Code: ECO/PRB/PR/01
Issue: One
Issue Date: 1/11/2018
Management
Revised by Moatz Hamed
Representative
Group Operation
Approved by Ahmed Fawzy
Director
PRODUCTION PROCEDURES
PRODUCTION PLANNING AND PRODUCTION
CONTROL
Amendment List
Amend Amend Modified
Ser Amendment Brief Requested By
No. Date Page
1.0. PURPOSE
To plan the yearly production requirement, raw material forecast, and how to control the production
quality during the production process as per the requirements of ISO 9001: 2015.
2.0. SCOPE
Planning, Production and Production Control Departments
3.0. RESPONSIBILITY
Production Manager
Production Supervisor
Plant Manager
Commercial Director
Reference
S. N. Description Responsibility
Documents
After the that the boards enters the dryer & Dryer station
team leader will fill on an hourly basis the result coming from T Dryer Operation
8 the Dryer process in the Dryer Operation Report Shift leader Report
(ECO/PRB/FR/09) which the Shift leader will approve at (ECO/PRB/FR/09)
the end of each shift.
At the end of the dry stage the board quality is monitored & Dry-end operation
9 accepted by the shift leader using Dry-end operation report Shift leader report
(ECO/PRB/FR/07) (ECO/PRB/FR/07)
After that is the packaging stage, output of the process is
Packaging Report
10 recorded with the parameters for each product & accepted Shift leader
by shift leader. (ECO/PRB/FR/08)