Professional Documents
Culture Documents
S 6
S 6
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date December 23, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date January 20, 2016
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date February 5, 2016
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date February 11, 2016
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date September 24, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date September 22, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date September 18, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 13, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 13, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 10, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 10, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 9, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 9, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 7, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 7, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 6, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 6, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 3, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 3, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 3, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date July 3, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date June 30, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date June 30, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date June 29, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date June 29, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
Requested:
Contractor: Roma Const.& Dev't Corp./GP&H Const.& Supply(JV)
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date June 26, 2015
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
GLENN G. DAYRIT
Project Engineer
(Name and Signature)
Name of Construction of Road from Purok 8 to Pawas of Brgy. San Vicente, Sto.
Project/Location Tomas, Davao del Norte
Contractor Metro Gear Construction Corp.
Part of Structure to
Estimated Volume (cu.m) 75.00 cu.m
be poured PCCP (Unreinforced 0.20m thk.)
Station Limits/Sect. Sta. 0+492 - Sta. 0+618 R/L
Date of Pouring September 27, 2019 Time of Pouring 8:00 a.m - 4:00 p.m
Requested: JOSELITO J. RAGORO
Contractor: Metro Gear Construction Corp.
Name & Signature
CHECKLIST
x Concrete Vibrator x Field Density Test
x Protective Covering Materials x Beam
x Warning Signs/Barricades/Flagmen x Curing Materials
x Concrete Saw x Slump Cone
x Concrete Black Spacers - Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of
x x
(Screeder, beam, etc.) Design/Trial Mix Test Reports etc.)
x Required Construction Equipment - Electrical Layout(Roughing-ins/Embodments)
x Rebars sizes,spacing & number - Plumbing Layout (Roughing-ins/Embodments)
x Rebars installation requirements x Falseworks/Formworks adequacy
CHECKED BY:
MATERIALS WARLITO A. LENDIO
ENGINEER Engineer II Date September 26, 2019
(Name and Signature)
REMARKS/
RECOMMENDATIONS Recommended to start pouring activities.
ARIS L. ROCETE
Project Engineer
(Name and Signature)