You are on page 1of 2

February 7, 2020

Delivered by email: Bryson.Sheetz@duke-energy.com

Ms. Bryson S. Allison


Duke Energy Progress, LLC
P.O. Box 1006, Mail Code EC13K
Charlotte, North Carolina 28201-1006

Subject: Permit to Construct/Permit to Operate – Original Issuance


Permit No. 1119-INDUS-2020, Duke Energy Asheville Steam Electric Plant
Buncombe County, FID 1389250

Dear Ms. Allison:

Enclosed you may find copy of Permit No. 1119-INDUS-2020, dated February 7, 2020 (FID
1360595). This permit is the original issuance of the Permit to Construct and Permit to Operate
an industrial landfill at the Duke Energy Progress, LLC (the Permittee) Asheville Steam Electric
Plant in Buncombe County. Please make note of the following:

• Read your permit carefully and thoroughly; should you have any questions, contact me
immediately.
• Since this is an original permit issuance, the permit requires recordation. Enclosed is a
certified original copy of the permit. It is important that the certified original permit be
recorded at the Register of Deed in Buncombe County. It should be indexed in the grantor
index under the name of the land owner. The certified original should be affixed with the
Register’s seal, date, book number and page number of recording. A certified original copy
of the permit with the Register’s information affixed should then be returned to me at the
address shown at the bottom of this page. The purpose of this recordation is to notify
potential future buyers that a solid waste management facility existed on the property, in
accordance with North Carolina General Statutes.
• All the documents related to this permit may be viewed and downloaded at:
https://edocs.deq.nc.gov/WasteManagement/Browse.aspx?id=732019&dbid=0&repo=Waste
Management
• The Permittee is required to maintain copies of this permit, the approved plans, and all
records at the facility and to make them available to the Solid Waste Section upon request
during normal business hours.
Ms. Bryson S. Allison
February 7, 2020
Page 2 of 2

Please do not hesitate to contact our office with any questions or requests for assistance.

Sincerely,

David Giachini, P.E., Permitting Engineer


Permitting Branch, Solid Waste Section
Division of Waste Management, NCDEQ

Enclosures: Permit to Construct/Permit to Operate

ec: Larry Frost – SWS/ARO


Ed Mussler – SWS/RCO
Sarah Rice - SWS/RCO
Sherri Stanley - SWS/RCO
Elizabeth Werner - SWS/RCO

You might also like