Work Statement
Study/review of tender documents, scope work,, drawings, BOQ specification ,client requirement etc from tender
Responsibility in the construction Activities of BNPP Project UAE.

DMS : Door Monitoring System.

BMS : Building Monitoring System

Documents for proper estimating works.

Preparing technical queries for ambiguities in drawings, specification and BOQ.

Coordination with quantity surveyor and make take off .

To estimate the use of labour, material & equipment to be used in given task.

To direct the preparation or execution of specific task to be done on site.

Inspection of completed Installations & equipment specification and standards.

Represent the company in professional & diligent manners all the time.

Attend all meetings with client & contractors.

Review & manage project during & post construction duties.

Communicate Ideas views in both written and verbally.

Having a flexible and open attitude towards new ways of working & commitment to long life learning.

Detailed study of the Approved shop drawings and preparation of as built drawings.

Committed to quality & Safety during all the task Assigned. Good knowledge of and compliance with F+P standards.

ESD system implementation on site as a hardwire for emergency trip.

Knowledge & understanding of the principles of: Safety Integrity Level (SIL), Safety Instrumented
System (SIS), Safety Instrumented Function (SIF), Supervisory control and data acquisition (SCADA).

Performs basic programming for utilities information systems; programs with ladder logic and relay
logic; operates PLCs, RTUs and associated inputs/outputs; operates VFDs; performs
telecommunications networking.
Career Summary:

⮚ 7 Years of experience in the Construction Phase of Oil & Gas, Refinery & water treatment &RO.

⮚ Experience in Leading or supervising a team of Electrical Foreman, Technician, Electrician & Fitters.

⮚ Able to work safely and efficiently and have a good knowledge of safe work practice including Hot/Cold
work permit. Following strictly of the company’s standard, codes and practice. Familiar with similar
permit system and area classifications.

⮚ Responsibilities during the construction phase of the project assisting the subordinates to carry out
Primary & Secondary Cable Tray, Junction Box frame, and Junction Box Installation as per plant
standard drawing. Instrument & fiber optic Cable Pulling, Dressing, and Termination Continuity Check
and IR testing.

⮚ Responsibilities of Testing and Commissioning for Instrumentation, communication, Valves, pumps,


VFDs, air compressor, surge system protection, vibration monitoring system, DAS Discrete Acoustic
system for leak detection

⮚ Experience in working for both the Client and Contractor. Proficient in working engineering documents
in Oil & Gas, Refinery, & Power Plant Industries such as IFC Drawing, Design Drawing, Shop Drawing,
As-Built Drawing, Single Line Diagram, Cable Schedule, piping &Instrumentation drawing P&ID, Hook-
up, PLC wiring scheme.

⮚ Experience in Cable Tray installation, Conduit installation, MCC Panel, Control panel, PLC panel, server
panel DB etc.

⮚ Experience in Instrument cable, fiber optic cable, Ethernet cable & sensor Cable Pulling, Laying,
Dressing, Glanding & Termination, Continuity testing, IR testing.

⮚ Experience in Electric Motor, Communication System and Power Generation equipment.

⮚ Responsible for site acceptance test and punch list clearance system sign off, site modification as
required at site condition, discuss & finalize with client changes required at site the site.

⮚ Assigning the daily basis job reporting directly to the Project Engineer, Project Manager and Planning
Department by filling out the allocation sheets on daily basis supervision.
Major Rolls in Various Organizations:
⮚ Instrument Engineer (water treatment, RO, and water transmission system) -April 2019 to ongoing.

⮚ Instrument Engineer (Oil & Gas) - Aug 2016 to June 2018


⮚ Instrument Engineer (Cement plant) -July 2018 to Apr 2019.

Educational Qualification / Certification:

⮚ B-tech in Electronics & Communication Engineer - at Rajasthan technical university, kota, India

Computer Skills:

⮚ Proficient in Microsoft Office Program, Outlook, Internet Explorer, Adobe Reader, MATLAB.

Employment Records:
Name of Organization : Saudi services for Electromechanical works. Co.(SSEM)
Project : jizan Desalination & waste water plant, khobar-jamiah water transmission
system, energy industrial city WTS, RC108-C01
Job Position : Instrument Engineer.
Duration : 15 Apr 2019 to ongoing.
Responsibilities:

Review all relevant other discipline documentation and participate in the development of the
P&IDs, Hook-up, PLC I/O scheme, interconnection drawing, Loop drawing, wiring drawing,
interconnection with Electrical system.
Review the project execution developed by the Cost and direct coordination with planning team
for the work and manpower update.
Performed scheduled and planned installation with coordination of every department in order to
work efficiently.
Provide strategic development of Instrument related working procedures and processes.
Inter-action with client, company management and other disciplines to develop the control, safety
and monitoring systems and instrumentation philosophies per the design criteria.
Issue material requisitions to the Procurement Department for enquiry, order placement and for
any subsequent revisions.
Prepare estimates and schedules for different activities according to project execution.

Name of Organization : Hyundai Engineering & Construction (Uae)


Project : Bnpp project abudhabi
Job Position : Electrical engineer
Duration : 16 Nov 2017 to 08 July 2019

Responsibilities:
Supervision of subordinates to carry out Installation of 11 Kva Sub-Station, L.T & H.T PANELS & D.B’S, cable
tray installation, electrical equipment installation. Renovation of existing earthing arrangements with new
earthing arrangement, switch board, MCC Panel, MCBs installation and connection. Cable pulling, laying,
Dressing, glanding and Termination. Knowledge of voltmeter, energy meter, C.T and P.T, change over and
isolator. Installation of transformers, motors, busbar in Sub-Station. All types of relay testing. Continuity
checking and cable meggaring. Connection of direct online and star delta star connection in 3-phase motor.
Switch Gear installation, Earth Grounding Work. Testing of MV/LV motor winding resistance, insulation
resistance, heater elements resistance test, motor no load run test, function check of LCS. Lighting system,
Insulation resistance check of Distribution panel board, Illumination level test on lighting circuits, polarity
check of sockets outlet and welding socket, testing of electrical heat trace circuit.

Name of Organization : Hyundai Engineering & Construction (Uae)


Project : Bnpp project abu dhabi
Job Position : Electrical engineer
Duration : 25 Apr 2016 to 20 July 2017

Responsibilities:
Supervision of subordinates to carry out Installation of 11 Kva Sub-Station, L.T & H.T PANELS & D.B’S, cable
tray installation, electrical equipment installation. Renovation of existing earthing arrangements with new
earthing arrangement, switch board, MCC Panel, MCBs installation and connection. Cable pulling, laying,
Dressing, glanding and Termination. Knowledge of voltmeter, energy meter, C.T and P.T, change over and
isolator. Installation of transformers, motors, busbar in Sub-Station. All types of relay testing. Continuity
checking and cable meggaring. Connection of direct online and star delta star connection in 3-phase motor
Ensure all work carried out in relation to electrical equipment & installation in their area of responsibility is
adequately supervised – this includes electrical staffs, contractors and labour hire employees. Testing of
MV/LV motor winding resistance, insulation resistance, heater elements resistance test, motor no load run
test, function check of LCS. Lighting system, Insulation resistance check of Distribution panel board,
Illumination level test on lighting circuits, polarity check of sockets outlet and welding socket, testing of
electrical heat trace circuit. Switch Gear installation, Earth Grounding Work. Testing of MV/LV motor
winding resistance, insulation resistance, heater elements resistance test, motor no load run test, function
check of LCS. Lighting system, Insulation resistance check of Distribution panel board, Illumination level test
on lighting circuits, polarity check of sockets outlet and welding socket, testing of electrical heat trace
circuit

Name of Organization : Imco ǀ Kuwait


Project : Mina Al-Ahmadi Refinery (Koc)
Job Position : Electrical Engineer
Duration : 25 Jan 2015 to 18 Feb 2016

Responsibilities:
Responsibilities during the construction phase of the project assisting the subordinates to carry out Primary
& Secondary Cable Tray, Junction Box frame, and Junction Box Installation as per plant standard drawing.
LT & HT Cable Pulling, Dressing, Cable Glanding and Termination Continuity Check and Meggering.
Lightning arrester installation, Lighting & Power installation, Fire Fighting Panel & Devices installation.
Earthling and Lighting Protection, Heat Tracing Work. AC Motor power connection and control connection
(Single Phase & Three Phase). Ensure implementation of quality control procedure and inspection test plan.
Identifying material as per drawing during cable tray installation, lighting and fire alarm Planning,
scheduling & monitoring the work to achieve the target within specified time and quality.
Name of Organization : Comsip ǀ Bahrain
Project : Bapco Refinery
Job Position : Electrical engineer
Duration : 10 Sep 2013 to 12 OCT 2014
Responsibilities:

Ensure all work carried out in relation to electrical equipment & installation in their area of responsibility is
adequately supervised – this includes electrical staffs, contractors and labour hire employees. Testing of
MV/LV motor winding resistance, insulation resistance, heater elements resistance test, motor no load run
test, function check of LCS. Lighting system, Insulation resistance check of Distribution panel board,
Illumination level test on lighting circuits, polarity check of sockets outlet and welding socket, testing of
electrical heat trace circuit.

Personal Details:

⮚ Date of Birth : 05 July 1994

⮚ Gender : Male

⮚ Religion : Islam

⮚ Nationality : Indian

⮚ Marital Status : Single

⮚ Language Known : English, Urdu, Hindi

Passport Details:

⮚ Passport No. : U7740115(ECNR)

⮚ Date of Issue : 13/01/2021

⮚ Date of Expiry : 12/01/2031

⮚ Place of Issue : PATNA

⮚ Old passport No : K7607919

Date Aamir Alam

You might also like