
Designation : Assistant Manager -C&I
Project Handle : 2x600 MW Moser bear Power plant, Anuppur (MP) Thermal Power Project
Organization : Lanco Infratech Ltd (EPC) Located at Singhitarai village, dist-Janjgir-champa (CG)
Duration : June 2014 to June 2015
Responsibilities : As a C&I engineer looking after various erection and commissioning activities.
Area of Responsibilities: 1. BTG C&I

🗹 Implementation of the instrument & termination according to I/O database and PID
🗹 Tapping points checking for all vessels and pipeline
🗹 Calibration of field instruments as per standard procedure
🗹 Instrument inspection with final instrument list and P&ID
🗹 Coordinate with Civil, Electrical and Mechanical departments in working areas
🗹 Performance Testing of the instruments
🗹 Auto loop testing in DCS, Protection Checking etc.
🗹 Knowledge about Electrical System and its interlocks
🗹 Involved in Site Commissioning Activity
🗹 Work planning and execution in erection as per the site requirement
🗹 Handling the site activity as per the project demand
🗹 Familiar with the safety system, work permits, hazardous area classifications necessary for power plants.
🗹 Having Knowledge on various specifications, JB Schedules and Termination Details preparation, I am well conversant
with P&I Diagrams, Electrical Schematics, Hookup drawings, logic Drawings and Loop Diagrams.
🗹 Planning & Supervision of Erection work at site
1. Checking I/O List, PID analysis, loop checking, motor cold run, hot run during commissioning time, termination
2. Erection & testing various temperature measuring, flow measuring, pressure measuring, Differential pressure
measuring, level measuring instruments.
3. Various System installation & commissioning viz. VMS, Tube leakage, SWAS, CPU,
4. BTG & BOP material inspection
5. Attended FAT of various PLC, UPS system as per standards
Key Responsibility:
⮚ Work planning with EPC contractors & Execution regarding the job
⮚ Distribution of work to my colleague as per the planning given by management
⮚ Preparation of Daily progress report, Weekly progress report same will sent to superiors.
⮚ Loop checking and commissioning of the instruments after installation work completed

Achievements:
⮚ UNIT-1 Boiler light up, steam blowing, synchronization and COD (commercial operation declaration)
⮚ UNIT-2 Boiler light up, steam blowing,

‘APR2013-MAY 2014 ABIR INFRATECH PVT LITD (AIPL)


2x600 MW singhitrai thermal power project, Janjgir-Champa (CG)

Designation : Dy. Manager (Control and Instrumentation) Erection & commissioning

Project Handled : C&I Erection & Commissioning of 2X 600MW units at STPP.

Organization: ABIR INFRATECH PVT LITD (AIPL)


Duration: APR2013-MAY 2014

Key Deliverables:
🗹 Implementation of the instrument & termination according to I/O database and PID
🗹 Calibration of field instruments as per standard procedure
🗹 Working experience on Invensys Foxboro DCS(FCP 270)
🗹 Knowledge about Electrical System and its interlocks
🗹 Involved in Site Commissioning Activity
🗹 Work planning and execution in erection as per the site requirement
🗹 Handling the site activity as per the project demand
🗹 Planning & Supervision of Erection work at site
Checking I/O List, PID analysis, loop checking, motor cold run, hot run during commissioning time, terminationErection & testing
of instrument like TT, PT, DPT, T/C, RTD, GWR LT, MOV, SOV, VMS SENSOR, VMS SYSTEM ,Gas Analyzer, Key-phasor, SWAS
system ,etc.

Key Responsibility:
⮚ Work planning with clients & Execution regarding the job
⮚ Distribution of work to my colleague as per the planning given by client
⮚ Preparation of Daily progress report
⮚ Loop checking and commissioning of the instruments after installation work completed.
Nov 2005 - APR 2013 Lanco Infratech Ltd (EPC)
2X300 MW, 2X660MW LANCO AMARKANTAK POWER LTD KORBA CG

Designation : Engineer-C&I Erection & commissioning

Area of Responsibilities: 1. BTG -C&I


Key Deliverables:
🗹 Implementation of the instrument & termination according to I/O database and PID
🗹 Tapping points checking for all vessels and pipeline
🗹 Calibration of field instruments as per standard procedure
🗹 Instrument inspection with final instrument list and P&ID
🗹 Coordinate with Civil, Electrical and Mechanical departments in working areas
🗹 Performance Testing of the instruments
🗹 Auto loop testing in DCS , Protection Checking etc.
🗹 Knowledge about Electrical System and its interlocks
🗹 Involved in Site Commissioning Activity
🗹 Work planning and execution in erection as per the site requirement
🗹 Handling the site activity as per the project demand
🗹 Familiar with the safety system, work permits, hazardous area classifications necessary for power plants.
🗹 Having Knowledge on various specifications, JB Schedules and Termination Details preparation, I am well conversant
with P&I Diagrams, Electrical Schematics, Hookup drawings, logic Drawings and Loop Diagrams.
🗹 Planning & Supervision of Erection work at site
Checking I/O List, PID analysis, loop checking, motor cold run, hot run during commissioning time, termination
Erection & testing various temperature measuring, flow measuring, pressure measuring, Differential pressure measuring, level
measuring instruments.
Various System installation & commissioning viz. FANS, DRUM, MFT, FSSS, SADC, Flame Televison..erc
BTG material inspection

Achievements:
⮚ UNIT-1 Boiler light up, steam blowing, synchronization and COD (commercial operation declaration)
⮚ UNIT-2 Boiler light up, steam blowing, synchronization and Full Load.

Key Responsibility:
⮚ Work planning with clients & Execution regarding the job
⮚ Distribution of work to my colleague as per the planning given by client
⮚ Preparation of Daily progress report
⮚ Loop checking and commissioning of the instruments after installation work completed

EDUCATIONAL SCAN
🗹 B.E (Electronics & Telecommunication Engineering) from NIE GUNTUR, JNTU in 2005 scoring 59.4 % marks
🗹 H.S.S.C from A.P Board in 2002 scoring 61.4 % marks.
🗹 S.S.C from A.P. Board in 1997 scoring 65 % marks.

INDUSTRIAL TRAINING
Construction Management of Thermal Power Plants at NICMAR Pune
Certification in project management- CIPM

PERSONAL DOSSIER

Name : K DURGA RAMANJANEYULU


Date of Birth : 10-07-1982
Father’s Name : K.HARI BABU
Sex : Male
Marital Status : MARRIED
Languages Known : Hindi, English and Telugu.
Nationality : Indian

I hereby declare that all the information given by me is correct.

Place: NELLORE

Date: 23 January 2022

(K DURGA RAMANJANEYULU)

You might also like