PROVINCE OF KWAZULU-NATAL

ESTIMATES OF CAPITAL
EXPENDITURE
2017/18
ISBN:1-920041-26-5 for 2017/18 Estimates of Capital Expenditure.

To obtain further copies of this document, please contact:


Provincial Treasury
5th Floor
Treasury House
145 Chief Albert Luthuli Road
3201
P.O. Box 3613
Pietermaritzburg
3200
Tel: +27 (0) 33 – 897 4524
Fax: +27 (0) 33 – 897 4580
CONTENTS
Page
FIGURES ............................................................................................................................................. II
TABLES ................................................................................................................................................V
LIST OF ACRONYMS ...................................................................................................................... IV
DEFINITIONS......................................................................................................................................V
EXECUTIVE SUMMARY ....................................................................................................................
1. CAPITAL EXPENDITURE OVERVIEW ................................................................................ 1
1.1. INTRODUCTION ..................................................................................................................................... 1
1.2. INFRASTRUCTURE BUDGET PER NATURE OF INVESTMENT ..................................................... 1
1.3. ECONOMIC, SOCIAL AND OTHER INFRASTRUCTURE BUDGET ALLOCATIONS ................... 3
2. ESTIMATES OF CAPITAL EXPENDITURE PER VOTE .................................................... 1
VOTE 1: OFFICE OF THE PREMIER ....................................................................................................................... 1
VOTE 2: PROVINCIAL LEGISLATURE ................................................................................................................... 2
VOTE 3: AGRICULTURE AND RURAL DEVELOPMENT .......................................................................................... 3
VOTE 4: ECONOMIC DEVELOPMENT, TOURISM AND ENVIRONMENTAL AFFAIRS ................................................ 4
VOTE 5: EDUCATION ........................................................................................................................................... 5
VOTE 6: PROVINCIAL TREASURY ......................................................................................................................... 7
VOTE 7: HEALTH ................................................................................................................................................ 8
VOTE 8: HUMAN SETTLEMENTS .......................................................................................................................... 9
VOTE 9: COMMUNITY SAFETY AND LIAISON ...................................................................................................... 10
VOTE 10: SPORTS AND RECREATION................................................................................................................. 11
VOTE 11: CO-OPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS .............................................................. 12
VOTE 12: TRANSPORT ....................................................................................................................................... 13
VOTE 13: SOCIAL DEVELOPMENT ..................................................................................................................... 14
VOTE 14: PUBLIC WORKS ................................................................................................................................. 15
VOTE 15: ARTS AND CULTURE ......................................................................................................................... 16
CONCLUSION .................................................................................................................................................... 17

i
FIGURES
Page

Figure 1: Importance of maintaining infrastructure ...................................................................... 1


Figure 2: Percentage share of infrastructure budget per nature of investment category ........... 3

iii
TABLES
Page
Table 1: Summary of infrastructure payments and estimates by votes
Table I: Summary of infrastructure payments and estimates by category 2
Table II: Economic, Social and other infrastructure 3
Table 1.1: Vote 1-Revenue source for infrastructure 1
Table 1.2: Vote 1-Summary of provincial estimates by nature of investment 1
Table 3.1: Vote 3- Revenue source for infrastructure 3
Table 3.2: Vote 3- Summary of provincial estimates by nature of investment 3
Table 4.1: Vote 4- Revenue source for infrastructure 4
Table 5.1: Vote 5-Revenue source for infrastructure 5
Table 5.2: Vote 5-Summary of provincial estimates by nature of investment 6
Table 7.1: Vote 7-Revenue source for infrastructure 7
Table 7.2: Vote 7-Summary of provincial estimates by nature of investment 7
Table 8.1: Vote 8-Revenue source for infrastructure 8
Table 8.2: Vote 8-Summary of provincial estimates by nature of investment 8
Table 10.1: Vote 10-Revenue source for infrastructure 9
Table 10.2: Vote 10-Summary of provincial estimates by nature of investment 9
Table 11.1: Vote 11-Revenue source for infrastructure 10
Table 11.2: Vote 11-Summary of provincial estimates by nature of investment 10
Table 12.1: Vote 12-Revenue source for infrastructure 11
Table 12.2: Vote 12-Summary of provincial estimates by nature of investment 11
Table 13.1: Vote 13-Revenue source for infrastructure 12
Table 13.2 Vote 13-Summary of provincial estimates by nature of investment 12
Table 14.1: Vote 14-Revenue source for infrastructure 13
Table 14.2: Vote 14-Summary of provincial estimates by nature of investment 13
Table 15.1: Vote 15-Revenue source for infrastructure 14
Table 15.2: Vote 15-Summary of provincial estimates by nature of investment 14

v
LIST OF ACRONYMS

COGTA Co-operative Governance and Traditional Affairs


DAC Department of Arts and Culture
DARD Department of Agriculture and Rural Development
DoHS Department of Human Settlements
DoPW Department of Public Works
DoRA Division of Revenue Act
DoE Department of Education
DEDTEA Department of Economic Development, Tourism and Environmental Affairs
DoT Department of Transport
DSD Department of Social Development
DSR Department of Sport and Recreation
DoH Department of Health
ECE Estimates of Capital Expenditure
MTEF Medium Term Expenditure Framework
OTP Office of the Premier
IDMS Infrastructure Delivery Management System
IDZ Industrial Development Zones
IRM Infrastructure Reporting Model
KZN KwaZulu-Natal
NDP National Development Plan
SA South Africa
MTEF Medium Term Expenditure Framework
IPIG Infrastructure Performance Incentive Grants

vii
DEFINITIONS
New infrastructure Assets
A department may purchase a completely new infrastructure asset or have a project to
construct new infrastructure. In both cases the expenditure incurred is capital in nature and
should be classified under new infrastructure assets.

Existing Infrastructure Assets

For existing infrastructure assets, there are three types of classifications available:

o Upgrades and additions


Includes activities aimed at improving the capacity and effectiveness of an asset above that
of the intended purpose. The decision to renovate, reconstruct or enlarge an asset is a
deliberate investment decision which may be undertaken at any time and is not dictated by
the condition of the asset, but rather in response to a change in demand and/or change in
service requirements. Spending under this classification is of a capital nature.

o Rehabilitation and refurbishment


Includes activities that are required due to neglect or unsatisfactory maintenance or
degeneration of an asset. The action implies that the asset is restored to its original
condition, enhancing the capacity and value of an existing asset that has become
inoperative due to the deterioration of the asset. Spending under this classification is of a
capital nature.

o Maintenance and repairs


Includes activities aimed at maintaining the capacity and effectiveness of an asset at its
intended level. The maintenance action implies that the asset is restored to its original
condition and there is no significant enhancement to its capacity or the value of the asset.
Spending under this classification is of a current nature.

Infrastructure transfers
Infrastructure transfers can be either capital in nature or current in nature.

o Infrastructure transfers capital


This category is relevant when the department makes a transfer of funds that the beneficiary
must use either
 for the construction of new infrastructure; or
 for upgrades/additions to capital or refurbishment/rehabilitation of existing
infrastructure.

o Infrastructure transfers current


This category is relevant when the department makes a transfer of funds to an entity to
cover administrative payments relating to the construction of infrastructure, such as
conducting a feasibility study in the construction of a new office building. Administrative
costs directly relating to the infrastructure project will only be capitalised once the
decision has been made to construct the infrastructure. Therefore records of such costs
should be maintained until the final decision on the project is made.

ix
Infrastructure leases
This category caters for both finance leases and operating leases. The category is used to
classify the monthly repayment as per the lease agreement.

Non-infrastructure
This category is specifically for spending that is not directly related to the construction or
purchase of infrastructure assets. Such spending can be either of a current or capital nature.
For non-infrastructure assets, there are three types of classifications available:

o Non-infrastructure: current
This category includes payments relating to stand-alone purchases of goods and services,
as well as purchases of goods and services relating to the maintenance and repair of a
non-infrastructure asset. It also includes payments relating to non-infrastructure projects
of a current nature other than maintenance projects. However it is important to note that
assets (major) bought into a current project should be recorded as “stand-alone capital
assets”.

o Non-infrastructure: capital
This category caters for the purchase of stand-alone capital assets and for projects for the
creation of new and/or the upgrading, rehabilitation or refurbishment of existing non-
infrastructure assets as well as other non-infrastructure projects of a capital nature.

o Non-infrastructure: leases
This category caters for both finance and operating leases and is used to classify the
monthly payments as per the lease agreement.

x
Executive Summary

In this first publication of its kind in the Province, the KwaZulu-Natal Provincial Treasury presents the
Estimates of Capital Expenditure (ECE) to all relevant stakeholders. The 2017/18 Medium Term
Expenditure Framework (MTEF) publication provides detailed anticipated infrastructure expenditure
plans for provincial department. This includes lists of infrastructure projects of provincial departments
planned to be implemented in the current 2017/18 MTEF period. The information published herein is
envisioned to give valuable insight into the infrastructure priority areas of KZN Provincial Government.
The Estimates of Capital Expenditure focuses on provincial departments that have an infrastructure
budget allocations in the 2017/18 MTEF.

Infrastructure encompasses construction, upgrading, repairs and maintenance of fixed assets including
roads, bridges, administrative buildings, schools and hospitals amongst others. The infrastructure budget
is used to fund new and existing infrastructure assets. In terms of existing assets it refers to maintenance,
repairs, upgrades, additions, refurbishment and rehabilitation of these assets. Over this MTEF period, a
total budget of R37.554 billion has been set aside for planning and implementation of various
infrastructure projects.

This publication consists of two sections; the narrative showing the budgets per vote classified in terms
of the nature of investment, and an annexure being Table B5 which lists in detail all the projects to be
implemented.

The detailed publication of all the projects is aimed at improving the infrastructure planning which in
turn will assist in ensuring timeous implementation of these projects. This publication is the first of its
kind to be continued on an annual basis and be built upon with increased quality, information and
substance.

Table 1 illustrates the medium term estimates for each department. This includes both social and
economic infrastructure. The notable allocations of substantial size are dedicated to three departments
namely Department of Transport, Health and Education.

Table 1: Summary of infrastructure payments and estimates by votes


Ma in Adjust e d
Re vise d
Audit e d O ut c ome Appropria t i Appropria t i Me dium- t e rm E st ima t e s
E st ima t e
R t housa nd on on

2 0 13 /14 2 0 14 /15 2 0 15 /16 2 0 16 /17 2 0 17 /18 2 0 18 /19 2 0 19 /2 0

1. Office of the Premier 24 272 10 049 2 271 3 108 11108 12 404 5 034 6 152 6 508

2. Provincial Legislature 11338 8 587 3 791 4 490 17 032 17 032 5 110 4 995 5 275

3. Agriculture and Rural Development 162 293 209 013 198 000 162 844 172 251 195 514 97 287 112 040 136 310

4. Economic Dev, Tourism and Enviro Affairs 559 655 540 775 632 203 463 691 463 691 463 691 493 524 530 513 560 222

5. Education 2 553 784 2 212 374 2 557 995 2 452 129 2 452 129 2 465 953 2 293 147 2 179 674 2 412 276

6. Provincial Treasury 21970 31665 10 280 - - - - - -

7. Health 2 000 806 1679 037 1517 618 1536 515 1472 695 1465 469 1657 528 1684 848 1891350

8. Human Settlements 66 334 144 915 190 062 138 531 128 831 139 634 167 698 161987 163 629

9. Community Safety and Liaison 312 - - - - - - - -

10. Sport and Recreation 50 466 62 375 41338 59 609 49 964 49 964 67 077 45 366 46 375

11. Co-operative Governance and Traditional Affairs 39 069 41689 43 086 76 596 42 395 33 695 20 674 24 558 24 672

12. Transport 5 805 930 6 506 106 6 674 684 6 771540 6 771540 6 728 933 6 846 738 7 137 890 7 591840

13. Social Development 203 739 152 152 142 701 137 701 137 701 128 919 156 708 128 959 144 866

14. Public Works 84 143 108 762 80 325 72 618 70 498 70 498 67 282 61139 70 406

15. Arts and Culture 42 825 56 466 88 771 99 000 114 749 115 921 162 864 171677 210 704

17. Reconstruction & Development Programme (RDP) - - - - - - - - -

Tot a l 11 6 2 6 9 3 6 11 7 6 3 9 6 5 12 18 3 12 5 11 9 7 8 3 7 2 11 9 0 4 5 8 4 11 8 8 7 6 2 7 12 0 4 0 6 7 2 12 2 4 9 7 9 8 13 2 6 4 4 3 3

Department of Transport receives the largest share of the KZN government’s infrastructure budget over
the current MTEF. It amounts to a total of R21.576 billion, with R6.846 billion allocated for the 2017/18
financial year. The department will utilise the funds to maintain the existing road infrastructure,
construct new roads and build new structures where necessary. The department will implement a number
of strategic projects over the MTEF period. These will include the Ladysmith N3 interchange upgrade
valued at more than R200 million which is co-funded between the department and SANRAL as well as
Paulpietersburg Pongola link road, and Tugela River bridge in Tugela Ferry. The department has also
identified 97km of existing sub-standard roads to be upgraded into an acceptable geometric design
standard in the next MTEF.

Department of Education is allocated R6.885 billion in total over the MTEF period of which R2.293
billion is allocated for the 2017/18 financial year. This will be utilised to build and maintain existing
schools in the province. Some of the major interventions by the Department of Education are in the
Ndumo village in the Umkhanyakude District, (under the aegis of the Inkululeko Development Projects)
which includes the upgrading of St. Phillips, Maphindela and Thelemama Primary Schools. This also
encompasses the construction of a new model high school. The new model school will place emphasis
on Maths, Science, Technology, Tourism and Hospitality, which will accommodate 1600 learners, 200
of whom will be boarders.

Department of Health is allocated a total of R5.233 billion for the 2017/18 MTEF period, with R1.657
billion set aside for the 2017/18 financial year. This budget will be utilised for rehabilitation,
refurbishment and maintenance of existing health facilities. A large share of the infrastructure budget is
allocated for the construction of two hospitals; the Dr Pixley Ka Seme Regional Hospital in eThekwini,
and the 192 bed multi-storey surgical block in the Ngwelezane Hospital in Uthungulu District. Together,
these two projects will account for at least one third of the total infrastructure budget.
Capital Expenditure overview

1. Capital Expenditure overview

1.1. Introduction

The provision of infrastructure is important for the country’s economic growth and development.
The level of capital investment delivered in the last decade in KwaZulu-Natal has covered
substantial ground in bridging the infrastructure backlog particularly in the historically
underdeveloped rural communities.

While these gains can be lauded, in the current fiscal climate, the balance between developing new
and maintaining the existing infrastructure is critical. Attention is usually devoted to building new
public infrastructure at the expense of the maintenance of existing infrastructure which either gets
neglected or is underfunded in favour of building new, highly prestigious structures. It therefore is
equally important for the maintenance of the existing infrastructure to be prioritised in order to
ensure the existing assets reach their maximum lifespan.

Figure 1 illustrates the lifecycle of a typical road pavement structure. The first curve shows the
normal life that the pavement will have up to collapse stage without any maintenance interventions.
As can be seen from this, the cost to get the pavement back to its optimal performance condition
will cost a substantial amount of money. The smaller curves above this first curve demonstrates the
cost effectiveness of scheduled and preventative maintenance interventions. It is therefore advisable
to prioritise preventative maintenance of existing infrastructure as it will optimise the life span and
performance of the asset, whilst costing less than delayed infrastructure maintenance.

Figure 1: Importance of maintaining infrastructure

Source: udot.utag.gov

It is the intention of provincial government to engender good practice in the 2017 MTEF period by
focussing provincial infrastructure investment on maintenance of existing assets. It is not only good
practice, as it is cost effective and beneficial to the citizens of the province, but it has also been
internationally proven that spending on the maintenance of existing infrastructures has potential
economic spin offs (benefits). The benefits include, amongst others, creation of job opportunities,
maximising functionality of the asset, maximisation of investment and achievement of value for
money.

1.2. Infrastructure budget per nature of investment

Infrastructure budgets are categorised by nature of investment which could be capital or current in
nature. For purposes of this publication, the Standard Charts of Accounts and Systems (SCOA)
definitions have been used.

1
Capital Expenditure overview

Table I shows a summary of infrastructure payments and estimates by category and nature of
investment. The existing infrastructure assets will receive the largest share of the KZN
infrastructure budget over the 2017/18 MTEF period amounting to R26.114 billion and
R8.125billion for the 2017/18 financial year. The new infrastructure assets will receive the second
largest share of R6.242 billion over the 2017 /18 MTEF period and R2.267 billion for the 2017/18
financial year. Infrastructure transfers will be allocated a total of R2.080 billion, leases
R429 million, and non-infrastructure R2.688 million over the MTEF period.

Table I - Summary of infrastructure payments and estimates by category


Main Adjusted
Revised
Audit ed Out come Appropriat i Appropriat i Medium- t erm Estimat es
Estimat e
on on

R t housand 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20

Existing infrastruct ure asset s 8 560 953 8 838 332 8 848 690 9 603 629 9 594 879 9 492 079 8 125 526 8 549 755 9 439 590
Maintenance and repair: Current 2 902 408 2 952 109 2 680 263 4 361572 4 303 261 4 313 453 3 736 639 3 998 440 4 293 230

Upgrades and additions: Capital 3 987 658 4 165 323 4 182 622 3 071705 3 354 247 3 302 057 2 705 798 2 932 379 3 325 392
Refurbishment and rehabilitation: Capital 1670 887 1720 900 1985 805 2 170 352 1937 371 1876 569 1683 089 1618 935 1820 968
New infrastruct ure asset s: Capit al 1 865 053 1 638 042 1 757 868 1 776 975 1 634 795 1 696 011 2 267 954 1 975 907 1 998 213
Infrastruct ure t ransfers 669 496 656 561 877 969 576 483 613 625 625 772 677 194 686 723 716 605
Infrastructure transfers: Current 3 322 3 337 2 450 2 000 2 000 2 000 2 000 - -
Infrastructure transfers: Capital 666 174 653 224 875 519 574 483 611625 623 772 675 194 686 723 716 605
Infrastruct ure: Payment s for financial asset s - - - - - - - - -
Infrastruct ure: Leases 80 675 95 684 108 096 21 285 61 285 73 765 163 462 125 777 139 784
Non infrastruct ure 450 759 535 346 590 502 - - - 806 535 911 636 970 240

Tot al 11 626 936 11 763 965 12 183 125 11 978 372 11 904 584 11 887 627 12 040 672 12 249 798 13 264 433
Capital infrastructure 8 189 772 8 177 489 8 801814 7 593 515 7 538 038 7 498 409 7 332 036 7 213 944 7 861178
Current infrastructure 2 986 405 3 051130 2 790 809 4 384 857 4 366 546 4 389 218 3 902 101 4 124 217 4 433 014

Figure 2 shows different infrastructure nature of investments being the existing and new
infrastructure assets. There are also transfers to other organs of state which may be capital or
current.

2
Capital Expenditure overview

Figure 2: Percentage share of infrastructure budget per nature of investment category

3.9% 4.6% 4.8% 0.0% 6.7% 7.4% 7.3%


0.6%
100% 0.7% 5.3%
0.8% 0.9% 1.4% 1.0% 1.1%
5.8% 5.6% 7.2%
90% 5.6% 5.6% 5.4%
14.3%
16.0% 13.9%
14.4% 16.1% 15.1%
80% 18.8%

70%

60%

50%

40% 73.6% 75.1% 72.6% 71.2%


79.8% 67.5% 69.8%
30%

20%

10%

0%
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20

Existing infrastructure assets New infrastructure assets: Capital


Infrastructure transfers Infrastructure: Leases
Non infrastructure

With regards to proportions in budgets, the existing infrastructure budget estimates for 2017/18
financial year allocations are 67.5% while, during the same period, the new infrastructure, transfers,
leases and non-infrastructure will receive 18.8%, 5.6%, 1.4% and 6.7% respectively.

1.3. Economic, Social and Other Infrastructure Budget Allocations

Table II shows the budget allocation split between economic, social infrastructure and other
infrastructure. The economic infrastructure in the 2017/18 financial year is allocated R7.437 billion
(62%) of the budget, which is the sum of the infrastructure allocation to the Department of
Agriculture and Rural Development, Transport, Economic Development, Tourism and
Environmental Affairs. Social infrastructure will account for R4.587 billion ( 37%) of the KZN
infrastructure budget in the 2017/18 financial year. The social infrastructure is for the Department
of Health, Education, Social Development, Arts and Culture, Sport and Recreation, Human
Settlements and COGTA. The balance of R77 million (1%), which is for other infrastructure, is
mainly allocated to administration buildings which include Department of Public Works and
Provincial Legislature.

Table II - Economic, Social and other infrastructure


Main Adjusted Revised
Audited Outcome Medium term estimate
Appropriation Appropriation Estimate

R thousand 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20

Economic Infrastructure 6 549 848 7 287 559 7 515 167 7 398 075 7 407 482 7 388 138 7 437 549 7 780 443 8 288 372

Social Infrastructure 4 957 335 4 349 008 4 581571 4 500 081 4 398 464 4 399 555 4 525 697 4 397 069 4 893 872

Other Infrastructure 119 753 127 398 86 387 80 216 98 638 99 934 77 426 72 286 82 189

Total 11 626 936 11 763 965 12 183 125 11 978 372 11 904 584 11 887 627 12 040 672 12 249 798 13 264 433

3
Estimates
of
Capital Expenditure
Vote 1 : Office of the Premier

Vote 1
Office of the Premier

The department is responsible for maintenance of the Moses Mabhida building (Head office) and the
King’s palaces. The Department’s infrastructure budget is mainly for facilities maintenance. Table 1.1
shows the number of projects per nature of investment.

The Infrastructure budget of the Office of the Premier is wholly funded from the Equitable Share.

Table 1.1: Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. Equitable Share 3 5 034 6 152 6 508 17 694
– – – – –
Total 3 5 034 6 152 6 508 17 694

The Office of the Premier has three projects in total which will be done in the current MTEF period. The
department has prioritised the upgrading of the King’s residences at Enyokeni, KwaKhangela and
KwaDlamahlahla, as well as the Premier’s Parkside guest house. The maintenance of the King’s Palaces
and the Premier’s guest house will be implemented in phases over the 2017/18MTEF

Table 1.2 - Summary of provincial estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New infrastructure assets – – – – –
2. Upgrades and additions – – – – –
3. Refurbishment and rehabilitation 2 2 034 2 152 2 276 6 462
4. Maintenance and repairs 1 3 000 4 000 4 232 11 232
5. Infrastructure: Leases – – – – –
Total 3 5 034 6 152 6 508 17 694

The department does not have any new or replacement infrastructure projects to be implemented in the
next three years.

1
Vote 2 : Provincial Legislature

Vote 2
Provincial Legislature
Provincial Legislature’s infrastructure budget is mainly utilised for maintenance of the legislature building
and other facilities that are utilised for legislature functions. This includes day to day maintenance of its
facilities. The Department has one project that is recently approved to commence in the 2017/18 financial
year which is the repairs and renovations of the Law Society Building.

2
Vote 3 : Agriculture and Rural Development

Vote 3
Agriculture and Rural Development

The Department of Agriculture and Rural Development’s infrastructure budget is mainly utilised for
construction, refurbishment and rehabilitation of agricultural infrastructure. These include amongst
others, irrigation schemes, chicken broiler houses, store houses, boreholes etc. Table 3.1 shows the
different revenue sources. The Department receives the Comprehensive Agricultural Support
Programme (CASP) Grant and Equitable share. The bulk of infrastructure projects are funded from
Equitable Share.

Table 3.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget

1. Equitable Share 17 86 666 112 040 136 310 335 016


2. Conditional Grant 1 10 621 – – 10 621
Total 18 97 287 112 040 136 310 345 637

Table 3.2 shows the number of projects in each nature of investment as well as the budget associated
with it. In the 2017/18 financial year the department is largely focussing on refurbishment and
rehabilitation of existing infrastructure and it shifts to the construction of new infrastructure assets in
the 2018/19 financial year. The Department has a total number of seven projects in the 2017/18 and
2018/19 financial years of which two projects are for new assets, three for refurbishment and
rehabilitation and one maintenance and repairs project. There is also an amount of R10.621 million
infrastructure transfers (capital).

Table 3.2 - Summary of provincial estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New Infrastructure Assets 8 37 713 59 495 58 898 156 106
2. Refurbishment And Rehabilitation 6 40 184 43 267 67 614 151 065
3. Maintenance And Repairs 3 8 769 9 278 9 798 27 845
4. Infrastructure Transfers - Capital 1 10 621 – – 10 621
Total 18 97 287 112 040 136 310 345 637

The department has grouped a number of projects into package(s). The department’s project list is
therefore packaged into. six (6) packages which have been allocated funding.

3
Vote 4 : Economic Development, Tourism and Environmental Affairs

Vote 4
Economic Development, Tourism and Environmental Affairs
The Department of Economic Development, Tourism and Environmental Affairs transfers its
infrastructure budget to entities like Richards Bay Industrial Development Zone (RBIDZ) and
Dube Trade Port Corporation for the development of infrastructure. The Department does not
implement infrastructure directly but supports the entities to develop infrastructure which will
contribute to economic growth of the Province. These projects include the development of Dube Trade
Port and Bayside acquisition.

The department has two (2) major projects which are funded by Infrastructure Transfer - Capital. These
transfers relate to the capital development projects for the Richards Bay Industrial Development Zone
(RBIDZ) and the Dube Trade Port Corporation (DTPC). The allocated budgets are R127.605 million
and R365.919 million respectively which amount to R493.524 million for the 2017/18 financial year.

Table 4. 1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget

1. Equitable Share 3 493 524 530 513 560 222 1 584 259
Total 3 493 524 530 513 560 222 1 584 259

The Richards Bay Industrial Development Zone (RBIDZ) was established to undertake the
development of industrial land in the Richards Bay area in line with a 50-year Master Plan.

The Dube Trade Port Corporation’s (DTPC) main objective is to facilitate economic growth by
developing the Dube Trade Port and attracting long term investment in KZN.

Table 4.2 - Summary of provincial estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. Infrastructure Transfers - Capital 3 493 524 530 513 560 222 1 584 259
Total 3 493 524 530 513 560 222 1 584 259

4
Vote 5 : Education

Vote 5
Education
The infrastructure budget allocated to the department is utilised for the construction of new schools,
upgrades and additions to existing schools as well as maintenance of the same. Over the 2017/18
MTEF period the department has prioritised provision of adequate and appropriate water and sanitation
infrastructure in all schools. The water and sanitation programme together with the electricity and
fencing programmes is receiving attention in the department as part of meeting the minimum norms
and standards as defined by National Department of Education.

As shown in table 5.1, the Department of Education derives its funding from the Education
Infrastructure Grant (EIG) and its own equitable share. The grant funding is allocated in the main to
capital projects which include new construction as well as upgrades and additions projects. Equitable
share funding is utilised for maintenance and repairs in all districts.

The table also further indicates that the bulk of the funding in the department comes from the
Education Infrastructure Grant at 87.6%, with equitable share only contributing 12.4% in the 2017/18
MTEF period.

Table 5.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget

1. Equitable Share 56 300 001 255 372 380 213 935 586
2. Eucation Infrastructure Grant (EIG) 3 054 1 993 146 1 924 302 2 032 063 5 949 511
Total 3 110 2 293 147 2 179 674 2 412 276 6 885 097

The department intends to continue delivering education infrastructure which will be safe and of
acceptable standards. The focus is also to ensure that these facilities will have access to basic services
such as water, sanitation and electricity. Short term solutions have been provided in the form of
chemical toilets for emergency situations that arise from pit toilets being rendered dysfunctional. In
order to try and address the issues of schools with inappropriate and inadequate toilets, Provincial
Treasury has allocated an additional R100 million in 2016/17, and R50 million in 2017/18 for the
construction of ablution facilities in these schools. This is an exclusive appropriation funded by the
provincial equitable share.

Table 5.2 shows 3110 projects for the Department of Education which includes packaged projects for
maintenance and supply of chemical toilets in schools where sanitation infrastructure is beyond a state
of repair. All maintenance projects are packaged according to district municipality areas which also
includes Ethekwini metro. The bulk of the budget is allocated to upgrades and additions projects
totalling to 1816.

5
Vote 5 : Education

Table 5.2 - Summary of provincial estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New infrastructure assets 101 428 836 334 779 278 734 1 042 349
2. Upgrades and additions 1 816 1 087 896 1 177 591 1 323 660 3 589 147
3. Refurbishment and rehabilitation 1 127 311 139 198 388 326 904 836 431
4. Maintenance and repairs 66 395 000 395 000 405 387 1 195 387
Non Infrastructure – 28 276 29 916 31 591 89 783
5. Infrastructure: Leases – 42 000 44 000 46 000 132 000
Total 3 110 2 293 147 2 179 674 2 412 276 6 885 097

In order to improve the security at schools and to meet the norms and standards regulations, the
department has prioritized a school fencing programme which is currently underway and is projected
for completion in the 2017/2018 financial year. This sub-programme falls under the upgrades and
addition programme as discussed above.

In terms of the norms and standards, the National Department of Basic Education identified 270
schools that required electrification. In response to this, KZN DoE prioritized interventions for 120
schools in the 2015/16, and 120 in 2016/2017 financial years respectively. The remainder of the
projects were planned for implementation in the 2017/18 financial year.

6
Vote 6 : Provincial Treasury

Vote 6
Provincial Treasury

The department does not receive an infrastructure grant.

7
Vote 7 : Health

Vote 7
Health
The Department of Health utilises the infrastructure budget to fund construction, upgrading and
maintenance of health facilities such as clinics, community health centres and hospitals. Table 7.1
indicates revenue sources for the infrastructure budget over the 2017/18 MTEF period. The budget
allocation of R3.019 billion is from the Health Facilities Revitalisation Grant which accounts for 57.7%
of the total budget allocation over the MTEF period, with equitable share funding of R2.187 billion
accounting for 41.8% of the budget. The remaining 0.5% comes from the EPWP grant.

Table 7.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget

1. Equitable Share 145 635 156 716 217 835 869 2 187 242
2. Health Facility Rev italisation Grant 86 1 013 972 959 631 1 045 481 3 019 084
3. EPWP 1 8 400 9 000 10 000 27 400
Total 232 1 657 528 1 684 848 1 891 350 5 233 726

Table 7.2 shows the total number of projects that will be implemented over the 2017/1/8 MTEF period.
The total number of projects that will be implemented by the Department over the MTEF period is 163,
with some projects being multi-year projects and starting at different times over this period.

Table 7.2 - Summary of provincial infrastructure estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New Infrastructure Assets 114 746 248 730 733 793 199 2 270 181
2. Upgrades And Additions 33 84 060 81 740 121 655 287 455
3. Refurbishment And Rehabilitation 39 99 958 113 238 130 292 343 488
4. Maintenance And Repairs 18 447 514 403 117 462 698 1 313 329
5. Non Infrastructure 28 279 748 356 019 383 507 1 019 273
Total 232 1 657 528 1 684 848 1 891 350 5 233 726

43 % of the total budget is allocated to new infrastructure assets over the 2017/18 MTEF period, which
equates to a budget of R2.270 billion for implementation of various projects. The department has also
packaged projects within the maintenance and repairs programme which has 14 packages throughout
the MTEF period at a total budget of R1.019 billion.

There are two major projects being implemented by the department over the MTEF period i.e. Dr.
Pixley Ka Seme Regional Hospital in eThekwini and the 192 bed multi-storey surgical block in
Ngwelezane Hospital under the Uthungulu District Municipality area. These two projects will take at
least one third of the total infrastructure budget annually.

8
Vote 8 : Human Settlements

Vote 8
Human Settlements
Department of Human Settlements infrastructure budget is utilised for social and economic amenities
as well as human settlement development programmes. These amenities are built and transferred to the
municipalities. The department does not directly implement the construction of housing projects but
funds are transferred to the municipalities to implement. The same strategy is also adopted for the
Community Residential Units (CRU) such as hostels. The equitable share portion of the budget is
mainly used to service the infrastructure leases. The department has allocated a total budget of
R493.314 million over the 2017/18 MTEF period for the above-mentioned programmes and services.

Table 8.1 shows that the department’s infrastructure is mainly funded from the Human Settlements
Development Grant (HSDG) which contributes 86.5% of the budget and the equitable share portion
which is 13.5% for the 2017/18 financial year. The HSDG aims to promote the provision of low
income housing.

Table 8.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget

1. Equitable Share 1 21 462 21 777 23 419 66 658


2. Human Settlement Dev elopment Grant 3 146 236 140 210 140 210 426 656
Total 4 167 698 161 987 163 629 493 314

Table 8.2 shows budgets allocated over the MTEF period per nature of investment. In this regard the
department has set aside R22.026 million for new infrastructure assets and R404.630 million for capital
transfers. New infrastructure assets include Social and Economic Amenities such as parks, crèche
facilities, taxi ranks and community halls. The balance of the budget, R66.658 million has been put
aside for servicing leases.
The balance of the Human Settlement Development Grant is reflected in the Transfers to the
households in the Vote 8 chapter in the EPRE.

Table 8.2 - Summary of provincial infrastructure estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New Infrastructure Assets 1 22 026 – – 22 026
2. Infrastructure Transfers - Capital 2 124 210 140 210 140 210 404 630
3. Infrastructure Leases 1 21 462 21 777 23 419 66 658
Total 1 167 698 161 987 163 629 493 314

9
Vote 9 : Community Safety and Liaison

Vote 9
Community Safety and Liaison

10
Vote 10 : Sports and Recreation

Vote 10
Sport and Recreation

Department of Sport and Recreation utilises its infrastructure budget to fund the construction of sports
facilities such as sport fields, swimming pools, and outdoor play /gym facilities. The implementation
strategy of the department involves transferring budgets to some municipalities as well as
implementing some projects internally for the construction of sports facilities. Where the Department is
using municipalities to implement projects, the relationship is governed by a signed Service Level
Agreement (SLA) which details how projects will be monitored by the department.

Table 10.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. Equitable Share 122 67 077 45 366 46 375 46 375
Total 122 67 077 45 366 46 375 46 375

Table 10.2 shows the summary of provincial infrastructure estimates by nature of investment. In terms
of the table, the department has planned for 109 new infrastructure assets, 18 infrastructure transfers
(current) and 8 infrastructure transfers (capital).

Table 10.2 - Summary of provincial infrastructure estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New infrastructure assets 109 29 238 29 366 30 202 30 202
2. Infrastructure Tranfers - Current 7 2 000 – – –
3. Infrastructure Tranfers - Capital 6 35 839 16 000 16 173 16 173
3. Infrastructure Leases – – – – –
Total 122 67 077 45 366 46 375 46 375

Sports facilities constructed by the department are handed over to the Municipalities for ownership,
operation and maintenance once they have reached final completion.

11
Vote 11 : Co-operative Governance and Traditional Affairs

Vote 11
Co-operative Governance and Traditional Affairs
The Department of Co-operative Governance and Traditional Affairs (Cogta) is responsible for the
maintenance of the Traditional Administration Centres (TAC’s), Community Service Centres (CSCs),
Multi-purpose Community Centres (MPCCs) and building of Imizi Yesizwe (Amakhosi houses).

The table below shows the number of projects in each nature of investment. The eight new projects
include the Provincial Disaster Management Centre (PDMC) in Pietermaritzburg. The COGTA
infrastructure projects are only funded from equitable share as indicated in table 11.1.

Table 11.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. Equitable Share 41 20 674 24 558 24 672 69 904
Total 41 20 674 24 558 24 672 69 904

Table 11.2 shows R69 million allocated to implement 41 projects over the MTEF period of which 8
projects are new infrastructure assets; and 33 will be refurbishment and rehabilitation.

Table 11.2- Summary of provincial infrastructure estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New Infrastructure Assets 8 10 000 14 108 14 222 38 330
2. Upgrades And Additions – – – – –
3. Refurbishment and Rehabilitation 33 10 674 10 450 10 450 31 574
4. Maintenance And Repairs – – – – –
Total 41 20 674 24 558 24 672 69 904

The Department is neither planning for upgrades and additions projects, nor maintenance projects over
the entire MTEF period.

12
Vote 12 : Transport

Vote 12
Transport
Department of Transport utilises its infrastructure budget to construct new road and bridges, as well as
upgrading and maintenance of existing road infrastructure. The department receives the bulk of the
provincial infrastructure budget which is sourced mainly from the equitable share.

Table 12.1 shows the revenue source for infrastructure. The transport infrastructure budget consists of
allocations from the Provincial Equitable Share, Provincial Roads Maintenance Grant (PRMG) and
Expanded Public Works Programme (EPWP) Grant. Equitable share contributes 73% whilst PRMG
contributes 27% and 0.1% is from the EPWP grant. Equitable share is utilised mainly for new
infrastructure assets, upgrades and additions; as well as refurbishment and rehabilitations projects. The
PRMG and EPWP grants are utilised for maintenance related projects.

Table 12.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. Equitable Share 1 041 4 984 123 5 204 891 5 521 057 15 710 071
2. Prov incial Roads Maintenance Grant (PRMG) 97 1 828 970 1 932 999 2 070 783 5 832 752
3. EPWP Integrated Grant for Prov inces 12 33 645 – – 33 645
Total 1 150 6 846 738 7 137 890 7 591 840 21 576 468

The Department has a total budget of R21.576 billion over the MTEF period as shown above.

Table 12.2 shows a summary of provincial infrastructure estimated by the nature of investment. The
Department of Transport will invest its infrastructure budget in a total number of 1 150 projects over
the 2017/18 MTEF period. Projects under maintenance and repairs have been packaged per district
municipal areas within each package. Table 12.2 summarises the number of projects whilst capital
projects are captured as individual projects over the MTEF period.

Table 12.2 - Summary of provincial infrastructure estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New infrastructure assets 685 782 230 586 963 552 755 1 921 948
2. Upgrades and additions 210 1 470 913 1 629 987 1 821 706 4 922 606
3. Refurbishment and rehabilitation 129 1 171 542 1 209 120 1 243 469 3 624 131
4. Maintenance and repairs 114 2 923 542 3 186 119 3 418 767 9 528 428
5. Non-infrastructure 12 498 511 525 701 555 143 1 579 355
Total 1 150 6 846 738 7 137 890 7 591 840 21 576 468

The project list includes individual and packaged road related construction projects. These projects
include the construction of the P700 road, which is allocated R53.790 million, Paulpietersburg link
road allocated R34.900 million and Tugela River bridge allocated R32.200 million over the 2017/18
MTEF period. The construction of new gravel roads and upgrading of the existing gravel roads to
blacktop are also on the plan for implementation for the department. These include roads like the P73
in Ubuhlebezwe Municipality, the D475 in uMshwathi and the P130 in Ntambanana Municipality.

13
Vote 13 : Social Development

Vote 13
Social Development

The Department of Social Development utilises its Infrastructure budget to build and maintain its
service delivery and administration facilities. The service delivery facilities include service centres,
Early Childhood Development Centres (ECD’s) and youth development centres amongst others.

Table 13.1 shows the revenue source for infrastructure over the 2017/18 MTEF period. The department
is budgeting to spend R430.533 million on various infrastructure projects over the 2017/18 MTEF
period. The revenue source for implementing infrastructure projects is equitable share and the Early
Childhood (ECD) Grant which is a new grant. The ECD grant will mainly be used for the maintenance
of existing ECD facilities.

Table 13.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. Equitable Share 69 143 753 114 114 129 195 387 062
2. ECD Grant for Maintenance 1 12 955 14 845 15 671 43 471
Total 70 156 708 128 959 144 866 430 533

Table 13.2 shows the summary of provincial infrastructure estimate by nature of investment. The
department has planned to implement 70 projects in the 2017/18 MTEF period. New infrastructure
assets include the construction of the Babanango Service Office, Bambanani Malota ECD, Ramaphosa
ECD in Danhausser and the continued construction of the Ndumo Elderly Day Care Centre which is
part of the Inkululeko Development Project

Table 13.2 - Summary of provincial infrastructure estimates by nature of investment


Table 1.19 : Summary of provincial infrastructure estimates by nature of investment
2017/18 2018/19 2019/20
Nature of Investment Number of 2017/18 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New infrastructure assets 48 66 281 44 358 60 705 171 344
2. Upgrades and additions 12 25 946 19 317 18 287 63 550
3. Refurbishment and rehabilitation 9 24 666 23 627 20 825 69 118
4. Maintenance and repairs 1 39 815 41 657 45 049 126 521
5. Infrastructure: Leases – – – – –
Total 70 156 708 128 959 144 866 430 533

The department will implement a number of maintenance and repairs projects which are packaged and
shown as one line item in this table.

14
Vote 14 : Public Works

Vote 14
Public Works
The Department of Public Works is used as an Implementing Agent (IA) by a number of client
departments in the Province. Apart from its role as an IA, Public Works is also responsible for the
construction and maintenance of its own office accommodation.

Table 14.1 shows the revenue source for infrastructure over the MTEF period, which for Public Works
is equitable share only. The department has a total budget of R198.827 million for new and existing
infrastructure assets over the 2017/18 MTEF period

Table 14.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source 2017/18 MTEF
Number of Estimated Estimated Estimated
(R Thousand) ( Total)
Projects Budget Budget Budget
1. Equitable Share 51 67 282 61 139 70 406 198 827
– – – – –
Total 51 67 282 61 139 70 406 198 827

Table 14.2 shows a summary of provincial infrastructure estimates by nature of investment. As can be
seen, the department has planned to spend its infrastructure budget on a total number of 51 projects
over the MTEF period.

Table 14.2 - Summary of provincial infrastructure estimate by nature of investment


2017/18 2018/19 2019/20
Nature of Investment 2017/18 MTEF
Number of Estimated Estimated Estimated
(R Thousand) ( Total)
Projects Budget Budget Budget
1. New infrastructure assets 8 15 112 25 628 16 355 57 095
2. Upgrades and additions 29 23 660 8 549 28 473 60 682
3. Refurbishment and rehabilitation 10 13 681 11 693 12 138 37 512
4. Maintenance and repairs 4 14 829 15 269 13 440 43 538
Total 51 67 282 61 139 70 406 198 827

Public Works has prioritised 8 new infrastructure asset projects, 29 projects for upgrades and additions,
10 projects for rehabilitation and renovation; and 4 for maintenance and repairs.

Maintenance and repairs projects are packaged into four one line items which are located throughout
the province and are mainly for maintenance of offices.

The list of projects includes the new Ilembe district office building in the KwaDukuza, Local
Municipality, the conference hall dining facility in the conference centre in Ethekwini region and the
Tugela Ferry depot to mention a few.

15
Vote 15 : Arts and Culture

Vote 15
Arts and Culture
The Department of Arts and Culture utilises its infrastructure budget for construction, and maintenance
of libraries, museums, and other arts and cultural infrastructure. The strategy employed by the
department to implement these projects is to use Implementing Agents as well as implement projects
directly by the department.

Table 15.1 shows the revenue source for infrastructure over the MTEF period, which is made up of
equitable share and the Community Library Services (CLS) grant. The total budget allocated for the
implementation of infrastructure programmes is R545.245 million over the MTEF period.

Table 15.1 - Revenue source for Infrastructure


2017/18 2018/19 2019/20
Funding Source Number of 2017/20 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. Equitable Share 7 68 975 67 925 109 104 246 004
2. Community Library Serv ices Grant 31 93 889 103 752 101 600 299 241
Total 38 162 864 171 677 210 704 545 245

Table 15.2 shows the summary of provincial infrastructure estimates by nature of investment. The
department has 38 projects over the MTEF period under the various categories as shown.

Table 15.2 - Summary of provincial infrastructure estimates by nature of investment


2017/18 2018/19 2019/20
Nature of Investment Number of 2017/20 MTEF
Estimated Estimated Estimated
(R Thousand) Projects (Total)
Budget Budget Budget
1. New Infrastructure Assets 20 130 270 150 477 188 143 468 890
2. Upgrades And Additions 9 12 383 14 200 15 561 42 144
3. Refurbishment and Rehabilitation 8 9 211 7 000 7 000 23 211
4. Maintenance And Repairs – – – – –
6. Infrastructure Transfers - Capital 1 11 000 – – 11 000
Total 38 162 864 171 677 210 704 545 245

The department is continuing with the initiation phase of the Arts and Culture Academy and the
Provincial Archives Repository.

Provincial Equitable Share will fund 7 projects and all other projects are funded by a conditional grant.

16
Conclusion
The annexures below show the projects per department which are anticipated to be implemented in the
2017/18 MTEF. The 2017/18 Estimates of Capital Expenditure (ECE) is the first publication of
Infrastructure project lists by the KwaZulu-Natal Province. It is important to note that the list is only
infrastructure projects planned by each department.

The project list indicates the name of each project and gives a brief detail e.g. the location, the estimated
start and finish date and financial information of each project. It must be noted that some maintenance
projects are clustered together into packages based on their nature and location but all capital projects are
indicated as individual projects.

The Provincial Legislature will spend their infrastructure budget mainly on day-to-day maintenance, hence
the list of projects is not included. It must be noted that the repairs to the Law Society Building will form
part of the maintenance programme.

This publication will be an annual publication that will continue to evolve.

17
Annexures

Table B 5

Estimates
of
Capital Expenditure
Annexure Table B5 – Vote 3 : Agriculture and Rural Development

Table B.5: Agriculture And Rural Development - Payments of infrastructure by category


MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands
1. New Infrastructure Assets
Construction Of Ablution
1 Cedara Juncao Mushroom Base Phase 2 Tender – Block, Wash Bay And – – Equitable Share Agriculture – – – – –
Parking Area
Construction Of Mushroom
2 Dukuduku Mushroom Project Construction – – – Equitable Share Agriculture – – – – –
Plant
Kwadweshula/Mehlomnyama/P68 Construction Of Mushroom
3 Tender – – – Equitable Share Agriculture – 450 – – –
Mushroom Project Plant
Construction Of Mushroom
4 Msinga Mushroom Project Tender – – – Equitable Share Agriculture – 20 075 – – –
Plant
Fencing, Irrigation, Poultry,
5 Farm Structures Various Various – – Equitable Share Agriculture – 207 872 3 869 8 454 23 454
Ets
Irrigation, Fencing,
6 Makhathini Development Various Umkhanyakude – – Equitable Share Agriculture – 126 849 33 844 41 763 35 444
Drainage Canal, Etc
7 Office Accomodation Various Various Offices – – Equitable Share Administration – 4 200 – 9 278 –

8 Sheds For Mechanisation Equipment Tender Various Sheds – – Equitable Share Agriculture – – – – –

Total New Infrastructure Assets 359 446 37 713 59 495 58 898


2. Upgrades And Additions
1 – 3 228 – – –
Total Upgrades And Additions 3 228 – – –
3. Refurbishment And Rehabilitation

1 Office Accommodation (Ho & Districts) Various Various Office Accommodation – – Equitable Share Administration – 21 759 22 189 39 143

Irrigation,
2 Makhathini Various Jozini Fencing\Drainage Canals, – – Equitable Share Agriculture – 6 474 11 057 13 338 16 579
Etc
3 Irrigation Schemes Various Various Irrigation Schemes – – Equitable Share Agriculture – 12 520 7 368 7 740 11 892
Handling Facilities, Poultry,
4 Farm Structures Various Various – – Equitable Share Agriculture – 182 963 – – –
Piggery, Etc
Access Roads, Dairy
5 Cedara Facilities Various Umngeni – – Equitable Share Administration – 2 330 – – –
Parlour, Etc

6 Scooping Of Dams - Drought Relief – – Scooping Of Dams – – – – – – – – –

Total Refurbishment And Rehabilitation – 205 311 40 184 43 267 67 614


4. Maintenance And Repairs
1 Office Accommodation Various Various Office Accommodation – – Equitable Share Administration – 7 780 8 769 9 278 9 798
Fencing, Irrigation, Poultry,
2 Farm Structures Various Various – – Equitable Share Agriculture – 70 509 – – –
Piggery, Etc
Irrigation, Fencing ,
3 Makhathini Various Jozini – – Equitable Share Agriculture – 4 103 – – –
Drainage Canals, Etc
Total Maintenance And Repairs 82 392 8 769 9 278 9 798
5. Infrastructure Transfers - Current
1 – – – – – – – – – 8 259 – – –
Total Infrastructure Transfers - Current 8 259 – – –
6. Infrastructure Transfers - Capital
1 – – – – – – – – – 8 000 10 621 – –
Total Infrastructure Transfers - Capital 8 000 10 621 – –
Total Agriculture And Rural Development Infrastructure 666 636 97 287 112 040 136 310

1
Annexure Table B5 – Vote 4 : Economic Development Tourism ad Environmental Affairs

Table B.5: Economic Development, Tourism and Environmental Affairs - Payments of infrastructure by category
Expenditure Total MTEF
Project Duration
Source Budget Total To Date From Available Forward
Project Municipality / MTEF MTEF
No. Project Name Type of Infrastructure Of Programme Project Previous 2017/18
Status Region Date: Start Date: Finish 2018/19 2019/20
Funding Name Cost Years
R Thousands
Total New Infrastructure Assets – 28 – – –
6. Infrastructure Transfers - Capital
1 Richards Bay Idz Construction Uthungulu – – – Equitable Share Programme 3 – 216 038 127 605 129 530 136 784
2 Dube Trade Port Construction Ethekwini – – – Equitable Share Programme 3 – 1 770 506 365 919 400 983 423 438
Total Infrastructure Transfers - Capital – 1 986 544 493 524 530 513 560 222
Total Economic Development, Tourism and Environmental Affairs Infrastructure – 1 986 572 493 524 530 513 560 222

3
Annexure Table B5 – Vote 5 : Education

Table B.5: Education - Payments of infrastructure by category


MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands
1. New Infrastructure Assets

Practical 2 613 2 045 67 – –


Completion Education
1 Marshmount Primary School (100%) Ugu Primary 2015-11-20 2016-11-30 Infrastructure Grant Programme 6
9 958 – 9 000 6 025 25
Education
2 Nkunyana Intermediate School Design Umzinyathi Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
5 441 214 3 000 800 200
Education
3 Tholinhlanhla Primary School Design Umzinyathi Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
864 574 91 – –
Construction 76% Education
4 Esiqhingini Primary School - 99% Pinetown Primary 2015-11-20 2018-01-30 Infrastructure Grant Programme 6
28 026 932 11 151 8 215 1 000
Education
5 Stanger Manor Secondary School Design Ilembe Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
30 455 8 731 5 000 8 731
Construction 1% - Education
6 Management Fee 25% Umgungundlovu Secondary 2015-10-24 2017-03-31 Infrastructure Grant Programme 6
38 760 – 3 466 5 000 4 000
Education
7 Bhevu Secondary School Design Uthukela Secondary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
37 308 28 804 1 500 4 –
Ebuhlenibenkosi Intermediate Construction 26% Education
8 School - 50% Zululand Primary 2015-11-20 2018-01-30 Infrastructure Grant Programme 6
26 000 – 1 244 16 856 8 956
Education
9 Emoyeni Primary School Project Initiation Uthungulu Primary 2015-10-24 2019-03-20 Infrastructure Grant Programme 6

Practical 1 821 627 194 – –


Glengarry Junior Secondary Completion Education
10 School (100%) Harry Gwala Secondary 2016-09-20 2013-06-30 Infrastructure Grant Programme 6
20 886 – 4 453 13 000 2 320
Construction 26% Education
11 Goodhome Secondary School - 50% Uthukela Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
29 839 – 5 076 9 031 8 099
Education
12 New Gungqula Secondary School Design Ugu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
32 914 32 709 5 – –
Construction 76% Education
13 Hibiscus Primary School - 99% Ugu Secondary 2012-08-03 2018-01-30 Infrastructure Grant Programme 6
37 991 37 572 19 – –
Construction 76% Education
14 Indawana Secondary School - 99% Harry Gwala Secondary 2015-11-20 2013-06-30 Infrastructure Grant Programme 6
19 784 – 8 637 8 924 1 076
Education
15 Mayeni Primary School Design Zululand Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
43 090 – 9 273 8 099 8 953
Construction 1% - Education
16 Merlewood Intermediate School 25% Ugu Secondary 2016-07-13 2018-01-20 Infrastructure Grant Programme 6
20 872 – 1 244 50 4 000
Education
17 Ncunjana Primary School Feasibility Uthukela Primary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6
29 321 16 5 076 8 000 8 099
Education
18 New Ehawini Secondary School Design Uthungulu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
30 839 16 5 076 6 000 8 099
New Harding Area Secondary Education
19 School (Near Sutton P) Design Ugu Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
30 839 16 5 076 10 000 4 895
New Mahlubine Area Seconday Education
20 School Design Ugu Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
25 950 9 661 6 095 4 000 100
Construction 26% Education
21 Mbongeleni Primary School - 50% Umzinyathi Secondary 2015-10-24 2018-01-30 Infrastructure Grant Programme 6
36 890 22 585 2 000 – –
Nonkqubela Primary School Construction 26% Education
22 (Horseshoe P) - 50% Harry Gwala Primary 2016-09-20 2018-01-30 Infrastructure Grant Programme 6
42 978 42 5 076 12 000 4 000
Education
23 Sunnydale S Seconday School Design Uthungulu Secondary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
28 995 – 5 076 11 000 5 623
Education
24 Albert Falls Intermediate School Design Umgungundlovu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
21 419 895 5 174 4 697 –
Education
25 Hhoye Secondary School Tender Umkhanyakude Primary 2016-09-20 2018-04-21 Infrastructure Grant Programme 6
62 419 62 346 73 – –
Construction 76% Education
26 Siphumelele Primary School - 99% Pinetown Secondary 2015-11-20 2018-01-30 Infrastructure Grant Programme 6
22 932 1 327 5 766 6 975 –
Education
27 Khindi Jobe Secondary School Tender Umkhanyakude Primary 2015-10-24 2018-04-21 Infrastructure Grant Programme 6

5
Annexure Table B5 – Vote 5 : Education

31 061 1 000 5 076 9 018 5 623


Education
28 New Etete Secondary School Design Ilembe Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
35 375 59 5 076 9 852 8 099
New Welbedacht East Area Education
29 Seconday School Feasibility Umlazi Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6

Practical 22 375 20 404 246 – –


Completion Education
30 Quarry Heights Primary School (100%) Umlazi Secondary 2014-11-26 2016-08-18 Infrastructure Grant Programme 6
14 204 – 1 244 5 000 3 366
Education
31 Sebenzile Primary School Project Initiation Amajuba Primary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6
21 795 896 1 244 5 000 8 099
Education
32 Siyakhula Secondary School Project Initiation Umkhanyakude Primary 2015-10-24 2019-03-20 Infrastructure Grant Programme 6
37 132 1 000 5 232 5 000 8 099
New Ulovu Area Secondary Construction 1% - Education
33 School 25% Umlazi Primary 2016-03-24 2018-03-20 Infrastructure Grant Programme 6
20 484 – 5 076 5 000 1 235
New Matshaheni Area Primary Education
34 School Design Umgungundlovu Secondary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
23 041 1 286 4 572 8 562 2 000
Education
35 Uxolophambili Secondary School Tender Pinetown Secondary 2015-10-24 2018-04-21 Infrastructure Grant Programme 6
24 574 43 5 076 7 526 8 099
Education
36 Chibelihle Combined School Design Umgungundlovu Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
30 839 16 5 076 6 520 8 099
New Grange (White Rd) Area Education
37 Seconday School Design Ugu Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
30 000 16 5 076 8 523 8 099
Education
38 New Woodmead Primary School Project Initiation Ilembe Secondary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
14 204 – 2 355 10 645 –
Education
39 Shepstone Lake Primary School Project Initiation Amajuba Primary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6
32 984 396 6 000 5 214 2 300
Construction 51% Education
40 Westmead Secondary School - 75% Pinetown Secondary 2015-10-24 2019-03-30 Infrastructure Grant Programme 6
30 000 16 6 101 12 230 8 099
Education
41 Umsilinga Primary School Design Ilembe Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
42 977 38 086 891 – –
Construction 76% Education
42 Umvuzo Secondary School - 99% Umgungundlovu Secondary 2015-11-20 2018-01-30 Infrastructure Grant Programme 6

Practical 56 364 62 346 73 – –


Completion Education
43 Siphumelele Primary School (100%) Amajuba Specialised 2015-10-24 2015-10-28 Infrastructure Grant Programme 6
21 616 900 4 588 5 623 500
Education
44 Zimele Secondary School Tender Umkhanyakude Primary 2016-09-20 2018-04-21 Infrastructure Grant Programme 6
10 480 – 2 345 50 6 523
Education
45 Celani Primary School Project Initiation Amajuba Specialised 2015-10-24 2018-11-02 Infrastructure Grant Programme 6
29 356 35 300 11 215 – –
Construction 76% Education
46 Harpo Primary School - 99% Zululand Specialised 2016-09-20 2017-03-30 Infrastructure Grant Programme 6
32 730 24 609 11 215 – 2 586
Construction 51% Education
47 Mona Primary School - 75% Uthungulu Specialised 2015-09-15 2018-01-30 Infrastructure Grant Programme 6
5 762 – 289 692 –
48 Management Fee Feasibility Umgungundlovu Public School 2016-04-01 2017-03-31 Equitable Share Programme 6
Solomon Mahlangu Primary 35 391 – 5 487 12 821 500
49 School (New Cornubia #1 P) Design Pinetown Public School 2017-02-01 2018-05-28 Equitable Share Programme 6
16 000 – 7 671 4 649 –
Construction 1% - Education
50 Management Fee 25% Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
20 000 – 2 579 50 5 000
New Ashburton Area Primary Education
51 School Feasibility Umgungundlovu Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
51 429 6 176 8 065 12 538 5 000
Construction 26% Education
52 Cosmo Primary School - 50% Umgungundlovu Primary 2015-05-27 2019-03-30 Infrastructure Grant Programme 6
20 000 – 2 579 50 4 000
Education
53 New Dlulumuzi Secondary School Feasibility Pinetown Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
32 953 23 961 1 000 – 2 000
Construction 26% Education
54 Ebuta Junior Secondary School - 50% Harry Gwala Primary 2013-10-28 2018-01-30 Infrastructure Grant Programme 6
35 745 6 886 3 579 5 000 8 956
New Emadungeni Secondary Education
55 School Project Initiation Harry Gwala Primary 2015-11-12 2018-03-30 Infrastructure Grant Programme 6
46 208 – 9 000 5 000 8 569
Education
56 Richem Secondary School Final Completion Uthungulu Secondary 2009-04-01 2011-03-30 Infrastructure Grant Programme 6

6
Annexure Table B5 – Vote 5 : Education

20 000 – 3 513 50 8 569


Education
57 Ingcindezi Intermediate School Feasibility Pinetown Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
42 270 32 487 786 – –
Construction 51% Education
58 Malusi Secondary School - 75% Ugu Primary 2013-09-28 2018-01-30 Infrastructure Grant Programme 6
30 831 21 357 2 000 – –
Construction 76% Education
59 Mdombolo Primary School - 99% Uthungulu Secondary 2012-01-09 2018-01-30 Infrastructure Grant Programme 6
26 000 – 3 579 5 000 3 523
Education
60 Mdumela Secondary School Project Initiation Zululand Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
20 000 – 3 579 50 11 595
Education
61 Makhanya Primary School Feasibility Pinetown Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6

Practical 19 980 19 647 17 928 – –


Completion Education
62 Mpolweni Secondary School (100%) Umgungundlovu Primary 2010-10-05 2011-10-01 Infrastructure Grant Programme 6
20 000 – 3 579 50 10 956
New Mt Moriah Area Primary Education
63 School Feasibility Pinetown Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
45 884 7 154 2 976 10 954 4 652
Construction 1% - Education
64 Mzamo Secondary School 25% Amajuba Primary 2015-11-24 2019-03-30 Infrastructure Grant Programme 6
41 773 13 493 12 000 3 280 3 526
New Kwambonambi Secondary Construction 26% Education
65 School - 50% Uthungulu Primary 2015-10-28 2019-03-30 Infrastructure Grant Programme 6
17 381 8 362 3 000 3 000 –
Ntshongo Junior Secondary Construction 76% Education
66 School - 99% Harry Gwala Secondary 2010-11-22 2018-01-30 Infrastructure Grant Programme 6
121 561 4 694 5 000 10 000 1 000
Siphumelele Secondary School Construction 1% - Education
67 (Meer-En-See) 25% Uthungulu Primary 2016-04-20 2019-03-30 Infrastructure Grant Programme 6
19 810 19 064 300 – –
Education
68 Tshanibezwe Secondary School Final Completion Zululand Primary 2013-08-26 2016-03-08 Infrastructure Grant Programme 6
4 349 – 4 349 50 –
Education
69 Antioch Junior Secondary School Feasibility Harry Gwala Secondary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
16 000 – 3 579 50 7 652
Education
70 Bloemfontein Primary School Feasibility Harry Gwala Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
5 841 – 5 841 50 –
Bontrand Junior Secondary Education
71 School Feasibility Harry Gwala Secondary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
10 567 – 4 533 50 1 000
Education
72 Cabane Junior Secondary School Feasibility Harry Gwala Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
5 788 – 5 788 50 –
Dovedale Junior Secondary Education
73 School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
11 887 – 2 355 50 782
Entsikeni Junior Secondary Education
74 School Feasibility Harry Gwala Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
4 297 – 4 190 50 –
Ezimpungeni Junior Secondary Education
75 School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
4 811 – 4 691 50 –
Education
76 Kayeka Primary School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
2 818 – 2 818 50 –
Education
77 Mahobe Junior Secondary School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
4 402 – 4 402 50 –
Mandlazi Junior Secondary Education
78 School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
2 818 – 2 818 50 –
Ngqumareni Junior Secondary Education
79 School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
4 402 – 4 402 50 –
Education
80 Samaria Junior Secondary School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
4 739 – 4 739 50 –
Education
81 Syria Junior Primary School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
5 927 – 5 927 50 –
Umgano Junior Secondary Education
82 School Feasibility Harry Gwala Secondary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
4 851 – 4 851 50 –
Education
83 Vulindlela Primary School Feasibility Harry Gwala Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6
5 524 – 5 386 50 –
Education
84 Zizamele Primary School Feasibility Harry Gwala Secondary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6

7
Annexure Table B5 – Vote 5 : Education

35 000 3 474 6 223 931 2 000


Construction 76% Education
85 Tongaat Primary School - 99% Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
30 000 – 3 579 1 000 1 000
Education
86 New Dungambili Primary School Project Initiation Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Site Handed - 5 570 – 2 000 – 1 000


Over to Education
87 Glenhills Combined School Contractor Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
New Indaleni Area Secondary Construction 26% 57 913 – 5 000 1 000 1 000
88 School - 50% Umgungundlovu Primary 2016-04-01 2018-03-30 Equitable Share Programme 6
18 797 – 3 579 1 000 1 000
Education
89 Khuba Secondary School Project Initiation Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
26 000 – 5 076 1 000 1 000
New Mahlabeni Primary School Education
90 (Makhana Area) Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
269 113 245 510 5 000 1 000 5 453
Construction 76% Education
91 Ndumo Secondary School - 99% Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
57 622 1 013 5 576 3 000 4 999
Education
92 New Canaan Primary School Design Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
57 623 – 6 076 2 000 5 000
Education
93 New Mkhamba Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
44 747 18 467 7 000 – –
Construction 26% Education
94 Ntulabakayise Secondary School - 50% Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
33 941 – 5 077 1 000 5 000
Education
95 Umhlali College Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
45 000 – 6 076 1 425 5 000
Education
96 Bhekabantu Secondary School Design Umzinyathi Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
41 773
Construction 26% Education
100 Kwambonambi Secondary School - 50% Uthungulu Primary 2015-02-15 2018-01-16 Infrastructure Grant Programme 6
57 622
New Mkhamba Gardens Primary Education
101 School Tender Uthukela Primary 2017-03-15 Infrastructure Grant Programme 6

Total New Infrastructure Assets – 818 499 428 836 334 779 278 734
2. Upgrades And Additions
1 671 1 235 436 – –
Construction 76% Education
1 Abathwa Primary School - 99% Umzinyathi Primary 2012-11-14 2018-03-30 Infrastructure Grant Programme 6
1 875 1 231 491 153 –
Construction 1% - Education
2 Amayese Primary School 25% Uthungulu Primary 2012-11-14 2018-03-30 Infrastructure Grant Programme 6
1 360 80 927 353 –
Construction 51% Education
3 Amazibu Primary School - 75% Ugu Primary 2016-03-07 2017-01-07 Infrastructure Grant Programme 6
3 483 1 293 2 190 – –
Construction 26% Education
4 Bangumuzi Primary School - 50% Umzinyathi Secondary 2013-06-13 2018-03-30 Infrastructure Grant Programme 6
1 377 135 676 566 –
Construction 1% - Education
5 Bhobhe Primary School 25% Uthungulu Secondary 2013-01-17 2018-03-30 Infrastructure Grant Programme 6
1 657 1 111 546 – –
Construction 76% Education
6 Buhlebelanga Primary School - 99% Zululand Primary 2012-11-14 2018-03-30 Infrastructure Grant Programme 6
1 596 1 163 433 – –
Construction 76% Education
7 Bukelakithi Primary School - 99% Uthungulu Secondary 2013-01-15 2018-03-30 Infrastructure Grant Programme 6
1 836 1 247 589 – –
Construction 26% Education
8 Cungcwana Primary School - 50% Uthungulu Primary 2013-01-15 2018-03-30 Infrastructure Grant Programme 6
1 753 1 196 332 225 –
Construction 26% Education
9 Dayiswayo Primary School - 50% Umzinyathi Primary 2012-12-05 2018-03-30 Infrastructure Grant Programme 6

Practical 3 089 2 511 – – –


Completion Education
10 Dukuza Primary School (100%) Uthukela Secondary 2013-01-17 2014-02-21 Infrastructure Grant Programme 6
1 855 1 597 258 – –
Construction 76% Education
11 Ebhethani Primary School - 99% Uthukela Primary 2012-11-14 2018-03-30 Infrastructure Grant Programme 6
3 221 883 2 338 – –
Construction 26% Education
12 Ebomvaneni Primary School - 50% Uthungulu Primary 2013-01-15 2018-03-30 Infrastructure Grant Programme 6

Practical 4 196 2 792 86 – –


Completion Education
13 Ebomvini Primary School (100%) Ugu Secondary 2013-03-11 2014-04-22 Infrastructure Grant Programme 6
1 138 682 178 420 –
Construction 51% Education
14 Egoli Primary School - 75% Ugu Primary 2016-03-07 2017-01-07 Infrastructure Grant Programme 6

8
Annexure Table B5 – Vote 5 : Education

2 721 89 2 432 200 –


Construction 1% - Education
15 Ekuzwaneni Primary School 25% Uthungulu Primary 2016-03-11 2018-03-30 Infrastructure Grant Programme 6
1 611 109 817 685 –
Construction 1% - Education
16 Eludimbi Primary School 25% Uthukela Primary 2012-11-13 2018-03-30 Infrastructure Grant Programme 6
2 229 473 830 926 –
Construction 1% - Education
17 Emhlungwini Primary School 25% Uthukela Primary 2016-03-17 2018-03-30 Infrastructure Grant Programme 6
1 848 1 179 669 – –
Construction 26% Education
18 Emkhandlwini Primary School - 50% Uthungulu Primary 2016-03-11 2018-03-30 Infrastructure Grant Programme 6
2 463 635 756 1 000 72
Construction 1% - Education
19 Empolombeni Primary School 25% Uthukela Primary 2016-03-08 2018-03-30 Infrastructure Grant Programme 6

Practical 4 868 3 467 100 – –


Completion Education
20 Emthini Primary School (100%) Ugu Primary 2013-02-07 2013-10-09 Infrastructure Grant Programme 6

Practical 2 712 2 436 – – –


Completion Education
21 Enhlanhleni Combined School (100%) Harry Gwala Secondary 2013-02-07 2013-08-16 Infrastructure Grant Programme 6
2 634 – 20 10 15
Education
22 Enkelabantwana Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
2 487 748 1 739 – –
Construction 26% Education
23 Ntumeni Primary School - 50% Uthungulu Secondary 2013-04-15 2018-03-30 Infrastructure Grant Programme 6
650 – 600 50 –
Enyanisweni Junior Secondary Education
24 School Tender Harry Gwala Primary 2016-08-09 2018-04-21 Infrastructure Grant Programme 6
3 768 781 1 596 1 391 –
Construction 1% - Education
25 Eqhweni Intermediate School 25% Uthukela Primary 2013-01-16 2018-03-30 Infrastructure Grant Programme 6
2 447 11 1 900 500 36
Esihlontlweni Junior Secondary Construction 1% - Education
26 School 25% Harry Gwala Secondary 2016-03-23 2018-03-30 Infrastructure Grant Programme 6
1 596 1 211 385 – –
Construction 76% Education
27 Ezimambeni Primary School - 99% Uthungulu Primary 2013-01-16 2016-03-01 Infrastructure Grant Programme 6
1 798 832 463 503 –
Fundani Primary School Construction 1% - Education
28 (Weenen) 25% Uthukela Primary 2016-03-08 2018-03-30 Infrastructure Grant Programme 6
1 862 1 648 36 – –
Education
29 Gayisani Primary School Final Completion Umzinyathi Primary 2013-04-26 2016-03-18 Infrastructure Grant Programme 6

Practical 3 456 2 512 27 – –


Completion Education
30 Gcilima Primary School (100%) Ugu Secondary 2013-02-07 2013-10-09 Infrastructure Grant Programme 6
1 821 627 654 540 –
Glengarry Junior Secondary Construction 1% - Education
31 School 25% Harry Gwala Secondary 2011-10-01 2018-03-30 Infrastructure Grant Programme 6
1 874 1 321 553 – –
Construction 26% Education
32 Gonzaga Primary School - 50% Uthungulu Primary 2013-05-14 2018-03-30 Infrastructure Grant Programme 6
5 267 – 20 10 3 521
Education
33 Gqumeni Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
1 855 – 20 10 1 825
Education
34 Gxalingenwa Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
4 228 434 2 039 1 755 –
Construction 26% Education
35 Hlaba Primary School - 50% Ugu Primary 2016-03-16 2018-11-30 Infrastructure Grant Programme 6
1 400 – 1 400 – –
Construction 76% Education
36 Ifafa Primary School - 99% Ugu Primary 2016-03-24 2017-05-05 Infrastructure Grant Programme 6
900 – 850 50 –
Education
37 Imfihlo Primary School Tender Uthungulu Secondary 2016-08-09 2018-04-21 Infrastructure Grant Programme 6
2 982 1 711 220 1 200 20
Construction 26% Education
38 Indlovana Primary School - 50% Umzinyathi Primary 2013-06-13 2018-03-30 Infrastructure Grant Programme 6
2 944 256 1 720 968 –
Construction 26% Education
39 Inqanula Primary School - 50% Ugu Primary 2016-03-02 2017-03-30 Infrastructure Grant Programme 6

Practical 4 688 3 303 85 – –


Completion Education
40 Inyandezulu Primary School (100%) Ugu Primary 2013-02-07 2013-10-09 Infrastructure Grant Programme 6
3 341 2 187 1 154 – –
Construction 76% Education
41 Isigodi Primary School - 99% Zululand Primary 2012-12-09 2018-03-30 Infrastructure Grant Programme 6
1 799 – 1 011 788 –
Construction 26% Education
42 Ithenjane Primary School - 50% Ugu Secondary 2016-03-07 2017-03-30 Infrastructure Grant Programme 6

9
Annexure Table B5 – Vote 5 : Education

1 948 140 20 10 1 253


Education
43 Ithubalethu Primary School Design Umzinyathi Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
3 740 – 20 10 2 356
Education
44 Ixopo Village Intermediate School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
2 720 1 436 1 284 – –
Construction 76% Education
45 Izingwelevu Primary School - 99% Uthungulu Primary 2013-01-21 2018-03-30 Infrastructure Grant Programme 6
1 684 1 318 366 – –
Construction 76% Education
46 Jikaza Primary School - 99% Zululand Primary 2012-12-05 2018-03-30 Infrastructure Grant Programme 6
1 671 1 348 323 – –
Construction 76% Education
47 Jojosini Primary School - 99% Zululand Primary 2012-12-03 2018-03-30 Infrastructure Grant Programme 6
3 117 1 233 1 798 86 –
Construction 26% Education
48 Keates Drift Primary School - 50% Umzinyathi Primary 2013-01-17 2018-03-30 Infrastructure Grant Programme 6
3 315 – 1 672 1 643 –
Construction 26% Education
49 Khuphuka Primary School - 50% Ugu Primary 2016-03-16 2017-03-30 Infrastructure Grant Programme 6
2 808 1 704 373 – –
Education
50 King Cyprian Primary School Final Completion Zululand Primary 2013-01-17 2016-08-11 Infrastructure Grant Programme 6
2 808 1 678 373 – –
Education
51 King Mageba Primary School Final Completion Zululand Primary 2013-01-17 2016-08-11 Infrastructure Grant Programme 6
2 250 – 314 1 941 –
Kwahlongwa Primary School Construction 1% - Education
52 (Retender) 25% Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 805 1 204 903 698 –
Construction 1% - Education
53 Kwamiya Primary School 25% Uthukela Primary 2013-03-01 2018-03-30 Infrastructure Grant Programme 6
1 753 997 442 314 –
Construction 26% Education
54 Kwasenge Primary School - 50% Umzinyathi Primary 2015-11-20 2018-03-30 Infrastructure Grant Programme 6
1 444 1 245 199 – –
Kwazihlakaniphele Primary Construction 76% Education
55 School - 99% Zululand Primary 2013-01-18 2018-03-30 Infrastructure Grant Programme 6
1 822 595 672 555 –
Longkloof Junior Secondary Construction 1% - Education
56 School 25% Harry Gwala Primary 2011-11-01 2018-03-30 Infrastructure Grant Programme 6
3 042 – 1 188 1 854 –
Lucas Memorial Primary School Construction 1% - Education
57 (Retender) 25% Ugu Primary 2016-08-16 2017-04-30 Infrastructure Grant Programme 6
1 753 1 215 323 215 –
Construction 26% Education
58 Luvisi Primary School - 50% Umzinyathi Primary 2015-10-24 2018-03-30 Infrastructure Grant Programme 6
2 964 – 20 10 1 235
Education
59 Luzindela Primary School Design Uthungulu Secondary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
1 753 1 112 375 266 –
Construction 26% Education
60 Macongco Primary School - 50% Umzinyathi Primary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6

Practical 2 138 1 652 – – –


Completion Education
61 Magaye Primary School (100%) Ugu Primary 2013-02-15 2015-02-09 Infrastructure Grant Programme 6
1 804 289 754 761 –
Construction 1% - Education
62 Mahlubimangwe Primary School 25% Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 286 420 518 348 –
Construction 1% - Education
63 Mahobe Junior Secondary School 25% Harry Gwala Primary 2011-11-24 2018-03-30 Infrastructure Grant Programme 6
1 872 1 564 308 – –
Construction 76% Education
64 Malottas Kraal Primary School - 99% Uthukela Primary 2013-03-06 2018-03-30 Infrastructure Grant Programme 6
2 136 – 20 10 1 253
Mandlazi Junior Secondary Education
65 School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
1 832 448 723 661 –
Construction 76% Education
66 Mankonjane Primary School - 99% Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 596 1 232 364 – –
Construction 76% Education
67 Manyala Primary School - 99% Uthungulu Primary 2013-01-16 2018-03-30 Infrastructure Grant Programme 6

Practical 2 117 1 767 25 – –


Completion Education
68 Maqakala Primary School (100%) Ugu Primary 2013-01-16 2014-03-14 Infrastructure Grant Programme 6
2 785 1 090 957 738 –
Construction 1% - Education
69 Masumpa Primary School 25% Uthukela Primary 2013-01-16 2018-03-30 Infrastructure Grant Programme 6
2 916 1 427 289 – –
Education
70 Mawezulu Primary School Final Completion Zululand Primary 2013-01-17 2016-08-11 Infrastructure Grant Programme 6

10
Annexure Table B5 – Vote 5 : Education

3 097 1 712 1 385 – –


Construction 76% Education
71 Mbandleni Primary School - 99% Zululand Primary 2013-01-18 2018-03-30 Infrastructure Grant Programme 6
3 338 – 1 663 1 675 –
Construction 1% - Education
72 Mbizoyamaswazi Primary School 25% Uthukela Primary 2016-03-09 2018-03-30 Infrastructure Grant Programme 6
2 950 – 1 039 1 911 –
Mceleni Primary School Construction 1% - Education
73 (Retender) 25% Ugu Primary 2016-08-16 2017-03-30 Infrastructure Grant Programme 6
900 88 483 329 –
Construction 1% - Education
74 Mfanefile Primary School 25% Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 114 1 639 75 – –


Completion Education
75 Mgawulane Primary School (100%) Ugu Primary 2013-02-15 2015-02-09 Infrastructure Grant Programme 6
1 945 1 918 7 – –
Education
76 Mhlazane Primary School Final Completion Umzinyathi Primary 2013-04-10 2016-02-11 Infrastructure Grant Programme 6
1 658 – 20 10 1 123
Education
77 Mjila Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
3 217 927 1 668 622 –
Construction 1% - Education
78 Inkosi Mjwayeli Primary School 25% Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 3 276 2 813 63 – –


Completion Education
79 Mmoyeni Primary School (100%) Ugu Primary 2013-01-21 2015-03-12 Infrastructure Grant Programme 6

Practical 2 110 1 956 – 4 –


Completion Education
80 Mondisa Primary School (100%) Uthukela Primary 2013-02-06 2014-08-04 Infrastructure Grant Programme 6

Practical 3 276 2 710 66 – –


Completion Education
81 Mphendu Primary School (100%) Ugu Primary 2013-01-21 2015-05-22 Infrastructure Grant Programme 6
2 494 – 20 10 1 253
Education
82 Mpofini Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
2 220 199 1 416 605 –
Construction 1% - Education
83 Mthiyane Primary School 25% Uthukela Primary 2016-02-23 2018-03-30 Infrastructure Grant Programme 6
533 403 130 – –
Murchison Primary School Construction 76% Education
84 (Retender) - 99% Ugu Primary 2016-03-16 2017-03-30 Infrastructure Grant Programme 6

Practical 3 317 2 285 120 8 –


Completion Education
85 Mvuyo Primary School (100%) Ugu Primary 2013-02-15 2014-03-14 Infrastructure Grant Programme 6
3 097 1 712 1 074 311 –
Construction 76% Education
86 Ndabikhona Primary School - 99% Zululand Primary 2013-01-18 2018-03-30 Infrastructure Grant Programme 6
2 331 591 1 141 599 –
Construction 1% - Education
87 Nikela Primary School 25% Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 718 – 20 10 1 256
Nkanyezi Primary School Education
88 (Kwambonambi) Design Uthungulu Secondary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
2 718 – 2 000 50 668
Education
89 Nkanyezi Primary School Tender Uthukela Primary 2016-08-09 2018-04-21 Infrastructure Grant Programme 6

Practical 1 730 937 93 – –


Completion Education
90 Nkosiyethu Primary School (100%) Zululand Primary 2013-01-17 2013-10-03 Infrastructure Grant Programme 6
2 844 1 392 884 568 –
Construction 1% - Education
91 Nogaga Primary School 25% Uthukela Primary 2013-03-01 2018-03-30 Infrastructure Grant Programme 6
1 944 – 20 10 1 914
Education
92 Nomandla Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
1 286 56 764 466 –
Construction 1% - Education
93 Ntambanane Primary School 25% Harry Gwala Primary 2011-11-24 2018-03-30 Infrastructure Grant Programme 6
3 904 219 1 927 1 700 58
Construction 1% - Education
94 Ntolwane Primary School 25% Uthungulu Primary 2016-03-11 2018-11-30 Infrastructure Grant Programme 6
2 718 – 20 10 1 259
Education
95 Ntuthunga Primary School Design Uthungulu Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
1 744 1 735 51 – –
Construction 76% Education
96 Nungwana Primary School - 99% Ugu Primary 2013-01-18 2016-02-26 Infrastructure Grant Programme 6
2 235 1 295 940 – –
Construction 76% Education
97 Obani Primary School - 99% Zululand Primary 2013-01-18 2018-03-30 Infrastructure Grant Programme 6
1 911 – 20 10 1 235
Education
98 Ocilwana Primary School Design Uthungulu Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6

11
Annexure Table B5 – Vote 5 : Education

1 948 101 20 10 1 362


Education
99 Osuthu Primary School Design Umzinyathi Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
1 785 1 286 499 – –
Construction 76% Education
100 Oviceni Primary School - 99% Uthungulu Primary 2012-11-15 2018-03-30 Infrastructure Grant Programme 6
9 959 668 5 373 2 356 1 562
Construction 1% - Education
101 Patsoana Primary School 25% Umzinyathi Primary 2013-01-18 2018-11-30 Infrastructure Grant Programme 6

Practical 2 924 2 346 – – –


Completion Education
102 Phumalanga Primary School (100%) Uthukela Primary 2013-01-18 2014-12-09 Infrastructure Grant Programme 6
1 948 148 20 10 1 452
Education
103 Phumela Primary School Design Umzinyathi Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6

Practical 1 873 1 766 7 – –


Completion Education
104 Pisgah Primary School (100%) Uthukela Primary 2012-11-15 2016-02-11 Infrastructure Grant Programme 6
1 873 1 766 7 – –
Education
105 Qedukoma Primary School Final Completion Umzinyathi Primary 2012-11-15 2016-05-11 Infrastructure Grant Programme 6
2 814 1 747 1 067 – –
Construction 76% Education
106 Qhoshangani Primary School - 99% Uthungulu Primary 2013-01-18 2018-03-30 Infrastructure Grant Programme 6
1 416 – 20 10 1 123
Education
107 Samaria Junior Secondary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
2 194 – 20 10 1 325
Education
108 Savela Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6

Practical 4 343 2 945 98 – –


Completion Education
109 Shibase Primary School (100%) Ugu Primary 2013-02-15 2015-02-09 Infrastructure Grant Programme 6
1 611 440 584 587 –
Construction 1% - Education
110 Sibongintuthuko Primary School 25% Uthukela Primary 2012-12-10 2018-03-30 Infrastructure Grant Programme 6
1 347 162 644 541 –
Construction 1% - Education
111 Simanjalo Primary School 25% Uthungulu Primary 2013-01-16 2018-03-30 Infrastructure Grant Programme 6
1 882 237 710 935 –
Siphiwesamangwe Primary Construction 1% - Education
112 School 25% Uthukela Primary 2016-01-28 2018-03-30 Infrastructure Grant Programme 6
1 879 1 770 9 – –
Education
113 Siyamthanda Primary School Final Completion Umzinyathi Primary 2013-04-10 2016-05-11 Infrastructure Grant Programme 6
1 286 71 1 143 72 –
Construction 1% - Education
114 Somangwe Primary School 25% Harry Gwala Primary 2011-11-24 2018-03-30 Infrastructure Grant Programme 6

Practical 3 270 2 929 41 – –


Completion Education
115 Sosukwana Primary School (100%) Ugu Primary 2013-09-26 2015-11-25 Infrastructure Grant Programme 6
2 014 – 1 515 400 99
Construction 1% - Education
116 St Odilo Primary School 25% Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 089 – 20 10 2 059
Education
117 Straalhoek Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
1 818 8 829 900 81
Thandanani Primary School Construction 51% Education
118 (Retender) - 75% Ugu Primary 2016-02-05 2017-03-30 Infrastructure Grant Programme 6
751 387 230 211 –
Construction 1% - Education
119 Thibani Intermediate School 25% Uthukela Primary 2016-02-23 2018-03-30 Infrastructure Grant Programme 6

Practical 566 219 46 – –


Umalusi Primary School Completion Education
120 (Retender) (100%) Ugu Secondary 2016-03-16 2018-03-30 Infrastructure Grant Programme 6
2 916 171 842 1 903 –
Umswilili Primary School Construction 1% - Education
121 (Retender) 25% Ugu Primary 2016-04-01 2017-03-30 Infrastructure Grant Programme 6

Practical 3 052 2 360 – – –


Completion Education
122 Umvolozi Primary School (100%) Ugu Primary 2013-02-15 2014-03-14 Infrastructure Grant Programme 6

Practical 2 713 2 048 65 – –


Umzimkulu Junior Secondary Completion Education
123 School (100%) Harry Gwala Primary 2013-03-20 2016-04-30 Infrastructure Grant Programme 6
3 124 2 500 624 – –
Construction 76% Education
124 Vukuzithathele Primary School - 99% Uthukela Primary 2013-03-06 2018-03-30 Infrastructure Grant Programme 6
1 288 874 414 – –
Construction 76% Education
125 Vumanhlamvu Primary School - 99% Uthungulu Primary 2013-01-21 2018-03-30 Infrastructure Grant Programme 6
1 657 – 20 10 1 236
Education
126 Vusindaba Primary School Design Harry Gwala Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6

12
Annexure Table B5 – Vote 5 : Education

1 819 5 1 040 774 –


Wolweni Primary School Construction 51% Education
127 (Retender) - 75% Ugu Secondary 2016-03-26 2017-03-30 Infrastructure Grant Programme 6

Practical 2 920 2 538 – – –


Completion Education
128 Woodford Primary School (100%) Uthukela Secondary 2012-12-07 2016/04/31 Infrastructure Grant Programme 6
2 036 58 1 190 788 –
Construction 1% - Education
129 Zamani Primary School 25% Harry Gwala Secondary 2016-03-16 2018-03-30 Infrastructure Grant Programme 6
1 863 1 614 49 – –
Education
130 Zamokuhle Primary School Final Completion Umzinyathi Secondary 2013-05-03 2016-03-18 Infrastructure Grant Programme 6
2 948 892 884 1 172 –
Construction 26% Education
131 Dumela Primary School - 50% Umgungundlovu Primary 2013-01-24 2018-03-30 Infrastructure Grant Programme 6
919 132 20 10 757
Education
132 Kufezekile Secondary School Design Umkhanyakude Primary 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
4 257 3 332 925 – –
Construction 76% Education
133 Efaye Primary School - 99% Umgungundlovu Primary 2013-02-06 2018-03-30 Infrastructure Grant Programme 6
2 072 311 740 1 021 –
Construction 26% Education
134 Engoleleni Primary School - 50% Umgungundlovu Primary 2013-05-13 2018-03-30 Infrastructure Grant Programme 6
2 104 894 1 113 97 –
Construction 26% Education
135 Esikhotho Primary School - 50% Umgungundlovu Primary 2016-03-01 2018-03-30 Infrastructure Grant Programme 6
3 729 1 495 2 200 34 –
Construction 26% Education
136 Haza Primary School - 50% Umgungundlovu Primary 2013-08-05 2018-11-30 Infrastructure Grant Programme 6
2 072 674 705 693 –
Construction 26% Education
137 Kwelifuphi Primary School - 50% Umgungundlovu Primary 2013-05-13 2018-03-30 Infrastructure Grant Programme 6
4 242 3 073 1 100 69 –
Construction 26% Education
138 Mpumelelo Primary School - 50% Umgungundlovu Primary 2013-02-18 2018-11-30 Infrastructure Grant Programme 6
3 009 1 277 1 312 420 –
Construction 26% Education
139 Nansindlela Primary School - 50% Umgungundlovu Primary 2013-06-21 2018-11-30 Infrastructure Grant Programme 6
1 893 898 306 689 –
Construction 26% Education
140 Ngoloshini Primary School - 50% Umgungundlovu Primary 2015-10-27 2018-03-30 Infrastructure Grant Programme 6
532 1 007 65 – –
Nomakhaladi Primary School Construction 26% Education
141 (Retender) - 50% Ilembe Primary 2011-11-24 2018-03-30 Infrastructure Grant Programme 6
2 219 854 531 834 –
Construction 26% Education
142 Ntweka Primary School - 50% Umgungundlovu Primary 2013-02-07 2018-03-30 Infrastructure Grant Programme 6

Practical 3 256 2 946 – – –


Completion Education
143 Saphinda Primary School (100%) Umlazi Primary 2013-01-23 2013-09-26 Infrastructure Grant Programme 6
1 272 1 037 235 – –
Sonqoba Primary School Construction 76% Education
144 (Retender) - 99% Ilembe Primary 2011-11-24 2018-03-30 Infrastructure Grant Programme 6
3 558 2 085 1 373 100 –
Construction 76% Education
145 Qanda Primary School - 99% Umgungundlovu Fencing 2012-11-26 2018-11-30 Infrastructure Grant Programme 6
1 398 – 20 10 1 152
Education
146 Sombongangani Primary School Design Umgungundlovu Fencing 2016-09-24 2018-03-20 Infrastructure Grant Programme 6
4 247 1 278 2 900 69 –
Construction 26% Education
147 Vezokuhle Primary School - 50% Umgungundlovu Fencing 2013-03-01 2018-11-30 Infrastructure Grant Programme 6
5 073 4 514 59 – –

Other - Packaged Education


148 Amajuba Fenc Ongoing Project Amajuba Fencing 2016-03-25 2018-03-30 Infrastructure Grant Programme 6
9 514 5 708 806 – –

Other - Packaged Education


149 Ilembe Fenc Ongoing Project Ilembe Fencing 2016-03-25 2018-01-30 Infrastructure Grant Programme 6
1 220 621 99 – –

Other - Packaged Education


150 Ugu Fenc Ongoing Project Ugu Fencing 2016-03-25 2018-01-30 Infrastructure Grant Programme 6
4 504 2 670 34 – –

Other - Packaged Education


151 Umgungundlovu Fenc Ongoing Project Umgungundlovu Fencing 2016-03-25 2018-01-30 Infrastructure Grant Programme 6
22 938 4 938 8 000 500 1 325

Other - Packaged Education


152 Umkhanyakude Fenc Ongoing Project Umkhanyakude Primary 2016-03-25 2018-01-30 Infrastructure Grant Programme 6

13
Annexure Table B5 – Vote 5 : Education

14 250 5 700 3 000 50 –

Other - Packaged Education


153 Umlazi Fenc Ongoing Project Umlazi Primary 2016-03-25 2018-01-30 Infrastructure Grant Programme 6
12 825 5 130 2 000 – –

Other - Packaged Education


154 Uthukela Fenc Ongoing Project Uthukela Primary 2016-03-25 2018-01-30 Infrastructure Grant Programme 6
2 000 – – – –
Education
155 Msinga Secondary School Project Initiation Umzinyathi Primary - - Infrastructure Grant Programme 6
18 709 17 666 1 223 – –
Education
156 Sampofu Intermediate School Final Completion Umzinyathi Primary 2013-03-08 2016-09-13 Infrastructure Grant Programme 6

Practical 19 222 15 621 1 000 – –


Completion Education
157 Dannhauser Primary School (100%) Amajuba Primary 2015-10-24 2016-03-31 Infrastructure Grant Programme 6
25 978 23 964 2 014 – –
Construction 76% Education
158 Esididini Primary School - 99% Amajuba Secondary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6
13 861 11 703 2 158 – –
Construction 26% Education
159 Nompondo Primary School - 50% Umkhanyakude Primary 2015-11-20 2018-03-30 Infrastructure Grant Programme 6
7 314 6 868 446 – –
Construction 76% Education
160 Nonjinjikazi Primary School - 99% Umkhanyakude Secondary 2015-10-24 2018-03-30 Infrastructure Grant Programme 6
15 326 13 261 2 065 – –
Construction 76% Education
161 Mampunga Intermediate School - 99% Umzinyathi Secondary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6
21 648 4 391 12 949 3 526 782
Construction 1% - Education
162 Carisbrooke Primary School 25% Harry Gwala Secondary 2015-11-20 2019-03-30 Infrastructure Grant Programme 6
18 419 – 20 10 15
Education
163 Cwaka Primary School Design Uthungulu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6

Practical 2 712 2 436 – – –


Completion Education
164 Enhlanhleni Combined School (100%) Harry Gwala Primary 2016-09-20 2013-08-16 Infrastructure Grant Programme 6
48 797 1 479 20 27 656 4 252
Education
165 Enqoleni Primary School Design Uthungulu Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
26 914 71 20 10 4 252
Education
166 Ethafeni Primary School Design Uthungulu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
16 890 – 12 588 50 4 252
Education
167 Ethulwane Primary School Tender Uthungulu Primary 2016-09-20 2018-04-21 Infrastructure Grant Programme 6
15 776 123 20 10 5 236
Education
168 Ferdinand Primary School Design Uthukela Secondary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
15 773 623 20 10 5 236
Education
169 Gabangenkosi Primary School Design Uthungulu Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
9 603 – 9 000 603 –
Construction 51% Education
170 Ifafa Primary School - 75% Ugu Primary 2016-03-24 2017-05-05 Infrastructure Grant Programme 6
24 679 3 393 20 10 5 236
Education
171 Inyamazwe Primary School Design Uthukela Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
2 391 14 20 10 1 235
Education
172 Ithongasi Primary School Design Ugu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
2 391 137 2 000 254 –
Construction 76% Education
173 Kromhoek Combined School - 99% Harry Gwala Primary 2016-09-20 2018-11-30 Infrastructure Grant Programme 6
14 046 12 417 1 600 29 –
Construction 26% Education
174 Muntuza Primary School - 50% Uthukela Primary 2015-10-24 2018-11-30 Infrastructure Grant Programme 6
35 731 – 29 767 50 5 243
Education
175 Mzingazi Primary School Tender Uthungulu Secondary 2016-09-20 2018-04-21 Infrastructure Grant Programme 6
32 183 – 20 10 5 243
Education
176 Mzingwenya Primary School Design Uthungulu Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
7 232 – 3 000 50 1 325
Education
177 Ngxongwane Primary School Tender Zululand Primary 2015-10-24 2018-04-21 Infrastructure Grant Programme 6
23 147 – 20 10 4 251
Education
178 Nongoma Primary School Design Zululand Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
8 602 – 20 10 4 251
Education
179 Nqulwane Primary School Design Zululand Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
9 959 851 20 10 4 251
Education
180 Patsoana Primary School Design Umzinyathi Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6

14
Annexure Table B5 – Vote 5 : Education

200 066 549 21 467 5 200 7 526


Education
181 Pholela Special School Tender Harry Gwala Primary 2015-11-20 2018-04-21 Infrastructure Grant Programme 6
8 307 884 20 10 4 251
Education
182 Pomeroy Primary School Design Umzinyathi Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
7 771 – 20 10 4 251
Education
183 Thakazela Primary School Design Zululand Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
16 193 – 20 10 5 236
Education
184 Thembalimbe Primary School Design Uthungulu Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
104 825 51 613 28 055 3 250 –
Ukukhanya Komsinga Special Construction 26% Education
185 School - 50% Umzinyathi Primary 2016-09-20 2019-03-30 Infrastructure Grant Programme 6

Practical 4 223 2 085 638 – –


Completion Education
186 Bhekinkosi Primary School (100%) Umkhanyakude Primary 2015-11-20 2016-10-24 Infrastructure Grant Programme 6
20 183 6 587 13 000 596 –
Construction 76% Education
187 Dannhauser Primary School - 99% Amajuba Secondary 2015-10-24 2019-03-30 Infrastructure Grant Programme 6
14 005 45 20 10 5 236
Education
188 Arthur Blaxall Special School Design Umgungundlovu Secondary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
4 674 2 996 1 678 – –
Construction 76% Education
189 Inkazimulo Primary School - 99% Pinetown Primary 2015-10-24 2018-03-30 Infrastructure Grant Programme 6
14 168 6 141 8 000 27 –
Construction 26% Education
190 Engoleleni Primary School - 50% Umgungundlovu Primary 2016-09-20 2018-11-30 Infrastructure Grant Programme 6
14 005 314 20 10 3 652
Education
191 Entokozweni Special School Design Umgungundlovu Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
29 113 27 379 1 700 34 –
Construction 76% Education
192 Kwamadlala Primary School - 99% Umgungundlovu Secondary 2015-10-24 2018-11-30 Infrastructure Grant Programme 6
42 169 1 865 20 9 866 –
Education
193 Open Gate Special School Design Umgungundlovu Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6

Practical 11 527 11 522 – – –


Completion Education
194 Peter Pan Special School (100%) Umgungundlovu Primary 2015-11-20 2016/04/31 Infrastructure Grant Programme 6
20 401 9 650 7 230 2 568 953
Construction 26% Education
195 Phangindawo Primary School - 50% Umgungundlovu Primary 2015-10-24 2018-11-30 Infrastructure Grant Programme 6
8 219 – 20 10 15
Education
196 Qhamukile Primary School Design Umgungundlovu Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
26 374 1 100 350 10 15
Education
197 Macambini Primary School Design Ilembe Secondary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
20 449 826 350 10 15
Education
198 Nokubusa Primary School Design Ilembe Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
30 766 1 272 350 10 5 243
Education
199 Noodsberg Primary School Design Ilembe Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6

Practical 7 670 3 881 789 – –


Nsimbini Primary School Completion Education
200 (Mayville) (100%) Umlazi Specialised 2015-11-20 2016-01-19 Infrastructure Grant Programme 6
88 637 4 674 3 040 9 428 7 526
Education
201 Stanger Training Centre Design Ilembe Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
75 012 3 244 5 050 8 520 7 526
Education
202 Ywca Special School Design Amajuba Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
15 981 – 10 908 8 932 –
Construction 1% - Education
203 Management Fee 25% Umgungundlovu Secondary 2015-11-20 2017-03-31 Infrastructure Grant Programme 6

Practical 2 703 2 295 108 – –


Completion Education
204 Beaulah Primary School (100%) Ugu Secondary 2015-10-24 2014-01-29 Infrastructure Grant Programme 6
21 402 14 053 6 904 445 –
Construction 76% Education
205 Bizimali Secondary School - 99% Uthungulu Secondary 2016-09-20 2018-11-30 Infrastructure Grant Programme 6

Practical 6 790 6 773 – – –


Completion Education
206 Drc Junior Secondary School (100%) Harry Gwala Primary 2015-11-20 2016/04/31 Infrastructure Grant Programme 6
26 053 – 20 10 5 236
Education
207 Emjalisweni Primary School Design Ugu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
12 607 9 760 2 847 – –
Construction 76% Education
208 Empathe Intermediate School - 99% Umzinyathi Primary 2016-09-20 2016-10-11 Infrastructure Grant Programme 6

15
Annexure Table B5 – Vote 5 : Education

Practical 1 743 1 510 – – –


Florence Booth Intermediate Completion Education
209 School (100%) Uthukela Secondary 2015-11-20 2016/04/31 Infrastructure Grant Programme 6

Practical 2 402 1 778 24 – –


Completion Education
210 Gem Ntshebe Primary School (100%) Ugu Primary 2015-10-24 2013-10-09 Infrastructure Grant Programme 6
13 609 – – 4 375 4 523
Education
211 Ihawulethu Secondary School Project Initiation Uthungulu Primary 2016-09-20 2019-03-20 Infrastructure Grant Programme 6
15 545 – 5 965 5 238 2 545
Impumelelo Senior Primary Construction 76% Education
212 School - 99% Ugu Secondary 2015-11-20 2017-03-30 Infrastructure Grant Programme 6

Practical 2 550 2 521 – – –


Completion Education
213 Jirah Primary School (100%) Harry Gwala Secondary 2015-10-24 2016/04/31 Infrastructure Grant Programme 6
4 807 – 20 10 15
Education
214 Khula Secondary School Design Uthungulu Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
10 000 – – 10 3 256
Education
215 Khuluma Intermediate School Project Initiation Harry Gwala Primary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6
1 946 1 087 220 – –
Construction 26% Education
216 Kwadinda Primary School - 50% Umzinyathi Primary 2015-10-24 2018-03-30 Infrastructure Grant Programme 6
4 623 2 880 543 – –
Construction 26% Education
217 Macala Primary School - 50% Uthungulu Secondary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6
12 112 9 206 906 – –
Construction 76% Education
218 Macekane Primary School - 99% Uthungulu Primary 2015-11-20 2018-03-30 Infrastructure Grant Programme 6
22 351 1 253 20 10 4 523
Education
219 Macingwane Seconday School Design Umzinyathi Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6

Practical 2 790 2 087 103 – –


Completion Education
220 Mahehle Primary School (100%) Harry Gwala Primary 2016-09-20 2013-08-16 Infrastructure Grant Programme 6
876 – – 10 15
Education
221 Manqoba Secondary School Project Initiation Umzinyathi Secondary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6

Practical 1 863 1 657 – – –


Completion Education
222 Mathendeka Primary School (100%) Umzinyathi Secondary 2015-10-24 2016-03-18 Infrastructure Grant Programme 6
20 737 – 20 10 5 236
Education
223 Mdlangaswa Secondary School Design Ugu Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6

Practical 8 215 6 20 10 15
Merlewood Secondary School Completion Education
224 (Phase 1) (100%) Ugu Secondary 2011-03-03 2013-06-05 Infrastructure Grant Programme 6
19 559 – 20 10 4 523
Education
225 Mgai Primary School Design Ugu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6

Practical 7 028 6 440 – – –


Completion Education
226 Mhayise Secondary School (100%) Umzinyathi Primary 2016-09-20 2016/04/31 Infrastructure Grant Programme 6

Practical 10 568 9 369 210 339 –


Mloyiswa Junior Secondary Completion Education
227 School (Ph 1) (100%) Uthungulu Secondary 2015-11-20 2012-04-19 Infrastructure Grant Programme 6

Practical 10 568 9 369 – – –


Mloyiswa Junior Secondary Completion Education
228 School (Ph 2) (100%) Uthungulu Primary 2015-11-20 2012-04-19 Infrastructure Grant Programme 6
27 439 908 20 10 4 586
Education
229 Morningside Combined School Design Umzinyathi Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
59 003 59 582 591 – –
Construction 76% Education
230 Mpumelelo Secondary School - 99% Uthukela Primary 2015-11-20 2018-03-30 Infrastructure Grant Programme 6

Practical 6 656 5 403 174 279 –


Completion Education
231 Muziwephahla Secondary School (100%) Zululand Primary 2015-10-24 2013-07-20 Infrastructure Grant Programme 6

Practical 3 093 2 477 116 – –


Completion Education
232 Ngadumbili Primary School (100%) Zululand Primary 2016-09-20 2013-12-13 Infrastructure Grant Programme 6

Practical 11 641 9 575 267 299 –


Completion Education
233 Nhloshane Primary School (100%) Uthungulu Primary 2015-11-20 2016/04/31 Infrastructure Grant Programme 6
18 014 519 20 10 15
Education
234 Nkayishana Primary School Design Umzinyathi Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
21 – – 10 15
Education
235 Nokhwezi Primary School Project Initiation Harry Gwala Primary 2016-09-20 2019-03-20 Infrastructure Grant Programme 6

Practical 16 680 10 853 730 3 694 –


Completion Education
236 Old Mill Secondary School (100%) Uthungulu Secondary 2015-11-20 2014-03-28 Infrastructure Grant Programme 6

16
Annexure Table B5 – Vote 5 : Education

Practical 19 552 14 959 1 410 471 –


Phalane Primary School Completion Education
237 (Nkandla) (100%) Uthungulu Primary 2015-10-24 2013-10-16 Infrastructure Grant Programme 6
28 012 1 061 20 10 15
Education
238 Phumelela Secondary School Design Umzinyathi Secondary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6

Practical 34 047 24 529 1 573 2 530 1 235


Completion
239 Pongola Combined School (100%) Zululand Primary 2015-11-20 2014-04-11 Equitable Share Programme 6
11 095 – 20 10 3 256
Education
240 Shonkweni Primary School Design Ugu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
– 5 878 – – –
Education
241 Sibomvu Primary School Project Initiation Uthungulu Secondary - - Infrastructure Grant Programme 6
1 – – – –
Construction 76% Education
242 Sibomvu Primary School - 99% Uthungulu Primary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6
3 841 – 20 10 1 235
Education
243 Sosukwana Primary School Design Ugu Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6

Practical 15 369 12 210 31 349 –


Completion Education
244 Thokoza Secondary School (100%) Uthukela Primary 2015-10-24 2016/04/31 Infrastructure Grant Programme 6

Practical 3 585 3 380 – – –


Completion Education
245 Vukuzame Primary School (100%) Zululand Primary 2016-09-20 2013-06-30 Infrastructure Grant Programme 6

Practical 5 468 4 842 26 – –


Completion Education
246 Vulekani Primary School (100%) Uthukela Primary 2015-11-20 2013-01-16 Infrastructure Grant Programme 6

Practical 23 743 19 417 – 1 528 253


Completion Education
247 Zakhele Primary School (100%) Umzinyathi Primary 2015-10-24 2013-01-16 Infrastructure Grant Programme 6

Practical 13 916 4 030 2 389 2 543 56


Completion Education
248 Zamukulungisa Primary School (100%) Harry Gwala Secondary 2016-09-20 2013-01-16 Infrastructure Grant Programme 6

Practical 4 390 4 268 – – –


Completion Education
249 Zimema Primary School (100%) Harry Gwala Primary 2015-11-20 2013-01-16 Infrastructure Grant Programme 6

Practical 3 451 3 074 – – –


Completion Education
250 Zondela Primary School (100%) Zululand Primary 2015-10-24 2013-01-16 Infrastructure Grant Programme 6
4 597 1 207 332 2 158 –
Construction 26% Education
251 Bukimvelo Secondary School - 50% Umkhanyakude Primary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6
14 627 12 889 900 100 –
Construction 76% Education
252 Entweni Primary School - 99% Umkhanyakude Secondary 2015-11-20 2018-11-30 Infrastructure Grant Programme 6

Practical 4 500 4 431 – – –


Completion Education
253 Bhekilanga Primary School (100%) Pinetown Primary 2015-10-24 2012-11-12 Infrastructure Grant Programme 6
17 279 – – 10 15
Education
254 Dawede Primary School Project Initiation Pinetown Primary 2016-09-20 2019-03-20 Infrastructure Grant Programme 6
8 829 3 101 1 142 3 256 3 260
Construction 51% Education
255 Duffs Road Primary School - 75% Umlazi Secondary 2016-03-18 2016-11-30 Infrastructure Grant Programme 6
14 678 12 447 1 000 – –
Construction 76% Education
256 Dulini Primary School - 99% Ilembe Secondary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6
7 152 – – 10 15
Education
257 Congco Secondary School Project Initiation Umgungundlovu Primary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6
889 142 20 10 15
Education
258 Godloza Secondary School Design Umkhanyakude Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
3 031 7 713 53 – –
CONSTRUCTION Education
259 Gokul Primary School 1% - 25% Umlazi Secondary 2016-06-30 2018-03-30 Infrastructure Grant Programme 6
612 121 20 10 15
CONSTRUCTION Education
260 Ikusasalethu Secondary School 1% - 25% Umkhanyakude Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
7 152 – 20 10 15
Education
261 Ebunguni Secondary School Design Umgungundlovu Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6

Practical 15 294 13 571 – 154 –


Completion Education
262 Khalipha Primary School (100%) Umlazi Primary 2011-06-17 2014-04-25 Infrastructure Grant Programme 6
27 356 – – 10 9 148
Education
263 Forest View Primary School Project Initiation Pinetown Primary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6
20 216 4 350 10 15
Education
264 Khanyisani Primary School Design Pinetown Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6

17
Annexure Table B5 – Vote 5 : Education

18 579 851 20 10 15
Education
265 Luhlanga Primary School Design Umkhanyakude Primary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
9 068 599 20 10 15
Education
266 Magcekeni Primary School Design Umkhanyakude Primary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
2 417 1 890 27 – –
Construction 76% Education
267 Emakeni Primary School - 99% Umgungundlovu Secondary 2015-10-24 2018-03-30 Infrastructure Grant Programme 6
16 205 675 350 10 5 236
Education
268 Hope Combined School Design Amajuba Secondary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6
1 340 183 20 10 1 127
Manhlenga Junior Secondary Education
269 School Design Umkhanyakude Secondary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
5 591 4 156 335 – –
Construction 76% Education
270 Mavela Secondary School - 99% Umkhanyakude Primary 2015-10-24 2018-03-30 Infrastructure Grant Programme 6

Practical 4 256 3 647 – 558 –


Completion Education
271 Nkanyiso Secondary School (100%) Umkhanyakude Secondary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6
15 435 11 148 800 1 200 –
Construction 76% Education
272 Nkungwini Primary School - 99% Umkhanyakude Primary 2015-11-20 2018-11-30 Infrastructure Grant Programme 6

Practical 5 425 4 540 285 – –


Nodineka Junior Secondary Completion Education
273 School (100%) Umkhanyakude Secondary 2015-10-24 2018-03-30 Infrastructure Grant Programme 6

Practical 7 670 – 47 – –
Nsimbini Primary School Completion Education
274 (Mayville) (100%) Umlazi Secondary 2014-03-20 2016-01-27 Infrastructure Grant Programme 6
1 100 122 20 10 15
CONSTRUCTION Education
275 Nomathiya Secondary School 1% - 25% Umkhanyakude Secondary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
20 094 – – 10 4 253
Education
276 Kwabazothini Secondary School Project Initiation Pinetown Secondary 2015-10-24 2019-03-20 Infrastructure Grant Programme 6
18 120 – – 10 4 253
Kwadinabakubo Secondary Education
277 School Project Initiation Pinetown Secondary 2016-09-20 2019-03-20 Infrastructure Grant Programme 6
251 595 16 789 62 800 5 269 7 526
CONSTRUCTION Education
278 La Mercy Primary School 1% - 25% Pinetown Primary 2016-07-19 2017-12-15 Infrastructure Grant Programme 6
3 821 56 2 000 50 100
Construction 1% - Education
279 Seatides Combined School 25% Pinetown Primary 2016-07-20 2016-10-20 Infrastructure Grant Programme 6
15 279 – – 10 5 236
Education
280 Tholisu Primary School Project Initiation Umlazi Primary 2016-09-20 2019-03-20 Infrastructure Grant Programme 6
3 95 – 10 1 253
Education
281 Unyazi Primary School Project Initiation Ilembe Primary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6
18 658 18 656 – – –
Zakhele Primary School Construction 76% Education
282 (Esidumbini) - 99% Ilembe Primary 2015-10-24 2013-10-30 Infrastructure Grant Programme 6
18 094 – – 10 4 598
Education
283 Sithembile Primary School Project Initiation Pinetown Secondary 2016-09-20 2019-03-20 Infrastructure Grant Programme 6
7 152 – – 10 15
Esimozomeni Senior Primary Education
284 School Project Initiation Umgungundlovu Secondary 2015-11-20 2019-03-20 Infrastructure Grant Programme 6
5 496 4 478 300 18 –
Construction 76% Education
285 Nothando Secondary School - 99% Umkhanyakude Secondary 2015-10-24 2018-11-30 Infrastructure Grant Programme 6
19 216 – – 10 15
Education
286 St Julius Secondary School Project Initiation Pinetown Secondary 2016-09-20 2019-03-20 Infrastructure Grant Programme 6
1 925 1 709 16 – –
Construction 26% Education
287 Ntaminemidwa Secondary School - 50% Umkhanyakude Primary 2015-11-20 2018-03-30 Infrastructure Grant Programme 6
3 472 – 20 10 15
Education
288 Imbali Junior Secondary School Design Umgungundlovu Secondary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
20 874 20 617 57 – –
Construction 76% Education
289 Isiphosemvelo Secondary School - 99% Amajuba Secondary 2016-09-20 2018-03-30 Infrastructure Grant Programme 6
10 490 29 20 10 3 523
Education
290 Mconjwana Secondary School Design Umgungundlovu Secondary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
4 876 32 20 10 1 253
Education
291 Waterloo Secondary School Design Pinetown Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
22 495 41 20 10 15
Thongwana Junior Secondary Education
292 School Design Umkhanyakude Secondary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6

18
Annexure Table B5 – Vote 5 : Education

13 984 888 20 10 3 652


Education
293 Mt Pleasant Primary School Design Umgungundlovu Secondary 2015-11-20 2018-03-20 Infrastructure Grant Programme 6
17 151 684 20 10 15
Education
294 Zandlazethu Secondary School Design Umkhanyakude Primary 2015-10-24 2018-03-20 Infrastructure Grant Programme 6
11 337 701 20 10 15
Ngcedomhlophe Secondary Education
295 School Design Umgungundlovu Secondary 2016-09-20 2018-03-20 Infrastructure Grant Programme 6

Practical 3 779 3 126 – – –


Completion Education
296 Sibongamandla Primary School (100%) Umgungundlovu Primary 2015-11-20 2014-02-13 Infrastructure Grant Programme 6

Practical 14 478 12 702 1 000 – –


Zizamele Junior Secondary Completion
297 School (100%) Pinetown Specialised 2011-07-17 2012-11-08 Equitable Share Programme 6
4 633 – – 10 15
Education
298 Zamelisizwe Primary School Project Initiation Umgungundlovu Secondary 2016-09-20 2019-03-20 Infrastructure Grant Programme 6
2 000 – – 10 30
Education
299 Bhokoza Primary School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6
1 832 – – 10 30
Embetha Junior Secondary Education
300 School Feasibility Umkhanyakude Primary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Esigedeni Junior Secondary Education
301 School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
302 Kwazibi Primary School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
303 Mashalaza Secondary School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
304 Mdungandlovu Secondary School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – – –
Education
305 Nhlange Junior Secondary School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
306 Vezukusa Primary School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Nkosikayingangathi Secondary Education
307 School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
308 Zizamele Secondary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
309 Khanyakufikile Primary School Project Initiation Zululand Secondary 2016-08-15 - Infrastructure Grant Programme 6
22 946 12 018 3 256 1 500 –

Other - Packaged Education


310 Zululand Fencing Ongoing Project Zululand Secondary 2015-11-20 2018-01-30 Infrastructure Grant Programme 6
8 000 – – 10 –
Education
311 Ethel Mthiyane Special School Project Initiation Ilembe Secondary 2015-11-20 2018-11-02 Infrastructure Grant Programme 6
8 000 – – 10 3 209
Education
312 Mason Lincoln Special School Project Initiation Umlazi Primary 2015-10-24 2018-11-02 Infrastructure Grant Programme 6
313 Bulwer Primary School Project Initiation Harry Gwala Public School 2017-09-01 2018-09-02 Equitable Share Programme 6 16 680 – – 10 –
3 341 – – 50 –
314 Dlilanga Secondary School Feasibility Umkhanyakude Public School 2017-09-01 2018-09-02 Equitable Share Programme 6
Construction 76% 17 089 14 629 27 – –
315 Duduzani Primary School - 99% Pinetown Public School 2015-11-20 2017-03-30 Equitable Share Programme 6
9 440 – – 50 –
316 Ntshongweni Primary School Feasibility Pinetown Public School 2017-09-01 2018-09-02 Equitable Share Programme 6
15 926 2 511 – 3 200 –
317 Public Pvt Partnership Design Umgungundlovu Public School 2016-04-01 2018-03-30 Equitable Share Programme 6
300 – 91 510 –
318 Management Fee Feasibility Umgungundlovu Specialised 2016-04-01 2017-03-31 Equitable Share Programme 6
319 Ebendle Primary School Design Ilembe Primary 2017-02-01 2018-05-28 Equitable Share Programme 6 6 369 – 96 10 3 500
7 161 – 20 10 3 500
320 Emkhambeni Primary School Project Initiation Ilembe Primary 2017-02-01 2018-05-28 Equitable Share Programme 6

Practical 4 201 4 201 – – –


Completion
321 Adams College (100%) Umlazi Primary 2014-06-03 2014-12-11 Equitable Share Programme 6

Practical 2 747 2 232 – 395 –


Completion Education
322 Adams Primary School (100%) Umlazi Secondary 2014-02-12 2014-11-14 Infrastructure Grant Programme 6

Practical 1 251 915 – 236 –


Amandlethu Secondary School Completion
323 (Inanda) (100%) Pinetown Secondary 2013-11-22 2014-05-09 Equitable Share Programme 6

19
Annexure Table B5 – Vote 5 : Education

Practical 1 638 1 345 – 179 –


Completion Education
324 Amaoti Primary School (100%) Pinetown Secondary 2014-07-17 2014-09-30 Infrastructure Grant Programme 6

Practical 953 476 – 375 –


Completion Education
325 Bhekisisa Secondary School (100%) Pinetown Primary 2014-02-26 2014-04-29 Infrastructure Grant Programme 6

Practical 1 402 1 094 – 200 –


Completion Education
326 Dubeyane Primary School (100%) Ilembe Primary 2014-02-12 2014-07-18 Infrastructure Grant Programme 6

Practical 1 989 1 968 – – –


Completion Education
327 Ekukhoseleni Primary School (100%) Umlazi Primary / Secondary 2013-03-08 2013-06-21 Infrastructure Grant Programme 6

Practical 2 253 1 822 – 300 –


Completion
328 Ekwazini Secondary School (100%) Umlazi Secondary 2014-02-12 2014-08-21 Equitable Share Programme 6

Practical 2 221 2 221 – – –


Completion Education
329 Emangadini Primary School (100%) Umlazi Specialised 2013-11-19 2014-09-02 Infrastructure Grant Programme 6

Practical 1 636 1 296 – 200 –


Completion
330 Embusweni Primary School (100%) Ilembe Specialised 2014-03-18 2015-05-12 Equitable Share Programme 6

Practical 2 201 2 201 – – –


Completion
331 Sikhwama Secondary School (100%) Umlazi Secondary 2013-11-19 2014-08-29 Equitable Share Programme 6

Practical 2 368 2 282 – – –


Completion
332 Fundinduku Secondary School (100%) Umlazi Secondary 2013-11-19 2014-09-14 Equitable Share Programme 6
Hlengisizwe Junior Primary 2 224 – 350 322 3 500
333 School Design Umlazi Specialised 2017-02-01 2018-05-28 Equitable Share Programme 6

Practical 1 982 998 400 300 –


Completion Education
334 Indukwentsha Secondary School (100%) Ilembe Primary 2014-04-09 2014-09-12 Infrastructure Grant Programme 6
2 000 – – 10 30
335 Emazabekweni Primary School Project Initiation Harry Gwala Specialised - - Equitable Share Programme 6
2 000 – – 10 30
Education
336 Isihlangusabasha Primary School Project Initiation Pinetown Secondary 1900-01-01 1900-01-01 Infrastructure Grant Programme 6
500 – 350 10 3 500
Education
337 Isihlangusabasha Primary School Design Pinetown Secondary 1900-01-02 1900-01-02 Infrastructure Grant Programme 6

Practical 2 528 1 558 – 673 –


Completion Education
338 Iziphozethu Primary School (100%) Ilembe Secondary 2014-03-26 2014-07-18 Infrastructure Grant Programme 6

Practical 2 407 2 018 – 200 –


Completion Education
339 Kwamkhumbuzi Primary School (100%) Ilembe Primary 2014-03-24 2014-12-08 Infrastructure Grant Programme 6

Practical 3 532 2 828 – 200 3 500


Completion Education
340 Kwavusumuzi Secondary School (100%) Ilembe Primary 2013-11-18 2014-05-07 Infrastructure Grant Programme 6

Practical 2 387 2 000 – 100 3 500


Completion Education
341 Mbulwini Primary School (100%) Ilembe Primary 2014-03-13 2014-09-09 Infrastructure Grant Programme 6

Practical 2 652 2 652 – – –


Completion Education
342 Mbuyazi Primary School (100%) Umlazi Secondary 2013-11-19 2014-09-19 Infrastructure Grant Programme 6
3 000 – 20 765 3 500
Education
343 Mfulamhle Combined School Feasibility Harry Gwala Primary 2017-02-01 2018-05-28 Infrastructure Grant Programme 6

Practical 1 774 1 347 – 300 –


Completion Education
344 Ngungwini Secondary School (100%) Ilembe Primary 2014-01-15 2014-09-26 Infrastructure Grant Programme 6

Practical 2 612 2 086 – 400 –


Completion Education
345 Nkunzemalunda Primary School (100%) Ilembe Secondary 2014-01-22 2014-07-18 Infrastructure Grant Programme 6
3 698 – 350 10 3 500
Education
346 Nkwenkwezi Secondary School Design Ilembe Primary 2017-02-01 2018-05-28 Infrastructure Grant Programme 6

Practical 2 415 1 670 – 500 –


Completion Education
347 Insuze-Gcwensa Primary School (100%) Ilembe Primary 2014-03-03 2014-09-17 Infrastructure Grant Programme 6

Practical 246 46 – 100 –


Completion Education
348 Ottawa Primary School (100%) Pinetown Primary 2014-06-25 2014-08-28 Infrastructure Grant Programme 6

Practical 2 212 1 019 – 893 –


Phezukomkhono Secondary Completion Education
349 School (100%) Ilembe Secondary 2014-01-14 2014-05-26 Infrastructure Grant Programme 6

Practical 1 570 1 226 – 200 –


Completion Education
350 Phuzulwazi Secondary School (100%) Ilembe Secondary 2014-02-26 2014-07-18 Infrastructure Grant Programme 6
2 505 – 350 10 3 500
Education
351 Saphumelela Primary School Design Umlazi Secondary 2017-02-01 2018-05-28 Infrastructure Grant Programme 6

Practical 3 653 2 917 – 600 –


Completion Education
352 Sithebe Primary School (100%) Ilembe Sanitation 2013-11-18 2014-05-26 Infrastructure Grant Programme 6

20
Annexure Table B5 – Vote 5 : Education

Practical 2 917 2 895 – – –


Completion Education
353 Sompukwane Secondary School (100%) Umlazi Primary 2013-11-19 2014-10-03 Infrastructure Grant Programme 6

Practical 1 742 1 146 – 400 –


Completion Education
354 Ubuhlebemfundo Primary School (100%) Ilembe Secondary 2014-01-22 2014-06-24 Infrastructure Grant Programme 6

Practical 1 927 1 108 – 300 3 500


Umsunduze Senior Primary Completion Education
355 School (100%) Ilembe Secondary 2014-01-22 2014-06-24 Infrastructure Grant Programme 6

Practical 441 176 – 100 –


Completion Education
356 Umtapho Secondary School (100%) Pinetown Primary 2014-05-17 2014-09-05 Infrastructure Grant Programme 6

Practical 1 596 682 111 250 3 500


Completion Education
357 Uyikhulu Secondary School (100%) Ilembe Primary 2014-01-15 2014-06-17 Infrastructure Grant Programme 6

Practical 2 480 1 666 – 236 3 500


Completion Education
358 Zwelethu Secondary School (100%) Umlazi Secondary 2014-02-27 2014-11-13 Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
359 Amatshezulu Secondary School Feasibility Pinetown Secondary - - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
360 Botate Primary School Feasibility Pinetown Primary 1900-01-01 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
361 Empilweni Primary School Feasibility Pinetown Secondary 1900-01-02 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
362 Esiphukwini Primary School Feasibility Umlazi Primary 1900-01-03 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
363 Fredville Senior Primary School Feasibility Pinetown Primary 1900-01-04 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
364 Gwadu Zenex Primary School Feasibility Pinetown Secondary 1900-01-05 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
365 Ingqungqulu Secondary School Feasibility Pinetown Secondary 1900-01-06 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
366 Intinyane Primary School Feasibility Umlazi Primary 1900-01-07 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
367 Khanyakhwezi Primary School Feasibility Pinetown Primary 1900-01-08 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
368 Lalelani Primary School Feasibility Pinetown Secondary 1900-01-09 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
369 Lockhat Secondary School Feasibility Pinetown Primary 1900-01-10 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
370 Luphaphe Secondary School Feasibility Pinetown Primary 1900-01-11 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
371 Mandosi Combined School Feasibility Pinetown Secondary 1900-01-12 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Maqhutshana Junior Secondary Education
372 School Feasibility Pinetown Secondary 1900-01-13 - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
373 Mcopheleli Primary School Project Initiation Pinetown Secondary 1900-01-14 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
374 Mcopheleli Primary School Feasibility Pinetown Secondary 1900-01-15 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
375 Ndengetho Secondary School Feasibility Pinetown Primary 1900-01-16 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
376 Noqomfela Primary School Feasibility Pinetown Primary 1900-01-17 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
377 Nqobane Primary School Feasibility Pinetown Primary 1900-01-18 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
378 Nwabi Secondary School Feasibility Umlazi Primary 1900-01-19 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
379 Nyoni Primary School Feasibility Pinetown Primary 1900-01-20 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Senzokuhle Primary School Education
380 (Inanda) Feasibility Pinetown Primary 1900-01-21 - Infrastructure Grant Programme 6

21
Annexure Table B5 – Vote 5 : Education

500 – 20 50 3 500
Education
381 Shembe Primary School Feasibility Pinetown Secondary 1900-01-22 - Infrastructure Grant Programme 6
680 – 20 50 3 500
Education
382 Silverdale Primary School Feasibility Pinetown Primary 1900-01-23 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
383 Sunduzwayo Primary School Feasibility Umlazi Primary 1900-01-24 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
384 Thabela Secondary School Feasibility Pinetown Primary 1900-01-25 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
385 Ukusa Secondary School Feasibility Pinetown Secondary 1900-01-26 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
386 Ukusakwabasha Primary School Feasibility Pinetown Secondary 1900-01-27 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Umnini Memorial Senior Primary Education
387 School Feasibility Umlazi Primary 1900-01-28 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
388 Umthente Secondary School Feasibility Umlazi Primary 1900-01-29 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
389 Umzamo Primary School Feasibility Pinetown Secondary 1900-01-30 - Infrastructure Grant Programme 6
500 – 20 50 3 500
Education
390 Wiliwili Primary School Feasibility Pinetown Primary 1900-01-31 - Infrastructure Grant Programme 6
Phumanyova Junior Primary 38 000 – – 1 010 4 050
391 School Project Initiation Zululand Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6
392 Zululand Project Initiation Zululand Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6 30 000 – – 1 010 4 050
393 Ecekeza Secondary School Feasibility Ugu Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6 4 000 – – 1 050 4 050
4 000 – – 1 050 4 050
394 Emzamweni Secondary School Feasibility Umgungundlovu Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6
395 Engwaqa Secondary School Feasibility Harry Gwala Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6 4 000 – – 1 050 4 050
396 Entabeni Primary School Feasibility Ugu Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6 4 000 – – 1 050 4 050
397 Franklin Secondary School Feasibility Harry Gwala Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6 4 000 – – 1 050 4 050
398 Gobume Secondary School Feasibility Ugu Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6 4 000 – – 1 050 4 050
399 Hlokozi Secondary School Feasibility Harry Gwala Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6 4 000 – – 1 050 4 050
400 Ingwemabala Comp School Feasibility Ugu Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6 4 000 – – 1 050 4 050
4 000 – – 1 050 4 050
401 Kwamasosha Secondary School Feasibility Ugu Chemical Toilets 2017-04-30 2019-03-30 Equitable Share Programme 6
4 000 – – 1 050 4 050
Education
402 Mabandla Secondary School Feasibility Harry Gwala Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
4 000 – – 1 050 4 050
Education
403 Madwaleni Primary School Feasibility Harry Gwala Specialised 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
4 000 – – 1 050 4 050
Education
404 Mbonwa Secondary School Feasibility Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
4 000 – – 1 050 4 050
Education
405 Phindavele Secondary School Feasibility Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
4 000 – – 1 050 4 050
Education
406 Siyaphambili Secondary School Feasibility Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
4 000 – – 1 050 4 050
Sizathina Junior Secondary Education
407 School Feasibility Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
4 000 – – 1 050 4 050
Education
408 Thanduxolo Primary School Feasibility Harry Gwala Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
22 102 172 20 1 010 4 050
Elukolweni Junior Secondary Education
409 School Design Harry Gwala Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
7 517 293 20 1 010 4 050
Education
410 Ewubwini Primary School Design Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
35 565 1 904 20 1 010 4 050
Education
411 Georgedale Primary School Design Pinetown Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6

Practical 7 219 8 015 – – –


Completion Education
412 Indonsa Secondary School (100%) Amajuba Secondary 2012-09-20 2015-04-05 Infrastructure Grant Programme 6
2 000 – – – –
Education
413 Ingulule Primary School Design Ilembe Secondary - - Infrastructure Grant Programme 6
7 896 – 20 10 4 050
Education
414 Ingulule Primary School Design Ilembe Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
13 486 292 20 10 4 050
Education
415 Inhlazuka Primary School Design Umgungundlovu Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6

22
Annexure Table B5 – Vote 5 : Education

19 012 282 20 10 4 050


Education
416 Inkwali Primary School Feasibility Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
10 065 6 707 110 1 091 4 050
Construction 76% Education
417 Isikhalisezwe Secondary School - 99% Amajuba Secondary 2012-02-22 2018-01-30 Infrastructure Grant Programme 6

Practical 9 425 4 914 – 1 091 4 050


Completion Education
418 Ithala Secondary School (100%) Uthungulu Secondary 2012-02-08 2013-09-29 Infrastructure Grant Programme 6

Practical 6 000 3 447 – – –


Completion Education
419 Khethukuthula Secondary School (100%) Zululand Secondary 2012-02-29 2015-08-30 Infrastructure Grant Programme 6
6 611 4 282 110 1 206 –
Construction 76% Education
420 Kwandunge Secondary School - 99% Umzinyathi Primary 2012-02-29 2018-01-30 Infrastructure Grant Programme 6
31 818 882 20 10 4 050
Education
421 Mabhila Intermediate School Design Pinetown Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
9 809 3 747 310 2 373 4 050
Construction 51% Education
422 Majiya Secondary School - 75% Uthungulu Secondary 2012-02-29 2018-01-30 Infrastructure Grant Programme 6

Practical 3 915 4 048 – 2 818 –


Completion Education
423 Mchitheki Secondary School (100%) Zululand Primary 2012-02-29 2013-09-29 Infrastructure Grant Programme 6
6 051 4 476 75 2 500 –
Construction 76% Education
424 Mhlangezulu Secondary School - 99% Umzinyathi Primary 2012-02-08 2018-01-30 Infrastructure Grant Programme 6
3 804 3 610 110 44 –
Construction 76% Education
425 Mqamathi Secondary School - 99% Umzinyathi Primary 2012-02-08 2018-01-30 Infrastructure Grant Programme 6

Practical 4 765 1 264 – 3 091 4 050


Completion Education
426 Ngwanya Secondary School (100%) Zululand Secondary 2012-02-29 2013-09-29 Infrastructure Grant Programme 6
19 387 352 20 10 4 050
Education
427 Ngweyonke Secondary School Design Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6

Practical 3 020 3 025 – – –


Completion Education
428 Nkanyiso Secondary School (100%) Uthungulu Secondary 2012-02-08 2013-09-29 Infrastructure Grant Programme 6
19 059 809 20 10 4 290
Education
429 Nkonkasecondary School Design Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
48 931 1 469 20 1 520 7 090
Education
430 Ohlange Secondary School Design Pinetown Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
Construction 76% 5 318 5 714 110 – –
431 Qhamuka Secondary School - 99% Uthungulu Secondary 2012-02-29 2018-01-30 Equitable Share Programme 6
15 713 225 20 10 4 050
Education
432 Ramarobi Secondary School Design Harry Gwala Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
7 856 548 20 10 4 050
433 Richlea Primary School Design Umgungundlovu Secondary 2017-04-30 2019-03-30 Equitable Share Programme 6
7 805 385 20 10 4 050
434 Shiyampahla Primary School Design Umgungundlovu Secondary 2017-04-30 2019-03-30 Equitable Share Programme 6
23 165 2 466 20 10 4 050
Education
435 Sibongumusa Secondary School Design Umgungundlovu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
20 901 750 20 10 4 050
Education
436 Sizakancane Primary School Design Harry Gwala Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
19 125 767 20 10 4 050
Education
437 Straalhoek Primary School Design Harry Gwala Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
27 278 716 20 513 4 050
Education
438 Sutton Primary School Design Ugu Secondary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6

Practical 6 019 7 099 – – –


Completion Education
439 Ziphakamiseni Secondary School (100%) Amajuba Secondary 2012-03-07 2013-10-30 Infrastructure Grant Programme 6
440 Amandawe Primary School Design Ugu Desludging 2017-04-30 2019-03-30 Equitable Share Programme 6 6 325 – 350 10 –
441 Amandlalathi Primary School Feasibility Ugu Desludging 2017-04-30 2019-03-30 Equitable Share Programme 6 1 140 – 20 50 –
18 749 985 350 10 2 272
442 Ashdown Primary School Design Umgungundlovu Desludging 2017-04-30 2019-03-30 Equitable Share Programme 6
5 971 – 20 10 –
443 Bazaneni Primary School Design Umkhanyakude Desludging 2017-04-30 2019-03-30 Equitable Share Programme 6
Construction 76% 2 267 245 110 – –
444 Peacetown Primary School - 99% Uthukela Desludging 2015-04-01 - Equitable Share Programme 6
Celimfundo Primary School Construction 51% 3 783 2 369 310 – –
445 (Tugela Ferry) - 75% Umzinyathi Desludging 2012-10-03 2018-01-30 Equitable Share Programme 6
446 Coniston Primary School Feasibility Ugu Desludging 2017-04-30 2019-03-30 Equitable Share Programme 6 2 530 – 20 50 486
2 985 – 20 10 621
447 Esiphahleni Primary School Design Umkhanyakude Desludging 2017-04-30 2019-03-30 Equitable Share Programme 6
5 971 – 20 10 1 113
448 Fukula Primary School Design Umkhanyakude Desludging 2017-04-30 2019-03-30 Equitable Share Programme 6

23
Annexure Table B5 – Vote 5 : Education

Practical 21 253 17 901 – – –


Gloucester Junior Secondary Completion Education
449 School (100%) Harry Gwala Primary 2010-10-01 2012-01-11 Infrastructure Grant Programme 6
1 493 – 20 10 –
Education
450 Inkuthazelo Primary School Design Umkhanyakude Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6

Practical 20 419 20 315 – – –


Completion Education
451 Jabulani Primary School (100%) Uthukela Primary 2012-09-06 2014-06-25 Infrastructure Grant Programme 6

Practical 1 344 1 286 – – –


Completion Education
452 Jaja Primary School (100%) Umlazi Primary 2012-02-08 2015-06-15 Infrastructure Grant Programme 6
1 196 – 20 10 973
Education
453 Masimdumise Primary School Design Ilembe Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
2 530 – 310 1 843 –
Construction 51% Education
454 Mlamleli Primary School - 75% Ugu Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
6 325 313 110 1 223 –
Construction 76% Education
455 Mntimande Primary School - 99% Ugu Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
3 143 – 20 10 152
Education
456 Mtikini Primary School Design Umkhanyakude Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
1 493 – 20 10 –
Education
457 Ncakubana Primary School Design Harry Gwala Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
6 178 – 20 10 843
Education
458 Nguluzana Primary School Design Uthungulu Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
3 143 – – 10 –
Education
459 Nkaseni Intermediate School Feasibility Uthukela Primary 2017-04-30 2019-03-30 Infrastructure Grant Programme 6
27 404 2 597 4 298 16 598 960
Construction 1% - Education
460 Nkosiyethu Primary School 25% Zululand Primary 2015-11-25 2018-11-30 Infrastructure Grant Programme 6
1 556 – 110 – –
Construction 76% Education
461 Kwenzokuhle Primary School - 99% Uthukela Primary 2015-04-01 - Infrastructure Grant Programme 6
1 156 – 110 – –
Construction 76% Education
462 Kopleegte Primary School - 99% Uthukela Primary 2015-04-01 Infrastructure Grant Programme 6
5 971 – 20 2 818 –
Education
463 Qhubimfundo Primary School Feasibility Amajuba Primary 2014-04-01 2018-03-30 Infrastructure Grant Programme 6
1 344 1 286 20 2 500 –
Education
464 Sizamokuhle Primary School Feasibility Umlazi Primary 2012-02-08 2015-06-15 Infrastructure Grant Programme 6
261 56 310 – –
Construction 51% Education
465 Esibanini Intermediate School - 75% Umzinyathi Primary 2010-11-03 2018-01-30 Infrastructure Grant Programme 6

Practical 1 555 1 177 – – –


Completion Education
466 Mathubu Primary School (100%) Uthungulu Primary 2011-01-18 2011-06-17 Infrastructure Grant Programme 6

Practical 577 388 – – –


Prince Dabulamanzi Senior Completion Education
467 Primary School (100%) Zululand Primary 2012-10-03 2014-06-15 Infrastructure Grant Programme 6
– 7 384 490 – –

Other - Packaged Education


468 Zululand Fence Ongoing Project Zululand Primary - - Infrastructure Grant Programme 6
– 10 239 6 752 93 –

Other - Packaged Education


469 Harry Gwala Fence Ongoing Project Harry Gwala Primary 1900-01-01 1900-01-01 Infrastructure Grant Programme 6
– 442 4 900 – –

Other - Packaged Education


470 Uthungulu Fence Ongoing Project Uthungulu Primary 1900-01-02 1900-01-02 Infrastructure Grant Programme 6
– 8 895 490 – –

Other - Packaged Education


471 Pinetown Fence Ongoing Project Pinetown Primary 1900-01-03 1900-01-03 Infrastructure Grant Programme 6
32 000 1 368 2 000 – –

Other - Packaged Education


472 Ugu Fence Ongoing Project Ugu Primary 1900-01-04 1900-01-04 Infrastructure Grant Programme 6
– 474 – – –

Other - Packaged
473 Umgungundlovu Fence Ongoing Project Umgungundlovu Primary 1900-01-05 1900-01-05 Equitable Share Programme 6
– 470 – – –

Other - Packaged
474 Ilembe Fence Ongoing Project Ilembe Primary 1900-01-06 1900-01-06 Equitable Share Programme 6

24
Annexure Table B5 – Vote 5 : Education

– 6 553 – – –

Other - Packaged
475 Umlazi Fence Ongoing Project Umlazi Primary 1900-01-07 1900-01-07 Equitable Share Programme 6
– 3 543 – – –

Other - Packaged Education


476 Umkhanyakude Fence Ongoing Project Umkhanyakude Secondary 1900-01-08 1900-01-08 Infrastructure Grant Programme 6

Practical 2 646 2 485 – – –


Completion Education
477 Himmelberg Intermediate School (100%) Ugu Primary 2012-05-26 2014-12-15 Infrastructure Grant Programme 6
1 100 1 100 – – –
Education
478 Khulani Special School Final Completion Umkhanyakude Secondary 2014-09-20 2014-12-28 Infrastructure Grant Programme 6

Practical 2 717 2 415 – – –


Completion Education
479 Lusiba Primary School (100%) Harry Gwala Primary 2012-05-26 2014-12-15 Infrastructure Grant Programme 6
110 775 108 189 207 – –
Construction 76% Education
480 Malezulu Primary School - 99% Harry Gwala Primary 2011-05-23 2018-01-30 Infrastructure Grant Programme 6

Practical 19 097 18 660 – – –


Completion Education
481 Inkanyezi Training Centre (100%) Uthukela Primary 2011-10-10 2014-09-30 Infrastructure Grant Programme 6
20 416 – 350 10 –
Education
482 Musa School For Disabled Design Zululand Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
29 897 – – 50 –
Education
483 St Christophers Special School Feasibility Umgungundlovu Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
37 715 – 11 713 18 956 –
Construction 1% - Education
484 Management Fee 25% Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
8 534 – 3 520 – 669
Construction 1% - Education
485 Amajuba Mobiles 25% Amajuba Primary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
3 520 – – 2 500 –
Education
486 Ilembe Mobiles Design Ilembe Primary 18/02/2016 2018-01-30 Infrastructure Grant Programme 6
6 140 – 6 090 – –
Construction 1% - Education
487 Pinetown Mobiles 25% Pinetown Primary 01/02/2016 2018-01-30 Infrastructure Grant Programme 6
13 490 – – 5 236 –
Education
488 Harry Gwala Mobiles Design Harry Gwala Primary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
3 520 – – 3 520 –
Education
489 Ugu Mobiles Design Ugu Primary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
825 – – – –
Education
490 Umgungundlovu Mobiles Design Umgungundlovu Primary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
37 798 – – 10 871 718
Education
491 Umkhanyakude Mobiles Design Umkhanyakude Secondary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
6 731 – – 2 818 3 569
Education
492 Umlazi Mobiles Design Umlazi Primary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
4 731 – 4 681 2 500 –
Construction 1% - Education
493 Umzinyathi Mobiles 25% Umzinyathi Primary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
10 863 – 3 363 – 1 977
Construction 1% - Education
494 Uthukela Mobiles 25% Uthukela Secondary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
4 440 – – 2 530 –
Education
495 Uthungulu Mobiles Design Uthungulu Primary 18/02/2016 2018-01-30 Infrastructure Grant Programme 6
14 723 – – 5 689 –
Education
496 Zululand Mobiles Design Zululand Secondary 16/02/2016 2018-01-30 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


497 Ilembe Replace Chemical Ongoing Project Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


498 Pinetown Replace Chemical Ongoing Project Pinetown Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


499 Harry Gwala Replace Chemical Ongoing Project Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


500 Ugu Replace Chemical Ongoing Project Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

25
Annexure Table B5 – Vote 5 : Education

3 000 – – 750 –

Umgungundlovu Replace Other - Packaged Education


501 Chemical Ongoing Project Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


502 Umlazi Replace Chemical Ongoing Project Umlazi Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Umkhanyakude Replace Other - Packaged Education


503 Chemical Ongoing Project Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


504 Umzinyathi Replace Chemical Ongoing Project Umzinyathi Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


505 Uthukela Replace Chemical Ongoing Project Uthukela Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


506 Uthungulu Replace Chemical Ongoing Project Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 000 – – 750 –

Other - Packaged Education


507 Zululand Replace Chemical Ongoing Project Zululand Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
2 000 – – – –
Education
508 Msinga Secondary School Project Initiation Umzinyathi Primary - - Infrastructure Grant Programme 6
7 838 5 916 110 – –
Construction 76% Education
509 Lethithemba Secondary School - 99% Ilembe Primary 2012-02-15 2018-01-30 Infrastructure Grant Programme 6

Practical 5 268 5 878 – – –


Completion Education
510 Singisi Comp Secondary School (100%) Harry Gwala Primary 2011-07-15 2012-05-15 Infrastructure Grant Programme 6

Practical 5 735 5 586 – – –


Completion Education
511 Isinyabusi Secondary School (100%) Ilembe Primary 2011-08-01 2014-04-30 Infrastructure Grant Programme 6

Practical 1 076 1 019 – – –


Completion Education
512 Amatimofu Primary School (100%) Uthungulu Primary 2012-02-08 2014-06-15 Infrastructure Grant Programme 6
20 000 – – 50 –
Education
513 Bambisandla Primary School Feasibility Pinetown Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
28 000 808 – 10 –
Education
514 Bangamaya Primary School Project Initiation Zululand Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
8 000 – – 10 –
Education
515 Banjana Primary School Project Initiation Umkhanyakude Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6

Practical 619 615 – – –


Completion Education
516 Birdswood Secondary School (100%) Uthungulu Primary 2014-10-05 2015-09-15 Infrastructure Grant Programme 6
20 000 611 – 50 –
Education
517 Bombolo Combined School Feasibility Zululand Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
24 829 22 950 110 – –
Construction 76% Education
518 Cato Crest Primary School - 99% Umlazi Primary 2013-08-27 2018-01-30 Infrastructure Grant Programme 6
31 422 29 402 110 – –
Construction 76% Education
519 Chief Lokothwayo Primary School - 99% Pinetown Primary 2012-11-01 2018-01-30 Infrastructure Grant Programme 6
27 599 13 701 220 2 500 –
Construction 26% Education
520 Cwakeme Secondary School - 50% Umkhanyakude Primary 2015-11-13 2018-01-30 Infrastructure Grant Programme 6

Practical 18 207 16 884 – – –


Completion Education
521 Danganya Primary School (100%) Umlazi Secondary 2013-09-09 2015-04-27 Infrastructure Grant Programme 6
14 546 509 350 10 –
Education
522 Dududu Junior Primary School Design Ugu Primary 2016-11-20 2018-03-30 Infrastructure Grant Programme 6
8 753 509 20 50 –
Education
523 Duduzile Secondary School Design Ugu Primary 2017-04-01 2018-03-30 Infrastructure Grant Programme 6
66 831 47 381 1 000 5 628 –
Construction 51% Education
524 Dulati Combined School - 75% Harry Gwala Primary 2014-03-10 2018-01-30 Infrastructure Grant Programme 6
25 000 4 208 6 840 5 689 –
Construction 1% - Education
525 Ebomvini Primary School 25% Ugu Secondary 2013-09-16 2018-11-30 Infrastructure Grant Programme 6
30 837 3 665 6 330 11 523 –
Empilweni Junior Secondary Construction 1% - Education
526 School 25% Zululand Secondary 2013-08-26 2018-11-30 Infrastructure Grant Programme 6

26
Annexure Table B5 – Vote 5 : Education

38 594 29 356 110 – –


Emtshibeni Junior Secondary Construction 76% Education
527 School - 99% Harry Gwala Primary 2013-09-16 2018-01-30 Infrastructure Grant Programme 6
26 612 2 630 6 668 5 243 –
Construction 1% - Education
528 Enqabeni Combined School 25% Zululand Primary 2015-11-05 2018-11-30 Infrastructure Grant Programme 6
17 984 5 787 2 558 3 256 –
Construction 1% - Education
529 Ezulwini Combined School 25% Umgungundlovu Primary 2012-09-21 2018-03-30 Infrastructure Grant Programme 6
20 000 – – 18 563 –
Education
530 Gobhela Primary School Feasibility Ugu Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6

Practical 34 599 34 030 – 2 500 –


Completion Education
531 Groutville Secondary School (100%) Ilembe Primary 2013-09-16 2015-11-11 Infrastructure Grant Programme 6
1 651 1 349 – 302 –
Education
532 Haig Intermediate School Final Completion Amajuba Primary 2012-02-21 2015-04-30 Infrastructure Grant Programme 6
23 174 19 404 310 – –
Construction 51% Education
533 Harding Combined School - 75% Ugu Primary 2013-08-08 2018-01-30 Infrastructure Grant Programme 6
12 850 10 351 110 – –
Construction 76% Education
534 Hlazane Primary School - 99% Umkhanyakude Primary 2012-09-04 2018-01-30 Infrastructure Grant Programme 6
41 007 1 872 4 030 17 453 –
Construction 1% - Education
535 Holinyoka Primary School 25% Zululand Primary 2015-07-15 2018-11-30 Infrastructure Grant Programme 6

Practical 33 551 32 386 – – –


Completion Education
536 Imbaliyethu Primary School (100%) Umlazi Primary 2012-10-31 2015-11-20 Infrastructure Grant Programme 6
14 703 2 976 220 3 985 –
Impumelelo Senior Primary Construction 26% Education
537 School - 50% Ugu Secondary 2015-04-15 2018-03-30 Infrastructure Grant Programme 6
17 840 592 2 712 50 –
Construction 26% Education
538 Incophelelo Primary School - 50% Umlazi Primary 2016-09-24 2017-04-21 Infrastructure Grant Programme 6
19 097 18 921 110 – –
Inkanyezi Yamachi Primary Construction 76% Education
539 School - 99% Ugu Secondary 2012-07-19 2018-01-30 Infrastructure Grant Programme 6
32 900 32 350 110 – –
Chief Albert Luthuli Sivananda Construction 76% Education
540 Secondary School - 99% Ilembe Primary 2015-11-04 2018-01-30 Infrastructure Grant Programme 6
208 – 210 – –
Construction 1% - Education
541 Inkunzi Senior Primary School 25% Uthukela Primary 2014-04-01 2018-03-30 Infrastructure Grant Programme 6
28 070 21 753 110 – –
Construction 76% Education
542 Isolemamba Secondary School - 99% Umlazi Primary 2013-09-13 2018-01-30 Infrastructure Grant Programme 6
48 979 7 480 4 511 17 356 –
James Nxumalo Agricultural Construction 1% - Education
543 Secondary School 25% Zululand Primary 2015-11-04 2017-05-04 Infrastructure Grant Programme 6

Practical 24 580 24 540 – – –


Completion Education
544 Kasturba Gandhi Primary School (100%) Pinetown Primary 2011-09-03 2014-09-01 Infrastructure Grant Programme 6
22 690 632 20 10 –
Education
545 Keate Street Primary School Design Uthukela Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
29 633 6 800 3 543 50 –
Construction 1% - Education
546 Khanyisani Primary School 25% Umzinyathi Primary 2016-09-24 2017-04-21 Infrastructure Grant Programme 6

Practical 75 – – – –
Completion Education
547 Khulani Junior Primary School (100%) Pinetown Secondary 2014-09-20 2014-12-28 Infrastructure Grant Programme 6
20 000 – – 50 –
Education
548 Kwaginga Primary School Feasibility Pinetown Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
39 571 34 930 110 – –
Construction 76% Education
549 Kwambonambi Primary School - 99% Uthungulu Primary 2014-05-14 2018-01-30 Infrastructure Grant Programme 6
6 740 610 350 10 –
Education
550 Kwangoza Secondary School Design Ilembe Primary 2017-04-01 2018-02-25 Infrastructure Grant Programme 6
20 000 – – 50 –
Education
551 Lihlithemba Secondary School Feasibility Ilembe Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
12 291 8 200 310 – –
Construction 51% Education
552 Lubelo Secondary School - 75% Umkhanyakude Primary 2014-02-24 2018-01-30 Infrastructure Grant Programme 6
34 937 1 149 20 10 –
Education
553 Mabaso Secondary School Design Umzinyathi Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
11 699 9 638 110 – –
Construction 76% Education
554 Madwaleni Secondary School - 99% Umkhanyakude Primary 2012-11-01 2018-01-30 Infrastructure Grant Programme 6

27
Annexure Table B5 – Vote 5 : Education

19 575 4 403 3 232 2 365 –


Construction 26% Education
555 Mahlokohloko Secondary School - 50% Umzinyathi Primary 2012-09-07 2018-03-30 Infrastructure Grant Programme 6
16 728 15 066 110 – –
Construction 76% Education
556 Mathiya Primary School - 99% Uthungulu Primary 2013-09-02 2018-01-30 Infrastructure Grant Programme 6
20 000 – – 50 –
Education
557 Mbonisweni Primary School Feasibility Pinetown Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
23 600 1 393 20 10 –
Education
558 Meadowsweet Combined School Design Uthukela Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
38 585 4 592 8 576 11 064 –
Construction 1% - Education
559 Mehlokazulu Secondary School 25% Umgungundlovu Primary 2016-02-15 2018-03-30 Infrastructure Grant Programme 6
15 000 611 20 10 –
Education
560 Melusi Primary School Feasibility Uthukela Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6

Practical 95 980 89 862 – – –


Completion Education
561 Mgezeni Secondary School (100%) Uthungulu Primary 2014-03-03 2015-11-11 Infrastructure Grant Programme 6
21 233 20 523 110 – –
Construction 76% Education
562 Mhlabulungile Primary School - 99% Ugu Primary 2013-08-08 2018-01-30 Infrastructure Grant Programme 6
41 007 1 872 64 50 –
Mtwanungamizizwe Secondary Construction 1% - Education
563 School 25% Zululand Primary 2015-07-15 2018-11-30 Infrastructure Grant Programme 6

Practical 1 326 850 – – –


Completion Education
564 Mthwane Secondary School (100%) Harry Gwala Primary 2013-09-09 2015-04-30 Infrastructure Grant Programme 6
18 734 5 757 2 552 2 896 –
Construction 26% Education
565 Mtuba Primary School - 50% Umkhanyakude Primary 2014-01-20 2018-03-30 Infrastructure Grant Programme 6
41 007 1 872 19 222 4 895 –
Construction 26% Education
566 Mvalo Secondary School - 50% Zululand Primary 2015-07-15 2018-11-30 Infrastructure Grant Programme 6
24 162 10 607 220 9 562 –
Construction 26% Education
567 Mvayiza Primary School - 50% Uthungulu Secondary 2013-11-26 2018-03-30 Infrastructure Grant Programme 6
56 314 1 620 5 000 17 856 –
Construction 26% Education
568 Mzwilili Primary School - 50% Umlazi Secondary 2014-02-24 2018-01-30 Infrastructure Grant Programme 6
12 673 3 933 310 3 520 –
Construction 51% Education
569 Nansimfundo Primary School - 75% Umgungundlovu Primary 2013-10-08 2018-03-30 Infrastructure Grant Programme 6
20 000 120 20 10 –
Education
570 Nikela Primary School Design Uthukela Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
13 807 9 157 220 – –
Construction 26% Education
571 Nondumiso Secondary School - 50% Umkhanyakude Primary 2014-01-24 2018-03-30 Infrastructure Grant Programme 6

Practical 13 680 13 187 – – –


Completion Education
572 Nongwinyaprimary School (100%) Ugu Primary 2012-07-19 2015-01-28 Infrastructure Grant Programme 6

Practical 41 681 39 590 – – –


Completion Education
573 Nonhlevu Secondary School (100%) Ilembe Primary 2012-04-23 2014-05-15 Infrastructure Grant Programme 6
3 051 304 20 10 –
Education
574 Novimba Primary School Design Ilembe Primary 2017-04-01 2018-02-25 Infrastructure Grant Programme 6
12 000 – 350 10 –
Education
575 Nqobani Primary School Design Zululand Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
25 000 – – 50 –
Education
576 Ntikili Primary School Feasibility Umkhanyakude Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
20 000 – – 50 –
Nyonebomvu Senior Primary Education
577 School Feasibility Zululand Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
31 779 – 5 257 8 956 –
Construction 1% - Education
578 Nyonyana Primary School 25% Umzinyathi Secondary 2015-11-09 2019-03-30 Infrastructure Grant Programme 6
20 000 – – 50 –
Education
579 Phelelani Intermediate School Feasibility Pinetown Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
20 000 473 350 10 –
Education
580 Phuthini Secondary School Feasibility Uthukela Primary 2017-04-01 2018-02-25 Infrastructure Grant Programme 6
2 309 1 337 110 – –
Construction 76% Education
581 Richem Secondary School - 99% Uthungulu Primary 2013-10-09 2018-01-30 Infrastructure Grant Programme 6
22 000 – 20 10 –
Education
582 Shakaskraal Primary School Design Ilembe Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6

28
Annexure Table B5 – Vote 5 : Education

12 518 6 267 310 – –


Construction 51% Education
583 Shayina Secondary School - 75% Umkhanyakude Secondary 2012-09-03 2018-01-30 Infrastructure Grant Programme 6
13 171 7 256 210 1 763 –
Construction 1% - Education
584 Sibutha Secondary School 25% Ugu Primary 2014-02-20 2018-03-30 Infrastructure Grant Programme 6
44 840 – 20 10 –
Education
585 Sinothando Primary School Design Zululand Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
33 325 1 495 20 10 –
Sithobelumthetho Senior Primary Education
586 School Design Amajuba Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
60 000 850 8 132 1 520 –
Education
587 St Christopher Primary School Design Ilembe Secondary 2014-04-01 2018-03-30 Infrastructure Grant Programme 6
26 005 11 672 5 000 2 000 –
Construction 26% Education
588 St Victor Secondary School - 50% Zululand Secondary 2013-10-21 2018-03-30 Infrastructure Grant Programme 6
16 085 14 525 110 – –
Construction 76% Education
589 Stabo Primary School - 99% Uthungulu Secondary 2013-09-02 2018-01-30 Infrastructure Grant Programme 6
19 622 17 960 110 – –
Construction 76% Education
590 Thandukwazi Primary School - 99% Pinetown Primary 2012-11-30 2018-01-30 Infrastructure Grant Programme 6
2 000 – – 50 –
Education
591 Tinley Manor Primary School Feasibility Ilembe Secondary 2017-04-01 2018-02-25 Infrastructure Grant Programme 6
18 381 800 20 10 –
Education
592 Ukuphumula Secondary School Design Umzinyathi Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
27 862 8 828 7 386 3 597 –
Construction 1% - Education
593 Umgnama Combined School 25% Zululand Primary 2013-08-26 2018-11-30 Infrastructure Grant Programme 6
38 341 20 546 3 980 9 856 –
Construction 1% - Education
594 Velangaye Secondary School 25% Uthungulu Primary 2014-10-16 2018-11-30 Infrastructure Grant Programme 6
52 724 3 069 15 500 11 253 –
Construction 1% - Education
595 Hoër Landbouskool Vryheid 25% Zululand Primary 2015-01-25 2019-03-30 Infrastructure Grant Programme 6
14 256 – – 10 –
Education
596 Vumokuhle Primary School Project Initiation Umlazi Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
104 765 52 092 310 20 598 –
Construction 51% Education
597 Welabasha Secondary School - 75% Uthungulu Primary 2014-10-01 2018-01-30 Infrastructure Grant Programme 6
24 000 – 350 6 259 –
Education
598 Weston Agric Design Umgungundlovu Primary 2017-04-01 2018-02-25 Infrastructure Grant Programme 6
45 136 1 842 20 6 598 –
Education
599 Zama Secondary School Design Amajuba Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
30 000 – – 10 3 656
Education
600 Albini Secondary School Design Pinetown Primary 20/05/2017 20/05/2019 Infrastructure Grant Programme 6
2 100 – 174 50 –
Education
601 Amoibe Intermediate School Tender Umzinyathi Primary 2016-09-24 2017-04-21 Infrastructure Grant Programme 6
2 100 – 286 50 –
Education
602 Craigmillar Primary School Tender Umzinyathi Secondary 2016-09-24 2017-04-21 Infrastructure Grant Programme 6
813 66 178 50 –
Education
603 Cranham Primary School Tender Umgungundlovu Primary 2016-09-24 2017-04-21 Infrastructure Grant Programme 6
1 193 178 475 350 –
Construction 1% - Education
604 Dingukwazi Secondary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 390 24 221 1 032 –
Construction 1% - Education
605 Dumabemsola Primary School 25% Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
862 62 161 557 –
Construction 1% - Education
606 Dumenkungwini Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 351 119 473 1 570 –
Construction 1% - Education
607 Ekuthokozeni Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 318 – 321 868 525
Construction 1% - Education
608 Elandsberg Primary School 25% Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 372 54 363 810 –
Construction 1% - Education
609 Emabhekazi Combined School 25% Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 223 – 29 50 –
Education
610 Emafakathini Primary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

29
Annexure Table B5 – Vote 5 : Education

1 290 – 105 50 –
Education
611 Emaguqeni Primary School Tender Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 856 87 220 – –
Construction 26% Education
612 Emhlungwini Primary School - 50% Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
558 30 334 50 –
Education
613 Emngceleni Primary School Tender Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 572 – 23 50 –
Education
614 Empolombeni Primary School Tender Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
626 – 20 10 –
Education
615 Emthunzini Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 017 – 350 10 –
Education
616 Encuntshe Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 152 87 235 50 –
Education
617 Engobhiyeni Primary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 455 525 220 – –
Construction 26% Education
618 Enhlanhleni Secondary School - 50% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
920 89 181 50 –
Gqamnjengelanga Intermediate Education
619 School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 001 76 204 50 –
Education
620 Gqugquma Primary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 133 73 286 50 –
Education
621 Heshe Junior Secondary School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 958 115 317 50 –
Hlobani Primary School (Hlobane Education
622 (Mine) P) Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 451 70 272 1 000 –
Construction 1% - Education
623 Hlophekhulu Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
862 62 681 50 –
Construction 1% - Education
624 Hluma Intermediate School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 798 93 391 50 –
Indabikhulunywayo Primary Education
625 School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 125 56 194 776 –
Construction 1% - Education
626 Ngqolothi Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
920 53 254 511 –
Construction 1% - Education
627 Joko Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 154 – 526 50 –
Education
628 Keates Drift Primary School Tender Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 504 134 363 50 –
Construction 1% - Education
629 Khulumeluzulu Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
570 66 350 10 –
Education
630 Koto Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
651 134 350 10 –
Education
631 Kwa Banakile Primary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 533 125 333 942 –
Construction 1% - Education
632 Kwa Mlimisi Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
17 – – 50 –
Education
633 Kwa Mphatha Primary School Feasibility Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
906 51 437 244 –
Kwabhamu Junior Secondary Construction 1% - Education
634 School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 975 175 739 50 –
Education
635 Kwadenge Secondary School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
958 63 216 568 –
Construction 1% - Education
636 Kwagoqo Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
687 – 350 10 –
Education
637 Kwamaduma Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 085 88 237 50 –
Education
638 Kwamaphumulo Primary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

30
Annexure Table B5 – Vote 5 : Education

1 146 108 288 635 –


Construction 1% - Education
639 Landokwakhe Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
548 41 104 329 –
Construction 1% - Education
640 Lelieshoek Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 294 453 355 1 344 –
Construction 1% - Education
641 Luhlanga Primary School 25% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 200 91 252 50 –
Education
642 Lungisile Primary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
919 63 519 130 –
Construction 1% - Education
643 Mabeka Primary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 385 84 771 50 –
Construction 1% - Education
644 Mabhidla Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 546 – 23 50 –
Education
645 Magoda Primary School Tender Umgungundlovu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
575 23 220 3 –
Construction 26% Education
646 Maguduberg Primary School - 50% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 351 120 319 784 –
Construction 1% - Education
647 Magutshwa Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 544 117 313 989 –
Construction 1% - Education
648 Magwegwana Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
549 – 350 10 –
Education
649 Mahlabaneni Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 185 100 394 534 –
Construction 1% - Education
650 Makheme Primary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 452 92 401 799 –
Construction 1% - Education
651 Makhosini Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 350 52 207 984 –
Construction 1% - Education
652 Mamponjwana Primary School 25% Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 944 1 387 – – –


Completion Education
653 Mandlakayise Primary School (100%) Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 426 – 220 – –
Construction 26% Education
654 Manduluza Primary School - 50% Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 412 124 493 598 –
Construction 1% - Education
655 Manyoni Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
673 45 110 439 –
Construction 1% - Education
656 Manzabomvu Primary School 25% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
109 – – 50 –
Education
657 Manzamhlophe Combined School Feasibility Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 053 39 173 752 –
Construction 1% - Education
658 Mashiyane Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 047 154 412 1 317 –
Masiphula Junior Secondary Construction 1% - Education
659 School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 568 97 523 739 –
Construction 1% - Education
660 Mathole Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 392 – 583 50 –
Education
661 Matimatolo Primary School Tender Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 121 136 333 1 519 –
Construction 1% - Education
662 Matshitsholo Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 131 – 374 1 607 –
Construction 1% - Education
663 Mavumbuka Secondary School 25% Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 367 80 314 50 –
Education
664 Mawezulu Primary School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 024 61 229 50 –
Education
665 Mayeni Primary School Tender Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 281 97 313 50 –
Education
666 Mayizekanye Secondary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

31
Annexure Table B5 – Vote 5 : Education

1 468 91 333 911 –


Construction 1% - Education
667 Mazonke Secondary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 300 – 319 50 –
Education
668 Mbalenhle Primary School Tender Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 971 160 465 50 –
Education
669 Mbambangalo Secondary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 055 85 230 50 –
Education
670 Mcoseleli Secondary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 609 – 355 2 112 –
Construction 1% - Education
671 Mdumisa Primary School 25% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
929 75 203 50 –
Education
672 Mehlwenkosi Primary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 464 93 141 1 158 –
Construction 1% - Education
673 Mfabeni Primary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 870 79 441 1 174 –
Construction 1% - Education
674 Mhongozini Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 267 103 284 50 –
Education
675 Mjele Secondary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
729 – 350 10 –
Education
676 Mkhazane Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
784 50 128 540 –
Construction 1% - Education
677 Mkhunjini Primary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
943 – 224 50 –
Education
678 Mlimeleni Primary School Tender Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 546 – 23 50 –
Education
679 Mnyanda Primary School Tender Uthukela Specialised 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
690 52 141 50 –
Education
680 Moyamuhle Primary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
864 – 350 10 –
Education
681 Mpindiso Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
715 54 210 384 –
Mpungamhlophe Secondary Construction 1% - Education
682 School 25% Zululand Specialised 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 521 105 416 834 –
Construction 1% - Education
683 Msebe Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 601 162 – – –


Completion Education
684 Mseni Primary School (100%) Zululand Specialised 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
685 Mshokobezi Primary School Design Zululand Specialised 2016-04-01 2018-03-30 Equitable Share Programme 6 536 11 350 10 –
Mthombowesizwe Secondary Construction 1% - 1 318 84 332 770 –
686 School 25% Zululand Specialised 2016-04-01 2018-03-30 Equitable Share Programme 6
Construction 26% 1 569 – 220 – –
687 Mthukwana Primary School - 50% Uthukela Specialised 2016-04-01 2018-03-30 Equitable Share Programme 6

Practical 2 294 1 784 – – –


Completion
688 Muziwesizwe Secondary School (100%) Zululand Specialised 2016-04-01 2018-03-30 Equitable Share Programme 6
779 – 184 50 –
Education
689 Mzibuli Secondary School Tender Umkhanyakude Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 424 – 220 – –
Construction 26% Education
690 Mzimela Primary School - 50% Uthungulu Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 219 576 333 1 177 –
Ndabeziphezulu Secondary Construction 1% - Education
691 School 25% Umkhanyakude Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 503 95 371 888 –
Construction 1% - Education
692 Ndlovana Secondary School 25% Zululand Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 185 70 350 10 –
Education
693 Ngobamakhosi Secondary School Design Zululand Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 346 198 553 1 374 –
Construction 1% - Education
694 Nhlakanipho Intermediate School 25% Zululand Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 572 – 23 50 –
Education
695 Nhlolamvula Primary School Tender Uthukela Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 081 – 264 50 –
Education
696 Nhloya Intermediate School Tender Umzinyathi Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

32
Annexure Table B5 – Vote 5 : Education

815 53 184 483 –


Construction 1% - Education
697 Nhlungwane Secondary School 25% Zululand Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 090 65 267 651 –
Construction 1% - Education
698 Nkalaneni Primary School 25% Zululand Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 323 – 323 50 –
Education
699 Nkonza Secondary School Tender Umzinyathi Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
132 – – 50 –
Education
700 Nkonzweni Primary School Feasibility Zululand Mobile 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 075 75 292 591 –
Nqabayembube Secondary Construction 1% - Education
701 School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 662 110 439 938 –
Construction 1% - Education
702 Ntabasuka Secondary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
932 – 435 50 –
Education
703 Ntathakusa Secondary School Tender Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Construction 1% - 810 52 181 484 –
704 Ntilingwe Senior Primary School 25% Zululand Secondary 2016-04-01 2018-03-30 Equitable Share Programme 6
1 299 – 350 10 –
Ntswalakahla Senior Primary Education
705 School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 301 94 371 688 –
Construction 1% - Education
706 Ogedleni Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 585 94 371 972 –
Construction 1% - Education
707 Ombimbini Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 1 185 1 063 – – –


Completion Education
708 Paddafontein Combined School (100%) Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 061 – 20 10 5 499
Education
709 Phondwane Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 1 182 1 161 – – –


Completion Education
710 Qalimfundo Primary School (100%) Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 598 101 397 941 –
Construction 1% - Education
711 Qalokusha Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 643 152 608 50 –
Education
712 Qediphika Secondary School Tender Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 261 156 514 50 –
Education
713 Qondisani Primary School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 179 22 532 50 –
Education
714 Sakhiseni Secondary School Tender Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 466 119 329 50 –
Education
715 Sansikane Primary School Tender Umgungundlovu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
900 – 214 50 –
Education
716 Shepstone Lake Primary School Tender Amajuba Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 533 125 511 50 –
Construction 1% - Education
717 Shongololo Combined School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 546 – 23 50 –
Education
718 Sibongintuthuko Primary School Tender Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 200 – 20 10 –
Education
719 Sigqamise Secondary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
548 41 333 50 –
Construction 1% - Education
720 Sihlengeni Combined School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 415 101 400 754 –
Construction 1% - Education
721 Sikhalelumuzi Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 048 – 230 50 –
Education
722 Sikhiye Secondary School Tender Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
464 – 350 10 –
Education
723 Singana Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 274 522 220 27 –
Construction 26% Education
724 Siphalaza Primary School - 50% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 100 – 596 50 –
Education
725 Sipheni Senior Primary School Tender Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

33
Annexure Table B5 – Vote 5 : Education

1 419 57 220 – –
Construction 26% Education
726 Siphokuhle Secondary School - 50% Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
67 – – 50 –
Education
727 Siqalukubona Secondary School Feasibility Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
593 – 350 10 –
Siqophumlando Secondary Education
728 School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
820 – 376 10 –
Education
729 Sivananda Senior Primary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 643 180 601 50 –
Siyangempumelelo Secondary Education
730 School Tender Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 860 137 420 50 –
Education
731 Siyaphambili Intermediate School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 1 638 1 497 – – –


Completion Education
732 Siyaphumula Secondary School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
588 32 56 556 –
Construction 1% - Education
733 Siyaqhubeka Primary School 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
65 – 20 10 –
Education
734 Siyaziqeqesha Primary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
822 – 376 10 –
Education
735 Sizamile Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Replacement Of Chemical 109 – 372 50 –
736 Sizana Combined School Tender Zululand Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Replacement Of Chemical 600 – 376 10 –
737 Sondoda Primary School Design Uthukela Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6

Practical 1 743 1 198 – – –


Completion Replacement Of Chemical
738 Sozama Secondary School (100%) Zululand Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Thandokwakhe Intermediate Replacement Of Chemical 1 934 141 438 50 –
739 School Tender Zululand Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Construction 1% - Replacement Of Chemical 2 047 154 376 10 –
740 Thaphokuhle Primary School 25% Zululand Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Replacement Of Chemical 242 20 66 50 –
741 The Grange Primary School Tender Umgungundlovu Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Replacement Of Chemical 1 929 141 436 50 –
742 Thelezi Primary School Tender Zululand Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Construction 26% Replacement Of Chemical 2 037 1 309 220 – –
743 Thembokuhle Primary School - 50% Zululand Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Construction 1% - Replacement Of Chemical 1 596 69 333 1 061 –
744 Thibani Intermediate School 25% Uthukela Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Construction 1% - Replacement Of Chemical 590 33 57 – –
745 Tholulwazi Senior Primary School 25% Zululand Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6
Replacement Of Chemical 846 68 184 50 –
746 Thornville Primary School Tender Umgungundlovu Toilets 2016-04-01 2018-03-30 Equitable Share Programme 6

Practical 967 910 – – –


Completion Project Not In Annx B And
747 Timoni Primary School (100%) Ilembe Commitment 2016-04-01 2018-03-30 Equitable Share Programme 6
Construction 26% Project Not In Annx B And 1 205 – 220 – –
748 Ugu Primary School - 50% Zululand Commitment 2016-04-01 2018-03-30 Equitable Share Programme 6
2 651 23 648 50 –
Education
749 Ulwazi Primary School Tender Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Umcebowolwazi Senior Primary 1 124 22 275 50 –
750 School Tender Amajuba Primary 2016-04-01 2018-03-30 Equitable Share Programme 6
656 53 143 50 –
Education
751 Umhloluthini Secondary School Tender Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
752 Valleyside Primary School Feasibility Zululand Secondary 2016-04-01 2018-03-30 Equitable Share Programme 6 52 – – 50 –
753 Velankosi Primary School Tender Zululand Primary 2016-04-01 2018-03-30 Equitable Share Programme 6 864 – 397 50 –
963 – 376 10 –
Education
754 Verdrukt Intermediate School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
995 60 226 593 –
Construction 1% - Education
755 Vezukukhanya Primary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 171 24 286 747 –
Construction 1% - Education
756 Vezulwazi Primary School 25% Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 542 119 348 50 –
Education
757 Vumabakushoyo Primary School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
660 – 376 10 –
Education
758 Vuthela Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 289 – 376 10 –
Education
759 William Booth Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

34
Annexure Table B5 – Vote 5 : Education

577 – 376 10 –
Education
760 Zalizwi Primary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
30 – 20 10 –
Education
761 Zangathi Primary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 600 121 332 50 –
Education
762 Prince Zilulwane Primary School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – – 1 265 –

Other - Packaged Education


763 Acquisitions And Disposals Ongoing Project Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
41 000 – 376 10 –
Education
764 Umzinyathi Cottages Design Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 13 828 8 684 – 1 230 –


Completion Education
765 Gugulesizwe Secondary School (100%) Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 610 154 220 50 –
Prince Mnyayiza Secondary Construction 26% Education
766 School - 50% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 037 924 113 – –
Construction 76% Education
767 Amaqhawe Primary School - 99% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 295 – 295 – –
Construction 76% Education
768 Emanqayini Primary School - 99% Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 000 – 376 10 –
Construction 76% Education
769 Emkhambeni Primary School - 99% Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
15 000 – 376 10 –
Construction 76% Education
770 Ezifundeni Secondary School - 99% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 711 – 376 10 –
Construction 76% Education
771 Nokukhanya Primary School - 99% Amajuba Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 490 515 200 – –
Construction 76% Education
772 Nqutshini Primary School - 99% Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 713 – 20 50 –
Construction 76% Education
773 Siyathuthuka Primary School - 99% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 307 – 376 10 –
Construction 76% Education
774 Uelzen Primary School - 99% Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
– – 685 – –

Other - Packaged
775 Harry Gwala 1 Fencing Ongoing Project Ilembe Primary - - Equitable Share Programme 6
– – 10 200 –

Other - Packaged Education


776 Umkhanyakude Fencing Ongoing Project Uthukela Secondary 1900-01-01 1900-01-01 Infrastructure Grant Programme 6

Practical 8 983 5 813 591 1 409 –


Completion Education
777 Bumbisizwe Special School (100%) Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
57 913 – 1 338 18 953 –
Construction 26% Education
778 Indaleni School For The Deaf - 50% Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Construction 1% - 73 640 67 172 2 244 2 333 –
779 Intuthuko Pre-Vocational 25% Umkhanyakude Secondary 2016-04-01 2018-03-30 Equitable Share Programme 6
– – 300 300 –

Other - Packaged Education


780 Amajuba (1) Fencing Ongoing Project Amajuba Primary - - Infrastructure Grant Programme 6
– – 5 000 6 253 –

Other - Packaged Education


781 Ilembe (216) Fencing Ongoing Project Ilembe Primary 1900-01-01 1900-01-01 Infrastructure Grant Programme 6
– – 300 300 –

Other - Packaged Education


782 Pinetown (25) Fencing Ongoing Project Pinetown Secondary 1900-01-02 1900-01-02 Infrastructure Grant Programme 6
– – 300 300 –

Other - Packaged Education


783 Umzinyathi (34) Fencing Ongoing Project Umzinyathi Secondary 1900-01-03 1900-01-03 Infrastructure Grant Programme 6
– – 300 300 –

Other - Packaged Education


784 Uthukela (12) Fencing Ongoing Project Uthukela Secondary 1900-01-04 1900-01-04 Infrastructure Grant Programme 6
– – 300 300 –

Other - Packaged Education


785 Uthungulu (21) Fencing Ongoing Project Uthungulu Primary 1900-01-05 1900-01-05 Infrastructure Grant Programme 6

35
Annexure Table B5 – Vote 5 : Education

– – 4 520 5 689 –

Other - Packaged Education


786 Umgungundlovu (115 Fencing Ongoing Project Umgungundlovu Primary 1900-01-06 1900-01-06 Infrastructure Grant Programme 6
– – 4 520 5 246 –

Other - Packaged Education


787 Ugu (93) Fencing Ongoing Project Ugu Primary 1900-01-07 1900-01-07 Infrastructure Grant Programme 6
– – 300 1 500 –

Other - Packaged Education


788 Umlazi (18) Fencing Ongoing Project Umlazi Primary 1900-01-08 1900-01-08 Infrastructure Grant Programme 6
– – 500 1 500 –

Other - Packaged Education


789 Harry Gwala Electrification Ongoing Project Harry Gwala Primary 1900-01-09 1900-01-09 Infrastructure Grant Programme 6
– – 900 300 –

Other - Packaged Education


790 Uthungulu Electrification Ongoing Project Uthungulu Primary 1900-01-10 1900-01-10 Infrastructure Grant Programme 6
– – 300 – –

Other - Packaged Education


791 Sisonke Electrification Ongoing Project Harry Gwala Secondary 1900-01-11 1900-01-11 Infrastructure Grant Programme 6
– – 500 300 –

Other - Packaged Education


792 Umgungundlovu Electric Ongoing Project Umgungundlovu Primary 1900-01-12 1900-01-12 Infrastructure Grant Programme 6
– – 500 300 –

Other - Packaged Education


793 Umkhanyakude Electrification Ongoing Project Umkhanyakude Secondary 1900-01-13 1900-01-13 Infrastructure Grant Programme 6
– – 500 300 –

Other - Packaged Education


794 Ilembe Electrification Ongoing Project Ilembe Secondary 1900-01-14 1900-01-14 Infrastructure Grant Programme 6
– – 200 400 –

Other - Packaged Education


795 Umlazi Electrification Ongoing Project Umlazi Primary 1900-01-15 1900-01-15 Infrastructure Grant Programme 6
– – 500 1 500 –

Other - Packaged Education


796 Ugu Electrification Ongoing Project Ugu Primary 1900-01-16 1900-01-16 Infrastructure Grant Programme 6
– – 500 1 500 –

Other - Packaged Education


797 Amajuba Electrical Ongoing Project Amajuba Primary 1900-01-17 1900-01-17 Infrastructure Grant Programme 6
– – 300 300 –

Other - Packaged Education


798 Umnzinyathi Electrification Ongoing Project Umzinyathi Primary 1900-01-18 1900-01-18 Infrastructure Grant Programme 6
– – 4 800 500 –

Other - Packaged Education


799 Zululand Electrification Ongoing Project Zululand Primary 1900-01-19 1900-01-19 Infrastructure Grant Programme 6
– – 800 500 –

Other - Packaged Education


800 Uthukela Electrification Ongoing Project Uthukela Primary 1900-01-20 1900-01-20 Infrastructure Grant Programme 6
– 11 558 – 3 014 –

Zululand Special Projects, Water Other - Packaged Education


801 Harvesting Ongoing Project Zululand Secondary 1900-01-21 1900-01-21 Infrastructure Grant Programme 6
70 000 – 18 230 18 952 –
Construction 1% - Education
802 Hiring 25% Umgungundlovu Secondary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
70 000 – 6 376 1 520 –
Construction 1% - Education
803 Ilembe District Office 25% Ilembe Secondary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
70 000 1 046 1 500 1 000 –
Construction 1% - Education
804 Malgate Office Complex 25% Umgungundlovu Secondary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
70 000 – 300 100 –
Construction 1% - Education
805 H/O Scott Street Complex 25% Umgungundlovu Secondary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
12 333 – 20 10 –
Education
806 Truro House Office Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – – 10 30
Education
807 Kwagumbi Primary School Project Initiation Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – – 10 30
Education
808 Ndoyela Secondary School Project Initiation Umlazi Primary - - Infrastructure Grant Programme 6

36
Annexure Table B5 – Vote 5 : Education

2 000 – – 10 30
Education
809 Northcrest Primary School Project Initiation Umlazi Primary 1900-01-01 1900-01-01 Infrastructure Grant Programme 6
2 000 – – 10 30
Education
810 Manyampisi Primary School Project Initiation Umkhanyakude Primary 1900-01-02 1900-01-02 Infrastructure Grant Programme 6
6 000 – 20 10 4 523
Acton Road Maritime Secondary Education
811 School Project Initiation Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 000 – 376 10 2 536
Education
812 Babazani Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 488 – 376 10 5 243
Education
813 Balcomb'S Hill Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 000 – 210 10 5 880
Construction 1% - Education
814 Banguni Secondary School 25% Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 214 866 8 – –
Construction 51% Education
815 Baphumile Primary School - 75% Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 4 861 4 406 – 50 –


Completion Education
816 Bhekukwazi Secondary School (100%) Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
50 000 – 376 6 990 4 386
Education
817 Bizimali Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
11 770 – 376 10 8 592
Education
818 Bothas Hill Primary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 7 980 7 979 – – –


Buhlebezwe Senior Primary Completion Education
819 School (100%) Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 20 195 18 825 200 70 –


Bungende Junior Secondary Completion Education
820 School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – 20 50 5 689
Education
821 Candabuthule Secondary School Feasibility Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 11 948 11 644 – – –


Completion Education
822 Cecilia Primary School (100%) Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 14 789 14 317 – – –


Completion Education
823 Celubuhle Primary School (100%) Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 360 – 376 10 1 953
Chief Ngonyama Secondary Education
824 School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
685 – 310 50 100
Construction 51% Education
825 Dabeka Secondary School - 75% Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – – 10 5 469
Education
826 Daninva Primary School Project Initiation Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
35 471 – 376 10 9 856
Education
827 Dnc Combined School Design Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 427 1 256 210 50 3 521
Construction 1% - Education
828 Dumakude Secondary School 25% Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
11 879 – 376 10 4 526
Dumane Comm Secondary Education
829 School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – – 10 5 623
Education
830 Dundee Junior Secondary School Design Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
9 359 – 376 10 4 562
Construction 26% Education
831 Emfanela Primary School - 50% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 5 080 3 307 93 472 –


Completion Education
832 Enkululekweni Primary School (100%) Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – – 10 3 256
Education
833 Enyanyeni Combined School Project Initiation Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 512 – 376 10 982
Education
834 Ezindlovini Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 823 – 376 10 4 523
Education
835 Ezithabeni Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
24 000 – – 10 12 365
Education
836 Fundukhaliphe Secondary School Project Initiation Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

37
Annexure Table B5 – Vote 5 : Education

Practical 4 782 – 564 2 270 –


Completion Education
837 Gcinimfundo Secondary School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
20 621 – 376 10 13 256
Education
838 George Caltex Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 15 473 13 248 507 1 051 –


Completion Education
839 Ginyiqhinga Secondary School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
907 – 220 8 952 3 965
Construction 26% Education
840 Henryville Primary School - 50% Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 000 – 376 10 2 563
Education
841 Hlabane Secondary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 919 – 376 10 1 253
Education
842 Igugulabanguni Primary School Project Initiation Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 100 – 210 4 528 985
Construction 1% - Education
843 Khethokuhle Secondary School 25% Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 250 – 376 10 2 453
Education
844 Induduzo Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 8 779 8 152 73 481 –


Completion Education
845 Inhlasana Primary School (100%) Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
9 519 – – 10 1 253
Education
846 Inkanyiso Special School Project Initiation Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 168 – 138 30 –
Intandoyesizwe Secondary Construction 51% Education
847 School - 75% Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – 50 50 3 562
Education
848 Intathakusa Primary School Tender Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
14 944 – 376 10 4 236
Education
849 Intshisekelo Secondary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 000 – 376 10 2 563
Education
850 Ithwelenye Primary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 874 – 634 2 149 253
Construction 1% - Education
851 Izwi Lesizwe Primary School 25% Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 000 – 376 10 3 526
Education
852 J G Zuma Secondary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 700 – 50 50 3 625
Education
853 Kadwa Secondary School Tender Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 826 – 376 10 2 563
Education
854 Khanyisa Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 977 – 376 10 2 563
Education
855 Khomba Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 399 – 376 10 2 456
Education
856 Khululekani Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
36 293 – 376 10 12 356
Construction 1% - Education
857 Kwamiya Primary School 25% Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
17 927 – 376 10 15
Education
858 Kwavusumuzi Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 43 053 36 235 226 2 145 3 521


Completion Education
859 Langa Secondary School (100%) Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
501 – 100 – –
Construction 26% Education
860 Lethukuthula Primary School - 50% Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – 376 10 15
Education
861 Limehill Secondary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – – – –
Education
862 Lloyd Primary School Project Initiation Ilembe Primary - - Infrastructure Grant Programme 6
27 121 – 376 10 15
Education
863 Lloyd Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 000 – 376 10 15
Education
864 Mabayana Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

38
Annexure Table B5 – Vote 5 : Education

10 000 – – 10 15
Education
865 Madilika Combined School Project Initiation Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – – 10 15
Education
866 Mahlaba Primary School Project Initiation Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 383 – 376 10 15
Education
867 Manaba Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 808 – 376 10 15
Education
868 Mangongo Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
457 – 100 – –
Construction 26% Education
869 Isikhalisanamuhla Primary School - 50% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 4 399 4 010 105 146 –


Completion Education
870 Mantulela Primary School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 7 557 7 104 300 599 –


Completion Education
871 Manzini Secondary School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 19 143 17 727 105 1 618 –


Completion Education
872 Maphindela Primary School (100%) Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
9 251 – 376 10 15
Mashesheleng Intermediate Education
873 School Design Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 000 – – 10 15
Education
874 Mathunjwa Secondary School Project Initiation Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 23 087 19 732 – 2 548 –


Completion Education
875 Mbekamusi Intermediate School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
11 151 – 2 500 3 589 500
Education
876 Mbuyiselo Secondary School Tender Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 000 – 376 10 15
Education
877 Mdepha Secondary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
11 168 – 376 10 15
Education
878 Mduku Secondary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 5 864 5 810 – – –


Completion Education
879 Mdumezulu Primary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
24 196 – 376 10 15
Education
880 Mehlwane Primary School Design Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
23 600 – 376 10 15
Education
881 Menzi Secondary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 18 441 12 792 15 1 258 352


Completion Education
882 Mgada Primary School (100%) Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
20 935 – 376 10 15
Education
883 Mgandeni Secondary School Design Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
19 400 – – 50 100
Education
884 Mkhazeni Primary School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 9 599 8 457 – – –


Completion Education
885 Mngomeni Secondary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
13 979 – 376 10 3 652
Education
886 Mqhawe Secondary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 469 – 200 100 –
Construction 26% Education
887 Qongwana Primary School - 50% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 997 – 376 10 15
Education
888 Mshiyane Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 611 376 10 15
Education
889 Mtwalume Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 16 336 15 856 130 150 –


Completion Education
890 Nzimende Primary School (100%) Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 25 256 24 836 53 900 –


Completion Education
891 Nazareth Primary School (100%) Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 375 – 376 10 15
Education
892 Ndukende Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

39
Annexure Table B5 – Vote 5 : Education

4 710 – 376 10 15
Education
893 Ngcolosi Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 518 2 518 – – –


Completion Education
894 Ngubukazi Primary School (100%) Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 4 140 3 841 2 730 –


Completion Education
895 Nkosinathi Secondary School (100%) Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
19 777 – 210 6 852 4 325
Prince Nomatiyela Secondary Construction 1% - Education
896 School (Nomatiyela Hp) 25% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 791 – 376 10 15
Education
897 Nombika Secondary School Design Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
11 937 – 376 10 15
Education
898 Noyibewu Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 000 – 376 10 15
Education
899 Nyakana Intermediate School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 211 – 376 10 15
Education
900 Otimati Primary School Design Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 302 – 376 10 15
Phezukomkhono Secondary Education
901 School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 14 679 9 145 95 2 135 265


Completion Education
902 Qhosheyiphethe Primary School (100%) Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 000 – 376 10 15
Education
903 Sabuyaze Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – 50 50 100
Education
904 Saligna Primary School Tender Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 341 2 274 – – –


Completion Education
905 Sanywana Secondary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 11 391 225 732 2 356 523


Completion Education
906 Sekusile Primary School (100%) Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 23 438 20 289 246 1 754 –


Sibambanezulu Secondary Completion Education
907 School (100%) Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 549 – 376 10 3 521
Education
908 Sibanisethu Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
11 185 – 376 10 15
Education
909 Silethukukhanya Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 24 118 21 845 120 2 488 –


Siphesihle Secondary Completion Education
910 School(Inchanga) (100%) Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
35 994 1 217 376 10 12 563
Education
911 Siphumelele Primary School Design Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 116 778 116 776 – 2 526 –


Completion Education
912 Sisizakele Primary School (100%) Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
23 121 – 376 10 15
Education
913 Siyabonga Secondary School Design Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – 20 10 15
Education
914 Slangrivier Primary School Project Initiation Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 16 658 13 511 264 1 727 –


Completion Education
915 Sonyongwana Secondary School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 642 1 642 150 – –
Construction 51% Education
916 Sotobe Secondary School - 75% Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
9 074 7 550 24 – –
Construction 76% Education
917 St Annes Primary School - 99% Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 24 590 22 770 150 870 –


Completion Education
918 Thelamama Primary School (100%) Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 254 – 254 – –
Construction 76% Education
919 Thembimfundo Special School - 99% Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 19 575 18 292 338 500 –


Completion Education
920 Trustfeed Combined School (100%) Umgungundlovu Primary 23/01/2012 09/12/2013 Infrastructure Grant Programme 6

40
Annexure Table B5 – Vote 5 : Education

10 000 – 20 10 15
Education
921 Ubongumenzi Secondary School Project Initiation Umzinyathi Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
12 900 – 376 10 3 652
Education
922 Udumo Primary School Design Pinetown Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
37 524 17 225 1 600 6 523 3 521
Princess Phumzile Primary Construction 51% Education
923 School (Ulundi Section D) - 75% Zululand Primary 18/11/2014 2018-03-30 Infrastructure Grant Programme 6
4 463 4 201 62 – –
Construction 76% Education
924 Umzila Primary School - 99% Amajuba Primary 2013-03-20 2017-03-30 Infrastructure Grant Programme 6

Practical 4 530 4 033 – 115 –


Completion Education
925 Unobhala Secondary School (100%) Umgungundlovu Primary 11/06/2013 01/12/2015 Infrastructure Grant Programme 6
3 944 – 450 10 15
Education
926 Uyengo Secondary School Design Uthungulu Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
30 000 – 450 10 15
Education
927 Velangaye Secondary School Design Uthungulu Primary 16/05/2016 03/11/2017 Infrastructure Grant Programme 6
8 481 – 450 10 15
Education
928 Velangezwi Secondary School Design Ilembe Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
18 000 – 20 10 15
Education
929 Vukuzakhe Secondary School Project Initiation Umlazi Primary 14/09/2016 14/09/2018 Infrastructure Grant Programme 6
13 505 – 3 500 4 253 500
Construction 76% Education
930 Waterfall Combined School - 99% Ilembe Primary 16/01/2016 2019-03-30 Infrastructure Grant Programme 6

Practical 33 752 31 755 508 950 –


Completion Education
931 Wood And Raw Primary School (100%) Uthungulu Primary 20/03/2012 15/10/2013 Infrastructure Grant Programme 6
10 000 – 450 10 15
Education
932 Zicole Secondary School Design Umzinyathi Primary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
6 179 – 1 100 2 079 –
Construction 26% Education
933 Zwelithule Primary School - 50% Harry Gwala Primary 30/06/2011 2018-11-30 Infrastructure Grant Programme 6
2 785 82 450 10 15
Education
934 Mfunzi Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 444 50 450 10 15
Mount Ernestina Combined Education
935 School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 521 76 450 10 15
Education
936 Mbopheni Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 572 77 450 10 15
Education
937 Nyoniyezwe Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 892 57 450 10 15
Education
938 Okhulana Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 932 60 450 10 15
Education
939 Mfushane Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 178 66 450 10 15
Education
940 Ntandoyethu Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 527 51 450 10 15
Education
941 Ntabende Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 867 59 450 10 15
Education
942 Emakhabeleni Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 191 67 450 10 15
Education
943 Khumbulani Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 546 76 450 10 15
Education
944 Ithembani Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 307 98 450 10 15
Education
945 Bangumuzi Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 620 80 450 10 15
Education
946 Esokheni Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 315 71 450 10 15
Education
947 Lilani Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 000 – – – –
Embetha Junior Secondary Education
948 School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6

41
Annexure Table B5 – Vote 5 : Education

448 55 300 10 15
Education
949 Lembethe Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 302 71 450 10 15
Education
950 Nculwane Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 763 50 450 10 15
Education
951 Vikindlala Intermediate School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 587 79 450 10 15
Education
952 Vavule Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 466 73 450 10 15
Ngome Primary School - Education
953 Greytown Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 857 – 450 10 15
Education
954 Mhlangezulu Secondary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 223 60 450 10 15
Education
955 Sheshisamsamo Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 930 58 450 10 15
Education
956 Ncunjana Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
860 59 450 10 15
Education
957 Weenen Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 915 87 450 10 15
Education
958 Kwenzokuhle Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 352 59 450 10 15
Education
959 Mthaniya Combined School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 251 67 450 10 15
Fundani Primary School Education
960 (Weenen) Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 334 69 450 10 15
Education
961 Morning Star Intermediate School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 167 64 450 10 15
Education
962 Kopleegte Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 261 66 450 10 15
M L Sultan Colenso Primary Education
963 School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 790 55 450 10 15
Education
964 Macongco Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 912 86 450 10 15
Education
965 Chothwane Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 283 70 450 10 15
Education
966 Siqalokusha Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 410 45 450 10 15
Education
967 Selbourne Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 409 50 450 10 15
Education
968 Shayamoya Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 861 50 450 10 15
Education
969 Lukazi Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
5 028 49 450 10 15
Education
970 Inkosi Mjwayeli Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 954 59 450 10 15
Education
971 Ncibidwane Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 333 99 450 10 15
Education
972 Pisgah Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 943 88 450 10 15
Education
973 Phumelelani Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 103 50 450 10 15
Education
974 Phasiwe Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 523 103 450 10 15
Education
975 Bhekathina Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 596 49 450 10 15
Education
976 Mathamo Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

42
Annexure Table B5 – Vote 5 : Education

4 792 49 450 10 15
Education
977 Sakhile Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 766 82 450 10 15
Education
978 Emanjokweni Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 251 49 450 10 15
Education
979 Enhlanganisweni Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 562 77 450 10 15
Education
980 Bhungane Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 601 77 450 10 15
Education
981 Mhubheni Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 154 49 450 10 15
Education
982 Mkhize Intermediate School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 984 – 450 10 15
Education
983 Abantungwa Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 408 98 450 10 15
Education
984 Mountainview Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 452 102 450 10 15
Education
985 Emangweni Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 175 94 450 10 15
Education
986 Emadolobheni Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 089 64 450 10 15
Education
987 Riverdale Intermediate School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 892 50 450 10 15
Education
988 Celukuphiwa Combined School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 584 49 450 10 15
Education
989 Estcourt Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 203 93 450 10 15
Education
990 Sibumba Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
873 59 450 10 15
Education
991 Sinqumeni Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 722 52 450 10 15
St Bernards Jolwayo Primary Education
992 School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 344 69 450 10 15
Education
993 Swebane Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 165 92 345 10 15
Education
994 Themane Combined School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 230 95 345 10 15
Education
995 Nomahaye Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 344 69 345 10 15
Education
996 Kusakusa Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 671 79 345 10 15
Education
997 Emkhuphula Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 767 81 345 10 15
Education
998 Holwane Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 629 77 345 10 15
Education
999 Fabeni Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 096 90 345 10 15
Education
1000 Mabizela Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 449 71 345 10 15
Education
1001 Mashunka Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 752 80 345 10 15
Education
1002 Bethulo Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 595 103 345 10 15
Mzomusha Intermediate School Education
1003 (Tugela Ferry) Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 360 97 345 10 15
Education
1004 Ngongolo Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

43
Annexure Table B5 – Vote 5 : Education

2 164 62 345 10 15
Education
1005 Esweni Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 836 83 345 10 15
Education
1006 Ntshishili Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 788 85 345 10 15
Education
1007 Osuthu Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 460 72 345 10 15
Education
1008 Ziz Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 224 65 345 10 15
Zimiseleni Junior Secondary Education
1009 School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 736 81 345 10 15
Education
1010 Mfenebude Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 830 50 345 10 15
Education
1011 Mhlumba Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 542 74 345 10 15
Mpikayizekanye Secondary Education
1012 School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
957 41 345 10 15
Education
1013 Mthaleni Junior Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 944 57 345 10 15
Education
1014 Mpompolwana Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 671 79 345 10 15
Education
1015 Mathinta Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 690 49 345 10 15
Education
1016 Phowane Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 557 104 345 10 15
Education
1017 Umbonje Secondary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
860 58 345 10 15
Education
1018 Phenduka Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 817 70 345 10 15
Education
1019 Mbondweni Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 503 74 345 10 15
Education
1020 Kwazenzele Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 614 76 345 10 15
Education
1021 Nomaqhulu Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 349 97 345 10 15
Education
1022 Emzweni Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 865 84 345 10 15
Education
1023 Emachunwini Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 591 75 345 10 15
Education
1024 Indlozana Secondary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 843 – 345 10 15
Education
1025 Kwavulamehlo Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 920 56 345 10 15
Sibonginhlanhla Junior Education
1026 Secondary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 061 60 345 10 15
Education
1027 Qalindlela Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 633 76 345 10 15
Education
1028 Ebuhlebemfundo Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 643 76 345 10 15
Education
1029 Iphuphuma Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 617 48 345 10 15
Education
1030 Mabedlana Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 096 89 345 10 15
Education
1031 Madudula Secondary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 137 90 345 10 15
Education
1032 Makhankana Intermediate School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

44
Annexure Table B5 – Vote 5 : Education

2 447 77 345 10 15
Education
1033 Nkamba Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 719 79 345 10 15
Education
1034 Gangeyana Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 439 71 345 10 15
Education
1035 Gayisani Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 956 85 345 10 15
Gordon Memorial Secondary Education
1036 School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 075 97 345 10 15
Education
1037 Esethu Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 585 59 345 10 15
Education
1038 Mandlethu Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 474 60 345 10 15
Education
1039 Ehlanzeni Intermediate School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 277 – 345 10 15
Education
1040 Pano Combined School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 364 – 345 10 15
Pomeroy Intermediate School Education
1041 (Msinga) Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 446 57 345 10 15
Education
1042 Ntokozweni L Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 798 – 345 10 15
Education
1043 Bhekabantu Secondary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 224 59 345 10 15
Education
1044 Batshazwayo Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 237 – 345 10 15
Education
1045 Phumela Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 136 34 345 10 15
Education
1046 Kwadophi Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
653 30 345 10 15
Education
1047 Nsingabantu Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
693 38 345 10 15
Education
1048 Ntshangase Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 941 85 345 10 15
Education
1049 Kwanyezi Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 000 – – 10 30
Education
1050 Ekucabangeni Secondary School Project Initiation Umzinyathi Primary - - Infrastructure Grant Programme 6
5 086 49 345 10 15
Education
1051 Ekucabangeni Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 495 73 345 10 15
Education
1052 Maholela Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 860 99 345 10 15
Education
1053 Langazela Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 241 67 345 10 15
Education
1054 Magabeng Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 012 86 345 10 15
Education
1055 Mzimela Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 741 79 345 10 15
Education
1056 Nhlokomo Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 355 40 345 10 15
Education
1057 Nkunyana Intermediate School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
779 48 345 10 15
Education
1058 Hlomisa Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 022 59 345 10 15
Education
1059 Hlazakazi Senior Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 964 57 345 10 15
Education
1060 Melokuhle Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

45
Annexure Table B5 – Vote 5 : Education

2 774 81 345 10 15
Education
1061 Mphondi Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 760 80 345 10 15
Education
1062 Mphazima Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 015 59 345 10 15
Education
1063 Zamokwakhe Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 318 39 345 10 15
Education
1064 Thembunyawo Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 879 55 345 10 15
Education
1065 Mathukulula Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 215 64 345 10 15
Education
1066 Springlake Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
846 26 345 10 15
Education
1067 Maqoqa Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 986 57 345 10 15
Education
1068 Mlandowethu Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 708 79 345 10 15
Education
1069 Mkhonjane Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 930 85 345 10 15
Education
1070 Mhlungwane Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 276 95 345 10 15
Education
1071 Haladu Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 495 102 345 10 15
Education
1072 Hlalele Intermediate School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 267 94 345 10 15
Education
1073 Hlubi Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 792 80 345 10 15
Education
1074 Jabavu Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 759 80 345 10 15
Education
1075 Ikaheng Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 658 78 345 10 15
Education
1076 Asibambisane Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 261 94 345 10 15
Education
1077 Mabululwana Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 056 62 345 10 15
Education
1078 Funulwazi Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 690 – 345 10 15
Education
1079 Sesiyabonga Secondary School Design Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 516 60 345 10 15
Education
1080 Nteneshana Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 790 50 345 10 15
Education
1081 Engudumeni Intermediate School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 526 73 345 10 15
Education
1082 Shiyane Secondary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 596 48 345 10 15
Education
1083 Tayside Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 923 49 345 10 15
Okhalweni Primary School Education
1084 (Hlobane) Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
349 40 289 10 –
Education
1085 Iphunguphungu Primary School Design Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 222 94 345 10 15
Education
1086 Zizuzele Primary School Design Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 836 60 345 10 15
Education
1087 Mafitleng Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 061 – 345 10 15
Education
1088 Qediphika Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

46
Annexure Table B5 – Vote 5 : Education

2 761 – 345 10 15
Education
1089 Isibukosabasha Primary School Design Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 124 92 345 10 15
Education
1090 Ekwaluseni Secondary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 193 66 345 10 15
Education
1091 Hambrook Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 047 33 345 10 15
Education
1092 Skraalhoek Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 952 87 345 10 15
Education
1093 Tabhane Secondary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 492 74 345 10 15
Education
1094 Mthende Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 449 73 345 10 15
Education
1095 Kholokazana Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 998 60 345 10 15
Education
1096 Mahlubimangwe Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 283 68 345 10 15
Education
1097 Rheibokspruit Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 715 52 345 10 15
Education
1098 Potshini Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 144 65 345 10 15
Education
1099 Amazizi Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 890 – 345 10 15
Education
1100 Ukhahlamba Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 204 66 345 10 15
Education
1101 Vulamehlo Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
938 20 432 10 15
Education
1102 Tholithemba Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 227 95 432 10 15
Education
1103 Ebhethani Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 653 50 432 10 15
Education
1104 Dukuza Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 401 42 432 10 15
Education
1105 Eboyeni Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 098 92 432 10 15
Education
1106 Nomtshilo Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 046 89 432 10 15
Education
1107 Nhlokwane Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 493 75 432 10 15
Education
1108 Okhombe Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 136 65 432 10 15
Education
1109 Nsetheni Intermediate School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 430 73 432 10 15
Education
1110 Ngunjini Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 137 24 432 10 15
Education
1111 Mqedandaba Secondary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 962 60 432 10 15
Education
1112 Myendane Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
617 32 432 10 15
Education
1113 Indanyana Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 775 80 432 10 15
Education
1114 Dival Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 211 81 432 10 15
Education
1115 Enjabulweni Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 990 58 432 10 15
Education
1116 Hursley Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

47
Annexure Table B5 – Vote 5 : Education

1 502 45 432 10 15
Education
1117 Ethuleni Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 915 55 432 10 15
Education
1118 Emafusini Senior Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 951 44 432 10 15
Education
1119 Mlonyeni Intermediate School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
656 34 432 10 15
Education
1120 Ezakheni Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 547 46 432 10 15
Education
1121 Bluebank Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 343 56 432 10 15
Watersmeet Senior Primary Education
1122 School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 175 51 432 10 15
Education
1123 Watershed Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 720 39 432 10 15
Education
1124 Sigidi Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 614 64 432 10 15
Education
1125 Silokoza Secondary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 410 42 432 10 15
Education
1126 Magenwini Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 743 49 432 10 15
Amancamakazana Primary Education
1127 School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 195 92 432 10 15
Tholulwazi Primary School Education
1128 (Ladysmith) Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 892 55 432 10 15
Education
1129 Vikinduku Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 415 98 432 10 15
Education
1130 Mbizoyamaswazi Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 817 53 432 10 15
Ntababusuku Junior Secondary Education
1131 School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 476 101 432 10 15
Education
1132 Nhlonhlweni Primary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 463 71 432 10 15
Education
1133 Mbelebele Combined School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 169 64 432 10 15
Education
1134 Mhlumayo Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
994 73 432 10 15
Education
1135 Endakane Secondary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 759 39 432 10 15
Fundulwazi Senior Primary Education
1136 School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 981 86 432 10 15
Education
1137 Bhevu Secondary School Design Uthukela Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 456 72 432 10 15
Education
1138 Ecancane Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 902 59 432 10 15
Education
1139 Weleni Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 000 59 432 10 15
Education
1140 Isibankwa Primary School Design Uthukela Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 097 93 432 10 15
Education
1141 Endabenhle Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 097 112 432 10 15
Education
1142 Bongaspoort Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 097 115 432 10 15
Education
1143 Emaphayini Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 097 87 432 10 15
Education
1144 Ntshidi Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

48
Annexure Table B5 – Vote 5 : Education

3 097 87 432 10 15
Education
1145 Ekhombe Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 795 113 432 10 15
Education
1146 Hlambanyathi Primary School Design Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 604 112 432 10 15
Education
1147 Khandane Primary School Design Umkhanyakude Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 445 112 432 10 15
Education
1148 Kwamboma Primary School Design Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 728 112 432 10 15
Education
1149 Mnyayiza Primary School Design Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 898 93 432 10 15
Education
1150 Amangwe Secondary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 680 96 432 10 15
Education
1151 Buthanani Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 955 87 432 10 15
Education
1152 Dlemudlemu Secondary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 064 93 432 10 15
Education
1153 Dover Combined School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 601 115 432 10 15
Education
1154 Emasundwini Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 803 92 432 10 15
Education
1155 Empembeni Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 938 93 432 10 15
Education
1156 Entenjane Intermediate School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 883 115 432 10 15
Education
1157 Exhaphozini Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 403 107 432 10 15
Education
1158 Floraton Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 810 93 432 10 15
Education
1159 Imfihlo Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 091 88 432 10 15
Education
1160 Ithala Secondary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 371 92 432 10 15
Education
1161 Iwangu Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 340 87 432 10 15
Education
1162 Khomo Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 548 93 432 10 15
Education
1163 Kwajazi Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 742 93 432 10 15
Education
1164 Mandawe Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 367 112 432 10 15
Education
1165 Mathanda Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 006 95 432 10 15
Education
1166 Mbongolwane Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 473 93 432 10 15
Education
1167 Mgebisa Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
5 862 87 432 10 3 521
Education
1168 Mthiyaqhwa Secondary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 555 112 432 10 15
Education
1169 Muntonokudla Secondary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 760 95 432 10 15
Education
1170 Ncekuya Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 802 96 432 10 15
Education
1171 Ngilandela Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 470 93 432 10 15
Education
1172 Ngqamzana Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

49
Annexure Table B5 – Vote 5 : Education

1 815 96 432 10 15
Education
1173 Ngwemnyama Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 981 93 432 10 15
Nomaqoni Junior Secondary Education
1174 School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 549 93 432 10 15
Education
1175 Nomdumo Intermediate School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 246 112 432 10 15
Education
1176 Nqundu Combined School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 290 88 432 10 15
Education
1177 Ntatshana Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 450 87 432 10 15
Education
1178 Qudeni Combined School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 820 – 432 10 15
Zenzeleni Mashamase Secondary Education
1179 School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 326 87 432 10 15
Education
1180 Entshiza Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 261 87 432 10 15
Education
1181 Makhathini Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 261 93 432 10 15
Education
1182 Maphukanqola Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 038 114 432 10 15
Matshemade Junior Primary Education
1183 School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 026 93 432 10 15
Education
1184 Mkhobosa Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 778 93 432 10 15
Education
1185 Mombeni Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 272 96 432 10 15
Education
1186 Ndluyesilo Secondary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 478 93 432 10 15
Education
1187 Nkosazana Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
746 88 432 10 15
Education
1188 Simanjalo Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 575 93 432 10 15
Education
1189 Thandinkosi Primary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 404 112 432 10 15
Education
1190 Zimeme Secondary School Design Uthungulu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 503 88 432 10 15
Education
1191 Celimpilo Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
902 115 432 10 15
Education
1192 Ekhombela Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 696 112 432 10 15
Education
1193 Ekwandeni Combined School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 630 88 432 10 15
Education
1194 Empucukweni Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
980 115 432 10 15
Emvunyane Senior Primary Education
1195 School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 761 115 432 10 15
Education
1196 Endlovukazi Secondary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 799 112 432 10 15
Education
1197 Enkembeni Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 562 113 432 10 15
Education
1198 Enyathi Intermediate School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 629 88 432 10 15
Education
1199 Esiphiva Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 088 90 432 10 15
Education
1200 Esusweni Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

50
Annexure Table B5 – Vote 5 : Education

1 704 115 432 10 15


Education
1201 Fortuin Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 017 112 432 10 15
Education
1202 Freiburg Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 554 87 432 10 15
Education
1203 Fundukhuphuke Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 634 113 432 10 15
Education
1204 Gudu Secondary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 071 88 432 10 15
Hambangendlela Secondary Education
1205 School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 980 90 432 10 15
Education
1206 Hlanganakahle Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
831 112 432 10 15
Education
1207 Hlongomiya Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 234 90 432 10 15
Education
1208 Impuphusi Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 835 115 432 10 15
Indondokazulu Intermediate Education
1209 School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 347 112 432 10 15
Education
1210 Intathakusa Intermediate School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 395 114 432 10 15
Education
1211 Iqhawelesizwe Combined School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 532 96 432 10 15
Education
1212 Isigodi Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 260 90 432 10 15
Isihlahlasenkosi Secondary Education
1213 School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 243 115 432 10 15
Education
1214 Isikhalisethu Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 853 90 432 10 15
Education
1215 Ivungu Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 104 115 432 10 15
Education
1216 Izinhlendleni Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 110 112 432 10 15
Education
1217 Khanyiseluzulu Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 683 115 432 10 15
Education
1218 Knoopaan Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 330 90 432 10 15
Education
1219 Kohlokoloprimary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 220 112 432 10 15
Education
1220 Konfoor Combined School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 626 112 432 10 15
Education
1221 Kwagamakazi Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 267 112 432 10 15
Education
1222 Kwalamlela Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 796 112 432 10 15
Education
1223 Kwamnyayiza Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 693 88 432 10 15
Education
1224 Kwankulu Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 715 – 432 10 15
Education
1225 Kwanqokotho Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 804 90 432 10 15
Education
1226 Kwansele Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 812 88 432 10 15
Education
1227 Kwanyoni Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 763 115 432 10 15
Education
1228 Lethithemba Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

51
Annexure Table B5 – Vote 5 : Education

1 683 112 432 10 15


Education
1229 Lujojwana Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 121 112 432 10 15
Education
1230 Magenqeza Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 581 112 432 10 15
Education
1231 Magubulundu Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 217 115 432 10 15
Education
1232 Makateeskop Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
726 115 432 10 15
Education
1233 Malamba Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 017 115 432 10 15
Education
1234 Mananjalo Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 499 115 432 10 15
Education
1235 Manhlanhle Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 060 115 432 10 15
Education
1236 Mankulumane Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 163 115 432 10 15
Education
1237 Manzezulu Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 406 88 432 10 15
Education
1238 Masibhekane Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 613 88 450 10 15
Education
1239 Mfanawendlela Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
530 112 398 10 –
Education
1240 Mfeni Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 418 87 432 10 15
Education
1241 Mgabhanyongo Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 127 112 354 10 15
Education
1242 Mhlambansila Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 349 115 336 10 15
Education
1243 Mkhuphane Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 835 115 300 10 15
Education
1244 Mpembeni Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 343 112 300 10 15
Education
1245 Mqwabe Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 010 114 300 10 15
Mshanelowesizwe Secondary Education
1246 School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 126 112 300 10 15
Education
1247 Mtakayise Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 354 115 300 10 15
Mthingana Junior Secondary Education
1248 School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 602 112 300 10 15
Education
1249 Ndabambi Combined School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 821 112 300 10 15
Education
1250 Ndema Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 554 112 300 10 15
Education
1251 Ngangayiphi Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 289 112 300 10 15
Education
1252 Ngebhuzana Secondary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 815 112 300 10 15
Education
1253 Ngome Primary School - Vryheid Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 934 113 300 10 15
Education
1254 Nhlabamkhosi Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 262 107 300 10 15
Education
1255 Nhlanhlayethu Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 599 88 300 10 15
Education
1256 Njomelwane Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

52
Annexure Table B5 – Vote 5 : Education

2 958 87 300 10 15
Thandulwazi Secondary School Education
1257 (Nkawu S) Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 589 112 300 10 15
Education
1258 Nkombabantu Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 053 – 300 10 15
Education
1259 Noju Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 499 92 300 10 15
Education
1260 Nomzinto Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
5 905 113 300 10 3 521
Nsikayezwe Senior Primary Education
1261 School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 242 112 300 10 15
Education
1262 Ntshiyangibone Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 450 – 300 10 15
Education
1263 Obivane Combined School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 968 88 300 10 15
Education
1264 Okhukho Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
5 048 112 300 10 15
Education
1265 Ophuzane Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 189 88 300 10 15
Education
1266 Osingisingini Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
4 684 115 300 10 15
Paulpietersburg Primary School Education
1267 (Maarschalk St) Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 491 114 300 10 15
Education
1268 Phembumuzi Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
6 012 113 300 10 3 521
Education
1269 Phumanyova Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 421 90 300 10 15
Prince Ndabuko Secondary Education
1270 School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
623 112 300 10 15
Education
1271 Protes Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 601 115 300 10 15
Education
1272 Qhoqhoza Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 318 115 300 10 15
Education
1273 Qonqo Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 509 112 300 10 15
Education
1274 Sawoti Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 913 87 300 10 15
Education
1275 Sheleza Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 419 115 300 10 15
Education
1276 Sibusiso Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
726 112 300 10 15
Education
1277 Siyazizamela Secondary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 832 90 300 10 15
Education
1278 Sizabonke Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 321 – 300 10 15
Education
1279 Sizakahle Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 535 114 300 10 15
Education
1280 Sizakala Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 588 112 300 10 15
Education
1281 Sizuzulu Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 178 112 300 10 15
Education
1282 Sizwelabantu Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 426 115 300 10 15
Education
1283 Sobethu Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 824 112 300 10 15
Education
1284 Sogaduzela Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

53
Annexure Table B5 – Vote 5 : Education

1 289 115 300 10 15


Education
1285 Thokazi Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 121 112 300 10 15
Education
1286 Tholakele Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 231 90 300 10 15
Education
1287 Thulwana Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 977 106 300 10 15
Education
1288 Thusane Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
861 – 300 10 15
Education
1289 Tshekhulu Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 914 – 300 10 15
Education
1290 Twasana Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 903 – 300 10 15
Education
1291 Uzwano Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 803 – 300 10 15
Education
1292 Wela Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
919 – 300 10 15
Education
1293 Zungwini Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 763 115 300 10 15
Education
1294 Encanyini Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
951 – 300 10 15
Education
1295 Moreson Primary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 574 – 300 10 15
Khiphunyawo Senior Primary Education
1296 School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 259 – 300 10 15
Education
1297 Manyala Primary School Design Uthungulu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
574 – 300 10 15
Education
1298 Ndabezitha Primary School Design Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
574 – 300 10 15
Education
1299 Mgidla Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
574 – 300 10 15
Education
1300 Makhosonke Secondary School Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 274 102 300 10 15
Education
1301 Magidigidi Primary School Design Harry Gwala Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 311 104 300 10 15
Education
1302 Hlabeni Primary School Design Harry Gwala Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 274 102 300 10 15
Education
1303 Bhidla Primary School Design Harry Gwala Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 454 113 300 10 15
Inqolobane Junior Secondary Education
1304 School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 231 99 300 10 15
Thomas Mbhele Junior Education
1305 Secondary School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 677 126 300 10 15
Education
1306 Gobume Secondary School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 344 107 300 10 15
Education
1307 Hyman Primary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
804 72 300 10 15
Mandlendoda Senior Primary Education
1308 School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
963 82 300 10 15
Education
1309 Kwaphuza Senior Primary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 367 108 300 10 15
Education
1310 Lucas Memorial Primary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 311 104 300 10 15
Education
1311 Nontshuntsha Primary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 006 142 300 10 15
Education
1312 Kwamasosha Secondary School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

54
Annexure Table B5 – Vote 5 : Education

1 364 108 300 10 15


Education
1313 Mgudlwa Secondary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 970 108 300 10 15
Education
1314 Mzukela Primary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 683 126 300 10 15
Education
1315 Sikanisweni Secondary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 274 102 300 10 15
Education
1316 Mthimude Secondary School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 364 108 300 10 15
Education
1317 Mkhandi Primary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 598 122 300 10 15
Education
1318 Umvolozi Primary School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 674 126 300 10 15
Education
1319 Gabangezwe Secondary School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 598 122 300 10 15
Education
1320 Enyandeni Primary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 155 95 300 10 15
Education
1321 Mjika Primary School Design Ugu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1 255 101 300 10 15
Education
1322 Siyephu Primary School Design Ugu Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1323 Amakhemfundo Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1324 Bathembu Secondary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1325 Buzubona Intermediate School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1326 Dewaar Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1327 Dlabesuthe Secondary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1328 Dolo Combined School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1329 Domremy Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1330 Ekuthuthukeni Secondary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1331 Emgaga Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1332 Emkhamo Combined School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1333 Endumeni Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1334 Gcotoi Secondary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1335 Halalisani Combined School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1336 Isandlwana Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1337 Khulekani Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1338 Kubuyakwezwe Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 10 15
Education
1339 Kwadinda Primary School Design Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1340 Kwamajola Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

55
Annexure Table B5 – Vote 5 : Education

680 – – 50 100
Education
1341 Landelani Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1342 Makhedama Secondary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1343 Mandleni Intermediate School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1344 Mandlenyosi Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Maqhinga Memorial Secondary Education
1345 School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1346 Mathutshana Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1347 Matshana Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1348 Mawele Secondary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1349 Mbalane Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Mgwempisi-Fabase Combined Education
1350 School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1351 Msawenkosi Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1352 Munywana Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1353 Mzamoyethu Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1354 Mziwenkosi Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1355 Ngwane Secondary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1356 Nhlalakahle Secondary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1357 Nomashaka Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1358 Ntanyandlovu Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1359 Ntanyezulu Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1360 Ophathe Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1361 Outfall Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1362 Qedukoma Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1363 Qinelane Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1364 Qiniso Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1365 Sampofu Intermediate School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1366 Shekelela Intermediate School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1367 Sithandene Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1368 Umkhathini Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

56
Annexure Table B5 – Vote 5 : Education

680 – – 50 100
Education
1369 Usizo Secondary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1370 Vegkop Primary School Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1371 Xongo Primary School Feasibility Umzinyathi Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Zwelinjani Secondary School Education
1372 (Ladysmith) Feasibility Umzinyathi Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1373 Annandale Primary School Feasibility Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1374 Khiphokuhle Secondary School Feasibility Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
3 923 49 20 50 100
Okhalweni Primary School Education
1375 (Dundee) Design Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1376 Annieville Senior Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1377 Celani Primary School Feasibility Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1378 Bothas Iass Intermediate School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1379 Muzokhanyayo Secondary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Isibonelesihle Intermediate Education
1380 School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1381 Inzululwazi Secondary School Feasibility Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1382 Nokukhanya Primary School Feasibility Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
St Lewis Bertrands Secondary Education
1383 School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1384 Siphuthando Combined School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Mandlamasha Intermediate Education
1385 School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1386 Cebelihle Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1387 Indoni Junior Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1388 Vumelani Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1389 Caca Primary School Feasibility Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1390 V S Zulu Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Emalahleni Combined School Education
1391 (Utrecht) Feasibility Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1392 Sabela Secondary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1393 Mana Secondary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1394 Kilkeel Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1395 Ntendeka Combined School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1396 Clavis Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

57
Annexure Table B5 – Vote 5 : Education

500 – 20 50 100
Education
1397 Blaauwbosch Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1398 Siyathuthuka Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1399 S E Vawda Primary School Feasibility Amajuba Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1400 Zabalaza Intermediate School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1401 Qhubimfundo Primary School Feasibility Amajuba Specialised 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1402 Sebenzani Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1403 Lembe Primary School Feasibility Amajuba Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1404 Rutland Intermediate School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
1405 Khaselihle Primary School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
Ezincwadini Senior Primary 500 – 20 50 100
1406 School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6
1407 Mlamleli Primary School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
500 – 20 50 100
1408 Qaphelani Junior Primary School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6
1409 Hlabana Primary School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
500 – 20 50 100
1410 Dedangifunde Secondary School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6
1411 Ngcaka Primary School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
500 – 20 50 100
1412 Bethamoya Secondary School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6
1413 Cathulani Primary School Feasibility Amajuba Public School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
500 – 20 50 100
1414 Mhlanganyelwa Combined School Feasibility Uthukela Public School 2017-11-20 2019-03-30 Equitable Share Programme 6
1415 Mthiyane Primary School Feasibility Uthukela Public School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
1416 Horseshoe Primary School Feasibility Uthukela Non- School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
1417 Bergsig Primary School Feasibility Uthukela Non- School 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 50 100
680 – – 50 100
1418 Ntabamhlophe Primary School Feasibility Uthukela Non- School 2017-11-20 2019-03-30 Equitable Share Programme 6
500 – 450 50 –
1419 Bhekundi Senior Primary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6
1420 Eludimbi Primary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 450 50 –
500 – 450 50 –
1421 Insukangihlale Primary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6
1422 Tatazela Secondary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 450 50 –
1423 Mangqasha Primary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 450 50 –
1424 Mndeni Primary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 450 50 –
1425 Ogade Primary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 450 50 –
– – – 10 30
Education
1426 Nciya Secondary School Project Initiation Ugu Primary 2016-07-20 2019-04-30 Infrastructure Grant Programme 6
– – – – –
Education
1427 Pholela Secondary School Feasibility Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – – –
Education
1428 Drc Secondary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
1429 Petezi Primary School Project Initiation Ilembe Primary - - Infrastructure Grant Programme 6
2 000 – – 10 30
Education
1430 Sinenhlanhla Secondary School Project Initiation Ilembe Primary - - Infrastructure Grant Programme 6
680 – – 50 100
Education
1431 Kwamanandi Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1432 Kwanyamazane Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Lubhoko Comp Secondary Education
1433 School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1434 Ludaka Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1435 Lundini Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1436 Mafutha Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

58
Annexure Table B5 – Vote 5 : Education

680 – – 50 100
Education
1437 Makhambane Primary School Feasibility Umkhanyakude Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1438 Mankunzi Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1439 Matshamhlophe Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1440 Mbekwane Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1441 Mbilini Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1442 Mbodla Primary School Feasibility Umkhanyakude Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1443 Mbopha Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1444 Mdladla Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1445 Mfakubheka Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1446 Mgabadeli Primary School Project Initiation Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1447 Mgwazeni Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1448 Moses Zikhali Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1449 Msiyane Secondary School Feasibility Umkhanyakude Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1450 Mthambalala Secondary School Feasibility Umkhanyakude Specialised 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Mthanti Commtech Secondary Education
1451 School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1452 Mtshakela Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
2 000 – – 10 30
Education
1453 Muthidlwe Primary School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
680 – – 50 100
Education
1454 Muthidlwe Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1455 Mziki Primary School Feasibility Umkhanyakude Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1456 Ndamkane Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1457 Ndimande Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1458 Nethezeka Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1459 Ngungunyane Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Nhlambanyathi Junior Secondary Education
1460 School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1461 Nhlamvu Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1462 Njakazana Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1463 Nobiya Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1464 Nqiwaneni Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

59
Annexure Table B5 – Vote 5 : Education

680 – – 50 100
Education
1465 Nqutshini Primary School Feasibility Umkhanyakude Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1466 Nyalazi Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1467 Phiwamandla Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1468 Phuzemthonjeni Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1469 Shengeza Secondary School Feasibility Umkhanyakude Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1470 Siyakhula Secondary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Sukasambe Junior Secondary Education
1471 School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1472 Sunshine Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1473 Umfolozi Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1474 Umlambozana Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Vezobala Junior Secondary Education
1475 School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Vulakwenile Junior Secondary Education
1476 School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – – 50 100
Education
1477 Emthonjeni Primary School Feasibility Umkhanyakude Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1478 Bantubaningi Secondary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1479 Bernica Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1480 Bhanganomo Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1481 Bhekamakhosi Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1482 Busekhaya Secondary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1483 Ceza Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1484 Dudusini Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1485 Dunduluzi Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1486 Emadulwini Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1487 Emandleni Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Emhlangeni Senior Primary Education
1488 School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1489 Endlozana Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Inkosi Godlumkhonto Primary Education
1490 School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1491 Hlanganani Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1492 Hlengingqondo Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

60
Annexure Table B5 – Vote 5 : Education

500 – 20 50 100
Education
1493 Imveloyamaswazi Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1494 Isiqulwane Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1495 Jabulisani Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1496 Jojosini Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1497 Khawuleza Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1498 Khethukuthula Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1499 Khumoleni Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1500 Klipwal Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Sinothile Primary School Education
1501 (Kuneningi P) Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1502 Kwa Mngotho Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1503 Kwadomba Secondary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1504 Kwamfemfeni Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1505 Kwampunzi Combined School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Kwazihlakaniphele Primary Education
1506 School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1507 Magadlela Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1508 Magwegwana Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 50 100
Education
1509 Mandlana Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1510 Mangqwashu Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1511 Maphambili Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1512 Maphovela Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1513 Maqiyana Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1514 Masihlangane Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1515 Masokaneni Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1516 Mboloba Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1517 Metzelfontein Combined School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1518 Mhlathuze Intermediate School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1519 Minya Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1520 Msenteli Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

61
Annexure Table B5 – Vote 5 : Education

500 – 20 10 15
Education
1521 Mtshekula Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Muziwengqondo Secondary Education
1522 School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1523 Ncotshane Senior Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1524 Ngolotsha Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1525 Ngongoma Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1526 Ngoza Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1527 Nguqe Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1528 Ngwabi Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1529 Ngwanya Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Ngwenyabeyigwinya Primary Education
1530 School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1531 Nhlazatshe Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1532 Nkabane Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1533 Nkamelwane Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1534 Nkwambazi Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1535 Nqobizitha Secondary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1536 Nsikayempilo Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1537 Ntsonyane Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1538 Nzobo Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1539 Oningeni Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1540 Ozweni Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1541 Phuzamanzi Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1542 Pivaan Intermediate School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1543 Prince Silwane Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1544 Qambokuhle Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1545 Sakhesethu Combined School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Senzokuhle Junior Secondary Education
1546 School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1547 Sibanisakhe Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1548 Sibiyangankomo Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6

62
Annexure Table B5 – Vote 5 : Education

– – 4 520 3 448 12 563


Hambanathi Senior Primary Construction 76% Education
1577 School Phase 1 - 99% Harry Gwala Primary 2015-04-01 - Infrastructure Grant Programme 6
Construction 76% – 178 300 2 963 –
1578 Magog Primary School - 99% Ugu Secondary 2015-04-01 - Equitable Share Programme 6
– 1 620 300 4 582 3 956
Construction 76% Education
1579 Sinqumeni Primary School - 99% Umzinyathi Specialised 2015-04-01 - Infrastructure Grant Programme 6
– 765 300 9 523 –
Isidingo Primary School 3Rd Construction 76% Education
1580 Phase - 99% Umlazi Primary 2015-04-01 - Infrastructure Grant Programme 6
– – – 10 41 588
Education
1581 Bambanani Secondary School Project Initiation Zululand Primary - - Infrastructure Grant Programme 6
– – 300 4 523 –
Construction 76% Education
1582 Sizwesonke Secondary School - 99% Uthungulu Secondary 2015-04-01 - Infrastructure Grant Programme 6
– – 300 1 472 –
Construction 26% Education
1583 Mbhanana Zenex Primary School - 50% Umlazi Primary 2016-04-01 - Infrastructure Grant Programme 6
– 681 300 10 15
Education
1584 Vulamehlo Primary School Design Zululand Secondary - - Infrastructure Grant Programme 6
– 8 543 300 12 356 5 623
Construction 1% - Education
1585 Bomvini Primary School 25% Harry Gwala Secondary 2016-04-01 - Infrastructure Grant Programme 6
– – 300 6 230 3 625
Construction 76% Education
1586 Mofu Primary School - 99% Umlazi Primary 2015-04-01 - Infrastructure Grant Programme 6
269 113 245 510 300 1 091 –
Mandla Mthwethwa
Comprehensive High School Construction 76% Education
1587 (Ndumo New Model High School) - 99% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
– – 70 – –
Construction 76% Education
1588 Thembumzamo Primary School - 99% Uthukela Primary 2015-04-01 - Infrastructure Grant Programme 6
– – 200 10 15
Education
1589 Thimuni Secondary School Feasibility Umgungundlovu Secondary - - Infrastructure Grant Programme 6
2 535 – 250 10 15
Education
1590 Fort Louis Primary School Design Uthungulu Secondary - - Infrastructure Grant Programme 6
– – 250 50 100
Education
1591 Nhlokwane Secondary School Tender Uthukela Secondary - - Infrastructure Grant Programme 6
– – 1 200 –
Siyalungelwa Secondary School - Construction 1% - Education
1592 Newcastle 25% Amajuba Primary 2016-04-01 - Infrastructure Grant Programme 6
– – 320 4 562 3 562
Construction 51% Education
1593 Nompondo Primary School - 75% Umkhanyakude Primary 2016-04-01 - Infrastructure Grant Programme 6
– 888 320 2 818 –
Construction 76% Education
1594 Sithunjwana Primary School - 99% Umgungundlovu Secondary 2015-04-01 - Infrastructure Grant Programme 6
– 531 320 2 500 –
Construction 76% Education
1595 Morning Star Primary School - 99% Uthukela Primary 2015-04-01 - Infrastructure Grant Programme 6
– 864 320 1 855 –
Construction 76% Education
1596 Ezinyonyana Primary School - 99% Uthukela Secondary 2015-04-01 - Infrastructure Grant Programme 6
1 404 490 110 804 –
Construction 76% Education
1597 Bhobhobho Primary School - 99% Zululand Primary 2015-04-01 - Infrastructure Grant Programme 6
– 61 310 1 747 –
Construction 51% Education
1598 Oqungweni Primary School - 75% Uthukela Secondary 2016-04-01 - Infrastructure Grant Programme 6
500 – – 10 15
Education
1599 Lingani Primary School Feasibility Amajuba Primary - - Infrastructure Grant Programme 6
– 10 167 210 6 259 12 532
Construction 1% - Education
1600 Xoloxolo Primary School 25% Harry Gwala Secondary 2016-04-01 - Infrastructure Grant Programme 6
– 280 – 10 15
Mzokhanyo/Mkhatshane Junior Education
1601 Secondary School Design Harry Gwala Primary - - Infrastructure Grant Programme 6
– – – 10 –
Education
1602 Dangazela Feasibility Ilembe Secondary - - Infrastructure Grant Programme 6
– – – 10 15
Education
1603 Thethandaba Primary School Design Ilembe Primary - - Infrastructure Grant Programme 6
– – – 10 15
Education
1604 Thobisizwe Primary School Feasibility Uthukela Secondary - - Infrastructure Grant Programme 6

63
Annexure Table B5 – Vote 5 : Education

500 – 20 10 15
Education
1549 Sigubudu Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1550 Sikhanyiseleni Combined School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1551 Sikhulile Combined School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1552 Silweni Combined School Feasibility Zululand Specialised 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1553 Sinquma Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1554 Sishongani Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
680 – 20 10 15
Education
1555 Sivulindlela Intermediate School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1556 Siyaphakama Secondary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – – 10 15
Education
1557 Siyathuthuka Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1558 Tholathemba Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1559 Tshendlovu Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1560 Tshenilokwazi Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1561 Ubumbano Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1562 Ugedla Primary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1563 Ulundi Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1564 Uqweqwe Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1565 Vukanimazulu Secondary School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1566 Vukuza Secondary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1567 Wykom Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Education
1568 Xasana Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Zamangothando Secondary Education
1569 School Feasibility Zululand Secondary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – 20 10 15
Zamani Primary School Education
1570 (Nongoma) Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
– – 12 580 10 15
Education
1571 Borehole Maintenance Project Initiation Umgungundlovu Secondary - - Infrastructure Grant Programme 6
– – 4 520 6 250 12 079
Education
1572 Borehole Drilling Project Initiation Umgungundlovu Primary - - Infrastructure Grant Programme 6
– – 300 4 253 3 521
Construction 76% Education
1573 Busana Secondary School - 99% Umzinyathi Primary 2015-04-01 - Infrastructure Grant Programme 6
– 9 024 300 6 523 3 562
Ekukhanyeni Special Special Construction 76% Education
1574 School - 99% Umgungundlovu Primary 2015-04-01 - Infrastructure Grant Programme 6
– 610 300 6 895 3 698
Construction 76% Education
1575 Phendukani Secondary School - 99% Amajuba Primary 2015-04-01 - Infrastructure Grant Programme 6
– 205 300 4 250 3 562
Construction 76% Education
1576 Hlalunolwazi Primary School - 99% Uthukela Primary 2015-04-01 - Infrastructure Grant Programme 6

64
Annexure Table B5 – Vote 5 : Education

– – 4 520 3 448 12 563


Hambanathi Senior Primary Construction 76% Education
1577 School Phase 1 - 99% Harry Gwala Primary 2015-04-01 - Infrastructure Grant Programme 6
Construction 76% – 178 300 2 963 –
1578 Magog Primary School - 99% Ugu Secondary 2015-04-01 - Equitable Share Programme 6
– 1 620 300 4 582 3 956
Construction 76% Education
1579 Sinqumeni Primary School - 99% Umzinyathi Specialised 2015-04-01 - Infrastructure Grant Programme 6
– 765 300 9 523 –
Isidingo Primary School 3Rd Construction 76% Education
1580 Phase - 99% Umlazi Primary 2015-04-01 - Infrastructure Grant Programme 6
– – – 10 41 588
Education
1581 Bambanani Secondary School Project Initiation Zululand Primary - - Infrastructure Grant Programme 6
– – 300 4 523 –
Construction 76% Education
1582 Sizwesonke Secondary School - 99% Uthungulu Secondary 2015-04-01 - Infrastructure Grant Programme 6
– – 300 1 472 –
Construction 26% Education
1583 Mbhanana Zenex Primary School - 50% Umlazi Primary 2016-04-01 - Infrastructure Grant Programme 6
– 681 300 10 15
Education
1584 Vulamehlo Primary School Design Zululand Secondary - - Infrastructure Grant Programme 6
– 8 543 300 12 356 5 623
Construction 1% - Education
1585 Bomvini Primary School 25% Harry Gwala Secondary 2016-04-01 - Infrastructure Grant Programme 6
– – 300 6 230 3 625
Construction 76% Education
1586 Mofu Primary School - 99% Umlazi Primary 2015-04-01 - Infrastructure Grant Programme 6
269 113 245 510 300 1 091 –
Mandla Mthwethwa
Comprehensive High School Construction 76% Education
1587 (Ndumo New Model High School) - 99% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
– – 70 – –
Construction 76% Education
1588 Thembumzamo Primary School - 99% Uthukela Primary 2015-04-01 - Infrastructure Grant Programme 6
– – 200 10 15
Education
1589 Thimuni Secondary School Feasibility Umgungundlovu Secondary - - Infrastructure Grant Programme 6
2 535 – 250 10 15
Education
1590 Fort Louis Primary School Design Uthungulu Secondary - - Infrastructure Grant Programme 6
– – 250 50 100
Education
1591 Nhlokwane Secondary School Tender Uthukela Secondary - - Infrastructure Grant Programme 6
– – 1 200 –
Siyalungelwa Secondary School - Construction 1% - Education
1592 Newcastle 25% Amajuba Primary 2016-04-01 - Infrastructure Grant Programme 6
– – 320 4 562 3 562
Construction 51% Education
1593 Nompondo Primary School - 75% Umkhanyakude Primary 2016-04-01 - Infrastructure Grant Programme 6
– 888 320 2 818 –
Construction 76% Education
1594 Sithunjwana Primary School - 99% Umgungundlovu Secondary 2015-04-01 - Infrastructure Grant Programme 6
– 531 320 2 500 –
Construction 76% Education
1595 Morning Star Primary School - 99% Uthukela Primary 2015-04-01 - Infrastructure Grant Programme 6
– 864 320 1 855 –
Construction 76% Education
1596 Ezinyonyana Primary School - 99% Uthukela Secondary 2015-04-01 - Infrastructure Grant Programme 6
1 404 490 110 804 –
Construction 76% Education
1597 Bhobhobho Primary School - 99% Zululand Primary 2015-04-01 - Infrastructure Grant Programme 6
– 61 310 1 747 –
Construction 51% Education
1598 Oqungweni Primary School - 75% Uthukela Secondary 2016-04-01 - Infrastructure Grant Programme 6
500 – – 10 15
Education
1599 Lingani Primary School Feasibility Amajuba Primary - - Infrastructure Grant Programme 6
– 10 167 210 6 259 12 532
Construction 1% - Education
1600 Xoloxolo Primary School 25% Harry Gwala Secondary 2016-04-01 - Infrastructure Grant Programme 6
– 280 – 10 15
Mzokhanyo/Mkhatshane Junior Education
1601 Secondary School Design Harry Gwala Primary - - Infrastructure Grant Programme 6
– – – 10 –
Education
1602 Dangazela Feasibility Ilembe Secondary - - Infrastructure Grant Programme 6
– – – 10 15
Education
1603 Thethandaba Primary School Design Ilembe Primary - - Infrastructure Grant Programme 6
– – – 10 15
Education
1604 Thobisizwe Primary School Feasibility Uthukela Secondary - - Infrastructure Grant Programme 6

65
Annexure Table B5 – Vote 5 : Education

500 – 20 10 15
Prince Zibhebhu Secondary Education
1605 School Feasibility Zululand Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
1606 Zwelisha Primary School Feasibility Zululand Primary 2017-11-20 2019-03-30 Equitable Share Programme 6 500 – 20 10 15
2 000 – – 10 50
Education
1607 Obonjaneni Primary School Project Initiation Uthukela Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1608 Cengesi Primary School Project Initiation Uthukela Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1609 Intaba Primary School Project Initiation Uthukela Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1610 Phuthini Secondary School Project Initiation Uthukela Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1611 Umbango Secondary School Project Initiation Uthukela Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1612 Hlathikhulu Primary School Project Initiation Uthukela Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1613 Khulangolwazi Secondary School Project Initiation Uthukela Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1614 Bhekuzulu Primary School Project Initiation Uthukela Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1615 Sidingulwazi Primary School Project Initiation Uthukela Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1616 Buhlebezwe Primary School Project Initiation Uthukela Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1617 Nsikayezwe Combined School Project Initiation Uthukela Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1618 Phindizwe Secondary School Project Initiation Uthungulu Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1619 Efuyeni Primary School Project Initiation Uthungulu Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1620 Ekuphakameni Primary School Project Initiation Uthungulu Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1621 Ngqekwane Secondary School Project Initiation Uthungulu Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1622 Nomyaca Secondary School Project Initiation Uthungulu Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1623 Maceba Secondary School Project Initiation Umzinyathi Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1624 Indlovana Primary School Project Initiation Umzinyathi Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1625 Mgabadeli Secondary School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1626 Thathezahke Special School Project Initiation Umzinyathi Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1627 Msimbu Secondary School Project Initiation Umzinyathi Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1628 Mjindi Secondary School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1629 Kwamtholo Primary School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Zwilenkosi Junior Secondary Education
1630 School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1631 Oshabeni Primary School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1632 Emasakeni Primary School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6
680 – – 10 50
Education
1633 Kwagxaba Secondary School Feasibility Umkhanyakude Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

66
Annexure Table B5 – Vote 5 : Education

2 000 – – 10 50
Education
1634 Masibonisane Secondary School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1635 Empumelelweni Primary School Project Initiation Umlazi Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1636 Kwakhwela Primary School Project Initiation Umlazi Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1637 Mbumbulwana Primary School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1638 Umgodi Primary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1639 Lusibalukhulu Secondary School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1640 Dingizwe Secondary School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1641 Sizisizwe Secondary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
500 – – 10 50
Education
1642 Webbstown Primary School Project Initiation Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
2 000 – – 10 50
Ngqumareni Junior Secondary Education
1643 School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1644 Rietviel Secondary School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1645 Ntwasahlobo High School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1646 Vukani Primary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
500 – – 10 50
Education
1647 St Micheals Primary School Project Initiation Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
2 000 – – 10 50
St Patrick`S Junior Secondary Education
1648 School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Deepdale Junior Secondary Education
1649 School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1650 Emazabekweni Primary School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6
2 000 – – – –
Education
1651 Clydesdale Secondary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1652 Clydesdale Secondary School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1653 Syria Primary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1654 Emaus Junior Secondary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1655 Entsikeni Secondary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1656 Ingeli Primary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1657 St Augustine Primary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1658 Kwadladla Primary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1659 Gudlintaba Primary School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1660 Egugwini Junior Primary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1661 Kwavimbela High School Project Initiation Harry Gwala Secondary - - Infrastructure Grant Programme 6

67
Annexure Table B5 – Vote 5 : Education

2 000 – – 10 50
Education
1662 Woodhurst Primary School Project Initiation Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1663 Mbhekwa Seconday School Project Initiation Zululand Primary - - Infrastructure Grant Programme 6
500 – – 10 50
Education
1664 Bothas Hill Primary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1665 Elangabini Primary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1666 Clernaville Primary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1667 Isibukosezwe Secondary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1668 Sibonise Primary School Project Initiation Pinetown Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1669 Vezamafa Primary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1670 Kranskloof Primary School Project Initiation Pinetown Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1671 Ndlokolo Primary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1672 Gabigabi Secondary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1673 Daluxolo Primary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1674 Phumuzuzulu Primary School Project Initiation Pinetown Secondary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1675 Faith Mlaba Primary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1676 Khabazela Secondary School Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 000 – – 10 50
Education
1677 Molweni Secondaryschool Project Initiation Pinetown Primary - - Infrastructure Grant Programme 6
2 961 – – 10 50
Education
1678 Upper Umvoti Combined School Feasibility Umzinyathi Secondary - - Infrastructure Grant Programme 6
2 472 – – 10 50
Esikhumbuzweni Secondary Education
1679 School Feasibility Umzinyathi Secondary - - Infrastructure Grant Programme 6
2 359 – – 10 50
Education
1680 Phathizwe Secondary School Feasibility Umzinyathi Secondary - - Infrastructure Grant Programme 6
2 286 – – 10 50
Education
1681 Tonyelana Primary School Feasibility Uthukela Secondary - - Infrastructure Grant Programme 6
3 505 – – 10 50
Education
1682 Intumbane Primary School Feasibility Uthukela Secondary - - Infrastructure Grant Programme 6
2 660 – – 10 50
Education
1683 Mhlwazini Secondary School Feasibility Uthukela Secondary - - Infrastructure Grant Programme 6
2 207 – – 10 50
Education
1684 Cwembe Primary School Feasibility Uthukela Primary - - Infrastructure Grant Programme 6
2 917 – – 10 50
Education
1685 Sicelokuhle High School Feasibility Uthukela Secondary - - Infrastructure Grant Programme 6
3 097 – – 10 50
Education
1686 Gwegwede Primary School Feasibility Umkhanyakude Primary - - Infrastructure Grant Programme 6
3 442 – – 10 50
Education
1687 Idlebe Primary School Feasibility Zululand Secondary - - Infrastructure Grant Programme 6
1 777 – – 10 50
Education
1688 Khambula Combined School Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5
2 846 – – 10 50
Education
1689 Lindizwe Primary School Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5

68
Annexure Table B5 – Vote 5 : Education

1 544 – – 10 50
Education
1690 Meyama High School Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5
3 980 – – 10 50
Paulpietersburg Primary School Education
1691 (Dumbe) Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5
2 683 – – 10 50
Prince Mnyayiza Secondary Education
1692 School Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5
1 117 – – 10 50
Education
1693 Zihlalo Primary School Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5
680 – – 10 50
Education
1694 Mahlokomane Primary School Feasibility Umzinyathi Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1695 Indonsa Secondary School Feasibility Amajuba Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1696 Sizamokuhle Primary School Feasibility Amajuba Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1697 Mdutshulwa Primary School Feasibility Amajuba Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1698 Enhlokwnei Primary School Feasibility Amajuba Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1699 Sahlumbe High School Feasibility Uthukela Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1700 Kirkintulloch Primary School Feasibility Uthukela Sanitation - - Infrastructure Grant Programme 5
3 505 – – 10 50
Education
1701 Intumbane Primary School Feasibility Uthukela Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1702 Matiwaneskop Primary School Feasibility Uthukela Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Ezinqoleni Junior Secondary Education
1703 School Feasibility Ugu Sanitation - - Infrastructure Grant Programme 5
680 – – 10 50
Education
1704 Mahlokomane Primary School Feasibility Ilembe Sanitation - - Infrastructure Grant Programme 5
1 544 – – 10 50
Education
1705 Meyama Secondary School Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1706 Mqiniseni Secondary School Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5
500 – – 10 50
Education
1707 Ncwecwe Secondary School Feasibility Zululand Sanitation - - Infrastructure Grant Programme 5
1 466 – 50 10 50
Education
1708 Silwanetshe Primary School Tender Stage Umgungundlovu Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
500 – 220 10 50
Sukasambe Junior Secondary Construction 26% Education
1709 School - 50% Umkhanyakude Sanitation 2016-04-01 - Infrastructure Grant Programme 5
– – – 10 50
Construction 51- Education
1710 Umfolozi Primary School 75% Umkhanyakude Sanitation 2016-04-01 - Infrastructure Grant Programme 5
500 – 220 10 50
Construction 26% Education
1711 Mabaso Secondary School - 50% Uthukela Sanitation 2016-04-01 - Infrastructure Grant Programme 5
2 219 – 210 10 50
Ndabeziphezulu Secondary Construction 1% - Education
1712 School 25% Umkhanyakude Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
500 – 220 10 50
Construction 26% Education
1713 Inkanyezi Primary School - 50% Uthukela Sanitation 2016-04-01 - Infrastructure Grant Programme 5
2 000 – 50 10 50
Education
1714 Mqamathi Secondary School Tender Stage Umzinyathi Sanitation - - Infrastructure Grant Programme 5
2 000 – 50 10 50
1715 Bambanani Secondary School Tender Stage Umzinyathi Sanitation - - Equitable Share Programme 5
– – – 10 50
Construction 76- Education
1716 Mabaso Junior Primary School 99% Uthukela Sanitation 2015-04-01 - Infrastructure Grant Programme 5
2 000 – 50 10 50
Inkanyezi Yesizwe Primary Education
1717 School Tender Stage Zululand Sanitation - - Infrastructure Grant Programme 5
2 000 – 50 10 50
1718 Intathakusa Combined School Tender Stage Zululand Sanitation - - Equitable Share Programme 5

69
Annexure Table B5 – Vote 5 : Education

Construction 1% - 920 – 210 10 50


1719 Joko Secondary School 25% Zululand Sanitation 2016-04-01 2018-03-30 Equitable Share Programme 5
2 000 – 50 10 50
Education
1720 Klein Eden Combined School Tender Stage Zululand Sanitation - - Infrastructure Grant Programme 5
1 385 – 210 10 50
Construction 1% - Education
1721 Buhlebuzile Secondary School 25% Zululand Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
– – 210 10 50
Construction 1% - Education
1722 Lalela Primary School 25% Zululand Sanitation 2016-04-01 - Infrastructure Grant Programme 5

Practical – – – 10 50
Completion Education
1723 Esinqeni Primary School (100%) Zululand Sanitation - - Infrastructure Grant Programme 5
Construction 1% - – – 210 10 50
1724 Manzimakhulu Secondary School 25% Zululand Sanitation 2016-04-01 - Equitable Share Programme 5
920 – 210 10 50
Construction 1% - Education
1725 Mathunjwa Secondary School 25% Zululand Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
– – 210 10 50
Construction 1% - Education
1726 Mdumela Secondary School 25% Zululand Sanitation 2016-04-01 - Infrastructure Grant Programme 5
Tholukukhanya Secondary Construction 1% - 1 870 – 210 10 50
1727 School 25% Zululand Sanitation 2016-04-01 2018-03-30 Equitable Share Programme 5
784 – 210 10 50
Construction 1% - Education
1728 Ulundi Primary School 25% Zululand Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
2 000 – 50 10 50
Education
1729 Zilulwane Primary School Tender Stage Zululand Sanitation - - Infrastructure Grant Programme 5

Practical – – – 10 50
Completion Education
1730 Misty Ridge Primary School (100%) Zululand Sanitation - - Infrastructure Grant Programme 5
– – 210 10 50
Construction 1% - Education
1731 Paulpitersburg Primary School 25% Zululand Sanitation 2016-04-01 - Infrastructure Grant Programme 5
– – 210 10 50
Construction 1% - Education
1732 Siyeza Primary School 25% Zululand Sanitation 2016-04-01 - Infrastructure Grant Programme 5
– – 210 10 50
Construction 1% - Education
1733 Manyandeni Primary School 25% Zululand Sanitation 2016-04-01 - Infrastructure Grant Programme 5

Practical – – – 10 50
Completion Education
1734 Emagovini Primary School (100%) Zululand Sanitation - - Infrastructure Grant Programme 5

Practical – – – 10 50
Bongaspoort Junior Primary Completion Education
1735 School (100%) Zululand Sanitation - - Infrastructure Grant Programme 5
– – 210 10 50
Construction 1% - Education
1736 Inkosentsha Primary School 25% Zululand Sanitation 2016-04-01 - Infrastructure Grant Programme 5
2 000 – 50 10 50
Education
1737 Dikana Secondary School Tender Stage Zululand Sanitation - - Infrastructure Grant Programme 5
2 000 – 50 10 50
Education
1738 Ensukangihlale Primary School Tender Stage Zululand Sanitation - - Infrastructure Grant Programme 5

Practical – – – 10 50
Completion Education
1739 Felifa Secondary School (100%) Zululand Sanitation - - Infrastructure Grant Programme 5
2 000 – 50 10 50
Education
1740 Gcinuxolo Primary School Tender Stage Zululand Sanitation - - Infrastructure Grant Programme 5
1741 Goje Primary School Tender Stage Zululand Sanitation - - Equitable Share Programme 5 2 000 – 50 10 50
2 000 – 50 10 50
1742 Gqokamandla Secondary School Tender Stage Zululand Sanitation - - Equitable Share Programme 5
1743 Hlushwana Primary School Tender Stage Zululand Sanitation - - Equitable Share Programme 5 2 000 – 50 10 50
Construction 1% - – – 210 10 50
1744 Jikaza Primary School 25% Zululand Sanitation 2016-04-01 - Equitable Share Programme 5
1745 Enkonjeni Primary School Design Zululand Sanitation - - Equitable Share Programme 5 – – – 10 50
1746 Bambanani High School Design Zululand Sanitation - - Equitable Share Programme 5 – – – 10 50
1747 Dwaleni High School Design Zululand Sanitation - - Equitable Share Programme 5 – – – 10 50
– – – 10 50
Education
1748 Dwarsrand High School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1749 Ekhohombela Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1750 Enqabeni Combined School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1751 Fumana High School Design Zululand Sanitation - - Infrastructure Grant Programme 5

70
Annexure Table B5 – Vote 5 : Education

– – – 10 50
Education
1752 Holinyoka Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1753 Khoza Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
King Senzangakhona High Education
1754 School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1755 Kortnek Lower Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1756 Kujabuleni Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
920 – – 10 50
Education
1757 Kwamadamu Primary School Design Zululand Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
– – – 10 50
Education
1758 Kwamame Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1759 Kwamusi Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1760 Landulwazi Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1761 Layukona Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
2 000 – – – –
Education
1762 Magcekeni Primary School Project Initiation Umkhanyakude Sanitation - - Infrastructure Grant Programme 5
2 000 – – 10 50
Education
1763 Magcekeni Primary School Project Initiation Umkhanyakude Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1764 Mandlakayise Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
1 929 – – 10 50
Education
1765 Mgulwane Primary School Design Zululand Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
656 – – 10 50
Education
1766 Mlomokazulu Secondary School Design Zululand Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
– – – 10 50
Education
1767 Mlovu Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1768 Mnyamana High School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1769 Mthunziwoxolo High School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1770 Musa Lsen School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1771 Ngengeni Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1772 Ngethule Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1773 Ngqengelele High School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1774 Nonzimana High School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1775 Nqobane Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1776 Ophongola High School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1777 Ozweleni Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1778 Phikwase Secondary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1779 Phophomeni Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5

71
Annexure Table B5 – Vote 5 : Education

– – – 10 50
Prince Mnyayiza Secondary Education
1780 School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1781 Sakhumuzi Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1782 Selinde Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1783 Sibonile Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1784 Sibumbene Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1785 Sicoco Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1786 Sidubelo Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1787 Silanda Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1788 Sivule Combined Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Siyazenzela Higher Primary Education
1789 School Design Zululand Sanitation - - Infrastructure Grant Programme 5
65 – – 10 50
Education
1790 Siyaziqeqesha Primary School Design Zululand Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
– – – 10 50
Education
1791 Sizumphakathi Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1792 Sizuzulu Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1793 Sondaba Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
2 047 – 100 10 50
Construction 1% - Education
1794 Thathokuhle Primary School 25% Zululand Sanitation 2016-04-01 2018-03-30 Infrastructure Grant Programme 5
– – – 10 50
Education
1795 Tholakele Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1796 Vulamehlo Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1797 Wela Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1798 Zihlalo Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
– – – 10 50
Education
1799 Ziqalele Senior Primary School Design Zululand Sanitation - - Infrastructure Grant Programme 5
2 000 – – – –
Education
1800 Jubilee Primary School Project Initiation Pinetown Sanitation - - Infrastructure Grant Programme 5
2 000 – – – –
Education
1801 Nonopha Intermediate School Project Initiation Pinetown Sanitation - - Infrastructure Grant Programme 5
2 000 – – – –
Education
1802 St Wendolins Primary School Project Initiation Pinetown Sanitation - - Infrastructure Grant Programme 5
2 000 – – – –
Education
1803 Mariannhill Primary School Project Initiation Pinetown Sanitation - - Infrastructure Grant Programme 5
1 754 – – – –
Education
1804 Heavitree Primary School Project Initiation Uthukela Sanitation 2017-04-11 2018-04-08 Infrastructure Grant Programme 5
2 100 – – – 2 100
Education
1805 Mariathal Combined School Project Initiation Harry Gwala Sanitation - - Infrastructure Grant Programme 5
74 583 – 74 583 –
Education
1806 Special Schools Programme Project Initiation Nqutu Sanitation - - Infrastructure Grant Programme 5
– – 52 916 258 732 388 512
Education
1807 Budget Adjustment 0 0 0 - - Infrastructure Grant Programme 6

72
Annexure Table B5 – Vote 5 : Education

34 511 9 900 12 000


Construction 51%- Education
1808 Vulekani Speical School 75% Harry Gwala Upgrades and Additions 2016-06-01 2017-12-15 Infrastructure Grant Programme 7
12 619 10 000 15 000
Construction 51% Education
1809 Lubelo Secondary School - 75% Umkhanyakude Secondary 2015-11-11 2017-04-15 Infrastructure Grant Programme 6
19 097 2 000
Construction 76% Education
1810 Nkanyezi Yamachi Secondary - 99% Ugu Secondary 2015-11-12 2017-04-10 Infrastructure Grant Programme 6
17 381 2 000
Construction 76% Education
1811 Ntshongo Primary School - 99% Harry Gwala Primary 2015-11-13 2017-04-20 Infrastructure Grant Programme 6
27 647 10 000 5 000
Construction 51% Education
1812 St. Victor's Secondary School - 75% Zululand Secondary 2015-11-14 2017-11-10 Infrastructure Grant Programme 6
27 000 15 000 5 000
Construction 1% - Education
1813 Umvalo Secondary School 25% Zululand Secondary 2015-11-15 2017-10-15 Infrastructure Grant Programme 6
20 000 2 000 15 000 3 000
Education
1814 Mzokhanyo Prumary School Design Harry Gwala Primary 2016-04-01 2018-04-30 Infrastructure Grant Programme 6
20 000 2 000 15 000 3 000
Education
1815 Deepale Primary School Design Harry Gwala Primary 2016-04-02 2018-05-01 Infrastructure Grant Programme 6
20 000 2 000 15 000 3 000
Education
1816 Fundokuhle High School Design Harry Gwala Primary 2016-04-03 2018-05-02 Infrastructure Grant Programme 6

Total Upgrades And Additions – 3 040 601 1 087 896 1 177 591 1 323 660
3. Refurbishment And Rehabilitation
2 000 – 115 – –
Education
1 Gonzaga Primary School Project Initiation Uthungulu Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
2 Ziphathele Secondary School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
3 Dumani Junior Primary School Project Initiation Pinetown Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
4 Phikiswayo Primary School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
33 550 – 100 500 1 000
Education
5 Management Fee Feasibility Umgungundlovu Secondary 2015-11-20 2017-03-31 Infrastructure Grant Programme 6
4 000 – 100 100 –
Education
6 Bangani Secondary School Design Uthukela Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
11 000 – 100 100 913
Bhekuzulu Primary School Education
7 (Ladysmith) Design Uthukela Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 100 100 275
Education
8 Bhokoza Primary School Design Umkhanyakude Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
8 000 – 100 100 1 503
Education
9 Colenso Combined School Design Uthukela Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 100 275
Education
10 Cwembe Primary School Design Uthukela Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
3 450 – 1 123 100 –
Dundee Junior Primary School Education
11 (Excelsior Lane) Design Umzinyathi Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
3 450 – 582 100 –
Dundee Secondary School Education
12 (Browning St) Design Umzinyathi Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 100 –
Embetha Junior Secondary Education
13 School Design Umkhanyakude Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 100 –
Education
14 Emfundweni Secondary School Design Amajuba Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
5 000 – 1 628 100 –
Education
15 Enhlokweni Primary School Design Amajuba Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 100 110
Education
16 Esidakeni Primary School Design Amajuba Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 100 –
Esigedeni Junior Secondary Education
17 School Design Umkhanyakude Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
10 000 – 3 465 100 2 000
Esikhumbuzweni Secondary Education
18 School Design Umzinyathi Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6

73
Annexure Table B5 – Vote 5 : Education

4 000 – 1 302 100 –


Education
19 Fort Louis Primary School Design Uthungulu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 100 –
Education
20 George Caltex Primary School Feasibility Umkhanyakude Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 100 110
Education
21 Hoye Secondary School Design Uthukela Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
10 000 – 3 465 100 2 000
Education
22 Indlovana Primary School Design Umzinyathi Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
10 000 – 3 465 100 2 000
Education
23 Indonsa Secondary School Design Amajuba Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
7 000 – 2 279 100 1 237
Education
24 Intumbane Primary School Design Uthukela Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 100 110
Education
25 Isibuko Secondary School Design Uthukela Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
40 000 – 100 100 –
Education
26 Khandisa Primary School Design Uthungulu Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
8 000 – 100 100 955
Education
27 Kirkintulloch Primary School Design Uthukela Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 100 –
Education
28 Kwamagwaza Primary School Design Uthungulu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 100 –
Education
29 Kwazibi Primary School Design Umkhanyakude Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
5 000 – 1 628 100 –
Education
30 Lengola Secondary School Design Amajuba Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 500 110
Education
31 Lingani Primary School Design Amajuba Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
8 000 – 100 400 955
Education
32 Madlala Primary School Design Uthukela Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
12 000 – 100 400 2 652
Education
33 Mahlabathini Secondary School Design Zululand Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
3 000 – 872 400 –
Education
34 Mahlokomane Primary School Design Umzinyathi Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
35 Manyampisi Primary School Design Umkhanyakude Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
36 Mashalaza Secondary School Design Umkhanyakude Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
12 000 – 4 158 400 868
Education
37 Mathole Secondary School Design Zululand Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
5 000 – 1 628 400 –
Education
38 Matiwaneskop Primary School Design Uthukela Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
39 Mdungandlovu Secondary School Design Umkhanyakude Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
40 Mdutshulwa Primary School Design Amajuba Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
41 Mfihlelwane Primary School Design Umzinyathi Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 400 110
Education
42 Mhlwazini Secondary School Design Uthukela Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
43 Mkholombe Primary School Design Uthukela Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 442 400 –
Education
44 Moy Primary School Design Amajuba Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 400 110
Education
45 Mpungane Primary School Design Umzinyathi Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
46 Muthidlwe Primary School Design Umkhanyakude Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6

74
Annexure Table B5 – Vote 5 : Education

5 000 – 1 628 400 –


Education
47 Ndalela Secondary School Design Uthukela Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
48 Ngwebini Primary School Design Umzinyathi Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
49 Nhlalakahle Primary School Design Uthukela Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 400 –
Education
50 Nhlange Junior Secondary School Design Umkhanyakude Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
8 000 – 2 186 350 937
Education
51 Nhlosokuhle Secondary School Design Amajuba Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 350 –
Education
52 Njinji Primary School Tender Umkhanyakude Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 350 –
Nkosikayingangathi Secondary Education
53 School Design Umkhanyakude Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
11 000 – 3 811 350 4 331
Education
54 Nobamba Secondary School Design Ugu Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
7 000 – 2 279 350 1 234
Education
55 Pelham Primary School Design Umgungundlovu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
40 000 – 2 301 350 21 532
Education
56 Phathizwe Secondary School Design Umzinyathi Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 442 350 –
Education
57 Phuzukubona Secondary School Design Amajuba Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 350 –
Education
58 Rantjiesvlakte Primary School Design Uthukela Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
10 000 – 3 465 350 1 532
Education
59 Sahlumbe Secondary School Design Uthukela Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 093 350 –
Education
60 Sinqobile Combined School Design Amajuba Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 350 110
Education
61 Siphendukile Primary School Design Uthukela Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 350 –
Sizakahle Secondary School Education
62 (Ladysmith) Design Uthukela Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 093 350 –
Education
63 Sizamokuhle Primary School Design Amajuba Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 093 350 –
Education
64 Sizwe Primary School Design Amajuba Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 442 350 –
Education
65 Stanger Secondary School Design Ilembe Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 350 –
Education
66 Tonyelana Primary School Design Uthukela Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
40 000 – 2 414 350 22 956
Education
67 Umqhele Secondary School Design Pinetown Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
10 000 – 3 465 350 1 532
Education
68 Upper Umvoti Combined School Design Umzinyathi Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 350 –
Education
69 Vezukusa Primary School Design Umkhanyakude Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 442 483 –
Education
70 Xolani Secondary School Design Amajuba Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 442 483 –
Education
71 Zibambeleni Secondary School Design Amajuba Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
4 000 – 1 302 1 423 –
Education
72 Zola Primary School Design Uthukela Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
73 Aldinville Primary School Design Ilembe Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 50 217 –
Education
74 Bambisanani Primary School Tender Umkhanyakude Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6

75
Annexure Table B5 – Vote 5 : Education

2 000 – 100 217 –


Construction 1% - Education
75 Bhekaphambili Primary School 25% Umlazi Primary 2016-08-17 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
76 Bhekikusasa Secondary School Design Uthungulu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
77 Bhidakhona Primary School Design Ilembe Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 442 483 –
Education
78 Bongimfundo Primary School Design Ilembe Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
79 Cebisa Secondary School Design Uthungulu Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
80 Delihlazo Primary School Design Ugu Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
81 Dendethu Primary School Design Ilembe Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 1 488
Education
82 Douglas Primary School Design Umzinyathi Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 50 217 –
Education
83 Ebomvaneni Primary School Tender Uthungulu Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
84 Ekupheleni Secondary School Design Uthungulu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
85 Emkhayideni Tech H Design Uthungulu Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
86 Emthunzini Primary School Design Zululand Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 442 483 –
Education
87 Endandathweni Primary School Design Ilembe Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 217 –
Education
88 Enembe Primary School Design Ilembe Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 981 –
Education
89 Enqabeni Combined School Design Zululand Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 475 123
Construction 1% - Education
90 Enyanisweni Primary School 25% Ugu Primary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – 582 500 123
Education
91 Eshowe Secondary School Design Uthungulu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 500 123
Education
92 Esigaganeni Primary School Tender Uthungulu Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 500 123
Construction 1% - Education
93 Etshenilikashoba Primary School 25% Ugu Primary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
94 George Caltex Primary School Feasibility Umkhanyakude Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
95 Gijimana Secondary School Design Uthungulu Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
96 Glendale Primary School Design Ilembe Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Gobindlovu Comp Secondary Education
97 School Design Umgungundlovu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
98 Gwegwede Primary School Design Umkhanyakude Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Hamilton Makhanya Secondary Construction 1% - Education
99 School 25% Umlazi Primary 2016-08-17 - Infrastructure Grant Programme 6
2 000 – – 500 123
Education
100 Hawkstone Primary School Design Umgungundlovu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
101 Holwane Primary School 25% Umzinyathi Secondary 2016-07-27 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
102 Hulsug Primary School Design Ilembe Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6

76
Annexure Table B5 – Vote 5 : Education

2 000 – 100 500 123


Construction 1% - Education
103 Igugulabanguni Primary School 25% Umlazi Primary 2016-08-17 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
104 Impande Secondary School 25% Umkhanyakude Primary 2016-07-25 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 500 123
Ingobamakhosi Secondary Education
105 School Design Ilembe Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
106 Inyandezulu Primary School 25% Ugu Primary 2016-08-15 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
107 Isibongo Primary School Design Umgungundlovu Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
108 Isifisosethu Secondary School Design Ilembe Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
109 Isithinta Primary School 25% Uthungulu Primary 2016-07-26 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
110 Isnembe Secondary School Design Ilembe Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
111 Izibuko Secondary School Design Uthungulu Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
112 Kati Primary School 25% Uthungulu Primary 2016-07-26 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
113 Kearsney Intermediate School 25% Ilembe Primary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Khandalesizwe Junior Secondary Construction 1% - Education
114 School 25% Ugu Secondary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Khulangolwazi Senior Primary Construction 1% - Education
115 School 25% Umkhanyakude Primary 2016-08-16 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
116 Klaarwater Primary School 25% Umlazi Primary 2016-08-16 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
117 Kwabulawayo Secondary School Design Umkhanyakude Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
118 Kwamphelelwa Primary School 25% Ugu Primary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
119 Lethuxolo Secondary School 25% Ilembe Secondary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
120 Louisiana Primary School Design Ugu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
121 Lubisana Primary School Design Ilembe Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
122 M L Sultan Secondary School Design Umgungundlovu Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – – –
Education
123 Mabhodla Primary School Design Uthungulu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
124 Mafumbuka Secondary School 25% Umzinyathi Secondary 2016-08-16 2018-07-26 Infrastructure Grant Programme 6
2 000 – – – –
Education
125 Mahedeni Primary School Design Uthungulu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
126 Mahlakwe Primary School Design Umkhanyakude Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Malabela Junior Secondary Education
127 School Design Umkhanyakude Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
128 Mangethe Primary School Design Ilembe Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
129 Mashoba Primary School Design Uthungulu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
130 Mathubesizwe Secondary School Design Ilembe Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6

77
Annexure Table B5 – Vote 5 : Education

2 000 – – 500 123


Education
131 Mazisi Ntuli Primary School Design Ilembe Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
132 Mbalane Primary School Design Umzinyathi Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
133 Mbhekaphansi Secondary School 25% Ilembe Primary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
134 Mcothoyi Secondary School 25% Umlazi Secondary 2016-08-17 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
135 Mehlokubheka Primary School 25% Umkhanyakude Primary 2016-07-27 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
136 Mehlomlungu Secondary School Design Ilembe Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
137 Mlonde Secondary School 25% Ugu Primary 2016-08-15 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
138 Mpukunyoni Primary School Design Umkhanyakude Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
139 Mzila Primary School Design Umkhanyakude Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
140 Nizam Road Primary School 25% Umlazi Primary 2016-08-15 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
141 Nkabini Primary School Design Umgungundlovu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
142 Enkanyisweni Primary School 25% Umlazi Primary 2016-08-17 2018-07-26 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
143 Nogabisela Secondary School 25% Uthungulu Secondary 2016-04-01 - Infrastructure Grant Programme 6
2 000 – – 500 123
Education
144 Nomzamo Primary School Design Harry Gwala Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
145 Nondabula Primary School 25% Ilembe Secondary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – 50 500 123
Education
146 Novunula Primary School Tender Uthungulu Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 50 500 123
Education
147 Noyibewu Primary School Tender Uthungulu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 50 500 123
Education
148 Nsabekhuluma Secondary School Tender Zululand Primary - - Infrastructure Grant Programme 6
2 000 – – 500 123
Education
149 Nsunguza Primary School Design Uthungulu Primary 2015-11-20 2018-07-26 Infrastructure Grant Programme 6
2 000 – 50 500 123
Education
150 Ntshibantshiba Primary School Tender Zululand Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
151 Ntuthunga Primary School 25% Uthungulu Secondary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
152 Nyakana Intermediate School Design Ilembe Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
153 Obuka Secondary School 25% Uthungulu Primary 2016-07-25 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
154 Parukabad Primary School Design Ilembe Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
155 Petezi Primary School 25% Harry Gwala Primary 2016-07-25 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
156 Phembokuhle Primary School Design Uthungulu Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 500 123
Construction 1% - Education
157 Platt Drive Primary School 25% Umlazi Primary 2016-08-16 2018-07-26 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
158 Qalakancane Primary School Design Umkhanyakude Primary 2016-08-16 2018-02-21 Infrastructure Grant Programme 6

78
Annexure Table B5 – Vote 5 : Education

2 000 – 100 500 123


Construction 1% - Education
159 Shallcross Primary School 25% Umlazi Primary 2016-08-16 2018-07-26 Infrastructure Grant Programme 6
2 000 – 50 500 123
Education
160 Sibhakuza Secondary School Tender Uthungulu Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Simandlangentsha Senior Education
161 Primary School Design Zululand Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
162 Sinenhlanhla Secondary School Design Ilembe Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – 50 500 123
Siyakhanya Senior Primary Education
163 School Tender Umkhanyakude Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
164 Siyakhanyisa Primary School Design Uthungulu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
165 Sokhulu Primary School Design Uthungulu Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
St Martin De Porres Special Education
166 School Design Ugu Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
167 St Pauls Primary School Design Uthungulu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
168 Stanger Secondary School Design Ilembe Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
169 Tendela Combined School Design Umgungundlovu Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
– – – 500 123
Thembalihle Combined School Education
170 (Estcourt) Design Uthukela Primary - - Infrastructure Grant Programme 6
2 000 – – 500 123
Education
171 Thembeni Primary School Design Ilembe Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
172 Thembinkosi Primary School Design Amajuba Secondary - - Infrastructure Grant Programme 6
2 000 – 50 500 123
Education
173 Thulwana Secondary School Tender Zululand Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
174 Triandra Primary School Design Umgungundlovu Secondary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
175 Tshana Secondary School Design Ilembe Primary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
176 Ubizo Primary School Design Uthungulu Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Ukuzamakwethu Secondary Education
177 School Design Ilembe Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
178 Umlambozana Primary School Design Umkhanyakude Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
179 Umphezeni Secondary School Design Uthungulu Primary 2016-09-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 500 123
Education
180 Uphaphazi Primary School Design Umkhanyakude Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – – 1 123
Education
181 Wasbank Intermediate School Design Umzinyathi Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 100 250 123
Construction 1% - Education
182 Werda Combined School 25% Umlazi Secondary 2016-08-16 2018-07-26 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
183 Zibambele Primary School Tender Uthungulu Secondary 2015-11-20 2018-02-21 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
184 Zinqobele Secondary School Design Uthungulu Primary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
– – – 250 123
Education
185 Zizamele Primary School Design Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – 250 123
Education
186 Batshazwayo Secondary School Design Harry Gwala Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6

79
Annexure Table B5 – Vote 5 : Education

2 000 – 50 250 123


Bekezelani Junior Secondary Education
187 School Tender Uthukela Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
188 Bhande Secondary School Design Uthukela Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Bhekabathembu Secondary Education
189 School Tender Harry Gwala Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
– – – – 1 123
Education
190 Buhlebezwe Primary School Design Harry Gwala Primary - - Infrastructure Grant Programme 6
2 000 – – – 1 123
Education
191 Cabangokuhle Secondary School Design Umzinyathi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Celimfundo Primary School Education
192 (Tugela Ferry) Design Umzinyathi Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
193 Cosh Primary School Design Umzinyathi Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
194 Dalala Primary School Design Umzinyathi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
195 Dlangamandla Primary School Tender Ugu Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
196 Dumisa Primary School Design Uthungulu Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
197 Efuyeni Primary School Design Umkhanyakude Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
– – – 250 123
Education
198 Egujini Primary School Design Umkhanyakude Primary - - Infrastructure Grant Programme 6
2 000 – – 250 123
Education
199 Ekubusisweni Primary School Design Umzinyathi Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
200 Ekuthuthukeni Secondary School Feasibility Zululand Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
– – – 250 123
Education
201 Mayeni Primary School Design Zululand Primary - - Infrastructure Grant Programme 6
2 000 – – 250 123
Education
202 Embadleni Primary School Design Umzinyathi Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 250 123
Construction 1% - Education
203 Emkhamo Combined School 25% Uthungulu Primary 2016-07-25 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
204 Emkhandlwini Primary School Design Umkhanyakude Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
205 Mkhonjeni Primary School Design Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – 50 – 1 123
Education
206 Enhlangwini Secondary School Tender Uthungulu Secondary - - Infrastructure Grant Programme 6
2 000 – – 250 123
Education
207 Enyawoshane Primary School Design Umkhanyakude Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
208 Esibhoweni Primary School Tender Umzinyathi Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
209 Esokheni Secondary School Design Uthungulu Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
210 Fangelakhe Primary School Design Umgungundlovu Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
211 Fezokuhle Primary School Design Umzinyathi Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
212 Fisokuhle Primary School Design Harry Gwala Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
213 Foleshill Primary School Design Ugu Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
214 Gamalakhe Comm H Design Umzinyathi Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6

80
Annexure Table B5 – Vote 5 : Education

2 000 – – 250 123


Education
215 Gangeyana Primary School Design Umzinyathi Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
216 Mpompolwana Primary School Design Umzinyathi Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
217 Giba Primary School Design Umzinyathi Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
218 Gwija Primary School Tender Uthungulu Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 250 123
Construction 1% - Education
219 Halambu Primary School 25% Uthungulu Primary 2016-07-25 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
220 Hambayedwa Primary School Design Amajuba Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
221 Hlalanathi Secondary School Tender Ilembe Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
222 Hluphizwe Primary School Design Umkhanyakude Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 250 123
Construction 1% - Education
223 Igugu Lesizwe Secondary School 25% Harry Gwala Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
224 Hluthankungu Primary School Design Umzinyathi Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
225 Impophoma Primary School Design Harry Gwala Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
226 Imvuleni Primary School Design Zululand Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
227 Indluyamandla Primary School Design Zululand Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Inkanyezi Yamachi Primary Education
228 School Design Ugu Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
229 Inkulu Primary School Design Uthungulu Secondary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
230 Mthunzini Secondary School Design Zululand Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
231 Intonga Secondary School Design Uthukela Secondary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
232 Isibankwa Primary School Tender Zululand Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
233 Isikhalisethu Primary School Design Umzinyathi Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
234 Ithembani Primary School Tender Harry Gwala Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
235 Ixopo Primary School Design Uthungulu Secondary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
– – – 250 123
Education
236 Izingwelevu Primary School Design Uthungulu Primary 2016-08-15 - Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
237 Izintambane Primary School Tender Zululand Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
238 Jikane Primary School Tender Harry Gwala Secondary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
239 Kayeka Primary School Tender Pinetown Secondary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Education
240 Khabazela Secondary School Design Uthungulu Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Education
241 Khanyakufikile Primary School Design Zululand Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Education
242 Khoza Secondary School on hold Umzinyathi Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6

81
Annexure Table B5 – Vote 5 : Education

2 000 – 582 250 123


Construction 1% - Education
243 Khulekani Primary School 25% Amajuba Primary 2016-08-15 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Kingsley Sivananda Combined Education
244 School Tender Zululand Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Education
245 Konfoor Combined School Design Umzinyathi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Kufanelesibonge Junior Education
246 Secondary School Design Zululand Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Education
247 Kwabhanya Secondary School Design Zululand Secondary 2015-10-24 2018-02-21 Infrastructure Grant Programme 6
2 000 – 582 250 123
Education
248 Kwagoqo Primary School Design Zululand Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Education
249 Kwaluhlaza Primary School Design Umkhanyakude Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 582 250 123
Education
250 Kwamboma Primary School Design Umzinyathi Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
251 Kwangqulu Primary School Design Uthungulu Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
252 Kwanjeke Primary School Design Umkhanyakude Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
253 Kwaphaweni Primary School Design Umzinyathi Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
254 Landulwazi Intermediate School Design Umkhanyakude Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
255 Lubelo Secondary School Tender Harry Gwala Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
256 Ludliki Primary School Tender Harry Gwala Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
257 Lufafa Primary School Tender Uthungulu Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
258 Luhlanga Primary School Design Umzinyathi Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
259 Mabizela Secondary School Design Umzinyathi Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
– – – 250 123
Education
260 Maceba Secondary School Design Umzinyathi Primary - - Infrastructure Grant Programme 6
2 000 – – 250 123
Education
261 Madonela Primary School Design Umgungundlovu Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
262 Mafahleni Secondary School Tender Umzinyathi Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
263 Magubulundu Secondary School Design Zululand Primary - - Infrastructure Grant Programme 6
2 000 – – 250 123
Malvern Primary School (Andes Education
264 St) Design Umzinyathi Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
265 Mambeni Primary School Design Pinetown Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
266 Mandlakayise Primary School Design Uthukela Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
267 Mandlakhe Secondary School Tender Umkhanyakude Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
268 Mangwazana Secondary School Tender Uthungulu Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
269 Manqamu Secondary School Design Zululand Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
270 Manyandeni Primary School Design Umzinyathi Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6

82
Annexure Table B5 – Vote 5 : Education

2 000 – – 250 123


Education
271 Manyonyo Primary School Design Uthungulu Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
272 Manzimhlophe Secondary School Design Harry Gwala Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
273 Maraiskop Primary School Design Uthukela Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
274 Mziyonke Primary School Design Umlazi Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 250 123
Construction 1% - Education
275 Mbalasi Primary School 25% Uthungulu Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
276 Mbizwe Secondary School Design Uthungulu Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Mbusowabathethwa Secondary Education
277 School Design Ugu Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
278 Mdlazi Primary School Design Uthungulu Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
279 Mehlathathani Primary School Tender Umzinyathi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
280 Mfenebude Primary School Design Umzinyathi Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
281 Mgombane Primary School Design Umgungundlovu Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
282 Middlefield Primary School Design Uthungulu Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
283 Mkhobosa Primary School Design Umzinyathi Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
284 Mkhonjane Primary School Design Zululand Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Education
285 Mkhunjini Primary School Tender Umkhanyakude Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
286 Mlalazini Primary School Design Uthungulu Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 250 123
Education
287 Mlindazwe Primary School Design Zululand Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 250 123
Mlomokazulu Junior Secondary Education
288 School Tender Umkhanyakude Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 700 5
Education
289 Mmemezi Secondary School Design Pinetown Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – – –
Education
290 Silindele Primary School Project Initiation Pinetown Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
291 Emngcwini Primary School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
292 Morning Star Intermediate School Design Umzinyathi Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
293 Mowbray Primary School Design Zululand Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
294 Mpemvaan Intermediate School Design Uthungulu Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
295 Mphathiswana Primary School Design Zululand Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
296 Mpindiso Secondary School Design Umzinyathi Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
297 Msawenkosi Primary School Design Umzinyathi Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
298 Msinga Secondary School Design Umzinyathi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6

83
Annexure Table B5 – Vote 5 : Education

2 000 – – 50 5
Education
299 Msitha Primary School Design Uthukela Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
300 Mthandi Primary School Tender Umkhanyakude Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 50 –
Construction 1% - Education
301 Mthombeni Primary School 25% Uthungulu Primary 2016-08-17 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
302 Mthwana Primary School Design Umzinyathi Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
303 Muntu Secondary School Design Uthukela Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
304 Mnyanda Primary School Tender Umzinyathi Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
305 Mziwenkosi Primary School Design Amajuba Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
306 Ncandu Combined School Design Ugu Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
307 Nciya Secondary School Design Uthungulu Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
308 Ncombo Primary School Design Zululand Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
309 Ncotshane Senior Primary School Tender Uthungulu Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
310 Ndesheni Secondary School Design Umlazi Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 50 5
Construction 1% - Education
311 Ngilosi Junior Primary School 25% Umzinyathi Primary 2016-08-17 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
312 Ngome Primary School Tender Umzinyathi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
313 Ngubevu Primary School Design Uthungulu Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 50 5
Construction 1% - Education
314 Nhlabane Primary School 25% Uthungulu Primary 2016-07-25 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
315 Nhlangenyuke Primary School Design Umzinyathi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
316 Nhloya Intermediate School Design Umzinyathi Secondary - - Infrastructure Grant Programme 6
2 000 – – 50 5
Education
317 Nkayishana Primary School Design Pinetown Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
318 Nkosibomvu Secondary School Design Pinetown Secondary - - Infrastructure Grant Programme 6
2 000 – – 50 5
Education
319 Nkwe Primary School Design Ugu Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
320 Nobuzwe Primary School Design Ugu Primary - - Infrastructure Grant Programme 6
– – – 50 5
Education
321 Nomaqhulu Primary School Design Umzinyathi Primary - - Infrastructure Grant Programme 6
2 000 – 100 50 5
Nomaqoni Junior Secondary Construction 1% - Education
322 School 25% Uthungulu Primary 2016-07-25 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
323 Nomuwa Primary School Design Uthungulu Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
324 Nomyaca Secondary School Design Uthungulu Secondary - - Infrastructure Grant Programme 6
2 000 – – 50 5
Education
325 Nongamlana Secondary School Design Umkhanyakude Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
326 Nqiwaneni Primary School Design Uthungulu Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6

84
Annexure Table B5 – Vote 5 : Education

2 000 – – 50 5
Education
327 Nqumizwe Secondary School Design Harry Gwala Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
328 Ntabende Secondary School Design Uthungulu Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
329 Ntshidi Primary School Tender Uthungulu Primary - - Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
330 Ntshosho Primary School Tender Uthungulu Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
331 Nxenjane Primary School Design Umlazi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 50 5
Construction 1% - Education
332 Nyanisweni Primary School 25% Umkhanyakude Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
333 Ohlalwini Primary School Design Umzinyathi Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 50 5
Construction 1% - Education
334 Okhulana Primary School 25% Ugu Primary 2016-07-25 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
335 Olwandle Secondary School Design Uthukela Secondary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
336 Oqungweni Primary School Design Umlazi Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 50 5
Construction 1% - Education
337 Overport Secondary School 25% Umlazi Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
– – – 50 5
Education
338 Penzance Primary School Design Umlazi Secondary 2016-08-16 - Infrastructure Grant Programme 6
2 000 – – 700 5
Petros Jozana Junior Secondary Education
339 School Design Uthungulu Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 700 5
Education
340 Phindizwe Secondary School Design Umzinyathi Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 700 5
Education
341 Phumela Primary School Design Umzinyathi Secondary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
– – – 50 5
Education
342 Phumulani Secondary School Design Umzinyathi Secondary 2016-08-16 - Infrastructure Grant Programme 6
2 000 – – 50 5
Education
343 Sakhiseni Secondary School Design Uthungulu Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
344 Shwashweni Primary School Design Uthukela Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
345 Sibongintuthuko Primary School Design Ugu Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
346 Sibongumfeka Secondary School Design Ugu Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
347 Sibutha Secondary School Design Uthukela Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Sicelukukhanya Secondary Education
348 School Design Umzinyathi Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
349 Siyabusa Primary School Design Ugu Secondary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
350 Siyakhona Primary School Design Uthungulu Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
351 Siyokomana Primary School Tender Harry Gwala Secondary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
352 Sizakancane Primary School Tender Zululand Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Education
353 Sizodela Primary School Tender Zululand Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
354 Somile Secondary School Design Zululand Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6

85
Annexure Table B5 – Vote 5 : Education

2 000 – 50 50 5
Education
355 Sozama Secondary School Tender Zululand Secondary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 –
Education
356 St Alexis Senior Primary School Tender Harry Gwala Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
– – – 50 5
St Patrick`S Junior Secondary Education
357 School Design Harry Gwala Primary 2016-08-16 - Infrastructure Grant Programme 6
2 000 – – 50 –
St Theresa Primary School Education
358 (Harding) Design Umkhanyakude Secondary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 5
Star Of The Sea Secondary Education
359 School Tender Umkhanyakude Primary 2016-08-16 - Infrastructure Grant Programme 6
2 000 – – 50 –
Education
360 Tauricus Intermediate School Design Umlazi Primary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 50 –
Construction 1% - Education
361 Tholisu Primary School 25% Ugu Secondary 2016-08-16 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 –
Thomas Mbhele Junior Education
362 Secondary School Design Umkhanyakude Secondary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Education
363 Ubombo Primary School Design Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 50 –
Education
364 Umbiya Secondary School Design Umkhanyakude Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 50 –
Education
365 Umfolozi Secondary School Tender Amajuba Primary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 50 – –
Education
366 Utrecht Combined School Tender Uthungulu Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 –
Education
367 Uyengo Secondary School Design Umzinyathi Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 –
Education
368 Vezulwazi Primary School Design Umlazi Secondary 2015-11-20 2019-04-30 Infrastructure Grant Programme 6
2 000 – 100 50 –
Construction 1% - Education
369 Vikingozi Secondary School 25% Umkhanyakude Secondary 2016-08-17 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 5
Vukani-Bantwana Secondary Education
370 School Design Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – – 50 –
Education
371 Wood And Raw Primary School Design Zululand Primary 2015-10-24 2019-04-30 Infrastructure Grant Programme 6
2 000 – – 50 –
Education
372 Wykom Primary School Design Zululand Primary 2016-09-20 2019-04-30 Infrastructure Grant Programme 6
– – 300 50 5
Education
373 Zicabangele Primary School Design Zululand Primary - - Infrastructure Grant Programme 6
4 000 – 2 000 – –
374 Sacred Heart Secondary School Project Initiation Pinetown Specialised 2017-09-01 2018-09-02 Equitable Share Programme 6
6 000 – 518 600 1 023
375 Russell Secondary School Project Initiation Umgungundlovu Public School 2017-09-01 2018-11-02 Equitable Share Programme 6
2 000 – 115 – –
Education
376 Ukusakwabasha Primary School Project Initiation Pinetown Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
377 Ntukuso Primary School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
378 Steven Davidson Primary School Project Initiation Pinetown Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
379 Ingomezulu Primary School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
380 Mabhila Intermediate School Project Initiation Pinetown Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
381 Inchanga Primary School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
37 715 – 3 252 100 –
Education
382 Management Fee Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
39 439 – 100 100 –
Education
383 Mophela Primary School Design Pinetown Primary 2017-04-20 2018-03-30 Infrastructure Grant Programme 6

86
Annexure Table B5 – Vote 5 : Education

25 288 – 100 100 2 356


Education
384 New Umthombo Primary School Project Initiation Umlazi Secondary 2017-11-02 2018-11-03 Infrastructure Grant Programme 6
25 000 442 199 100 6 760
Education
385 Asizenzele Primary School Project Initiation Pinetown Secondary 2017-11-15 2019-09-30 Infrastructure Grant Programme 6
12 099 11 964 – – –
Education
386 Dlangamandla Primary School Final Completion Umzinyathi Primary 2010-11-03 2015-03-31 Infrastructure Grant Programme 6
25 000 495 7 334 – –
Education
387 Dr J L Dube Secondary School Design Pinetown Primary 2016-11-20 2018-03-30 Infrastructure Grant Programme 6
26 611 2 630 5 801 250 180
Construction 1% - Education
388 Enqabeni Combined School 25% Zululand Secondary 2015-11-05 2018-03-30 Infrastructure Grant Programme 6
3 000 – – 25 4
Education
389 Idlebe Primary School Feasibility Zululand Secondary 2017-04-01 2018-03-30 Infrastructure Grant Programme 6
3 000 – – 25 4
Education
390 Imizamo Secondary School Feasibility Zululand Primary 2017-04-01 2018-03-30 Infrastructure Grant Programme 6
4 000 – 48 27 –
Education
391 Isifisosethu Secondary School Project Initiation Ilembe Primary 2016-11-20 2018-03-30 Infrastructure Grant Programme 6
3 000 – – 25 4
Education
392 Kwazamokuhle Primary School Feasibility Ugu Secondary 2017-04-01 2018-03-30 Infrastructure Grant Programme 6
477 423 54 – –
Education
393 Madonela Primary School Final Completion Umkhanyakude Primary 2014-02-01 2014-09-30 Infrastructure Grant Programme 6
3 000 – – 25 4
Mthingana Junior Secondary Education
394 School Feasibility Zululand Primary 2017-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 717 244 – – –


Completion Education
395 Ophapheni Primary School (100%) Umlazi Secondary 2011-03-25 2018-03-30 Infrastructure Grant Programme 6

Practical 1 600 1 552 – – –


Completion Education
396 Oyemeni Primary School (100%) Uthungulu Primary 2012-05-25 2014-11-12 Infrastructure Grant Programme 6

Practical 1 583 1 496 – – –


Completion Education
397 Phangisa Primary School (100%) Umlazi Primary 2012-05-25 2013-01-15 Infrastructure Grant Programme 6
3 000 – 100 25 –
Construction 1% - Education
398 Qantayi Secondary School 25% Uthungulu Primary 2017-04-01 2018-03-30 Infrastructure Grant Programme 6
4 692 4 394 298 – –
Education
399 Sicelokuhle Secondary School Final Completion Uthukela Primary 2013-11-28 2016/04/31 Infrastructure Grant Programme 6
3 000 – – 25 –
Education
400 Silimela Primary School Feasibility Pinetown Primary 2017-04-01 2016/04/31 Infrastructure Grant Programme 6
3 000 – – 25 –
Simandlangentsha Senior Education
401 Primary School Feasibility Zululand Primary 2017-04-01 2016/04/31 Infrastructure Grant Programme 6

Practical 918 775 – – –


Completion Education
402 Siyathokoza Primary School (100%) Umlazi Primary 2012-12-10 2016/04/31 Infrastructure Grant Programme 6
1 205 1 205 – – –
Education
403 Sizwakele Primary School Final Completion Umlazi Primary 2012-05-25 2016/04/31 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
404 Gala Secondary School Project Initiation Uthungulu Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6

Practical 37 914 36 421 – – –


Completion Education
405 Sukuma Comp Secondary School (100%) Umgungundlovu Primary 2011-11-01 2013-09-29 Infrastructure Grant Programme 6

Practical 887 764 – – –


Completion Education
406 Zungwini Primary School (100%) Zululand Primary 2012-05-25 2015-01-15 Infrastructure Grant Programme 6
1 951 852 – 500 –
Education
407 Zwelithule Primary School Final Completion Harry Gwala Secondary 2012-02-08 2013-10-15 Infrastructure Grant Programme 6

Practical 7 410 5 536 – – –


Completion Education
408 Charles Memorial Primary School (100%) Pinetown Primary 2012-02-08 2015-06-23 Infrastructure Grant Programme 6
1 879 1 530 49 – –
Kromellenboog Intermediate Education
409 School Final Completion Amajuba Primary 2012-05-25 2013-02-25 Infrastructure Grant Programme 6

Practical 3 215 2 774 – – –


Completion Education
410 Magwababa Secondary School (100%) Uthukela Secondary 2012-02-22 2016-03-15 Infrastructure Grant Programme 6

Practical 2 124 1 953 – – –


Completion Education
411 Mbovu Primary School (100%) Umlazi Primary 2014-09-25 2016-04-01 Infrastructure Grant Programme 6

87
Annexure Table B5 – Vote 5 : Education

Practical 1 664 1 140 – – –


Completion Education
412 Mkholombe Primary School (100%) Uthukela Primary 2012-02-08 2018-03-30 Infrastructure Grant Programme 6

Practical 3 060 2 983 – – –


Completion Education
413 Msinga Secondary School (100%) Umzinyathi Primary 2012-05-25 2014-11-15 Infrastructure Grant Programme 6
2 344 2 234 15 – –
Education
414 Mziwamandla Secondary School Final Completion Umlazi Primary 2012-02-08 2015-10-15 Infrastructure Grant Programme 6

Practical 1 550 1 251 – – –


Completion Education
415 Mziwenkosi Primary School (100%) Umzinyathi Primary 2011-09-15 2012-01-15 Infrastructure Grant Programme 6

Practical 139 124 – – –


Completion Education
416 Ntshidi Primary School (100%) Uthungulu Primary 2011-09-15 2012-04-15 Infrastructure Grant Programme 6

Practical 2 938 2 886 – – –


Completion Education
417 Okhombe Primary School (100%) Uthukela Primary 2012-05-25 2013-02-02 Infrastructure Grant Programme 6
– – 800 100 –
Construction 26% Education
418 Indaleni Primary School - 50% Umgungundlovu Secondary 2016-04-01 - Infrastructure Grant Programme 6
200 000 – 5 000 100 27 895
Education
419 Dokkies Office Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Construction 26% 10 645 2 151 100 100 4 253
420 Alston Primary School - 50% Umgungundlovu Primary 2016-04-01 2018-03-30 Equitable Share Programme 6

Practical 1 836 1 360 – 200 –


Completion Education
421 Bazaneni Primary School (100%) Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 222 2 139 – – –


Completion Education
422 Bethulo Primary School (100%) Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 319 2 176 – – –


Completion Education
423 Bhamu Secondary School (100%) Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 2 652 900 5 623
Bhaqalwesizwe Secondary Education
424 School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 8 478 6 808 – – –


Completion Education
425 Bhekindlela Secondary School (100%) Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 4 516 4 222 – – –


Completion Education
426 Bhekukuphiwa Primary School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 820 2 969 51 – –
Construction 26% Education
427 Bhuqwini Secondary School - 50% Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 12 807 11 503 – 203 –


Completion Education
428 Bukimvelo Secondary School (100%) Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 803 2 698 – – –


Completion Education
429 Ceremony Primary School (100%) Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 000 – 2 652 900 3 256
Education
430 Cibilili Combined School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 1 922 1 647 – – –


Completion Education
431 Cophela Primary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
432 Denver Zoar Primary School Design Ugu Secondary 2016-04-01 2018-03-30 Equitable Share Programme 6 4 000 – – 975 –
84 572 – 100 200 28 956
Umkhanyakude District Office Education
433 Ptn 51 Erf 5 Design Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 142 – 623 680 –
Dr B W Vilakazi Junior Primary Education
434 School (Groutville) Design Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 5 815 5 423 – – –


Completion Education
435 Dumisa Combined School (100%) Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
9 170 – 70 – –
Construction 1% - Education
436 Dwaleni Secondary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
14 812 – 100 800 890
Construction 1% - Education
437 Emafa Combined School 25% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 875 2 416 – – –


Emanyonini Senior Primary Completion Education
438 School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 565 2 188 – – –


Completion Education
439 Embonini Primary School (100%) Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 823 688 1 000 – 1 235
Construction 51% Education
440 Emfanela Primary School - 75% Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

88
Annexure Table B5 – Vote 5 : Education

Practical 2 916 2 615 – – –


Completion Education
441 Emthaleni Primary School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 139 2 093 – – –


Engonyameni Senior Primary Completion Education
442 School (100%) Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 3 242 3 125 – – –


Completion Education
443 Esindi Primary School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 520 780 –
Education
444 Esiqiwini Secondary School Design Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 000 – 1 290 700 –
Estcourt Secondary School Education
445 (Martin Rd) Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 850 30 100 500 –
Ezinqoleni Junior Secondary Education
446 School Design Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 830 6 685 – – –
Education
447 Gwegwede Primary School Design Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 3 000 2 990 – – –


Completion Education
448 Hillview Primary School (100%) Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 10 196 9 799 – – –


Completion Education
449 Inala Primary School (100%) Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
214 448 16 977 100 500 41 214
Education
450 Inanda Special School Design Umlazi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 582 250 110
Education
451 Ingogo Primary School Design Amajuba Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 250 26 – – –
Completion Education
452 Ntengo Primary School (100%) Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 127 2 014 – – –


Completion Education
453 Isaviyo Primary School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 809 736 120 353 –
Construction 26% Education
454 Jongimfundo Primary School - 50% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
– – 100 100 4 253
Education
455 Khambula Combined School Design Zululand Primary - - Infrastructure Grant Programme 6
9 535 – 100 100 1 023
Education
456 Khangelani Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 100 100 2 536
Education
457 Khishwa Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 636 – 110 320 350
King Bhekuzulu Secondary Construction 26% Education
458 School - 50% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 19 064 18 494 – 400 –


Completion Education
459 King Dinuzulu Secondary School (100%) Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 582 250 100
Education
460 Kloof Secondary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 008 474 1 500 250 –
Construction 26% Education
461 Kwamanqondo Primary School - 50% Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 16 812 16 759 – 924 –


Completion Education
462 Kwampunzana Primary School (100%) Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 100 900 3 569
Education
463 Kwanogcoyi Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 035 1 950 – – –


Completion Education
464 Kwashukela Primary School (100%) Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 12 959 11 979 – 366 –


Completion Education
465 Kwasoni Primary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 709 – – 900 523


Completion Education
466 Kwathathani Secondary School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
21 087 2 297 – 900 –
Education
467 Lindizwe Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 209 – 520 568 –
Education
468 Livangeli Primary School Design Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

89
Annexure Table B5 – Vote 5 : Education

12 500 – 100 1 000 2 153


Mabedlana Primary School Education
469 (Ulundi) Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 746 – 508 554 –
Education
470 Mabuthela Secondary School Design Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 6 373 4 251 – 200 –


Completion Education
471 Madundubala Primary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 632 2 446 – – –


Completion Education
472 Magemfane Secondary School (100%) Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 971 393 78 – –
Construction 1% - Education
473 Manqindi Primary School 25% Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 055 171 84 – –
Construction 1% - Education
474 Manzimakhulu Primary School 25% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 1 455 1 398 – – –


Completion Education
475 Mashinga Secondary School (100%) Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 3 391 3 236 – – –


Completion Education
476 Mavangana Secondary School (100%) Harry Gwala Specialised 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
13 907 942 100 1 000 1 235
Mavumengwane Secondary Education
477 School Tender Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 750 – – – –
Education
478 Mbalekelwa Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 902 – 1 922 200 –
Education
479 Mcathu Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
19 411 – 3 820 200 –
Education
480 Meyama Secondary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 369 – 1 010 200 –
Education
481 Mfingose Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 3 820 200 5 246
Education
482 Mgazini Primary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 560 – 744 200 342
Education
483 Mkhabela Primary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 5 871 5 812 – – –


Completion Education
484 Mlinganiswa Primary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
35 162 14 172 2 290 200 2 569
Construction 51% Education
485 Mlokothwa Secondary School - 75% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 250 – 2 688 200 980
Education
486 Mnyamana Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 3 820 200 4 253
Education
487 Mqiniseni Secondary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 000 – 10 200 –
Construction 76% Education
488 Msitha Primary School - 99% Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
– – 3 820 200 4 253
Education
489 Nceceni Primary School Design Zululand Primary - - Infrastructure Grant Programme 6
12 500 – 3 820 200 4 937
Education
490 Ncwecwe Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 126 – 200 – –
Ndabazamanina Secondary Education
491 School Tender Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 505 – 1 792 1 958 –
Education
492 Newton Secondary School Design Umgungundlovu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 9 968 9 005 – – –


Ngcedomhlophe Secondary Completion Education
493 School (100%) Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 44 377 29 048 – 469 2 356


Completion Education
494 Ngono Secondary School (100%) Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 3 820 1 259 5 462
Education
495 Ngwenya Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 3 741 373 – – –


Completion Education
496 Nkweletsheni Primary School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

90
Annexure Table B5 – Vote 5 : Education

8 360 – 1 600 260 –


Construction 1% - Education
497 Nokhalela Secondary School 25% Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 7 051 5 017 – 320 189


Completion Education
498 Nondumiso Secondary School (100%) Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 7 417 6 847 – – –


Completion Education
499 Northbury Park Secondary School (100%) Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 248 – 2 034 1 254 523
Education
500 Nqakathela Secondary School Design Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 294 – 667 729 –
Education
501 Nsongeni Secondary School Design Umgungundlovu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 11 962 11 288 – – –


Completion Education
502 Ongoye Primary School (100%) Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 017 – 3 471 523 2 539
Education
503 Othungwini Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 180 – 1 798 200 –
Education
504 Ovukaneni Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
28 400 – 5 060 200 –
Education
505 Panorama Combined School Design Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 4 652 200 3 526
Paulpietersburg Primary School Education
506 (Dumbe) Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 7 487 6 890 – – –


Completion Education
507 Prestbury Primary School (100%) Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 851 – 2 517 1 890 859
Prince Mnyayiza Secondary Construction 26% Education
508 School - 50% Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 582 500 100
Education
509 Queensburgh Secondary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 539 634 – 1 494 –


Completion Education
510 Roseville Secondary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 538 1 199 – 109 –


Completion Education
511 Sambane Primary School (100%) Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 12 389 11 964 – 694 –


Completion Education
512 Sawoti Primary School (100%) Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 006 – 1 293 1 412 –
Education
513 Sihayo Secondary School Design Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 6 919 5 991 – – –


Completion Education
514 Singele Secondary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 9 050 8 744 – – –


Completion Education
515 Siphakamile Primary School (100%) Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 893 – 130 1 890 700
Construction 26% Education
516 Siphosethu Secondary School - 50% Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 583 – 1 000 1 890 2 543
Education
517 Sitheku Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 6 179 5 730 – – –


Completion Education
518 Sivelile Junior Secondary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 000 – 110 270 –
Construction 26% Education
519 Siyamukela Secondary School - 50% Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 000 – 200 – –
Construction 1% - Education
520 Sizaminqubeko Combined School 25% Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
27 917 1 363 1 000 200 –
Education
521 Sizanani Secondary School Design Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 583 – – 200 5 563
Education
522 Somopho Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 14 940 9 629 – 200 700


Completion Education
523 Stanmore Secondary School (100%) Pinetown Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 4 000 – 1 950 200 –


Completion Education
524 Table Mountain Primary School (100%) Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

91
Annexure Table B5 – Vote 5 : Education

24 747 – 1 000 200 250


Education
525 Thembokuhle Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 984 – 100 200 1 526
Education
526 Thulwana Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 6 010 5 708 – – –


Completion Education
527 Ukuthula Secondary School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 1 000 1 890 3 563
Education
528 Umhloluthini Secondary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 2 709 – 1 000 1 347 –


Completion Education
529 Umqatsheni Primary School (100%) Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 160 – 100 686 –
Umsunduze Senior Primary Education
530 School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 384 328 – – –


Completion Education
531 Umzintovale Primary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
15 761 – 100 1 259 500
Education
532 Usuthu Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 17 410 12 836 – 269 –


Completion Education
533 Vuleka School For The Deaf (100%) Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 1 557 1 440 – – –


Completion Education
534 Zakhekahle Secondary School (100%) Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 1 661 1 470 – – –


Completion Education
535 Zamazisa Primary School (100%) Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 11 261 10 723 – – –


Completion Education
536 Zembeni Senior Primary School (100%) Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

Practical 1 940 1 828 – – –


Completion Education
537 Zihlalo Primary School (100%) Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 250 – 100 – 562
Education
538 Zombizwe Secondary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
12 500 – 100 – 500
Education
539 Zombode Primary School Design Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 087 – 1 005 – 98
Education
540 Addington Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 153 – 50 – 12
Education
541 Athlone Primary School Tender Umgungundlovu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 431 – 500 – –
Education
542 Avoca Primary School Tender Umlazi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
543 Bedlane Intermediate School Tender Uthungulu Primary 2016-04-01 2018-03-30 Equitable Share Programme 6 992 – 50 – –
4 536 – 100 – –
Education
544 Bhekabelungu Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 398 – 398 – –
Construction 51% Education
545 Bhokwe Secondary School - 75% Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 260 – 542 – –
Education
546 Bonomunye Intermediate School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
15 539 – 2 200 – 500
Education
547 Brettonwood Secondary School Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 685 – 85 – –
Construction 1% - Education
548 Buyani Primary School 25% Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 038 – 1 966 – –
Education
549 Congco Secondary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 357 – 685 – –
Education
550 Dr Made Senior Primary School Design Umlazi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 581 – 2 000 – 952
Education
551 Duze Primary School Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 526 – 1 473 – –
Education
552 Ekunqobeni Primary School Design Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 589 – 689 – 189
Education
553 Ekwazini Secondary School Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

92
Annexure Table B5 – Vote 5 : Education

3 968 – 652 – –
Education
554 Emabheleni Primary School Tender Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 053 – 597 – –
Education
555 Embabane Primary School Design Amajuba Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 195 – 514 – –
Education
556 Embabe Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 097 – 1 332 – –
Education
557 Empembeni Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 799 – 1 634 – –
Education
558 Empucukweni Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 738 – 3 721 – 250
Education
559 Empusheni Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 944 – 1 696 – –
Education
560 Engalangala Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 178 – 507 – –
Education
561 Entembeni Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 716 – 738 320 189
Esiphethwini Sendiza Primary Education
562 School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 057 – 1 000 101 500
Education
563 Falcon Park Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 604 – 1 000 101 562
Education
564 Ginyane Secondary School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
694 – 153 101 –
Education
565 Glenmore Primary School Design Umlazi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 083 – 1 326 101 –
Gqokinsimbi Junior Secondary Education
566 School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 557 – 670 101 –
Gwejobomvu Junior Secondary Education
567 School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 771 – 515 101 –
Education
568 Hlangabeza Secondary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 048 – 1 000 101 250
Education
569 Indunduma Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 896 – 842 101 –
Education
570 Ingqalabutho Primary School Design Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 983 – 853 101 –
Education
571 Isangoyana Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 240 – 1 055 101 123
Education
572 Isipingo Primary School Design Umlazi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 134 – 1 997 101 –
Education
573 Isiqalo Primary School Design Pinetown Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 685 – 1 000 101 1 752
Education
574 Kenterton Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 905 – 844 101 –
Education
575 Khandane Primary School Design Umkhanyakude Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 678 – 1 000 101 856
Education
576 Khanyangodumo Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 125 – 1 668 101 –
Kwahluzingqondo Secondary Education
577 School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 057 – 1 321 101 –
Education
578 Kwajakobe Combined School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
13 922 – 1 000 101 500
Kwamakhutha Comp Secondary Education
579 School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 255 – 1 000 101 500
Education
580 Kwesethu Secondary School Design Pinetown Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 084 – 466 510 –
Education
581 Machotshaneni Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

93
Annexure Table B5 – Vote 5 : Education

819 – 353 384 –


Education
582 Madidima Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 188 – 941 – –
Education
583 Mafunda Secondary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 336 – 1 086 200 123
Mahlashana Senior Primary Education
584 School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 739 – 1 608 200 –
585 Makhwela Intermediate School Design Zululand Primary 2016-04-01 2018-03-30 Equitable Share Programme 6
1 194 – 513 200 –
Education
586 Mathungela Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 458 – 1 487 200 –
Education
587 Mevamhlophe Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 233 – 1 000 200 500
Education
588 Mhongozini Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 853 – 1 580 200 –
Education
589 Mphendu Primary School Design Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 468 – 1 000 200 452
Education
590 Mtumaseli Secondary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 078 – 1 328 200 –
Education
591 Mvuthuluka Secondary School Design Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
543 – 234 255 –
Education
592 Mzingazi Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 750 – 1 221 1 334 –
Education
593 Mziwethu Secondary School Design Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 756 – 801 875 –
Education
594 Ncazuka Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 745 – 507 555 –
Education
595 Ndamkane Secondary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 209 – 520 568 –
Education
596 Ndlongolwane Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
935 – 402 440 –
Education
597 Ngedlesi Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 062 – 456 500 –
Education
598 Ngwemnyama Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
908 – 390 427 –
Education
599 Nogajuka Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 175 – 1 000 200 660
Education
600 Nomavimbela Secondary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 750 – 113 200 –
Education
601 Nonjinjikazi Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 446 – 1 000 200 660
Education
602 Ntabasuka Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 512 – 730 200 –
Education
603 Nyanda Primary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 632 – 800 200 11 344
Education
604 Ocheni Primary School Design Ilembe Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 425 – 613 200 –
Phalane Primary School Education
605 (Kwadlangezwa) Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 689 – 800 200 –
Education
606 Qwembe Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 922 – 1 000 200 250
Education
607 R A Padayachee Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 333 – 1 818 200 700
Education
608 Sesifikile Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
10 620 – 100 200 500
Education
609 Sibongimfundo Secondary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
9 333 – 33 200 982
Construction 26% Education
610 Sidumile Primary School - 50% Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
94
Annexure Table B5 – Vote 5 : Education

6 837 – 100 200 500


Education
611 Sinkonkonko Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 712 – 789 200 –
Education
612 Sobantu Secondary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 469 – 427 200 –
Education
613 Thethandaba Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 769 – 1 000 200 880
Education
614 Umbelebele Secondary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 583 – 50 200 –
Umnini Memorial Senior Primary Education
615 School Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 905 – 20 200 900
Education
616 Vulingqondo Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Watersmeet Senior Primary 12 137 – 20 200 500
617 School Design Uthukela Specialised 2016-04-01 2018-03-30 Equitable Share Programme 6
618 Wiggins Secondary School Tender Umlazi Primary 2016-04-01 2018-03-30 Equitable Share Programme 6 1 019 – 50 31 –
3 251 – 1 059 100 123
Education
619 Yellowwood Park Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 474 – 1 000 – –
Education
620 Zamukwe Primary School Tender Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
621 Zithume Secondary School Tender Uthungulu Secondary 2016-04-01 2018-03-30 Equitable Share Programme 6 3 245 – 242 3 –
2 000 – 313 – –
Education
622 Adams College Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 50 – –
Construction 1% - Education
623 Ashdown Primary School 25% Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
624 Ays Memorial Primary School Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
625 Ekubongeni Primary School Tender Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
626 Ekuthuleni Primary School Tender Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 355 – 313 – –
Gwebushe Junior Secondary Education
627 School Tender Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
628 Sithilo Primary School Tender Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
629 Siyahlomula Secondary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
630 St Christopher Special School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Stanger Intermediate School (Hill Education
631 Crescent) Tender Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 352 – 313 – 250
Thandayiphi Junior Secondary Education
632 School Tender Ilembe Primary - - Infrastructure Grant Programme 6
785 – 313 – 250
Education
633 Thembelani Primary School Tender Uthungulu Primary - - Infrastructure Grant Programme 6
3 197 – 313 – –
Education
634 Thembalesizwe Primary School Tender Uthungulu Secondary - - Infrastructure Grant Programme 6
3 234 – 313 – –
Education
635 Thembalihle Primary School Tender Umlazi Primary - - Infrastructure Grant Programme 6
2 000 – 313 – –
Education
636 Thokozwayo Secondary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
637 Vukani Junior Secondary School Tender Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
638 Amahuku Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
639 Amandosi Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
640 Andrew Zondo Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

95
Annexure Table B5 – Vote 5 : Education

6 837 – 100 200 500


Education
611 Sinkonkonko Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 712 – 789 200 –
Education
612 Sobantu Secondary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
1 469 – 427 200 –
Education
613 Thethandaba Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 769 – 1 000 200 880
Education
614 Umbelebele Secondary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 583 – 50 200 –
Umnini Memorial Senior Primary Education
615 School Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 905 – 20 200 900
Education
616 Vulingqondo Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Watersmeet Senior Primary 12 137 – 20 200 500
617 School Design Uthukela Specialised 2016-04-01 2018-03-30 Equitable Share Programme 6
618 Wiggins Secondary School Tender Umlazi Primary 2016-04-01 2018-03-30 Equitable Share Programme 6 1 019 – 50 31 –
3 251 – 1 059 100 123
Education
619 Yellowwood Park Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
7 474 – 1 000 – –
Education
620 Zamukwe Primary School Tender Ugu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
621 Zithume Secondary School Tender Uthungulu Secondary 2016-04-01 2018-03-30 Equitable Share Programme 6 3 245 – 242 3 –
2 000 – 313 – –
Education
622 Adams College Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 50 – –
Construction 1% - Education
623 Ashdown Primary School 25% Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
624 Ays Memorial Primary School Tender Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
625 Ekubongeni Primary School Tender Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
626 Ekuthuleni Primary School Tender Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 355 – 313 – –
Gwebushe Junior Secondary Education
627 School Tender Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
628 Sithilo Primary School Tender Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
629 Siyahlomula Secondary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
630 St Christopher Special School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Stanger Intermediate School (Hill Education
631 Crescent) Tender Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 352 – 313 – 250
Thandayiphi Junior Secondary Education
632 School Tender Ilembe Primary - - Infrastructure Grant Programme 6
785 – 313 – 250
Education
633 Thembelani Primary School Tender Uthungulu Primary - - Infrastructure Grant Programme 6
3 197 – 313 – –
Education
634 Thembalesizwe Primary School Tender Uthungulu Secondary - - Infrastructure Grant Programme 6
3 234 – 313 – –
Education
635 Thembalihle Primary School Tender Umlazi Primary - - Infrastructure Grant Programme 6
2 000 – 313 – –
Education
636 Thokozwayo Secondary School Tender Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 313 – –
Education
637 Vukani Junior Secondary School Tender Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
638 Amahuku Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
639 Amandosi Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
640 Andrew Zondo Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

96
Annexure Table B5 – Vote 5 : Education

270 – 3 3 –
Education
669 Enkoneni Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
670 Ensingweni Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
671 Entabeni Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
672 Entumeni Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
673 Enungwini Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
674 Enxolobeni Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Florence Booth Intermediate Education
675 School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
676 Gcininhliziyo Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
677 Gcotoi Secondary School Design Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Gloucester Junior Secondary Education
678 School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Gqokamandla Junior Secondary Education
679 School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
680 Gudu Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
681 Hlwemini Primary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
682 Imbizane Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
683 Impaphala Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
684 Inkuthu Primary School Design Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
685 Inyathi Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
686 Isipingo Hills Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
687 Ismont Secondary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
688 Isonto Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
689 Ithongasi Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
690 Iwangu Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
691 Khangelani Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
692 Khethwayo Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
693 Khishwa Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Kukhanyeni Junior Secondary Education
694 School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
695 Kumkani Primary School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
696 Kwafica Secondary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

97
Annexure Table B5 – Vote 5 : Education

270 – 27 127 –
Education
697 Kwagumbi Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
698 Kwamasosha Secondary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
699 Kwamgabo Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
700 Kwamondi Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
701 Kwamqadi Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
702 Kwanzimakwe Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
703 Kwasokoyi Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
704 Lakeside Park Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
705 Lenjane Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
706 Lenford Baleni Primary School Design Harry Gwala Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
707 Qedizaba Primary School Project Initiation Amajuba Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
270 – 3 3 –
Lincoln Heights Secondary Education
708 School Design Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
709 Lindizwe Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
710 Macekane Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
711 Mafitleng Primary School Design Umzinyathi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
712 Makhathini Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
713 Malanga Senior Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
714 Manqondo Primary School Design Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
715 Manyampisi Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
716 Mariannhill Primary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
717 Mariannpark Primary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
718 Marklands Secondary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Masheshisa Primary School Education
719 (Ladysmith) Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
720 Mason Lincoln Special School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Matamzana Dube Secondary Education
721 School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Matholamnyama Secondary Education
722 School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
723 Mbatshazwa Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
724 Mboko Primary School Design Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

98
Annexure Table B5 – Vote 5 : Education

270 – 3 3 –
Education
725 Mbusi Secondary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
726 Mcitsheni Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
727 Mehlokazulu Secondary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
728 Mjindi Secondary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
729 Mkangala Primary School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
730 Mngayi Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
731 Mome Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
732 Mossdale Primary School Design Amajuba Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
733 Mseni Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
734 Mthimude Secondary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
735 Mthiyaqhwa Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Muzikawuthandwa Secondary Education
736 School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
737 Mvundlana Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
738 Nani Junior Secondary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
739 Nhlokwane Secondary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
740 Nongoma Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
741 Nongweleza Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
742 Nsuze Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
743 Ntabantuzuma Secondary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
744 Ntumbeni Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
745 Ntwela Primary School Design Umlazi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
746 Pisgah Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
747 Qhubandaba Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
748 Rantjiesvlakte Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
749 Riverdale Intermediate School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
750 Rosettenville Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
751 Sabokwe Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
752 Salpine Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

99
Annexure Table B5 – Vote 5 : Education

270 – 3 3 –
Education
753 Sankontshe Primary School Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Senzokwethu Primary School Education
754 (Winterton) Design Uthukela Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
755 Sibhangwana Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
756 Sibumbene Secondary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
757 Sigweje Secondary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
758 Sinamuva Primary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
759 Siqongweni Secondary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
760 Sitheku Secondary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Siyabonga Secondary School Education
761 (Kwadlangezwa) Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
762 Siyeza Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
763 Somopho Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
764 Somotha Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
765 St Francis Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
766 Star Of The Sea Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
767 Thembumzamo Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
768 Thuthukani Special School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
769 Tongaat School For The Smh Design Pinetown Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
770 Ugome Combined School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
771 Umqongqotho Primary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
772 Uphindo Secondary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
773 Vogelvlei Primary School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Vulamehlo Junior Secondary Education
774 School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
775 Xhonywa Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
776 Yarrow Primary School Design Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
777 Yetheni Primary School Design Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
778 Zakheleni Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
779 Zamokuhle Secondary School Design Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
780 Zamukuzakha Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6

100
Annexure Table B5 – Vote 5 : Education

270 – 27 127 –
Education
781 Zibone Primary School Design Uthungulu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
782 Zola Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 3 3 –
Education
783 Zombizwe Secondary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
270 – 27 127 –
Education
784 Zuzimfundo Primary School Design Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
8 322 – 1 000 254 500
Durban Girls Secondary Education
785 School(Dartnell Cres) Design Umlazi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
5 736 – 700 500 –
Ezinqoleni Junior Secondary Education
786 School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 998 – 600 500 –
Education
787 Manzimakhulu Primary School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 259 – 1 000 500 –
Education
788 Mfingose Primary School Design Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
9 032 – 200 500 500
Prince Ndabuko Secondary Education
789 School Design Zululand Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 851 – 200 500 70
Education
790 St Thomas Primary School Design Ugu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 000 – 115 500 –
Education
791 Mdepha Secondary School Project Initiation Pinetown Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6

Practical – – 90 500 500


Pinetown District Office - Completion Education
792 Voortrekker St (100%) Pinetown Primary - - Infrastructure Grant Programme 6
– 113 352 500 –
Construction 26% Education
793 Sheshisamsamo Primary School - 50% Umzinyathi Primary 2016-04-01 - Infrastructure Grant Programme 6
2 000 – 115 – –
Education
794 Greyville Primary School Project Initiation Umlazi Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
795 Masibhekane Secondary School Project Initiation Zululand Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6

Practical – 153 – 320 189


Completion Education
796 Sabela Secondary School (100%) Amajuba Primary - - Infrastructure Grant Programme 6
500 – 50 25 –
797 Ngcongcosi Secondary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6
798 Bambe Primary School Feasibility Uthukela Non- School 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 50 25 –
Sinenhlanhla Primary School 500 – 50 25 –
799 (Ladysmith) Feasibility Uthukela Specialised 2016-04-01 2017-03-31 Equitable Share Programme 6
800 Thobisizwe Primary School Feasibility Uthukela Admin 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 50 25 –
801 Ezwelethu Primary School Feasibility Uthukela Primary 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 50 25 –
Zimisele Primary School 500 – 50 25 –
802 (Ladysmith) Feasibility Uthukela Primary 2016-04-01 2017-03-31 Equitable Share Programme 6
500 – 50 25 –
803 Emngwenya Intermediate School Feasibility Uthukela Specialised 2016-04-01 2017-03-31 Equitable Share Programme 6
500 – 50 25 –
Education
804 Ngibongeleni Secondary School Feasibility Uthukela Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
805 Kwadlamini Secondary School Feasibility Uthukela Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
806 Usizolwethu Primary School Feasibility Uthukela Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
807 Albert Secondary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
808 Bashise Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
809 Bhanoyi Secondary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
810 Emabheleni Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
811 Enkungwini Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
812 Ewubwini Primary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

101
Annexure Table B5 – Vote 5 : Education

500 – 50 25 –
Education
813 Fakazi Primary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
814 Fundeduze Primary School Feasibility Ugu Admin 2016-04-01 2017-03-31 Equitable Share Programme 6 500 – 50 25 –
500 – 50 25 –
Education
815 Gugulesizwe Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
816 Ikhwezilamachi Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
817 Ikhwezilokusa Primary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
818 Induma Junior Secondary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
819 Isubalasha Primary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
820 Itshehlophe Primary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
821 Kwabombo Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
822 Kwafica Secondary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
823 Makhowane Primary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
824 Marshmount Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Mashesha Junior Secondary Education
825 School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
826 Mbambuya Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Mdulashi Junior Secondary Education
827 School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
828 Mehlomnyama Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Equitable Share Programme 6
500 – 50 25 –
Education
829 Mgamule Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Mhlabuhlangene Junior Education
830 Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
831 Mhlangamkhulu Primary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Equitable Share Programme 6
500 – 50 25 –
Education
832 Mqhakama Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
833 Mthwalume Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
834 Mtumaseli Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
835 Mtwalume Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
836 Nciya Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
837 Ndunge Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
838 Nhlawane Primary School Project Initiation Ugu Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
839 Dubandlela Secondary School Project Initiation Ugu Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
840 Nomageje Primary School Project Initiation Ugu Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
500 – 50 25 –
Education
841 Nomageje Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
842 Nombuso Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

102
Annexure Table B5 – Vote 5 : Education

500 – 50 25 –
Education
843 Nositha Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
844 Nungwana Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
845 Phindavele Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
846 Phumza Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
847 Salem Primary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
848 Sibuyile Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
849 Sihle Secondary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
850 Siphapheme Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
851 Sister Joans Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
852 Siyathokoza Primary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
853 Sizophumelela Secondary School Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
St Theresa Primary School Education
854 (Harding) Feasibility Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
855 Thembuzulu Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
856 Tholimfundo Secondary School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Zibonele Junior Secondary Education
857 School Feasibility Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
858 Byrne Intermediate School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
859 Amandus Hill Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
860 Amathuli Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
861 Bhekamatshe Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
862 Echameni Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
863 Ekhamanzi Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
864 Emalangeni Primary School Feasibility Umkhanyakude Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
865 Dargle Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
866 Emaswazini Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
867 Fortmannspruit Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
868 Huba Secondary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
869 Emtulwa Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
870 Emwaneni Primary School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

103
Annexure Table B5 – Vote 5 : Education

500 – 50 25 –
Education
871 Esikhotho Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
872 Gaju Secondary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
873 Harburg Intermediate School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
874 Hlanzeni Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
875 Holcombe Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
876 Ilanga Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Inqolayolwazi Senior Primary Education
877 School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
878 Ismont Secondary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
879 Jabulani Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
880 Kwamadlala Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
881 Mahlutshini Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
882 Malizayo Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
883 Mbava Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
884 Mbeka Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
885 Mbuthisweni Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
886 Mbutho Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
887 Menziwa Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 50 25 –
Education
888 Mkhobeni Secondary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 248 25 –
Education
889 Nobanda Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Education
890 Nogasela Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Shea O'Connor Combined Education
891 School(Prev. Nottingham Rd) Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Education
892 Nyambayi Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Education
893 Oqaqeni Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Education
894 Phatheni Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Education
895 Powerscourt Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Education
896 Scottsfontein Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Education
897 Sethabe Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 300 25 –
Education
898 Sidunge Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

104
Annexure Table B5 – Vote 5 : Education

680 – 300 25 100


Education
899 Siyanda Secondary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

Practical – 70 800 900 500


Completion Education
900 The Grove Combined School (100%) Umgungundlovu Primary - - Infrastructure Grant Programme 6
500 – 100 25 –
Education
901 The Grove Combined School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
902 Thimuni Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Thornville St Aided Primary Education
903 School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
904 Umqongqotho Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
905 Windy Hill Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
906 Yarrow Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
907 Yise Secondary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
908 Gengeshe Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
909 Cebolesizwe Intermediate School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
910 Lozi Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
911 Rocky'S Drift Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
912 Buzulwazi Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
913 Insika Junior Secondary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
914 Iwahlanga Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
915 Kwagwegwe Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
916 Lions River Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
917 Kwamsinga Primary School Feasibility Umgungundlovu Primary 2017-11-20 2019-03-30 Infrastructure Grant Programme 6
500 – – 25 –
Education
918 Langalakhe Secondary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
919 Lugaju Junior Secondary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
920 Maliphume Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
921 Meyershoek Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
922 Middelrus Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
923 Mpofana Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
924 Mpofanyana Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
925 Congco Secondary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
926 Nhlanhleni Senior Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

105
Annexure Table B5 – Vote 5 : Education

500 – – 25 –
Education
927 Nonzila Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
928 Nyanda Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Senzokuhle Combined School Education
929 (Prev. Onverwag C) Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
930 Pheshe Primary School Feasibility Harry Gwala Specialised 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
931 Rosettenstein Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
932 Sanelisiwe Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
933 Shayabantu Secondary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
934 Sikhukhukhu Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
935 Triandra Primary School Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
936 Umsilinga Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
937 Vrystaat Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
938 Vuka Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
939 Vumuthando Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
940 Zamokuhle Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
941 Baniyena Primary School Feasibility Umgungundlovu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Phakathwayo Junior Secondary Education
942 School (Stanger) Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 150 25 –
Education
943 Batlokoa Secondary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 150 25 –
Education
944 Charlton Primary School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 150 25 –
Education
945 Cooperdale Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 150 25 –
Edgerton Junior Secondary Education
946 School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 150 25 –
Education
947 Gqwalu Combined School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 150 25 –
Longkloof Junior Secondary Education
948 School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
949 Lufafa Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Glengarry Junior Secondary Education
950 School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
951 Mzwendaba Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
952 Ncomani Secondary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
953 Palmiet Primary School (Kokstad) Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Qondokuhle Junior Primary Education
954 School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

106
Annexure Table B5 – Vote 5 : Education

500 – – 25 –
Education
955 Shalom Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
956 Masameni Secondary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
957 Nomeva Vukazi Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Mzokhanyayo Junior Secondary Education
958 School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
959 Reichenau Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
960 Troutwaters Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
961 Maryhelp Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Emfundweni Junior Secondary Education
962 School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
963 Springvale Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Summerfield Junior Secondary Education
964 School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
965 Mazongo Primary School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
966 Engwaqa Secondary School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
967 Singisi Comp Secondary School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
968 Pholela Secondary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
969 Pholela Special School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
970 Tafeni Junior Secondary School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
971 Drc Secondary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
972 Zamani Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
973 Newtonville Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
974 Mahafana Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
975 Kwapitela Primary School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
976 Emacabazini Primary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Emvubukazi Junior Secondary Education
977 School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
978 Rietvlei Junior Secondary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Ezimpungeni Junior Secondary Education
979 School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
980 Nyaka Junior Secondary School Feasibility Harry Gwala Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
981 Cabane Junior Secondary School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Mhlaba`S Junior Secondary Education
982 School Feasibility Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

107
Annexure Table B5 – Vote 5 : Education

500 – – 25 –
Education
983 Makhapha Combined School Feasibility Pinetown Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
984 Sinenzuzo Primary School Feasibility Pinetown Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
985 Mvini Primary School Feasibility Pinetown Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
986 Matabetulu Primary School Feasibility Pinetown Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
2 000 – – – –
Education
987 Umthunzi Primary School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
500 – – 25 –
Education
988 Umthunzi Primary School Feasibility Pinetown Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
989 Inkazimulo Primary School Feasibility Pinetown Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
990 Inanda Primary School Feasibility Pinetown Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
991 Georgedale Primary School Feasibility Pinetown Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
992 Sidiya Primary School Feasibility Umlazi Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
993 A M Moola Secondary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
994 Dendethu Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Emakhuluseni Senior Primary Education
995 School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
996 Embuyeni Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
997 Emphise Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
998 Ekujulukeni Primary School Feasibility Zululand Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
999 Gogovuma Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1000 Enyokeni Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1001 Etete Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1002 Gasela Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1003 Gem Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1004 Ikhusana Combined School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1005 Inhlokozi Secondary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1006 Isigudu Junior Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1007 Iwetane Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1008 Kwashangase Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1009 Kwasimamane Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1010 Magongolo Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

108
Annexure Table B5 – Vote 5 : Education

500 – – 25 –
Education
1011 Masiwela Combined School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1012 Mcathu Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1013 Mcatshangelwa Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1014 Mepho Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1015 Mgigimbe Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1016 Ndondakusuka Secondary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1017 Nhlangakazi Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – – 25 100
Education
1018 Nkomidli Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1019 Nokubusa Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1020 Noodsberg Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1021 Nsongansonga Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1022 Ozwathini Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1023 Phambela Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1024 Qhubakahle Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1025 Sakhisizwe Secondary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1026 Sibanisethu Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1027 Siphiwe Secondary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1028 Siqondokuhle Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1029 Sisebenzile Secondary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1030 Sithelosethu Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1031 Tshelabantu Intermediate School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1032 Tshutshutshu Secondary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Ubuhlebesizwe Junior Secondary Education
1033 School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1034 Wangu Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1035 Wosiyane Secondary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1036 Thekelimfundo Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1037 Zamazisa Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1038 Mnawe Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

109
Annexure Table B5 – Vote 5 : Education

500 – – 25 –
Education
1039 Masimdumise Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1040 Ntabakakhathaza Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1041 Itshelencwadi Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1042 Inyanganye Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1043 Jonase Secondary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Mandeni Primary School Education
1044 (Reserve 21) Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1045 Manqondo Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1046 Mbitane Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1047 Mgqwabagqwaba Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1048 M I Paruk Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1049 Nondabula Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1050 Ntando Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1051 Ntathakusa Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1052 Ntendeni Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1053 Osizweni Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1054 Petezi Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1055 Sakhesethu Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1056 Siyacothoza Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1057 Sontshenge Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – – 25 100
Education
1058 St Cyprians Intermediate School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1059 Umvozane Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1060 Vuma Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1061 Ndleleni Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1062 Ifalethu Intermediate School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1063 Sinenhlanhla Secondary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1064 Mqungebe Secondary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1065 Mankayiyana Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1066 Magojolo Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

110
Annexure Table B5 – Vote 5 : Education

500 – – 25 –
Education
1067 Joel Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1068 Mazisi Ntuli Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1069 Vukuzenzele Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1070 Eziqungeni Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – – 25 –
Education
1071 Lethuxolo Secondary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1072 Ngqokwane Secondary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1073 Sakhumuzi Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1074 Mqedi Senior Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1075 Iqabavu Primary School Feasibility Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1076 Mashiza Primary School Feasibility Ilembe Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 100
Education
1077 Makhanyezi Primary School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1078 Enhlanzini Primary School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Nqamana Junior Secondary Education
1079 School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1080 Enhlisa Primary School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1081 Gezahlale Primary School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1082 Dlolwane Primary School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1083 Ezilozini Primary School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1084 Ubizo Primary School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1085 Baqaqe Primary School Feasibility Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1086 Bethangwe Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1087 Bhekabantu Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Bongubuhle Senior Primary Education
1088 School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1089 Buyani Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1090 Egujini Primary School Feasibility Umkhanyakude Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1091 Ekwakheni Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1092 Emanyiseni Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1093 Emfihlweni Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
500 – 100 25 –
Education
1094 Fukula Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

111
Annexure Table B5 – Vote 5 : Education

680 – 100 25 25
Education
1095 Gadokuwayo Primary School Feasibility Umkhanyakude Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1096 Ikhwezi Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1097 Ingutshana Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1098 Isambulo Primary School Feasibility Umkhanyakude Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1099 Isigcino Primary School Feasibility Umkhanyakude Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1100 Khethwayo Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Khobongo Junior Secondary Education
1101 School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1102 Khulubone Primary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 25 25
Education
1103 Kwabulawayo Secondary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
680 – 100 – 25
Education
1104 Kwagxaba Secondary School Feasibility Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
– – 100 – –
Education
1105 Myeleni Project Initiation Umgungundlovu Primary - - Infrastructure Grant Programme 6
2 000 – 100 – –
Mnyameni-Zenex Secondary Education
1106 School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 50 – –
Education
1107 Umphumela Primary School Project Initiation Pinetown Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 1 071 – –
Education
1108 Mofu Primary School Project Initiation Umlazi Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
– – 200 100 25
Education
1109 Mahlabathini Secondary School Design Uthukela Secondary 2017-05-10 2018-12-30 Infrastructure Grant Programme 6
– 1 314 800 100 500
Education
1110 Mgai Primary School Project Initiation Ugu Primary - - Infrastructure Grant Programme 6
270 – – – –
Kufanelesibonge Junior Education
1111 Secondary School Project Initiation Umzinyathi Secondary - - Infrastructure Grant Programme 6
270 – – – –
Education
1112 Khulekani Primary School Project Initiation Umzinyathi Secondary - - Infrastructure Grant Programme 6
270 – – 3 100 –
Education
1113 Sakhiseni Secondary School Design Umzinyathi Primary - - Infrastructure Grant Programme 6
1 098 – – 3 100 –
Education
1114 Mkhonjeni Primary School Project Initiation Umkhanyakude Primary - - Infrastructure Grant Programme 6
– 443 – 3 100 100
Education
1115 Mathole Secondary School Project Initiation Zululand Secondary - - Infrastructure Grant Programme 6
– 1 500 – 3 100 562
Education
1116 Nobamba Secondary School Project Initiation Ugu Primary - - Infrastructure Grant Programme 6
– – – – –
Repairs And Renovation 2019- Education
1117 2020 Project Initiation Umgungundlovu Primary - - Infrastructure Grant Programme 6
2 000 – 50 100 100
Education
1118 Esther Payne Secondary School Tender Umgungundlovu Primary - - Infrastructure Grant Programme 6
2 000 – – – –
Education
1119 Emasakeni Primary School Project Initiation Umkhanyakude Secondary - - Infrastructure Grant Programme 6
2 000 – 115 – –
Education
1120 Sibonise Primary School Project Initiation Pinetown Primary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – 115 – –
Education
1121 Ndlokolo Primary School Project Initiation Pinetown Secondary 2016-11-10 2018-04-30 Infrastructure Grant Programme 6
2 000 – – – –
Education
1122 Faith Mlaba Primary School Project Initiation Pinetown Secondary - - Infrastructure Grant Programme 6

112
Annexure Table B5 – Vote 5 : Education

6 000
Education
1123 Maria Memorial Primary School Project Initiation Ungungundlovu Primary Infrastructure Grant Programme 6
6 000
Education
1124 Zuzulwazi Senior Secondary Project Initiation Ungungundlovu Secondary Infrastructure Grant Programme 6
6 000
Education
1125 Sifiswesihle Primary School Project Initiation Ungungundlovu Secondary Infrastructure Grant Programme 6
6 000
Education
1126 Mqhathi Primary School Project Initiation Ungungundlovu Primary Infrastructure Grant Programme 6
6 000
Education
1127 Mandlezizwe Priamry School Project Initiation Pinetown Secondary Infrastructure Grant Programme 6

Total Refurbishment And Rehabilitation – 417 968 311 139 198 388 326 904
4. Maintenance And Repairs
2 600 – 2 181 2 600 3 500
Education
1 Umgungundlovu Project Initiation Umgungundlovu Secondary 2016-09-20 2017-03-31 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
2 Amajuba Feasibility Amajuba Secondary 2015-11-20 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
3 Uthukela Feasibility Uthukela Secondary 2015-10-24 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
4 Umzinyathi Feasibility Umzinyathi Secondary 2016-09-20 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
5 Harry Gwala Feasibility Harry Gwala Secondary 2015-11-20 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
6 Umgungundlovu Feasibility Umgungundlovu Secondary 2015-10-24 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
7 Ugu Feasibility Ugu Secondary 2016-09-20 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
8 Ilembe Feasibility Ilembe Secondary 2015-11-20 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
9 Umlazi Feasibility Umlazi Secondary 2015-10-24 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
10 Pinetown Feasibility Pinetown Primary 2016-09-20 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
11 Uthungulu Feasibility Uthungulu Secondary 2015-11-20 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
12 Umkhanyakude Feasibility Umkhanyakude Secondary 2015-10-24 30/03/2017 Infrastructure Grant Programme 6
3 000 – 3 000 3 000 3 500
Education
13 Zululand Feasibility Zululand Fencing 2016-09-20 30/03/2017 Infrastructure Grant Programme 6
1 000 – 10 328 3 000 3 500
14 Machinery And Equipment Feasibility Umgungundlovu Specialised 2015-11-20 2018-03-30 Equitable Share Programme 6
500 – 550 675 675
15 Management Fee Feasibility Umgungundlovu Public School 2016-04-01 2017-03-31 Equitable Share Programme 6
16 Umlazi Pre-feasibility Umlazi Public School 2015-04-01 2017-03-31 Equitable Share Programme 6 6 521 – 5 250 6 400 6 400
17 Pinetown Pre-feasibility Pinetown Public School 2015-04-01 2018-03-30 Equitable Share Programme 6 6 521 – 5 178 6 400 6 400
570 – 4 050 4 050 5 230

Other - Packaged Education


18 Amajuba Chemical Toilets Ongoing Project Amajuba Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
651 – 4 050 4 050 4 050

Other - Packaged Education


19 Ilembe Chemical Toilets Ongoing Project Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
17 – 4 050 4 050 4 050

Other - Packaged Education


20 Pinetown Chemical Toilets Ongoing Project Pinetown Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 975 – 4 050 4 050 4 050

Other - Packaged Education


21 Harry Gwala Chemical Toilets Ongoing Project Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
687 – 4 050 4 050 4 050

Other - Packaged Education


22 Ugu Chemical Toilets Ongoing Project Ugu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6

113
Annexure Table B5 – Vote 5 : Education

1 085 – 4 050 4 050 3 218

Other - Packaged Education


23 Umgungundlovu Chemical Toilets Ongoing Project Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
1 200 – 4 050 4 050 4 050

Other - Packaged Education


24 Umlazi Chemical Toilets Ongoing Project Umlazi Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
1 385 – 4 050 4 050 4 050

Other - Packaged Education


25 Umkhanyakude Chemical Toilets Ongoing Project Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
2 546 – 4 050 4 050 4 050

Other - Packaged Education


26 Umzinyathi Chemical Toilets Ongoing Project Umzinyathi Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
549 – 4 050 4 050 4 050

Other - Packaged Education


27 Uthukela Chemical Toilets Ongoing Project Uthukela Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
109 – 4 050 4 050 4 050

Other - Packaged Education


28 Uthungulu Chemical Toilets Ongoing Project Uthungulu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
2 392 – 4 050 4 050 4 050

Other - Packaged
29 Zululand Chemical Toilets Ongoing Project Zululand Chemical Toilets 2016-04-01 2017-03-31 Equitable Share Programme 6
2 868 – 4 063 4 050 4 050

Other - Packaged Education


30 Amajuba Desludging Ongoing Project Amajuba Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
7 949 – 4 007 4 050 4 050

Other - Packaged Education


31 Ilembe Desludging Ongoing Project Ilembe Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
816 – 4 458 4 050 4 050

Other - Packaged Education


32 Harry Gwala Desludging Ongoing Project Harry Gwala Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
403 – 4 050 4 050 4 050

Other - Packaged Education


33 Ugu Desludging Ongoing Project Ugu Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
3 163 – 4 050 4 050 4 050

Other - Packaged Education


34 Umgungundlovu Desludging Ongoing Project Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
1 995 – 4 050 4 050 4 050

Other - Packaged Education


35 Umlazi Desludging Ongoing Project Umlazi Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
2 079 – 4 050 4 050 4 050

Other - Packaged Education


36 Umkhanyakude Desludging Ongoing Project Umkhanyakude Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
1 735 – 4 050 4 050 4 050

Other - Packaged Education


37 Umzinyathi Desludging Ongoing Project Umzinyathi Primary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
5 115 – 4 050 4 050 4 050

Other - Packaged Education


38 Uthukela Desludging Ongoing Project Uthukela Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
846 – 4 050 4 050 4 050

Other - Packaged
39 Uthungulu Desludging Ongoing Project Uthungulu Desludging 2016-04-01 2017-03-31 Equitable Share Programme 6
3 705 – 4 050 4 050 4 050

Other - Packaged
40 Zululand Desludging Ongoing Project Zululand Desludging 2016-04-01 2017-03-31 Equitable Share Programme 6
5 957 – 5 978 5 754 3 666
Education
41 Management Fee Feasibility Umgungundlovu Secondary 2016-04-01 2017-03-31 Infrastructure Grant Programme 6
70 000 – 13 663 7 200 –

Other - Packaged Education


42 Siyazenzela Youth Development Ongoing Project Umgungundlovu Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Construction 1% - 6 816 4 594 2 700 2 700 3 000
43 Amajuba 25% Amajuba Primary 2016-04-01 2019-03-30 Equitable Share Programme 6
Construction 1% - 6 568 3 305 2 700 2 700 3 000
44 Ilembe 25% Ilembe Primary 2016-04-01 2019-03-30 Equitable Share Programme 6
Construction 1% - 11 009 5 757 2 700 2 700 3 000
45 Pinetown 25% Pinetown Primary 2016-04-01 2019-03-30 Equitable Share Programme 6

114
Annexure Table B5 – Vote 5 : Education

Construction 1% - 10 512 6 160 2 700 2 700 3 000


46 Umlazi 25% Umlazi Secondary 2016-04-01 2019-03-30 Equitable Share Programme 6
Construction 1% - 7 325 730 2 700 2 700 3 000
47 Harry Gwala 25% Harry Gwala Secondary 2016-04-01 2019-03-30 Equitable Share Programme 6
Construction 1% - 8 747 2 031 2 700 2 700 3 000
48 Ugu 25% Ugu Secondary 2016-04-01 2019-03-30 Equitable Share Programme 6
7 728 4 450 2 700 2 700 3 000
Construction 1% - Education
49 Umgungundlovu 25% Umgungundlovu Primary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
9 627 6 556 2 700 2 700 3 000
Construction 1% - Education
50 Umkhanyakude 25% Umkhanyakude Primary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
6 816 4 594 2 700 2 700 3 000
Construction 1% - Education
51 Umzinyathi 25% Umzinyathi Primary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
6 816 4 594 2 700 2 700 3 000
Construction 1% - Education
52 Uthukela 25% Uthukela Primary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
10 621 8 399 2 700 2 700 3 000
Construction 1% - Education
53 Uthungulu 25% Uthungulu Primary 2016-04-01 2019-03-30 Infrastructure Grant Programme 6
Construction 1% - 12 999 9 468 2 700 2 700 3 000
54 Zululand 25% Zululand Primary 2016-04-01 2019-03-30 Equitable Share Programme 6
2 775 553 2 700 2 700 3 000

Other - Packaged Education


55 Amajuba Ongoing Project Amajuba Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 526 1 304 2 700 2 700 3 000

Other - Packaged Education


56 Ilembe Ongoing Project Ilembe Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
4 794 2 572 2 700 2 700 3 000

Other - Packaged Education


57 Pinetown Ongoing Project Pinetown Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
6 623 4 401 22 700 3 721 3 025

Other - Packaged Education


58 Umlazi Ongoing Project Umlazi Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 505 283 22 700 23 700 3 000

Other - Packaged Education


59 Harry Gwala Ongoing Project Harry Gwala Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 618 1 396 22 700 23 700 25 673

Other - Packaged Education


60 Umgungundlovu Ongoing Project Umgungundlovu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 797 575 22 700 23 700 28 175

Other - Packaged
61 Ugu Ongoing Project Ugu Primary 2016-04-01 2018-03-30 Equitable Share Programme 6
2 223 2 22 700 23 700 28 175

Other - Packaged Education


62 Uthukela Ongoing Project Uthukela Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 514 293 22 700 23 700 28 175

Other - Packaged Education


63 Umzinyathi Ongoing Project Umzinyathi Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 875 653 22 700 23 700 28 175

Other - Packaged Education


64 Uthungulu Ongoing Project Uthungulu Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
2 530 309 22 700 23 700 28 175

Other - Packaged Education


65 Umkhanyakude Ongoing Project Umkhanyakude Primary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
3 738 1 517 244 23 700 28 175

Other - Packaged Education


66 Zululand Ongoing Project Zululand Secondary 2016-04-01 2018-03-30 Infrastructure Grant Programme 6
Total Maintenance And Repairs 321 040 74 496 395 000 395 000 405 387
5. Infrastructure transfers - current
Total Infrastructure transfers - current – – – – –
6. Infrastructure transfers - capital
Total Infrastructure transfers - capital – – – – –
7. Infrastructure payments for financial assets
Total Infrastructure payments for financial assets – – – – –
8. Infrastructure leases
Total Infrastructure leases – – – – –
9. Non infrastructure 42 000 44 000 46 000
Total Non infrastructure – – 28 276 29 916 31 591
Total Education Infrastructure – 4 351 564 2 293 147 2 179 674 2 412 276

115
Annexure Table B5 – Vote 7 : Health

Table B.5: Health - Payments of infrastructure by category


MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands

1. New Infrastructure Assets


Madundube Clinic -
Kwadukuza
1 Madundube Clinic – Construct New Medium – – Equitable Share – – – 1 000 – –
(Kzn292)
Clinic

Northdale Hospital -
Msunduzi
2 Northdale Hospital – Upgrade / Replace 4 Otis – – Equitable Share – – – 77 – –
(Kzn225)
Lifts

Equipping Of Completed
3 Non-Facility Specific – Not Applicable – – Equitable Share – – – 30 000 30 000 30 000
New Facilities

Eshowe Hospital-
Umlalazi
4 Eshowe Hospital – Upgrade/Replace 4 Otis – – Hfrg – – – 81 – –
(Kzn284)
Lifts

Greytown Tb Hospital -
5 Greytown Hospital – Umvoti (Kzn245) Replace And Upgrade – – Hfrg – – – 80 – –
Generator

Greytown Hospital -
6 Greytown Hospital – Umvoti (Kzn245) Replace And Upgrade – – Hfrg – – – 325 – –
Generator

Charles Johnson Memorial -


Charles Johnson Memorial
7 – Nquthu (Kzn242) Replace And Upgrade – – Hfrg – – – 180 – –
Hospital
Generator

Church Of Scotland
8 Church Of Scotland Hospital – Msinga (Kzn244) Hospital-Replace And – – Hfrg – – – 138 – –
Upgrade Generator

Mkhuphula Clinic -
9 Mkhuphula Clinic – Msinga (Kzn244) Construction Of A Small – – Equitable Share – – – 280 – –
Clinic

Mahhehle / Ncakubana
Ubuhlebezwe
10 Mahhehle / Ncakubana Clinic – Clinic -Construct New – – Equitable Share – – – 12 000 16 000 1 638
(Kzn434)
Clinic

Mambulu Clinic (Kranskop)-


Maphumulo
11 Mambulu (Kranskop)Clinic – Construction Of A New – – Equitable Share – – – – – 3
(Kzn294)
Clinic

Montebello Hospital -
Ndwedwe Replacement Of 1 X
12 Montebello Hospital – – – Hfrg – – 370 20 –
(Kzn293) Autoclaves (400L Single
Door) Phase 4

Melmoth- New District


Mthonjaneni
13 Melmothhospital – Hospital:Development Of – – Equitable Share – – – 50 – –
(Kzn285)
Business Case

Prince Mshiyeni Hospital -


Prince Mshiyeni Memorial Replacement Of 1 X
14 – Ethekwini (Eth) – – Hfrg – – 370 20 –
Hospital Autoclaves (400L Single
Door) Phase 4

R K Khan Hospital -
Replacement Of 2 X
15 R K Khan Hospital – Ethekwini (Eth) – – Hfrg – – – 740 40 –
Autoclaves (400L Single
Door) Phase 4

Nkandla Hospital -
Nkandla Replacement Of 2 X
16 Nkandla Hospital – – – Hfrg – – – 740 40 –
(Kzn286) Autoclaves (400L Single
Door) Phase 4

Stanger Hospital -
Kwadukuza Replacement Of 1 X
17 Stanger Hospital – – – Hfrg – – – 370 20 –
(Kzn292) Autoclaves (400L Single
Door) Phase 4

Ngwelezane Hospital -
Umhlathuze Replacement Of 2 X
18 Ngwelezane Hospital – – – Hfrg – – – 740 40 –
(Kzn282) Autoclaves (400L Single
Door) Phase 4

Osindisweni Hospital -
Replacement Of 1 X
19 Osindisweni Hospital – Ethekwini (Eth) – – Hfrg – – – 370 20 –
Autoclaves (400L Single
Door) Phase 4

Ubuhlebezwe Ofafa/ Ntakama Clinic-


20 Ofafa/ Ntakama Clinic – – – Equitable Share – – – 1 000 12 000 11 500
(Kzn434) Construct New Clinic

Northdale Hospital -
Msunduzi Replacement Of 2 X
21 Northdale Hospital – – – Hfrg – – – 740 40 –
(Kzn225) Autoclaves (400L Single
Door) Phase 4

Dr Pixley Ka Isaka Seme


Dr Pixley Ka Isaka Seme
22 – Ethekwini (Eth) Memorial Hospital : New – – Hfrg – – – 512 406 410 289 361 504
Memorial Hospital
500-Bed Regional Hospital

Highway House :
Highway Houseaccommodation:
23 – Ethekwini (Eth) Replacement Of Central – – Hfrg – – – 130 130 130
Office
Plant Compressors

117
Annexure Table B5 – Vote 7 ; Health

Charles Johnson Memorial


Charles Johnson Memorial
24 – Nquthu (Kzn242) Hospital - Upgrade / – – Hfrg – – – 100 – –
Hospital
Replace 2 Schindler Lifts

Benedictine Nursing
Nongoma College-Student
25 Benedictine Nursing College – – – Hfrg – – – 497 – –
(Kzn265) Accommodation (40 Beds);
Phase 1

Highway Houseaccommodation: Highway House-


26 – Ethekwini (Eth) – – Equitable Share – – – 2 000 200 –
Office Replacement Of Two Lifts

Msunduzi Edendale Hospital Cdc


27 Edendale Hospital – – – Equitable Share – – – 1 686 – –
(Kzn225) Clinic

Addington Hospital -
Upgrade / Replace 5 Otis
28 Addington Hospital – Ethekwini (Eth) – – Hfrg – – – 691 – –
Lifts, 2 Kone Lifts And 7
Schindler Lifts

Usuthu Clinic-Replacement
Nongoma
29 Usuthu Clinic – Clinic (Completion – – Equitable Share – – – 495 – –
(Kzn265)
Contract)
Umzimkhulu Umzimkhulu Chc -
30 Umzimkhulu Chc – – – Equitable Share – – – 1 000 – –
(Kzn435) Construct New Chc
Addington Hospital -
31 Addington Hospital – Ethekwini (Eth) Installation Of A Backup – – Equitable Share – – – 1 000 – 9 500
Chiller

Gwaliweni Clinic - New


Clinic, Renovate Staff
32 Gwaliweni Clinic – Jozini (Kzn272) – – Equitable Share – – – 950 – –
Houses (Completion
Contract)

Groutville Clinic -
Kwadukuza Replacement Of Existing
33 Groutville Clinic – – – Equitable Share – – – 12 000 15 000 19 190
(Kzn292) Clinic With Xl Clinic And
Provision Of Pmtct Unit

King Dinizulu Hospital:


New Psychiatric Hospital
34 King Dinizuluhospital – Ethekwini (Eth) – – Equitable Share – – – 3 000 20 000 1 500
Phase 2 (Completion
Contract)

Jozini Chc- Construction Of


35 Jozini Chc – Jozini (Kzn272) A New Community Health – – Hfrg – – – 4 500 – –
Centre

Mpophomeni Clinic- New


Umhlabuyalingan
36 Mpophomeni Clinic – Clinic ( 3Rd Completion – – Equitable Share – – – 12 317 317 –
a (Kzn271)
Contract)

Msizini Clinic - Construction


37 Msizini Clinic – Msinga (Kzn244) – – Equitable Share – – – 313 – –
Of Small Clinic

Hibiscus Coast Murchison Hospital -


38 Murchison Hospital – – – Equitable Share – – – 1 000 2 500 –
(Kzn216) Replace Theatre A/C Plant

Ndelu Clinic -Replacement


Umzumbe
39 Ndelu Clinic – Of A New Clinic Small – – Equitable Share – – – – 1 000 5 000
(Kzn213)
Clinic With A Medium Clinic

Wentworth Hospital -
Supply And Deliver To Site
40 Wentworth Hospital – Ethekwini (Eth) – – Equitable Share – – – – – –
2 Portable Emergency
Standby Generators

Wentworth Hospital -
Replacement Of 1 X
41 Wentworth Hospital – Ethekwini (Eth) – – Hfrg – – – 370 20 –
Autoclaves (400L Single
Door) Phase 4

Vryheid Hospital-
Abaqulusi
42 Vryheid Hospital – Upgrade/Replace 2 Otis – – Hfrg – – – 47 – –
(Kzn263)
Lifts
Maphumulo Umphumulo Hospital - New
43 Umphumulo Hospital – – – Hfrg – – – 5 000 30 000 60 000
(Kzn294) Core Block

Townhill Hospital-
Msunduzi Infrastructure Offices -
44 Townhill Accommodation: Office – – – Equitable Share – – – 30 000 30 000 –
(Kzn225) Construction Of Parkhome
Offices

Townhill Hospital -
Msunduzi Installation Of A New
45 Townhill Hospital – – – Equitable Share – – – – – –
(Kzn225) Emergency Power
Generator

Thathezakhe Clinic - New


46 Thathezakhe Clinic – Nquthu (Kzn242) – – Equitable Share – – – – – –
Clinic

Stanger Hospital-
Kwadukuza Replacement Of
47 Stanger Hospital – – – Equitable Share – – – 7 400 313 –
(Kzn292) Theatre/Wards Chillers-
Completion Project

118
Annexure Table B5 – Vote 7 : Health

Stanger Hospital - Upgrade


Kwadukuza
48 Stanger Hospital – / Replace 1 Otis Lifts And 1 – – Equitable Share – – – 127 – –
(Kzn292)
Hoist

Ngwelezane Hospital: 192


Umhlathuze
49 Ngwelezanehospital – Bed Ward Block - Surgical – – Hfrg – – – 50 000 58 879 –
(Kzn282)
Wards

Ngwelezane Hospital: New


8-Theatre Block, New
Umhlathuze
50 Ngwelezanehospital – Entrance, Parking And – – Hfrg – – – 5 000 20 000 100 000
(Kzn282)
Upgrade Of Sewer/ Water
Services

Stanger Hospital - New


Kwadukuza
51 Stanger Hospital – Labour And Neo Natal – – Hfrg – – – 4 599 – –
(Kzn292)
Wards

Estcourt Hospital -
Umtshezi Replacement Of 1 X
52 Estcourt Hospital – – – Hfrg – – – 370 20 –
(Kzn234) Autoclaves (400L Single
Door) Phase 4

Ngabayena Clinic -
53 Ngabayena Clinic – Msinga (Kzn244) – – Equitable Share – – – 299 – –
Construction A Small Clinic

Rk Khan Hospital -
54 R K Khan Hospital – Ethekwini (Eth) Replacement Of 4 Lifts : – – Equitable Share – – – 141 – –
Nurses Residents

Kwamagwaza Hospital -
Mthonjaneni Replacement Of 2 X
55 St Mary Kwamagwaza Hospital – – – Hfrg – – – 740 40 –
(Kzn285) Autoclaves (400L Single
Door) Phase 4

Ekombe Hospital -
Replacement Of 2 X 400L
Nkandla
56 Ekhombe Hospital – Single Door Autoclaves – – Hfrg – – – 740 40 –
(Kzn286)
(400L Single Door) Phase
4

King Edward Viii Hospital -


57 King Edward Viii Hospital – Ethekwini (Eth) Replacement Of 1 X – – Hfrg – – – 370 20 –
Autoclaves - Phase 4

King Dinizulu Hospital:


58 King Dinizuluhospital – Ethekwini (Eth) New Tb Complex – – Hfrg – – – 3 000 19 000 9 000
(Completion Contract)
King Dinizulu Hospital:
59 King Dinizuluhospital – Ethekwini (Eth) – – Hfrg – – – 680 – –
New Helistop

Dr Pixley Ka Isaka Seme


Dr Pixley Ka Isaka Seme
60 – Ethekwini (Eth) Memorial Hospital : Bridge – – Hfrg – – – 1 134 1 134 1 134
Memorialhospital
City Levy

Christ The King Hospital -


Ubuhlebezwe Replacement Of 1 X
61 Christ The King Hospital – – – Hfrg – – – 370 20 –
(Kzn434) Autoclave (400L Single
Door) Phase 4

Mayor'S Walk Cps Msunduzi Mayor'S Walk Cps -


62 – – – Equitable Share – – – 132 – –
Accommodation: Office (Kzn225) Upgrade / Replace 1 Hoist

Clairwood Hospital -
Replacement Of 1 X
63 Clairwood Hospital – Ethekwini (Eth) – – Hfrg – – – – 380 20
Autoclaves (400L Single
Door) Phase 5

Estcourt Hospital -
Replacement Of 1 X
64 Estcourt Hospital – Uthukela – – Hfrg – – – – 380 20
Autoclaves (400L Single
Door) Phase 5

Hillcrest Hospital -
Replacement Of 1 X
65 Hillcrest Hospital – Ethekwini (Eth) – – Hfrg – – – – 380 20
Autoclaves (160L Single
Door) Phase 5

King Edward Viii Hospital -


Replacement Of 1 X
66 King Edward Viii Hospital – Ethekwini (Eth) – – Hfrg – – – – 380 20
Autoclaves (400L Single
Door) Phase 5

Madadeni Hospital -
Replacement Of 2 X
67 Madadeni Hospital – Amajuba – – Hfrg – – – – 760 40
Autoclaves (400L Single
Door) Phase 5

Northdale Hospital -
Replacement Of 3 X
68 Northdale Hospital – Umgungundlovu – – Hfrg – – – – 1 140 60
Autoclaves (400L Single
Door) Phase 5

Gj Crookes Hospital -
Replacement Of 2 X
69 G J Crookes Hospital – Ethekwini (Eth) – – Hfrg – – – – 760 40
Autoclaves (400L Single
Door) Phase 5

119
Annexure Table B5 – Vote 7 ; Health

Rk Khan Hospital -
Replacement Of 1 X
70 R K Khan Hospital – Ethekwini (Eth) – – Hfrg – – – – 380 20
Autoclaves (400L Single
Door) Phase 5

St Appolinaris Hospital -
Replacement Of 2 X
71 St Appolinaris Hospital – Harry Gwala – – Hfrg – – – – 760 40
Autoclaves (400L Single
Door) Phase 5

Stanger Hospital -
Replacement Of 1 X
72 Stanger Hospital – Ilembe – – Hfrg – – – – 380 20
Autoclaves (400L Single
Door) Phase 5

Addington Hospital -
Replacement Of 1 X
73 Addington Hospital – Ethekwini (Eth) – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Christ The King Hospital -


Replacement Of 1 X
74 Christ The King Hospital – Harry Gwala – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Lower Umfolozi War


Memorial Hospital -
Lower Umfolozi War Memorial
75 – Uthungulu Replacement Of 1 X – – Hfrg – – – – – 380
Hospital
Autoclave (400L Single
Door) Phase 6

Ngwelezane Hospital -
Replacement Of 2 X
76 Ngwelezane Hospital – Uthungulu – – Hfrg – – – – – 760
Autoclaves (400L Single
Door) Phase 6

Niemeyer Hospital -
Replacement Of 1 X
77 Niemeyer Hospital – Amajuba – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

St Andrew'S Hospital -
Replacement Of 1 X
78 St Andrew'S Hospital – Ugu – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Sundumbili Chc -
Replacement Of 1 X
79 Sundumbili Chc – Ilembe – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Untunjambili Hospital -
Replacement Of 1 X
80 Untunjambili Hospital – Ilembe – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Vryheid Hospital -
Abaqulusi Replacement Of 1 X
81 Vryheid Hospital – – – Hfrg – – – – – 380
(Kzn263) Autoclave (400L Single
Door) Phase 6

Hlathi Dam Clinic:


82 Hlathi Dam Clinic – Nquthu (Kzn242) Replacement Of Existing – – Equitable Share – – – 1 200 72 –
Sewer System

Nondweni Clinic -
83 Nondweni Clinic – Nquthu (Kzn242) Replacing Of Existing – – Equitable Share – – – 1 457 – –
Sewer System

Ethembeni Clinic:
84 Ethembeni Clinic – Msinga (Kzn244) Replacement Of Existing – – Equitable Share – – – 1 036 – –
Sewer System

Douglas Clinic - Replacing


85 Douglas Clinic – Msinga (Kzn244) – – Equitable Share – – – 1 431 – –
Of Existing Sewer System

Rorke'S Drift Clinic:


Endumeni
86 Rorke'S Drift Clinic – Replacement Of Existing – – Equitable Share – – – 1 033 – –
(Kzn241)
Sewer System

Mandleni Clinic - Replacing


87 Mandleni Clinic – Msinga (Kzn244) – – Equitable Share – – – 1 431 – –
Of Existing Sewer System

Collessie Clinic:
88 Collessie Clinic – Msinga (Kzn244) Replacement Of Existing – – Equitable Share – – – 1 121 – –
Sewer System

Mazabeko - Replacing Of
89 Mazabeko Clinic – Msinga (Kzn244) – – Equitable Share – – – 1 595 – –
Existing Sewer System

Eshane Clinic:
90 Eshane Clinic – Umvoti (Kzn245) Replacement Of Existing – – Equitable Share – – – 1 312 – –
Sewer System

Newcastle Hospital -
Newcastle
91 Newcastle Hospital – Installation Of Nicu Hvac – – Equitable Share – – – 500 – –
(Kzn252)
System

120
Annexure Table B5 – Vote 7 : Health

Rk Khan Hospital -
Replacement Of 1 X
70 R K Khan Hospital – Ethekwini (Eth) – – Hfrg – – – – 380 20
Autoclaves (400L Single
Door) Phase 5

St Appolinaris Hospital -
Replacement Of 2 X
71 St Appolinaris Hospital – Harry Gwala – – Hfrg – – – – 760 40
Autoclaves (400L Single
Door) Phase 5

Stanger Hospital -
Replacement Of 1 X
72 Stanger Hospital – Ilembe – – Hfrg – – – – 380 20
Autoclaves (400L Single
Door) Phase 5

Addington Hospital -
Replacement Of 1 X
73 Addington Hospital – Ethekwini (Eth) – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Christ The King Hospital -


Replacement Of 1 X
74 Christ The King Hospital – Harry Gwala – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Lower Umfolozi War


Memorial Hospital -
Lower Umfolozi War Memorial
75 – Uthungulu Replacement Of 1 X – – Hfrg – – – – – 380
Hospital
Autoclave (400L Single
Door) Phase 6

Ngwelezane Hospital -
Replacement Of 2 X
76 Ngwelezane Hospital – Uthungulu – – Hfrg – – – – – 760
Autoclaves (400L Single
Door) Phase 6

Niemeyer Hospital -
Replacement Of 1 X
77 Niemeyer Hospital – Amajuba – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

St Andrew'S Hospital -
Replacement Of 1 X
78 St Andrew'S Hospital – Ugu – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Sundumbili Chc -
Replacement Of 1 X
79 Sundumbili Chc – Ilembe – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Untunjambili Hospital -
Replacement Of 1 X
80 Untunjambili Hospital – Ilembe – – Hfrg – – – – – 380
Autoclave (400L Single
Door) Phase 6

Vryheid Hospital -
Abaqulusi Replacement Of 1 X
81 Vryheid Hospital – – – Hfrg – – – – – 380
(Kzn263) Autoclave (400L Single
Door) Phase 6

Hlathi Dam Clinic:


82 Hlathi Dam Clinic – Nquthu (Kzn242) Replacement Of Existing – – Equitable Share – – – 1 200 72 –
Sewer System

Nondweni Clinic -
83 Nondweni Clinic – Nquthu (Kzn242) Replacing Of Existing – – Equitable Share – – – 1 457 – –
Sewer System

Ethembeni Clinic:
84 Ethembeni Clinic – Msinga (Kzn244) Replacement Of Existing – – Equitable Share – – – 1 036 – –
Sewer System

Douglas Clinic - Replacing


85 Douglas Clinic – Msinga (Kzn244) – – Equitable Share – – – 1 431 – –
Of Existing Sewer System

Rorke'S Drift Clinic:


Endumeni
86 Rorke'S Drift Clinic – Replacement Of Existing – – Equitable Share – – – 1 033 – –
(Kzn241)
Sewer System

Mandleni Clinic - Replacing


87 Mandleni Clinic – Msinga (Kzn244) – – Equitable Share – – – 1 431 – –
Of Existing Sewer System

Collessie Clinic:
88 Collessie Clinic – Msinga (Kzn244) Replacement Of Existing – – Equitable Share – – – 1 121 – –
Sewer System

Mazabeko - Replacing Of
89 Mazabeko Clinic – Msinga (Kzn244) – – Equitable Share – – – 1 595 – –
Existing Sewer System

Eshane Clinic:
90 Eshane Clinic – Umvoti (Kzn245) Replacement Of Existing – – Equitable Share – – – 1 312 – –
Sewer System

Newcastle Hospital -
Newcastle
91 Newcastle Hospital – Installation Of Nicu Hvac – – Equitable Share – – – 500 – –
(Kzn252)
System

121
Annexure Table B5 – Vote 7 ; Health

Umhlathuze Ngwelezane Hospital-


3 Ngwelezane Hospital – – – Equitable Share – – – 4 000 15 500 855
(Kzn282) Security Upgrade

Sokhela Clinic- Clinic


Expansion To Include Hast
4 Sokhela Clinic – Ingwe (Kzn431) – – Equitable Share – – – – – –
Unit And Midwife Obstetric
Unit

Manguzi Hospital -
Umhlabuyalingan Upgrading Of Electrical
5 Manguzi Hospital – – – Equitable Share – – – 630 – –
a (Kzn271) Reticulation For Laundry &
Staff Accomodation

Edendale Hospital-
Completion Contract For
Msunduzi
6 Edendale Hospital – Conversion From Steam – – Hfrg – – – 17 – –
(Kzn225)
To Electrical And 7 Air
Handling Uni

Edendale Hospital
Msunduzi
7 Edendale Hospital – Alterations And Addititionns – – Equitable Share – – – 5 822 – –
(Kzn225)
To (A & E) And Opd

Cwaka Clinic: Additions &


8 Cwaka Clinic – Msinga (Kzn244) – – Equitable Share – – – 5 000 10 000 800
Upgrades To Existing Clinic

Kwamagwaza Hospital -
Mthonjaneni Construction Of New
9 St Mary Kwamagwaza Hospital – – – Equitable Share – – – – – –
(Kzn285) Pharmacy - Completion
Contract - Building Works

Bruntville Chc-Construction
Mpofana Of A Shelteres Pathways
10 Bruntville Chc – – – Equitable Share – – – – – –
(Kzn223) And Install Ramps. New
Dinspensary Dispathing Ro

Kwamagwaza Hospital -
Mthonjaneni Construction Of New
11 St Mary Kwamagwaza Hospital – – – Equitable Share – – – – – –
(Kzn285) Pharmacy - Completion
Contract - Electrical Works

Kwamagwaza Hospital -
Construction Of New
Mthonjaneni
12 St Mary Kwamagwaza Hospital – Pharmacy - Completion – – Equitable Share – – – – – –
(Kzn285)
Contract - Mechanical
Works

Kwazulu Provincial Central


Kwazulu-Natal Provincial Central
13 – Ethekwini (Eth) Laundry: Install High – – Equitable Share – – – 5 000 – –
Laundrylaundry
Security Fencing & Cctv

Inanda C Chc - Additions


14 Inanda C Chc – Ethekwini (Eth) And Alterations To – – Equitable Share – – – – – –
Administration Block

King Dinuzulu Hospital:


15 King Dinizuluhospital – Ethekwini (Eth) A/C To Tb Multi-Storey – – Equitable Share – – – – – –
Building

St Mary Kwamagwaza
Mthonjaneni Hospital-New Pharmacy
16 St Mary Kwamagwaza Hospital – – – Equitable Share – – – 25 – –
(Kzn285) Completion Contract-
Building Works

R K Khan Hospital -
17 R K Khan Hospital – Ethekwini (Eth) – – Equitable Share – – – – – –
Completion Of P Block

Wentworth Hospital -
Investigate And Implement
18 Wentworth Hospital – Ethekwini (Eth) – – Equitable Share – – – – – –
Requirements For Fire And
Emergency Services

Newcastle Hospital -
Newcastle
19 Newcastle Hospital – Construction Of A New – – Equitable Share – – – – – –
(Kzn252)
Pharmacy & Physio Dept

King Dinuzulu Hospital -


20 King Dinizuluhospital – Ethekwini (Eth) Upgrade Psych Closed – – Equitable Share – – – – – –
Unit And Moth Hall

Dundee Hospital:
Endumeni
21 Dundeehospital – Assessment And Upgrade – – Equitable Share – – – 1 000 – –
(Kzn241)
Of Air-Conditioning System

Hlabisa Hospital- Upgrade


22 Hlabisa Hospital – Hlabisa (Kzn274) – – Hfrg – – – 20 323 15 000 60 000
Opd

122
Annexure Table B5 – Vote 7 : Health

St Aidans Hospital:
Assesment And Upgrading
23 St Aidanshospital – Ethekwini (Eth) – – Equitable Share – – – 1 000 – –
Of The Central
Airconditioning System

St Aidans Hospital -
24 St Aidans Hospital – Ethekwini (Eth) Replace Collapsing – – Equitable Share – – – 650 – –
Boundary Wall

Emnambithi/Lady Ladysmith Hospital: Water


25 Ladysmithhospital – – – Equitable Share – – – 300 700 –
smith (Kzn232) Storage Upgrade

King Edward Viii Hospital -


26 King Edward Viii Hospital – Ethekwini (Eth) – – Hfrg – – – 18 000 18 000 10 000
Upgrade Nursery

King Edward Viii Hospital-


27 King Edward Viii Hospital – Ethekwini (Eth) – – Hfrg – – – 1 958 – –
Upgrade Family Clinic

Addington Hospital:
28 Addingtonhospital – Ethekwini (Eth) – – Equitable Share – – – 1 000 – –
Investigation Of Services

Newtown A Chc:
29 Newtown A Chc – Ethekwini (Eth) Replacement Of Retaining – – Equitable Share – – – 510 40 –
Wall And Security Fence.

Kwazulu-Natal Central
Kwazulu-Natal Central Provincial Provincial Laundry - 3 Yrs
30 – Ethekwini (Eth) – – Equitable Share – – – 5 000 5 500 –
Laundry Laundry Facilities Management
Contract

Edendale Hospital:
Msunduzi Professional Fees For
31 Edendalehospital – – – Equitable Share – – – 5 525 – –
(Kzn225) Priority Maintenance
Implemented By Ndoh
32 2016/17 – 0 Upgrading – – 0 – – – – – –
33 2015/16 – 0 Upgrading – – 0 – – – – – –
Total Upgrades And Additions 84 060 81 740 121 655
3. Refurbishment And Rehabilitation
Osindisweni Hospital -
1 Osindisweni Hospital – Ethekwini (Eth) Repairs & Renovations - – – Equitable Share – – – 20 000 30 000 30 000
Tb Ward

King Edward Viii Hospital-


2 King Edward Viii Hospital – Ethekwini (Eth) – – Equitable Share – – – – – –
Renovations To Mopd

Ex- Boys Model-School:


Major Repairs And
Ex Boys Model Msunduzi
3 – Renovations_Conversions – – Equitable Share – – – 1 673 – –
Schoolaccommodation: Office (Kzn225)
Of Existing Building To
Offices And

Msunduzi Greys Hospital - M2 To


4 Grey'S Hospital – – – Equitable Share – – – – – –
(Kzn225) Nicu

Natalia Building - Relocate


Ems Provincial Health
Natalia Building Accommodation: Msunduzi
5 – Operational Centre From – – Equitable Share – – – 3 500 – –
Office (Kzn225)
16Th Floor To Ground
Floor

G J Crookes Hospital -
Upgrade The Roof And
6 G J Crookes Hospital – Umdoni (Kzn212) – – Equitable Share – – – – – –
Plumbing In Maternity
Ward

St Apolinaries Hospital -
Reconfigure Existing
7 St Appolinaris Hospital – Ingwe (Kzn431) – – Equitable Share – – – – – –
Building To Provide For
Neotal Nursary

Fort Napier Hospital-


Renovations To Peter De
Msunduzi
8 Fort Napier Hospital – Vos Building Nurses – – Equitable Share – – – 500 – –
(Kzn225)
Residence, Ward 3,
Forensic Ward, D

Northdale Hospital -Nurses


Msunduzi
9 Northdale Hospital – Home Rooms & Convert – – Equitable Share – – – 10 000 40 000 14 900
(Kzn225)
Into Flatlets

Vryheid Hospital-
Abaqulusi Reconfigure Existing
10 Vryheid Hospital – – – Equitable Share – – – 950 – –
(Kzn263) Building To Provide For A
Neonatal Nursary

Mbongolwane Hospital-
Umlalazi
11 Mbongolwane Hospital – R&R And Additions To – – Equitable Share – – – – – –
(Kzn284)
Staff Accomodation

123
Annexure Table B5 – Vote 7 ; Health

Greytown Tb Hospital -
12 Greytown Hospital – Umvoti (Kzn245) Extractor Fans At Male Tb – – Equitable Share – – – 1 000 – –
Ward X6

King Edward Viii Hospital-


13 King Edward Viii Hospital – Ethekwini (Eth) – – Equitable Share – – – 30 000 12 898 2 392
Storm Water Unblocking

King Dinuzulu Hospital:


14 King Dinizuluhospital – Ethekwini (Eth) Additional Works To Level – – Equitable Share – – – – – –
1 Hospital

Nkonjeni Hospital-Build A
15 Nkonjeni Hospital – Ulundi (Kzn266) New Neonatal Facility & – – Equitable Share – – – 950 – –
Renovate Existing

Port Shepstone Hospital:


Hibiscus Coast
16 Port Shepstonehospital – Multi Core – – Equitable Share – – – – – –
(Kzn216)
Block(Completion Contract)

Townhill Hospital - Storm


Msunduzi Damage Repairs To
17 Townhill Hospital – – – Equitable Share – – – – – –
(Kzn225) Hospital Facilities And
Accommodation

Cato Manor Regional


Cato Manor Regional Laundry Laundry - Reseal And
18 – Ethekwini (Eth) – – Equitable Share – – – 200 – –
Laundry Waterproof Flat Roof And
Skylights

Endumeni Dundee Hospital - Rtc &


19 Dundee Hospital – – – Equitable Share – – – 1 000 – –
(Kzn241) Mmc

Rk Khan Hospital - Repairs


20 R K Khan Hospital – Ethekwini (Eth) And Waterproofing To Flat – – Equitable Share – – – 450 – –
Roof Over Physio Dept.

Mccord Hospital -
21 Mccord Hospital – Ethekwini (Eth) Renovations To Doctors – – Equitable Share – – – 2 000 3 190 –
Residence And Rtc

Mccord Hospital -
Refurbishment Of
22 Mccord Hospital – Ethekwini (Eth) – – Equitable Share – – – – 2 000 3 000
Abandoned Admin Block
Floors (1St & 2Nd Floors)

Kwazulu Provincial Central


Kwazulu Provincial Central Laundry -Repair To Leak
23 – Ethekwini (Eth) – – Equitable Share – – – 820 – –
Laundry Laundry Roof Of Maternity &
Laundry Works

Hibiscus Coast Gcilima Clinic-Completion


24 Gcilima Clinic – – – Equitable Share – – – 35 – –
(Kzn216) Contract To The Clinic

Madadeni Hospital-
(Amajuba Maintenance
Newcastle
25 Madadeni Hospital – Programme) - Various – – Hfrg – – – 2 780 – –
(Kzn252)
Buildings Including
Electrical Installation

King Dinuzulu: Springfield


King Dinuzulu: Springfield Staff
Staff Accommodation:
26 Accommodationaccommodation: – Ethekwini (Eth) – – Equitable Share – – – – – –
Renovate Staff
Residential
Accommodation

Charles Johnson Memorial Charles Johnson Memorial -


27 – Nquthu (Kzn242) – – Equitable Share – – – 7 851 – –
Hospital Nursing College (Phase 2)

Umlalazi Catherine Booth Hospital-


28 Catherine Booth Hospital – – – Equitable Share – – – – – –
(Kzn284) Refurbish Existing Wards

Ekuhlengeni Psychiatric
Hospital - Rehabilitation Of
29 Ekuhlengeni Hospital – Ethekwini (Eth) Existing Borehole & – – Equitable Share – – – 500 – –
Refurbish/Replace Water
Res

King Dinizulu Hospital:


30 King Dinizuluhospital – Ethekwini (Eth) Infrastructure Maintenance – – Equitable Share – – – – – –
Hub In Ethekwini

King Dinizulu Hospital:


31 King Dinizuluhospital – Ethekwini (Eth) Repairs To Existing Water – – Equitable Share – – – 500 – –
Reservoir & Tower

Newcaslte Hospital-
Amajuba Maintenance
Newcastle
32 Newcastle Hospital – Programme (Nwchspt) - – – Equitable Share – – – 13 000 25 000 20 000
(Kzn252)
Various Buildings And
Electrical Installation

124
Annexure Table B5 – Vote 7 : Health

Kwamashu Chc - Attend To


33 Kwamashu Chc – Ethekwini (Eth) – – Equitable Share – – – 300 – –
Latent Defects

Prince Mshiyeni Memorial


Prince Mshiyeni Memorial
34 – Ethekwini (Eth) Hospital - Refurbishment – – Equitable Share – – – 850 150 –
Hospital
Of Water Reservoir

Ulundi Residential
Ulundi Residential Accommodation -
35 Accommodation Accommodation: – Ulundi (Kzn266) Renovations To 7 X 3 – – Equitable Share – – – 1 100 – –
Residential Bedrooms House With
Double Garages

36 2016/17 – 0 Rehabilitation – – 0 – – – – – –

National Core Standards


Compliance: Renovations
Based On Condition
37 Kzn Whole Provice – 0 – – 0 – – – – – –
Assessment For National
Core Standards
Compliance

38 2015/16 – 0 Rehabilitation – – 0 – – – – – –

National Core Standards


Compliance: Renovations
Based On Condition
39 Kzn Whole Provice – 0 – – 0 – – – – – 60 000
Assessment For National
Core Standards
Compliance

Total Refurbishment And Rehabilitation – 99 958 113 238 130 292


4. Maintenance And Repairs

Institutional Maintenance:
1 Non-Facility Specific – Not Applicable – – Hfrg – – – 8 000 8 200 8 500
Amajuba District

Institutional Maintenance:
2 Non-Facility Specific – Not Applicable – – Hfrg – – – 29 000 29 000 33 000
Zululand District

Institutional Maintenance:
3 Non-Facility Specific – Not Applicable – – Hfrg – – – 32 000 32 000 40 000
Uthungulu District

Institutional Maintenance:
4 Non-Facility Specific – Not Applicable – – Hfrg – – – 12 000 12 000 15 000
Uthukela District

Institutional Maintenance:
5 Non-Facility Specific – Not Applicable – – Hfrg – – – 15 000 15 000 18 000
Umzinyathi District

Institutional Maintenance:
6 Non-Facility Specific – Not Applicable – – Hfrg – – – 39 000 39 000 58 000
Umgungundlovu District

Institutional Maintenance:
7 Non-Facility Specific – Not Applicable – – Hfrg – – – 29 000 29 000 32 000
Ugu District

Institutional Maintenance:
8 Non-Facility Specific – Not Applicable – – Hfrg – – – 11 000 12 000 20 000
Harry Gwala District

Institutional Maintenance:
9 Non-Facility Specific – Not Applicable – – Hfrg – – – 9 000 10 000 11 000
Ilembe District

Institutional Maintenance:
10 Non-Facility Specific – Not Applicable – – Hfrg – – – 3 000 3 000 3 000
Head Office

Institutional Maintenance:
11 Non-Facility Specific – Not Applicable – – Hfrg – – – 134 134 126 899 126 113
Ethekwini District

Institutional Maintenance:
12 Non-Facility Specific – Not Applicable – – Hfrg – – – 20 000 20 000 20 000
Umkhanyakude District

Radio Repeater High Sites


Throughout Kzn:
13 Non-Facility Specific – Not Applicable – – Equitable Share – – – 6 380 7 018 7 720
Maintenance And Licence
Fees
14 2016/17 – – Maintenance – – 0 – – – – – –
15 2015/16 – – Maintenance – – 0 – – – – – –
Total Maintenance And Repairs 347 514 343 117 392 333
8. Infrastructure Leases
Office And Residential
1 Non-Facility Specific – Not Applicable Accommodation Lease – – Equitable Share – – – 100 000 60 000 70 365
Agreements 2016/17
2 2015/16 – – Leases Of Buildings – – 0 – – – – – –
3 2016/17 – – Leases Of Buildings – – 0 – – – – – –
Total Infrastructure Leases 100 000 60 000 70 365
9. Non Infrastructure

Bethesda Hospital-Replace
1 Bethesda Hospital – Jozini (Kzn272) & Install 1 X 300 Kva With – – Equitable Share – – – 362 – –
Larger Unit

125
Annexure Table B5 – Vote 7 ; Health

Phoenix Rehabilitation
2 Phoenix Rehabilitation Centre – Ethekwini (Eth) Centre - Emergency Power – – Hfrg – – – 50 – –
Generator 1X100Kva

Phoenix Chc -
Replacement Of
3 Phoenix Chc – Ethekwini (Eth) Emergency Power – – Hfrg – – – 75 – –
Generators 1X200Kva With
Larger Unit

Montebello Hosptal -
Ndwedwe
4 Montebello Hospital – Replace And Install 1 X – – Hfrg – – – 1 000 – –
(Kzn293)
300Kva With Larger Unit

Osindisweni Hospital -
5 Osindisweni Hospital – Ethekwini (Eth) Replace And Install 1 X – – Hfrg – – – 1 000 – –
200Kva With Larger Unit

Hillcrest Hospital - Replace


6 Hillcrest Hospital – Ethekwini (Eth) And Install 1 X 200Kva – – Hfrg – – – 80 – –
With Larger Unit

Essential Health
7 Non-Facility Specific – Not Applicable Technology Equipment – – Equitable Share – – – 192 518 294 519 289 257
Programme

Dunstan Farrell -
Replacement Of
Hibiscus Coast
8 Dunstan Farrell Hospital – Emergency Power – – Hfrg – – – 70 – –
(Kzn216)
Generators 1X100 Kva
With Larger Unit

Eg & Usher Memorial


Greater Kokstad Hospital - Replace And
9 Eg & Usher Memorial Hospital – – – Hfrg – – – 68 – –
(Kzn433) Install 1 X 500Kva With
Larger Unit

Catherine Booth Hospital-


Umlalazi
10 Catherine Booth Hospital – Replace & Install 1 X – – Hfrg – – – 139 – –
(Kzn284)
200Kva With Larger Unit

Appelsboch Hospital -
Umshwathi
11 Appelsboch Hospital – Replace And Install 1 X – – Hfrg – – – 95 – –
(Kzn221)
300Kva With Larger Unit

Clairwood Hospital -
12 Clairwood Hospital – Ethekwini (Eth) Replacement Of 1 X 400 – – Equitable Share – – – 337 – –
Kva Generator Set

Addington Hospital -
13 Addington Hospital – Ethekwini (Eth) Replace And Install 1 X – – Hfrg – – – 200 – –
500 Kva With Larger Unit

Compensation Of Epwp: Maintenance Of


14 Non-Facility Specific – – – Epwp – – – 8 400 9 000 10 000
Employees Gardens/Grounds

Mseleni Hospital- Replace


Umhlabuyalingan
15 Mseleni Hospital – 1 X 250 Kva Generator – – Equitable Share – – – 515 – –
a (Kzn271)
With Larger Unit

Umzimkhulu Hospital -
Umzimkhulu
16 Umzimkhulu Hospital – Replace And Install 1 X – – Hfrg – – – 308 – –
(Kzn435)
100 Kva With A Large Unit

Umphumulo Hospital -
Maphumulo Replacement Of
17 Umphumulo Hospital – – – Hfrg – – – 240 – –
(Kzn294) Emergency Power
Generators 1X300Kva

Tongaat Chc - Replace


18 Tongaat Chc – Ethekwini (Eth) And Install 1 X 100Kva – – Hfrg – – – 160 – –
With Larger Unit

St Andrews Hospital -
Umuziwabantu
19 St Andrew'S Hospital – Replace And Install 1 X – – Hfrg – – – 110 – –
(Kzn214)
300Kva With Larger Unit

Msunduzi Imbalenhle Chc-Install 1 X


20 Imbalenhle Chc – – – Equitable Share – – – 304 – –
(Kzn225) 200 Kva With Larger Units

Hlabisa Hospital -Replace


21 Hlabisa Hospital – Hlabisa (Kzn274) And Install 1 X 500 Kva – – Equitable Share – – – 318 – –
With Larger Unit

Greytown Hospital -
Completion Contract
22 Greytown Hospital – Umvoti (Kzn245) (044023): Installation Of – – Equitable Share – – – 400 – –
Surveillance Equipment In
Seclussion

Epwp: Maintenance Of
Compensation Of
23 Non-Facility Specific – Gardens/Grounds- – – Equitable Share – – – 20 000 20 000 19 000
Employees
Equitable Share

126
Annexure Table B5 – Vote 7 : Health

Compensation Of Idms Posts-Programme


24 Non-Facility Related – – – Hfrg – – – 23 000 25 000 27 000
Employees Management

Dundee Regional Laundry -


Dundee Regional Laundry Endumeni Upgrade The Regional
25 – – – Equitable Share – – – 30 000 7 500 38 250
Laundry (Kzn241) Laundry: Buildings And
Equipment

26 2015/16 – – C.O.E – – – – – – – – –
27 2015/16 – – Equipment – – – – – – – – –
28 2016/17 – – Equipment – – – – – – – – –
Total Non Infrastructure 279 748 356 019 383 507
Total Health Infrastructure 1 657 528 1 684 848 1 891 350

127
Vote 8 : Human Settlements

Table B.5: Human Settlements - Payments Of Infrastructure By Category


MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands

1. New Infrastructure Assets

Parks , Creche Facilities ,


Housing
1 Social And Economic Amentites Various Ethekwini Taxi Ranks And – – Hsdg – – 22 026 – –
Development
Community Halls: Etc

Total New Infrastructure Assets 22 026 – –


6. Infrastructure Transfers - Capital
Housing
1 Cru Programme Various Ethekwini Hostels – – Hsdg – – 69 000 85 000 85 000
Development
Housing
2 Accreditation Of Municipalities Various Various Tranfers To Municipalities Ongoing Ongoing Hsdg – – 55 210 55 210 55 210
Development
Total Infrastructure Transfers - Capital 124 210 140 210 140 210
8. Infrastructure Leases
Corporate
1 Leases Of Office Accommodation N/A Various Leases Of Buildings Ongoing Ongoing Equitable Share – – 21 462 21 777 23 419
Services
Total Infrastructure Leases 21 462 21 777 23 419
Total Human Settlements Infrastructure 167 698 161 987 163 629

129
Vote 10 : Sports and Recreation

Table B.5: Sport, Recreation, Arts And Culture - Payments of infrastructure by category
MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands
1. New infrastructure assets
Mbongolwane/Mavumengwane – Sport and – – – –
1
Sportsfield Construction Umlalazi Sportfield 01/04/2016 31/03/2017 Recreation
– Sport and – – – –
2
Thokothe/Gcilima Sportsfield Construction Hibiscus Coast Sportfield 01/04/2016 31/03/2017 Recreation
– Sport and – 3 086 1 360 –
3
Kwa-Mashu Bowling Club Construction Ethekwini Sportfield 01/04/2016 31/03/2017 Recreation
– Sport and – 3 000 – –
4
Zondi Store Sportsfield Construction Umsunduzi Sportfield 01/04/2016 31/03/2017 Recreation
– Sport and – 3 000 – –
5
Matimatolo Sportsfield Construction Umvoti Sportfield 01/04/2016 31/03/2017 Recreation
– Sport and – 872 909 920
6
Amajuba Construction Amajuba Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 872 909 920
7
Harry Gwala Construction Harry Gwala Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 872 909 920
8
Ilembe Construction Ilembe Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 873 909 920
9
Ugu Construction Ugu Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 873 909 920
10
Umgungundlovu Construction Umgungundlovu Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 873 909 920
11
Umzinyathi Construction Umzinyathi Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 873 909 920
12
Umkhanyakude Construction Umkhanyakude Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 873 909 920
13
Uthukela Construction Uthukela Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 873 909 920
14
Uthungulu Construction Uthungulu Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 873 909 920
15
Ethekwini Construction Ethekwini Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 873 909 920
16
Zululand Construction Zululand Outdoor Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
17
Gcotoi Kick-Abut Construction Umvoti Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
18
Maphumulo Kick-About Construction Maphumulo Kick-About 01/04/2016 31/03/2017 Recreation
Nositha Primary School Kick- – Sport and – 150 150 150
19
About Construction Hibiscus Coast Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
20
Noshezi Kick-About Construction Umsunduzi Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
21
Ward 1 Kick-About Construction Abaqulusi Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
22
Emboyi Kick-About Construction Mkhambathini Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
23
Tholakele Kick-About Construction Edumbe Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
24
Empikiswaneni Kick-About Construction Ulundi Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
25
Kwamzwezwe Kick-About Construction Abaqulusi Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
26
Springlake Kick-About Construction Nquthu Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – 150 150 150
27
Kwagama Stand Kick-About Construction Newcastle Kick-About 01/04/2016 31/03/2017 Recreation
– Sport and – – – –
28
Enseleni Kick-About Construction Umhlathuze Kick-About 01/04/2016 31/03/2017 Recreation
Khanyakhwezi Primary School – Sport and – 350 350 350
29
Combo Court Construction Ethekwini Combo Court 01/04/2016 31/03/2017 Recreation
Mount Currie School Combo – Sport and – 350 350 350
30
Court Construction Greater Kokstad Combo Court 01/04/2016 31/03/2017 Recreation
Vryheid Comprehensive Combo – Sport and – 350 350 350
31
Court Construction Abaqulusi Combo Court 01/04/2016 31/03/2017 Recreation
– Sport and – 350 350 350
32
Isilutshana Primary Combo Court Construction Nquthu Combo Court 01/04/2016 31/03/2017 Recreation
Umsunduze Primary Combo – Sport and – 350 350 350
33
Court Construction Ndwedwe Combo Court 01/04/2016 31/03/2017 Recreation
Amancamakazana School Combo – Sport and – 350 350 350
34
Court Construction Indaka Combo Court 01/04/2016 31/03/2017 Recreation
Gula Primary School Combo – Sport and – 350 350 350
35
Court Construction Big 5 False Bay Combo Court 01/04/2016 31/03/2017 Recreation
Sizimeleni Combined School – Sport and – 350 350 350
36
Combo Court Construction Umtshezi Combo Court 01/04/2016 31/03/2017 Recreation
Harding Full Service School – Sport and – 350 350 350
37
Combo Court Construction Umuziwabantu Combo Court 01/04/2016 31/03/2017 Recreation
Sithunjwa Full Service School – Sport and – 350 350 350
38
Combo Court Construction Impendle Combo Court 01/04/2016 31/03/2017 Recreation
Exhaphozini Primary School – Sport and – 350 350 350
39
Combo Court Construction Umhlathuze Combo Court 01/04/2016 31/03/2017 Recreation
Mavumegwana Sportfield – Sport and – – – –
40
Maintenance Equipment Construction Umlalazi Maintenance Equipment 01/04/2016 31/03/2017 Recreation
Nxamalala Sportsfield – Sport and – – – –
41
Maintenance Equipment Construction Impendle Maintenance Equipment 01/04/2016 31/03/2017 Recreation

131
Annexure Table B5 – Vote 10 : Sports and Recreation

Kwamashu Bowling Club – Sport and – – – –


42
Maintenance Equipment Construction Ethekwini Maintenance Equipment 01/04/2016 31/03/2017 Recreation
Thokothe/Gcilima Sportsfield – Sport and – – – –
43
Maintenance Equipment Construction Hibiscus Coast Maintenance Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 182 200
44
Children'S Play Gym Equipment Construction Zululand Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 181 200
45
Children'S Play Gym Equipment Construction Amajuba Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 182 200
46
Children'S Play Gym Equipment Construction Harry Gwala Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 181 200
47
Children'S Play Gym Equipment Construction Uthungulu Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 182 200
48
Children'S Play Gym Equipment Construction Umkhanyakude Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 181 200
49
Children'S Play Gym Equipment Construction Ilembe Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 182 200
50
Children'S Play Gym Equipment Construction Umgungundlovu Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 181 200
51
Children'S Play Gym Equipment Construction Metro Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 182 200
52
Children'S Play Gym Equipment Construction Ugu Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 181 200
53
Children'S Play Gym Equipment Construction Uthukela Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 150 181 200
54
Children'S Play Gym Equipment Construction Umzinyathi Play Gym Equipment 01/04/2016 31/03/2017 Recreation
– Sport and – 2 902 – 5 121
55
Fitness Hub Construction Umgungundlovu Gym Equipment 01/04/2017 31/03/2018 Recreation
– Sport and – – – –
56
Sport Fields Construction Umgungundlovu Sports Fields 01/04/2016 31/03/2017 Recreation
Zondi Store Maintenance – Sport and – 100 – –
57
Equipment Construction Msunduzi Maintenance Equipment 01/04/2017 31/03/2018 Recreation
Matimatolo Maintenance – Sport and – 100 – –
58
Equipment Construction Umvoti Maintenance Equipment 01/04/2017 31/03/2018 Recreation
Mawombe Maintenance – Sport and – 100 – –
59
Equipment Construction Mfolozi Maintenance Equipment 01/04/2017 31/03/2018 Recreation
Kwamsane Maintenance – Sport and – 100 150 150
60
Equipment Construction Mtubatuba Maintenance Equipment 01/04/2017 31/03/2018 Recreation
– Sport and – – 5 000 1 800
61
Isilutshana Sportfield Construction Nquthu Sportfield 01/04/2017 31/03/2020 Recreation
– Sport and – – 3 009 611
62
Protea Sport Complex Construction Msunduzi Sportfield 01/04/2017 31/03/2020 Recreation
– Sport and – – 1 852 4 200
63
Bilanyoni Sportfield Construction Edumbe Sportfield 01/04/2017 31/03/2020 Recreation
– Sport and – – 100 –
64
Cwaka Maintenance Equipment Construction Msinga Maintenance Equipment 01/04/2017 31/03/2020 Recreation
Isilutshana Maintenance – Sport and – – 100 –
65
Equipment Construction Nquthu Maintenance Equipment 01/04/2017 31/03/2020 Recreation
– Sport and – – 200 –
66
Bilanyon Maintenance Equipment Construction Edumbe Maintenance Equipment 01/04/2017 31/03/2020 Recreation
Nkungumathe Maintenance – Sport and – – 100 –
67
Equipment Construction Nkandla Maintenance Equipment 01/04/2017 31/03/2020 Recreation
– Sport and – – – 200
68
Protea Sport Complex Construction Msunduzi Sportfield 01/04/2017 31/03/2020 Recreation
Dundee Rural Horse Riding – Sport and – – – 300
69
Project Construction Endumeni Horse Track 01/04/2017 31/03/2020 Recreation
70 Ugu District Office Complete Ugu Office Buildings 01/04/2012 31/03/2016 – Administrtaion 6 485 – – –
71 Harry Gwala District Office Complete Harry Gwala Office Buildings 01/04/2012 31/03/2016 – Administrtaion 16 736 100 – –
– Sport and 5 089 – – –
72
Ndumo Sportsfieldphase 3 Construction Jozini Sportfield 01/04/2013 31/03/2016 Recreation
– Sport and – – – –
73
Joel Primary School Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
74
Matholamnyama Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
75
Phumlani Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
76
Vulingqondo Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
77
Dlangeni Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
78
Qondokuhle Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
79
Silethimfundo Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
80
Cwaka Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
81
Sthembile Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
82
Durnacol Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
83
Embizweni Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
84
Mlinganiswa Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
85
Mkhombeni School Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation

132
Vote 10 : Sports and Recreation

– Sport and – – – –
86
Ukukhanyakwezwe Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
87
Qongqo Construction Ethekwini Combi Court 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
88
Sibonasonke Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
89
Ngongolo Ward 6 Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
90
Philakahle Ward 92 Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
91
Mthonjaneni Ward 5 Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
92
Uyengo Ward 8 Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
93
Antioch Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
94
Dendethu Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
95
Emoyeni Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
96
Manchester Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
97
Mkhobeni Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
98
Qongqo Construction Ethekwini Kick-About 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
99
Mbulula Store Construction Vulamehlo Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
100
Franklin Construction Greater Kokstad Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
101
Richmond Construction Richmond Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
102
Imbali Construction Msunduzi Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
103
Snathing Construction Msunduzi Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
104
Ntabamhlophe Construction Imbabazane Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
105
Pomeroy Construction Umsinga Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
106
Ncotshane Construction Uphongolo Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
107
Hlabisa Town Construction Hlabisa Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
108
Sabuyasi Construction Maphumulo Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
– Sport and – – – –
109
Nkwzela Construction Ingwe Outdoor Gym Equipment 01/04/2015 31/03/2016 Recreation
Total New Infrastructure Assets 28 310 29 238 29 366 30 202
2. Upgrades and additions
Total Upgrades and additions – – – –
3. Refurbishment and rehabilitation
Total Refurbishment and rehabilitation – – – –
4. Maintenance and repairs
Total Maintenance and repairs – – – –
5. Infrastructure Transfers - Current
– Sport and – 300 – –
1
Ethekwini Maintenance Grant Construction Ethekwini Grant 01/04/2016 31/03/2017 Recreation
Outdoor Gym Maintencance – Sport and – 166 – –
2
Grant Construction Maphumulo Grant 01/04/2016 31/03/2017 Recreation
– Sport and – 167 – –
3
Outdoor Gym Maintenance Grant Construction Nquthu Grant 01/04/2016 31/03/2017 Recreation
Mavumengwane Maintenance – Sport and – 300 – –
4
Grant Construction Mlalazi Grant 01/04/2016 31/03/2017 Recreation
– Sport and – 300 – –
5
Nxamalala Maintenance Grant Construction Impendle Grant 01/04/2016 31/03/2017 Recreation
Thokothe/Gcilima Maintenance – Sport and – 600 – –
6
Grant Construction Hibiscus Coast Grant 01/04/2016 31/03/2017 Recreation
– Sport and – 167 – –
7
Zululand Maintenance Grant Construction Uphongolo Grant 01/04/2016 31/03/2017 Recreation
Total Infrastructure Transfers - Current – 2 000 – –
6. Infrastructure Transfers - Capital
– Sport and – 2 800 5 600 –
1
Cwaka Sports Field Construction Msinga Sportfield 01/04/2016 31/03/2020 Recreation
– Sport and – 5 848 1 400 –
2
Nxamalala Sportsfield Construction Impendle Sportfield 01/04/2016 31/03/2017 Recreation
– Sport and – 4 000 – –
3
Emawombe Sportsfield Construction Mfolozi Sportfield 01/04/2016 31/03/2017 Recreation
– Sport and – 3 191 – –
4
Kwamsane Sportsfield Construction Mtubatuba Sportfield 01/04/2016 31/03/2017 Recreation
– Sport and – 20 000 – –
5
Hoy Park Development Academy Construction Ethekwini Sport Academy 01/04/2016 31/03/2018 Recreation
– Sport and – – 4 000 1 673
6
Nkungumathe Sportfield Construction Nkandla Sportfield 01/04/2017 31/03/2020 Recreation
Dundee Rural Horse Riding – Sport and – – 5 000 14 500
7
Project Construction Endumeni Horse Track 01/04/2017 31/03/2020 Recreation
Total Infrastructure Transfers - Capital – 35 839 16 000 16 173
7. Infrastructure payments for financial assets
Total Infrastructure payments for financial assets – – – –
8. Infrastructure leases
Total Infrastructure leases – – – –
9. Non infrastructure
Total Non infrastructure – – – –
Total Sport, Recreation, Arts And Culture Infrastructure 28 310 67 077 45 366 46 375

133
Annexure Table B5 – Vote 11 : Co-operative Governance and Traditional Affairs

Table B.5: Co-operative Governance and Traditional Affairs - Payments of infrastructure by category
MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands
1. New Infrastructure Assets
Portable Houses (Disaster Portable Houses (Disaster
1 Construction Various 01/04/2016 31/03/2017 Equitable Share Programme 3 8 700 – – – –
Management) relief)
Provincial Disaster Management Disaster Management
2 Construction Msunduzi 26/2/2014 30/11/2014 Equitable Share Programme 3 37 000 – – – –
Centre Centre
Practical Ethekwini & Harry
3 District Office (Admin Block) Park home offices 30/4/2018 30/4/2019 Equitable Share Administration – – – – –
Completion Gwala
Construction Inkosazana Community Service Centre -
4 Bulwer 19/08/2016 31/03/2017 Equitable Share Programme 3 1 573 708 665 – –
Works Dlamini Zuma Grade 1
Construction Community Service Centre -
5 Matimatolo Umvoti 6/11/2016 31/01/2017 Equitable Share Programme 3 14 659 2 365 1 635 1 000 2 398
Works Grade 1
Construction Inkosi Community Service Centre -
6 Amahlubi 14/9/2016 31/7/2017 Equitable Share Programme 3 16 693 – 2 000 9 608 239
Works Langalebele Grade 1
Community Service Centre -
7 Mvuzane Develop Approval Maphumulo 31/05/2017 31/03/2018 Equitable Share Programme 3 15 000 – 1 000 1 000 6 411
Grade 1
Community Service Centre -
8 Silutshane Bid Ajudication Nquthu 31/03/2017 30/08/2017 Equitable Share Programme 3 6 435 – 1 000 1 000 4 309
Grade 2
Community Service Centre -
9 Ngwenya Final Delivery Jozini 24/6/2013 30/8/2016 Equitable Share Programme 3 8 248 7 887 – – –
Grade 2
Community Service Centre -
10 Biyela Final Delivery Umlalazi 28/7/2013 15/8/2016 Equitable Share Programme 3 8 219 8 137 – – –
Grade 2
Community Service Centre -
11 Xulu-Msiyane Final Delivery Abaqulusi 11/2/2014 22/7/2016 Equitable Share Programme 3 8 015 7 673 – – –
Grade 2
Community Service Centre -
12 Shange (Old Project Completion) Final Delivery Umlalazi 6/10/2011 26/11/2016 Equitable Share Programme 3 8 104 6 924 – – –
Grade 2
Shiyabane (Old Project Community Service Centre -
13 Bid Advertisement Ubuhlebezwe 31/03/2017 30/06/2017 Equitable Share Programme 3 2 012 – 750 750 602
Completion) Grade 2
Community Service Centre -
14 Madlebe (Old Project Completion) Bid Advertisement Umhlathuze 31/03/2017 30/06/2017 Equitable Share Programme 3 1 763 – 750 750 263
Grade 2
Qwaka Community Service Site Community Service Centre -
15 Msinga 31/03/2019 31/03/2020 Equitable Share Programme 3 20 000 – – – –
Centre Indentification Grade 1

16 Imizi Yeziwe - Dr Db Khumalo Bid Advertisement Nongoma House (Imizi) 28/02/2017 31/05/2017 Equitable Share Programme 3 4 200 – 2 200 – –

Total New Infrastructure Assets 160 621 33 694 10 000 14 108 14 222
2. Upgrades And Additions
Total Upgrades And Additions – – – – –
3. Refurbishment And Rehabilitation
Construction Community Service Centre -
1 Shabalala -Thekwane Emadlangeni 15/09/2016 31/03/2017 Equitable Share Programme 3 1 300 – – – –
Works Grade 2
Construction Community Service Centre -
2 Inadi Sub Clan Umshwathi 15/09/2016 31/03/2017 Equitable Share Programme 3 935 – – – –
Works Grade 2

3 Biyela Bid Adjudication uMlalazi House (Imizi) 15/09/2016 31/03/2017 Equitable Share Programme 3 375 – – – –

Community Service Centre -


4 Ntanzi (Atlernate Energy) Bid Advertisement Umshwathi 10/02/2017 31/03/2017 Equitable Share Programme 3 300 – – – –
Grade 2
Isibonelo-Isihle (Alternate Dr Nkosazana Community Service Centre -
5 Bid Advertisement 10/02/2017 31/03/2017 Equitable Share Programme 3 300 – – – –
Energy) Dlamini Zuma Grade 2
Community Service Centre -
6 Mbazwana (Final Account) Final Delivery Umhlabuyaligana - - Equitable Share Programme 3 74 475 – – –
Grade 2
Macala Gwala (Final Account/old Dr Nkosazana Community Service Centre -
7 Final Delivery - - Equitable Share Programme 3 26 686 – – –
works) Dlamini Zuma Grade 2
Community Service Centre -
8 Ngcobo (Final Account/old works) Final Delivery Kwadukuza - - Equitable Share Programme 3 34 646 – – –
Grade 2
Inkosazana Community Service Centre -
9 Vukani Bid Adjudication 15/02/2017 15/05/2017 Equitable Share Programme 3 1 665 – 413 – 865
Dlamini Zuma Grade 2
Inkosazana Community Service Centre -
10 Memela Bid Adjudication 15/02/2017 15/05/2017 Equitable Share Programme 3 1 509 – 413 – –
Dlamini Zuma Grade 2
Community Service Centre -
11 Embo Bid Adjudication uBuhlebezwe 15/02/2017 15/05/2017 Equitable Share Programme 3 1 939 – 413 500 1 139
Grade 2
Community Service Centre -
12 Mbotho Bid Adjudication Umuziwabantu 15/02/2017 15/05/2017 Equitable Share Programme 3 1 424 – 413 500 –
Grade 2
Community Service Centre -
13 Thokozane Madumisa Bid Adjudication Umuziwabantu 15/02/2017 15/05/2017 Equitable Share Programme 3 1 460 – 413 500 –
Grade 2
Community Service Centre -
14 Fodo Bid Adjudication Umuziwabantu 15/02/2017 15/05/2017 Equitable Share Programme 3 1 574 – 413 500 –
Grade 2
Community Service Centre -
15 Qwabe P Bid Adjudication Umzumbe 15/02/2017 15/05/2017 Equitable Share Programme 3 1 799 – 413 500 999
Grade 2
Community Service Centre -
16 Mthuli Bid Adjudication Umshwathi 15/02/2017 15/05/2017 Equitable Share Programme 3 1 191 – 413 500 391
Grade 2
Community Service Centre -
17 Mbokodwebomvu Bid Adjudication Nquthu 15/02/2017 15/05/2017 Equitable Share Programme 3 1 336 – 413 500 636
Grade 2
Community Service Centre -
18 Ingwe Bid Adjudication Alfred Duma 15/02/2017 15/05/2017 Equitable Share Programme 3 884 – 413 500 –
Grade 2
Community Service Centre -
19 Qadi Bid Adjudication Ethekwini 15/02/2017 15/05/2017 Equitable Share Programme 3 1 669 – 413 400 969
Grade 2
Community Service Centre -
20 Qwabe Mthandeni Bid Adjudication Maphumulo 15/02/2017 15/05/2017 Equitable Share Programme 3 1 287 – 413 300 –
Grade 2
Community Service Centre -
21 Amambhedu Bid Adjudication Maphumulo 15/02/2017 15/05/2017 Equitable Share Programme 3 1 150 – 413 400 –
Grade 2
Community Service Centre -
22 Magwaza Bid Adjudication Ndwedwe 15/02/2017 15/05/2017 Equitable Share Programme 3 1 437 – 413 500 737
Grade 2
Big Five False Community Service Centre -
23 Makhase Bid Adjudication 15/02/2017 15/05/2017 Equitable Share Programme 3 1 145 – 413 500 –
Bay Grade 2

135
Annexure Table B5 – Vote 11 : Co-operative Governance and Traditional Affairs

Community Service Centre -


24 Nxamalala Bid Adjudication Nkandla 15/02/2017 15/05/2017 Equitable Share Programme 3 1 718 – 613 500 1 018
Grade 2
Community Service Centre -
25 Nstinde Bid Adjudication Jozini 15/02/2017 15/05/2017 Equitable Share Programme 3 1 892 – 413 500 1 192
Grade 2
Community Service Centre -
26 Khoza Bhejane Bid Adjudication King Chetswayo 15/02/2017 15/05/2017 Equitable Share Programme 3 818 – 413 400 –
Grade 2
Community Service Centre -
27 Hlahlindlela Bid Adjudication Abaqulusi 15/02/2017 15/05/2017 Equitable Share Programme 3 984 – 413 400 –
Grade 2
Community Service Centre -
28 Mandlakazi Bid Adjudication Nongoma 15/02/2017 15/05/2017 Equitable Share Programme 3 1 482 – 413 500 –
Grade 2
Community Service Centre -
29 Buhlebomziyathi Bid Adjudication Dannhauser 15/02/2017 15/05/2017 Equitable Share Programme 3 2 180 – 414 650 1 480
Grade 2
Proff Team Community Service Centre -
30 Ekuvukeni Alfred Duma 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 700 –
Appointment Grade 1
Proff Team Community Service Centre -
31 Kwamdakane Dannhauser 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 700 –
Appointment Grade 1
Proff Team Community Service Centre -
32 Inhlahzuka Richmond 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 – –
Appointment Grade 1
Proff Team Community Service Centre -
33 Lindela Nkandla 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 – –
Appointment Grade 1
Proff Team Community Service Centre -
34 Tugela Ferry Msinga 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 – –
Appointment Grade 1
Proff Team Community Service Centre -
35 Molefe Nquthu 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 – –
Appointment Grade 1
Proff Team Community Service Centre -
36 Jama Nquthu 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 – –
Appointment Grade 1
Proff Team uMhlabuyalingan Community Service Centre -
37 Mbazwana 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 – –
Appointment e Grade 1
Proff Team Community Service Centre -
38 Highflats uBuhlebezwe 31/03/2017 31/05/2017 Equitable Share Programme 3 500 – 200 – –
Appointment Grade 1
Community Service Centre -
39 Gule Alternate Energy Bid Advetisement Dannhauser 10/02/2017 31/03/2017 Equitable Share Programme 3 125 – – – –
Grade 2
Community Service Centre -
40 Amazizi Assessment Okhahlamba 31/03/2018 30/06/2018 Equitable Share Programme 3 1 250 – – – 1 024
Grade 2
Community Service Centre -
41 Qwabe Waterfall Assessment Umzumbe 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Community Service Centre -
42 Mthembu Assessment Kwadakuza 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Community Service Centre -
43 Dube Mpembeni Assessment King Chetswayo 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Community Service Centre -
44 Mthethwa Assessment eDumbe 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Community Service Centre -
45 Godide Assessment Nkandla 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Community Service Centre -
46 Mthembu Assessment Alfred Duma 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Inkosi Community Service Centre -
47 Mhlungwini Assessment 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Langalebele Grade 2
Community Service Centre -
48 Dlamini Assessment Alfred Duma 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Community Service Centre -
49 Amazizi Assessment Okhahlamba 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Community Service Centre -
50 Amaswazi (Nkosi) Assessment Alfred Duma 31/03/2019 30/06/2019 Equitable Share Programme 3 1 250 – – – –
Grade 2
Total Refurbishment And Rehabilitation 52 262 1 807 10 674 10 450 10 450
4. Maintenance And Repairs
Total Maintenance And Repairs – – – – –
5. Infrastructure Transfers - Current
Total Infrastructure Transfers - Current – – – – –
6. Infrastructure Transfers - Capital
Total Infrastructure Transfers - Capital – – – – –
7. Infrastructure Payments For Financial Assets
Total Infrastructure Payments For Financial Assets – – – – –
8. Infrastructure Leases
Total Infrastructure Leases – – – – –
9. Non Infrastructure
Total Non Infrastructure – – – – –
Total Co-operative Governance and Traditional Affairs 212 883 35 501 20 674 24 558 24 672

136
Annexure Table B5 – Vote 12 : Transport

Table B.5: Transport - Payments of infrastructure by category


MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands
1. New infrastructure assets
3756 Mgeni River Bridge On Gate 7 Works KZ221 Transport
1 Vehicle Bridge 01/09/2017 01-092018 Equitable Share – 5 000 – –
D1027 (1%-25%) uMshwathi LM Infrastructure
Gate 6 Design KZ221 Transport
2 3791 Little Mooi River Bridge Vehicle Bridge 01-012017 01-092017 Equitable Share – 5 000 – –
Documentation uMshwathi LM Infrastructure
3796 Mpolweni River Bridge On Gate 6 Design KZ221 Transport
3 Vehicle Bridge 01-012018 01-112018 Equitable Share – – – –
D708 Documentation uMshwathi LM Infrastructure
Msunduzi River Bridge Gate 6 Design KZ221 Transport
4 Vehicle Bridge 01-012018 01-092018 Equitable Share – 4 000 – –
(Ob_Pmb_29) On P423 Documentation uMshwathi LM Infrastructure
Gate 6 Design Transport
5 Mabisane River Bridge KZ431 Ingwe LM Vehicle Bridge 01-042017 31-032020 Equitable Share – 5 000 5 700 5 985
Documentation Infrastructure
Gate 6 Design Transport
6 Kwamceba Pedestrian Bridge KZ431 Ingwe LM Pedestrian Bridge 01-042017 31-032020 Equitable Share – 5 000 5 700 5 985
Documentation Infrastructure
Gate 6 Design Transport
7 Kwazicole Pedestrian Bridge KZ431 Ingwe LM Pedestrian Bridge 01-042017 31-032020 Equitable Share – 1 000 1 140 1 197
Documentation Infrastructure
Gate 7 Works KZ221 Transport
8 Bhanda Vehicle Bridge On L791 Vehicle Bridge 01-042017 31-032018 Equitable Share – 5 000 – –
(1%-25%) uMshwathi LM Infrastructure
Gate 6 Design Transport
9 Bisi River Bridge KZ431 Ingwe LM Vehicle Bridge 01-042017 31-032020 Equitable Share – 5 000 5 700 5 985
Documentation Infrastructure
3564 Mhlalane River Pedestrian Gate 7 Works KZ221 Transport
10 Pedestrian Bridge 01-032017 01-032018 Equitable Share – 5 000 – –
Bridge (1%-25%) uMshwathi LM Infrastructure
3585 Mvubukazi Pedestrian Gate 6 Design KZ221 Transport
11 Pedestrian Bridge 04-042016 31-032019 Equitable Share – 500 1 100 –
Bridge Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ221 Transport
12 3775 Lovu Pedestrian Bridge Pedestrian Bridge 01-042016 01-032017 Equitable Share – 663 – –
Documentation uMshwathi LM Infrastructure
3810 Slangspruit Pedestrian Gate 6 Design KZ221 Transport
13 Pedestrian Bridge 01-042016 01-032019 Equitable Share – 200 201 –
Bridge Documentation uMshwathi LM Infrastructure
3474 Lufafa River Pedestrian Gate 6 Design KZ221 Transport
14 Pedestrian Bridge 01-042018 31-032020 Equitable Share – – 5 700 5 985
Bridge Documentation uMshwathi LM Infrastructure

3505 Zunkels Ndunwane River Gate 7 Works KZ235 Transport


15 Pedestrian Bridge 07-012013 31-032018 Equitable Share – 344 – –
Pedestrian Bridge (76%-99%) Okhahlamba LM Infrastructure

Gate 5 Design KZ221 Transport


16 Umlwazi River Bridge Vehicle Bridge 01-042017 31-032020 Equitable Share – – 5 700 5 985
Development uMshwathi LM Infrastructure

3500 Mpambanyoni Vehicular Gate 7 Works KZ292 Transport


17 Vehicle Bridge 01-062015 01-102018 Equitable Share – 700 – –
Bridge On L2807 (26%-50%) KwaDukuza LM Infrastructure

Gate 7 Works KZ211 Vulamehlo Transport


18 3481 Boboyi Pedestrian Bridge Pedestrian Bridge 01-072015 01-022018 Equitable Share – 600 – –
(1%-25%) LM Infrastructure
3590 Gj Crookes Hospital Gate 7 Works KZ211 Vulamehlo Transport
19 Pedestrian Bridge 01-062016 01-062018 Equitable Share – 5 000 – –
Pedestrian Bridge (1%-25%) LM Infrastructure
Gate 7 Works Transport
20 Mkomazi River Vehicular Bridge A ETH Metro Vehicle Bridge 01-042017 31-032019 Equitable Share – 5 000 6 320 –
(26%-50%) Infrastructure

3730 Mangwenya River Gate 6 Design KZ292 Transport


21 Pedestrian Bridge 01-062016 01-062017 Equitable Share – 1 200 – –
Pedestrian Bridge Documentation KwaDukuza LM Infrastructure

3727 Due South Pedestrian Gate 6 Design Transport


22 ETH Metro Pedestrian Bridge 01-042017 31-032018 Equitable Share – 5 000 – –
Bridge Documentation Infrastructure
Gate 6 Design Transport
23 Mkomazi River Vehicular Bridge B ETH Metro Vehicle Bridge 01-042017 31-032019 Equitable Share – 5 000 7 322 –
Documentation Infrastructure
Gate 7 Works Transport
24 3689 Lovu River Bridge L1281 ETH Metro Vehicle Bridge 01-042017 31-032019 Equitable Share – 5 000 5 500 –
(1%-25%) Infrastructure
3383 Lovu River Pedestrian Gate 7 Works Transport
25 ETH Metro Pedestrian Bridge 01-042016 31-032018 Equitable Share – 5 000 – –
Bridge (1%-25%) Infrastructure

3845 Tributary To Manzimtoti Gate 6 Design Transport


26 ETH Metro Pedestrian Bridge 01-012016 01-032016 Equitable Share – 4 500 – –
River Pedestrian Bridge Documentation Infrastructure

3417 Emagazeni Mlazi River Gate 6 Design Transport


27 ETH Metro Pedestrian Bridge 01-012016 01-032016 Equitable Share – 68 – –
Pedestrian Bridge Documentation Infrastructure
3468 Mqeku River Pedestrian Transport
28 Gate 9 Close Out ETH Metro Pedestrian Bridge 01-022015 01-102017 Equitable Share – 500 – –
Bridge Infrastructure

Gate 7 Works KZ292 Transport


29 3425 L1960 Mona River Bridge Vehicle Bridge 01-032016 01-042017 Equitable Share – 1 500 – –
(1%-25%) KwaDukuza LM Infrastructure

3433 Mvumase Tugela River Ped Gate 7 Works KZ292 Transport


30 Pedestrian Bridge 01-012016 28-112016 Equitable Share – 5 000 – –
Bridge (Handover) KwaDukuza LM Infrastructure

3553 Pambela River Pedestrian Gate 7 Works KZ292 Transport


31 Pedestrian Bridge 01-012016 28-082016 Equitable Share – 770 – –
Bridge (1%-25%) KwaDukuza LM Infrastructure

3202 Msunduze River Bridge On Gate 5 Design KZ292 Transport


32 Vehicle Bridge 01-012016 28-112017 Equitable Share – 1 000 – –
New Road - Nyoni Development KwaDukuza LM Infrastructure

137
Annexure Table B5 – Vote 12 : Transport

3586 & 3587 Mshwati River Gate 5 Design Transport


38 ETH Metro Vehicle Bridge 01-012014 01-012016 Equitable Share – 1 000 – –
Bridges On D1021 Development Infrastructure
3484 Mbokodweni River Gate 5 Design Transport
39 ETH Metro Pedestrian Bridge 01-042018 31-032020 Equitable Share – – 1 000 1 000
Pedestrian Bridge Development Infrastructure

Gate 7 Works
(Practical DC28 UThungulu Transport
40 3118 P534 Mfule River Bridge Vehicle Bridge 01-032015 31-032020 Equitable Share – 5 000 3 500 5 700
Completion DM Infrastructure
100%)

3356 Munzimakhulu River Bridge Gate 6 Design DC26 Zululand Transport


41 Vehicle Bridge 01-042017 31-032020 Equitable Share – 4 000 200 5 700
On D1890 Documentation DM Infrastructure
Gate 6 Design Transport
42 3428 Maphophoma River Bridge KZ266 Ulundi LM Vehicle Bridge 01-052016 31-012018 Equitable Share – 300 – –
Documentation Infrastructure
Gate 7 Works KZ265 Nongoma Transport
43 3429 Vuna River Bridge Vehicle Bridge 01-052014 31-032019 Equitable Share – 400 – –
(51%-75%) LM Infrastructure
3444 L860 Kwanovoc River Gate 6 Design Transport
44 KZ266 Ulundi LM Culvert 01-112013 01-052017 Equitable Share – 2 900 100 –
Structure Documentation Infrastructure
3524 P736 Mahambuma River Gate 6 Design DC26 Zululand Transport
45 Vehicle Bridge 01-042016 31-032019 Equitable Share – – 1 000 3 679
Bridge Documentation DM Infrastructure
3525 P736 Mpenjane River Gate 7 Works DC26 Zululand Transport
46 Vehicle Bridge 01-112014 31-032019 Equitable Share – 300 1 000 –
Bridge (51%-75%) DM Infrastructure
Gate 6 Design KZ265 Nongoma Transport
47 3526 P736 Phethu River Bridge Vehicle Bridge 01-042017 31-032019 Equitable Share – 300 1 000 –
Documentation LM Infrastructure
Gate 6 Design KZ265 Nongoma Transport
48 3527 Kwasitholane River Bridge Vehicle Bridge 01-112016 01-052017 Equitable Share – 1 900 250 700
Documentation LM Infrastructure
3886 Mabedlana Protal Culvert Gate 7 Works DC28 UThungulu Transport
49 Culvert 01-102013 01-072017 Equitable Share – 5 000 300 –
Structure (26%-50%) DM Infrastructure
Holinyoka New Local Road & Gate 6 Design DC26 Zululand Transport
50 Road 01-042017 31-032019 Equitable Share – 50 1 000 1 140
Causeway Nongoma Documentation DM Infrastructure

Stc3922 - 2/2.1M X 2.1M Box


Gate 6 Design Transport
51 Culvert On P487 (Armco KZ266 Ulundi LM Culvert 01-042018 31-032021 Equitable Share – 500 2 100 1 140
Documentation Infrastructure
Replacement) Prof Fees

Emdudubenzini Mvunyane River Gate 6 Design DC26 Zululand Transport


52 Vehicle Bridge 01-042017 31-032020 Equitable Share – 5 000 6 000 –
Bridge Documentation DM Infrastructure

3511 Dirkchinburg (Kwasengeni Gate 7 Works DC28 UThungulu Transport


53 Vehicle Bridge 01-042016 01-062019 Equitable Share – 9 1 000 1 500
River) Pedestrian Bridge (26%-50%) DM Infrastructure

Gate 6 Design DC28 UThungulu Transport


54 Stc3945 Madiyana Portal Culvert Culvert 01-042016 01-062019 Equitable Share – 6 1 000 –
Documentation DM Infrastructure
3661 Nseleni River Bridge On Gate 6 Design DC28 UThungulu Transport
55 Vehicle Bridge 01-012016 31-032019 Equitable Share – 65 1 000 –
D1585 Documentation DM Infrastructure
3721 Nembe River Pedestrian Gate 6 Design DC28 UThungulu Transport
56 Pedestrian Bridge 01-042017 31-032019 Equitable Share – 45 1 000 1 710
Bridge Documentation DM Infrastructure
3726 Nomyeni River Pedestrian Gate 6 Design DC28 UThungulu Transport
57 Pedestrian Bridge 01-042017 31-032020 Equitable Share – 35 1 000 1 710
Bridge Documentation DM Infrastructure
Gate 6 Design DC28 UThungulu Transport
58 P511 Double Barrel Box Culvert Culvert 01-042017 31-032020 Equitable Share – – 1 000 1 140
Documentation DM Infrastructure
3782 Umlalazi River Bridge On Gate 6 Design DC28 UThungulu Transport
59 Vehicle Bridge 01-042017 31-032019 Equitable Share – 4 530 1 000 –
D1551 Documentation DM Infrastructure
3800 Mhlathuzana River Vehicle Gate 6 Design DC28 UThungulu Transport
60 Vehicle Bridge 1/04/2017 31-032020 Equitable Share – 14 030 1 000 1 200
Bridge On L3984 Documentation DM Infrastructure

3837 Mhlatuze (Nkungumathe) Gate 6 Design KZ286 Nkandla Transport


61 Vehicle Bridge 01-042017 31-032021 Equitable Share – 10 000 5 500 5 700
River Vehicle Bridge On D2238 Documentation LM Infrastructure

3532 Mhlathuze River Bridge On Gate 6 Design KZ286 Nkandla Transport


62 Vehicle Bridge 01-042017 31-032020 Equitable Share – 6 700 5 500 5 700
P223 Documentation LM Infrastructure
KZ281
3561 Mfolozi River Bridge On Gate 6 Design Transport
63 Mbonambi/Mfoloz Vehicle Bridge 01-042017 31-032020 Equitable Share – 12 947 3 500 5 900
D780 At Km 2.10 Documentation Infrastructure
i LM
3406 Mhlatuze River Bridge On Gate 6 Design DC28 UThungulu Transport
64 Vehicle Bridge 01-042017 31-032020 Equitable Share – 200 1 000 –
D1560 Extn Documentation DM Infrastructure
3784 Mpangeni River Bridge On Gate 6 Design DC28 UThungulu Transport
65 Vehicle Bridge 01-042017 31-032019 Equitable Share – 6 700 500 –
D1558/P569 Documentation DM Infrastructure
3749 Manyane River Pedestrian Gate 6 Design DC28 UThungulu Transport
66 Pedestrian Bridge 01-042017 31-032020 Equitable Share – 5 400 1 000 –
Bridge Documentation DM Infrastructure
3757 Nsimbakazi River Gate 6 Design DC28 UThungulu Transport
67 Pedestrian Bridge 01-042018 31-032021 Equitable Share – 3 440 1 000 1 710
Pedestrian Bridge Documentation DM Infrastructure
3794 Mfolozi River Bridge On Gate 6 Design KZ275 Mtubatuba Transport
68 Vehicle Bridge 01-012017 01-122018 Equitable Share – 5 000 8 296 –
L1792 Documentation LM Infrastructure
3600 White Mfolozi River Bridge Gate 6 Design Transport
69 KZ266 Ulundi LM Vehicle Bridge 01-042017 31-032019 Equitable Share – 11 280 1 500 –
& L2598 Link Rd Documentation Infrastructure

3380 P425 Nseleni River Bridge Gate 6 Design KZ282 Transport


70 Vehicle Bridge 01-012016 01-012019 Equitable Share – 5 000 1 000 –
Replacement Documentation uMhlathuze LM Infrastructure

3404 Hlazane River Bridge On Gate 6 Design KZ275 Mtubatuba Transport


71 Vehicle Bridge 18-042016 01-022019 Equitable Share – 1 282 1 000 –
D856 Documentation LM Infrastructure
KZ271
3513 Pongola (Mboza) River Gate 7 Works Transport
72 Umhlabuyalingan Vehicle Bridge 01-032017 30-082019 Equitable Share – 1 000 11 000 2 194
Vehicle Bridge (1%-25%) Infrastructure
a LM
3289 Thulwana Tugela River Gate 6 Design KZ286 Nkandla Transport
73 Vehicle Bridge 1/04/2017 31/03/2019 Equitable Share – 11 000 8 362 –
Bridge Documentation LM Infrastructure
3338 Sikwebezi River Bridge On Gate 7 Works KZ265 Nongoma Transport
74 Vehicle Bridge 01-042017 31-072019 Equitable Share – 500 1 000 –
L1603 (51%-75%) LM Infrastructure
3598 Mbhekamuzi River Gate 6 Design DC26 Zululand Transport
75 Pedestrian Bridge 01-042018 31-032020 Equitable Share – – 4 750 1 710
Pedestrian Bridge Documentation DM Infrastructure

138
Annexure Table B5 – Vote 12 : Transport

3779 Efefe Pedestrian Bridge Gate 5 Design DC26 Zululand Transport


76 Pedestrian Bridge 01-042018 31-032020 Equitable Share – – 6 300 1 710
Over P49-2 Development DM Infrastructure
3534 Mbilane River Vehicle Gate 6 Design Transport
77 KZ266 Ulundi LM Vehicle Bridge 01-042018 31-032019 Equitable Share – – 9 650 –
Bridge Documentation Infrastructure
Gate 6 Design DC26 Zululand Transport
78 Vumankala - St Pauls Causeway Vehicle Bridge 01-042018 31-032020 Equitable Share – – 2 500 1 140
Documentation DM Infrastructure

3522 Ntuze River Bridge On P525 Gate 7 Works KZ282 Transport


79 Vehicle Bridge 01-042013 31-072018 Equitable Share – 500 – –
At Km 5.49 (76%-99%) uMhlathuze LM Infrastructure

Stc3906 D1555 Single Barrel Box Gate 7 Works KZ282 Transport


80 Culvert 1/04/2017 31-072018 Equitable Share – 500 – –
Culvert (76%-99%) uMhlathuze LM Infrastructure

3560 Mfule River Pedestrian Gate 7 Works KZ283 Transport


81 Pedestrian Bridge 10-062013 01-052018 Equitable Share – 21 000 – –
Bridge (76%-99%) Ntambanana LM Infrastructure

3509 Mzimane River Bridge On Gate 6 Design DC26 Zululand Transport


82 Vehicle Bridge 01-042017 31-032020 Equitable Share – – 1 000 5 700
D1905 Documentation DM Infrastructure
3367 Mbilane River Pedstrian Gate 6 Design Transport
83 KZ266 Ulundi LM Pedestrian Bridge 01-042019 31-032020 Equitable Share – – – 5 700
Bridge Documentation Infrastructure
3766 Manyane River Pedestrian Gate 5 Design DC26 Zululand Transport
84 Pedestrian Bridge 01-042019 31-032020 Equitable Share – – – 3 420
Bridge Development DM Infrastructure
3832 Mkwakwini River Bridge On Gate 6 Design DC26 Zululand Transport
85 Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 5 700
P571 Documentation DM Infrastructure

3834 Gosweni River Bridge On Gate 6 Design DC26 Zululand Transport


86 Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 5 700
D2222 (Presidential Task Team) Documentation DM Infrastructure

3795 D878 Tributary Stream To


Gate 6 Design DC26 Zululand Transport
87 Tugela River (Presidential Task Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 5 700
Documentation DM Infrastructure
Team)
3833 Mvuzane River Bridge On Gate 6 Design DC26 Zululand Transport
88 Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 5 700
D873 Documentation DM Infrastructure
0559 Gosweni River Bridge On Gate 6 Design DC26 Zululand Transport
89 Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 5 700
P50-3 At Km 13.60 Documentation DM Infrastructure
Gate 6 Design DC26 Zululand Transport
90 3252 Tugela River Bridge Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 5 700
Documentation DM Infrastructure
Manzamnyama River Pedestrian Gate 6 Design DC26 Zululand Transport
91 Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 5 700
Bridge Documentation DM Infrastructure
3399 Ystermynspruit Pedestrian Gate 6 Design KZ252 Utrecht Transport
92 Pedestrian Bridge 1/10/2016 31-032019 Equitable Share – 5 000 100 –
Bridge Documentation LM Infrastructure
3787 D1240 Ncibidwane River Gate 6 Design DC23 Uthukela Transport
93 Vehicle Bridge 01-042017 01-032019 Equitable Share – 1 000 150 –
Bridge Documentation DM Infrastructure

Gate 6 Design KZ235 Transport


94 3369 Khombe River Bridge Vehicle Bridge 01-042017 31-032019 Equitable Share – 4 500 150 –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ235 Transport


95 3402 Zunkels Pedestrian Bridge Pedestrian Bridge 3/03/2016 01-042019 Equitable Share – 3 000 75 –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ232 Transport


96 3471 Modderspruit River Bridge Vehicle Bridge 1/04/2017 31-032020 Equitable Share – 56 3 500 –
Documentation eMnambhithi LM Infrastructure

Gate 7 Works DC23 Uthukela Transport


97 3507 Sandspruit River Bridge Vehicle Bridge 10-022020 10-112020 Equitable Share – 90 – –
(26%-50%) DM Infrastructure

3545 Nkunzi River Bridge On Gate 6 Design KZ232 Transport


98 Vehicle Bridge 01-042020 31-032020 Equitable Share – 3 800 75 –
D2404 Documentation eMnambhithi LM Infrastructure

3717 Buffels River Bridge On Gate 6 Design KZ232 Transport


99 Vehicle Bridge 01-042014 31-032018 Equitable Share – 128 – –
L2953 (Mahlaba) Documentation eMnambhithi LM Infrastructure

3720 Nhlesi/Mooi River Bridge Gate 7 Works KZ244 Msinga Transport


100 Vehicle Bridge 16-042014 01-072019 Equitable Share – 147 – –
(L2985) (Handover) LM Infrastructure

3822 Makhabeleni Tugela River Gate 6 Design DC24 Umzinyathi Transport


101 Vehicle Bridge 01-042017 31-032020 Equitable Share – 10 000 11 400 630
Bridge Documentation DM Infrastructure

3595 Tugela River Bridge On P6- Gate 7 Works KZ244 Msinga Transport
102 Vehicle Bridge 01-042017 31-032020 Equitable Share – 20 000 11 400 800
3 At Tugela Ferry (1%-25%) LM Infrastructure

3725 Tugela River Bridge On


Gate 6 Design DC24 Umzinyathi Transport
103 New Link Road (Mashunka, Vehicle Bridge 01-042017 31-032020 Equitable Share – 2 000 5 500 300
Documentation DM Infrastructure
Mtateni & Ngubo)

Gate 7 Works KZ244 Msinga Transport


104 3397 Ngubevu River Bridge Vehicle Bridge 01-042017 30-032018 Equitable Share – 131 – –
(51%-75%) LM Infrastructure
3501 Mfifiyela Mlambonja River Gate 6 Design DC23 Uthukela Transport
105 Vehicle Bridge 01-042017 31-032020 Equitable Share – – – 163
Vehicle Documentation DM Infrastructure

3504 D1238 Emoyeni Gate 6 Design DC24 Umzinyathi Transport


106 Vehicle Bridge 01-042016 31-032017 Equitable Share – 2 000 – –
Emedweleni River Vehicle Bridge Documentation DM Infrastructure

3793 D878 Khomfini Tugela River Gate 7 Works KZ244 Msinga Transport
107 Vehicle Bridge 31-032015 31-032018 Equitable Share – 20 000 – –
Bridge (L661 Extn) (1%-25%) LM Infrastructure

3351 Mbabane River Pedestrian Gate 6 Design KZ254 Transport


108 Pedestrian Bridge 01-042017 31-032018 Equitable Share – 1 722 – –
Bridge (Sandmines) Documentation Dannhauser LM Infrastructure

Gate 7 Works KZ254 Transport


109 3398 Mbane Pedestrian Bridge Pedestrian Bridge 01-042016 31-032018 Equitable Share – 3 087 – –
(Handover) Dannhauser LM Infrastructure

Gate 7 Works KZ252 Newcastle Transport


110 3293 Buffels River Bridge (Jiyane) Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 1 500
(76%-99%) LM Infrastructure

139
Annexure Table B5 – Vote 12 : Transport

3503 Ifidi Nsetheni River Vehicle Gate 7 Works KZ235 Transport


111 Vehicle Bridge 01-042013 31-032018 Equitable Share – 2 239 – –
Bridge On L466 Extn (76%-99%) Okhahlamba LM Infrastructure

3537 D1316 Sigqobheleni Ntinini Gate 7 Works KZ244 Msinga Transport


112 Vehicle Bridge 01-042017 31-032018 Equitable Share – 6 147 – –
River Vehicle Bridge (1%-25%) LM Infrastructure

3529 Injesuthi Tugela Bridge On Gate 5 Design KZ236 Transport


113 Vehicle Bridge 01-042016 31-032019 Equitable Share – 2 000 20 613 –
D214 Development Imbabazane LM Infrastructure

Gate 6 Design KZ213 Umzumbe Transport


114 A2333 New Gravel Road Road 03-072017 30-112017 Equitable Share – 2 205 – –
Documentation LM Infrastructure
Gate 6 Design KZ212 UmdoniI Transport
115 A2712 New Gravel Road Road 03-072017 30-112017 Equitable Share – 2 312 – –
Documentation LM Infrastructure

Gate 6 Design KZ216 Hibuscus Transport


116 Bhudubhudu New Gravel Road Road 03-072017 30-112017 Equitable Share – 1 050 – –
Documentation Coast LM Infrastructure

Gate 6 Design KZ211 Vulamehlo Transport


117 L2900 New Gravel Road Road 03-072017 30-112017 Equitable Share – 1 050 – –
Documentation LM Infrastructure

Gate 6 Design KZ215 Transport


118 Khuthu New Gravel Road Road 03-072017 30-112017 Equitable Share – 1 050 – –
Documentation Ezinqolweni LM Infrastructure

L2445 (Bhomela) New Gravel Gate 6 Design KZ216 Hibuscus Transport


119 Road 03-072017 30-112017 Equitable Share – 1 050 – –
Road Documentation Coast LM Infrastructure

Gate 6 Design KZ211 Vulamehlo Transport


120 Ncabela New Gravel Road Road 03-072017 30-112017 Equitable Share – 1 260 – –
Documentation LM Infrastructure
KZ214
Gate 6 Design Transport
121 Ol 3293 New Gravel Road uMuziwabantu Road 03-072017 30-112017 Equitable Share – 2 100 – –
Documentation Infrastructure
LM

KZ214
Gate 6 Design Transport
122 Ol 3436 New Gravel Road uMuziwabantu Road 03-072017 30-112017 Equitable Share – 1 050 – –
Documentation Infrastructure
LM
Gate 6 Design KZ211 Vulamehlo Transport
123 Ezivandeni New Gravel Road Road 03-072017 30-112017 Equitable Share – 1 050 – –
Documentation LM Infrastructure

Geotec,Design,Eia New Gravel Gate 6 Design KZ216 Hibuscus Transport


124 Road 03-072017 30-032018 Equitable Share – 5 250 – –
Road Documentation Coast LM Infrastructure

L2692 Extension New Gravel Gate 6 Design KZ213 Umzumbe Transport


125 Road 03-072017 30-112017 Equitable Share – 1 155 – –
Road Documentation LM Infrastructure
Gate 6 Design KZ211 Vulamehlo Transport
126 Mandlalathi New Gravel Road Road 03-072017 30-112017 Equitable Share – 2 940 – –
Documentation LM Infrastructure
Gate 6 Design KZ211 Vulamehlo Transport
127 Ndabeni New Gravel Road Road 03-072017 30-112017 Equitable Share – 2 940 – –
Documentation LM Infrastructure
Gate 6 Design KZ213 Umzumbe Transport
128 Off D859 New Gravel Road Road 03-072017 30-112017 Equitable Share – 1 155 – –
Documentation LM Infrastructure
Gate 6 Design KZ213 Umzumbe Transport
129 Off Gebhasi New Gravel Road Road 03-072017 30-112017 Equitable Share – 1 470 – –
Documentation LM Infrastructure

Gate 6 Design KZ215 Transport


130 Thenjani New Gravel Road Road 03-072017 30-112017 Equitable Share – 1 543 – –
Documentation Ezinqolweni LM Infrastructure

Gate 6 Design KZ221 Transport


131 Hlathikhulu Road Causeway Road 01-062016 31-102017 Equitable Share – 1 800 – –
Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ221 Transport
132 P26 At Km 18 3Box Culvert Road 01-102016 31-032017 Equitable Share – 3 000 – –
Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
133 D59 Causeway Road 01-062017 31-122017 Equitable Share – 100 – –
Documentation LM Infrastructure

Gate 6 Design KZ226 Transport


134 L341 Causeway Road 01-062017 31-122017 Equitable Share – 100 – –
Documentation Mkhambathini LM Infrastructure

Gate 6 Design KZ227 Richmond Transport


135 P116 Causeway Road 01-052017 20-092017 Equitable Share – 1 500 – –
Documentation LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
136 Tehuis Causeway Road 01-052017 30-092017 Equitable Share – 1 300 – –
Documentation LM Infrastructure
Emaromeni New Gravel Road- Gate 6 Design KZ221 Transport
137 Road 01-062017 31-102017 Equitable Share – 800 – –
L1961-0-2Km Documentation uMshwathi LM Infrastructure
Esikhaleni New Gravel Road-0- Gate 6 Design KZ221 Transport
138 Road 01-062017 31-102017 Equitable Share – 500 – 1 500
1.2Km Documentation uMshwathi LM Infrastructure
Mtizane New Gravel Road-0- Gate 6 Design KZ221 Transport
139 Road 01-062017 31-102017 Equitable Share – 2 400 – –
6.5Km Documentation uMshwathi LM Infrastructure
Ndlovu New Gravel Road Off Gate 6 Design KZ221 Transport
140 Road 01-062017 31-102017 Equitable Share – 600 – –
D661-0-1.5Km Documentation uMshwathi LM Infrastructure
Gququma New Gravel Road -Ol Gate 6 Design KZ221 Transport
141 Road 01-062017 31-102017 Equitable Share – 1 700 – –
1154-0-4Km Documentation uMshwathi LM Infrastructure
Mbalenhle New Gravel Road-0- Gate 6 Design KZ221 Transport
142 Road 01-062017 31-102017 Equitable Share – 1 200 – –
3Km Documentation uMshwathi LM Infrastructure

Nyaniga School New Gravel Gate 6 Design KZ221 Transport


143 Road 01-062017 31-102017 Equitable Share – 600 – –
Road Off D1017-0-1.3Km Documentation uMshwathi LM Infrastructure

Sizameleni New Gravel Road-0- Gate 6 Design KZ221 Transport


144 Road 01-062017 31-102017 Equitable Share – 800 – –
2Km Documentation uMshwathi LM Infrastructure

Vela Maria New Gravel Road-0.0- Gate 6 Design KZ226 Transport


145 Road 01-062017 31-102017 Equitable Share – 550 – –
1.295Km Documentation Mkhambathini LM Infrastructure

Bhinini Rd-L3142- Phase 2-0-


Gate 6 Design KZ225 Msunduzi Transport
146 0.3Kmnew Gravel Road New Road 01-062017 30-082017 Equitable Share – 250 – –
Documentation LM Infrastructure
Gravel Road

140
Annexure Table B5 – Vote 12 : Transport

Chamane New Gravel Road-0- Gate 6 Design KZ227 Richmond Transport


147 Road 01-052017 30-092017 Equitable Share – 1 000 – –
2.548Km Documentation LM Infrastructure
Dangwini New Gravel Road-0- Gate 6 Design KZ225 Msunduzi Transport
148 Road 01-062017 30-082017 Equitable Share – 780 – –
1.2Km Documentation LM Infrastructure

Jobe New Gravel Road-0- Gate 6 Design KZ226 Transport


149 Road 01-052017 30-092017 Equitable Share – 800 – –
1.753Km Documentation Mkhambathini LM Infrastructure

Lubhaqa New Gravel Road-O- Gate 6 Design KZ227 Richmond Transport


150 Road 01-062017 31-102017 Equitable Share – 900 – –
2.363Km Documentation LM Infrastructure

Mabhalishi New Gravel Road-0- Gate 6 Design KZ226 Transport


151 Road 01-062017 31-102017 Equitable Share – 500 – –
1Km Documentation Mkhambathini LM Infrastructure

Majeza New Gravel Road- 0.00- Gate 6 Design KZ227 Richmond Transport
152 Road 01-062017 30-092017 Equitable Share – 700 – –
1.1Km Documentation LM Infrastructure
Mangethe New Gravel Road-0.0- Gate 6 Design KZ225 Msunduzi Transport
153 Road 01-062017 30-082017 Equitable Share – 400 – –
0.6Km Documentation LM Infrastructure
Ndlovu New Gravel Road-L1116- Gate 6 Design KZ227 Richmond Transport
154 Road 1/5/2017 30/9/2017 Equitable Share – 1 500 – –
0-3.331Km Documentation LM Infrastructure

Nonzila New Gravel Road-0.0- Gate 6 Design KZ226 Transport


155 Road 1/6/2017 30/9/2017 Equitable Share – 500 – –
0.646Km Documentation Mkhambathini LM Infrastructure

Sontweni New Gravel Road- Gate 6 Design KZ226 Transport


156 Road 1/5/2017 30/9/2017 Equitable Share – 500 – –
From 0.00-0.525Km Documentation Mkhambathini LM Infrastructure

Udle Usuthe New Gravel Road- Gate 6 Design KZ222 uMngeni Transport
157 Road 01-062017 30-082017 Equitable Share – 360 – –
0.0-1.0 Documentation LM Infrastructure
Extention Of D481-Km2.902-
Gate 6 Design KZ223 Mooi Transport
158 Km6.102=3.2Km New Gravel Road 01-062017 30-082017 Equitable Share – 950 – –
Documentation Mpofana LM Infrastructure
Road

Phindangene New Gravel Road Gate 6 Design KZ224 Impende Transport


159 Road 01-062017 30-082017 Equitable Share – 1 900 – –
(Off D14 To Local Rd)-0-0.8 Documentation LM Infrastructure

Sbhelu New Gravel Road-0- Gate 6 Design KZ225 Msunduzi Transport


160 Road 01-062017 30-082017 Equitable Share – 600 – –
1.8Km(1.8Km) Documentation LM Infrastructure
Tholinhlanhla New Gravel Road Gate 6 Design KZ223 Mooi Transport
161 Road 01-062017 30-082017 Equitable Share – 700 – –
Phase 2(Km5-7)(2Km) Documentation Mpofana LM Infrastructure

Gate 6 Design KZ235 Transport


162 D2353 New Causeway Road 01-082017 30-112017 Equitable Share – 2 000 – –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ234 Umtshezi Transport


163 D385 New Causeway Road 03-042017 30-062017 Equitable Share – 2 000 – –
Documentation LM Infrastructure

Gate 6 Design KZ232 Transport


164 Foloyi New Causeway Road 01-062017 30-092017 Equitable Share – 1 000 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ235 Transport


165 L 2128 New Causeway Road 03-042017 30-082017 Equitable Share – 1 000 – –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ235 Transport


166 L444 Causeway Repairs Road 01-082017 30-112017 Equitable Share – 2 000 – –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ235 Transport


167 L459 New Causeway Road 03-042017 30-082017 Equitable Share – 1 000 – –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ232 Transport


168 Manseleni Causeway Road 01-062017 30-092017 Equitable Share – 1 000 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ235 Transport


169 P182 New Causeway Road 03-042017 30-082017 Equitable Share – 1 000 – –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ232 Transport


170 L1292 New Bridge Vehicle Bridge 03-042017 30-072017 Equitable Share – 1 000 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ232 Transport


171 L2019 New Bridge Vehicle Bridge 03-042017 30-072017 Equitable Share – 3 000 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ232 Transport


172 P32 New Bridge Vehicle Bridge 03-042017 30-072017 Equitable Share – 2 000 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ235 Transport


173 L464 New Bridge Vehicle Bridge 03-042017 30-082017 Equitable Share – 5 800 – –
Documentation Okhahlamba LM Infrastructure

Ezinyonyana Cp New Gravel Gate 6 Design KZ235 Transport


174 Road 01-082017 30-102017 Equitable Share – 1 500 – –
Road Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ235 Transport


175 L20 Link New Gravel Road Road 01-062017 30-082017 Equitable Share – 2 500 – –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ232 Transport


176 Bhiliya New Gravel Road Road 31-012017 31-032017 Equitable Share – 1 500 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ234 Umtshezi Transport


177 Magebulini New Gravel Road Road 02-102017 30-122017 Equitable Share – 1 000 – –
Documentation LM Infrastructure
Gate 6 Design KZ234 Umtshezi Transport
178 Majola New Gravel Road Road 01-052017 30-072017 Equitable Share – 2 250 – –
Documentation LM Infrastructure
Gate 6 Design KZ234 Umtshezi Transport
179 Mathunzaneni New Gravel Road Road 01-052017 30-072017 Equitable Share – 2 050 – –
Documentation LM Infrastructure

141
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ234 Umtshezi Transport


180 Umhlumba New Gravel Road Road 01-052017 30-072017 Equitable Share – 750 – –
Documentation LM Infrastructure
Gate 6 Design KZ234 Umtshezi Transport
181 Umswenya New Gravel Road Road 01-052017 30-072017 Equitable Share – 1 500 – –
Documentation LM Infrastructure

Gate 6 Design KZ232 Transport


182 Emadongeni New Gravel Road Road 01-062017 30-082017 Equitable Share – 1 500 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ232 Transport


183 Hholo New Gravel Road Road 31-012018 31-032018 Equitable Share – 1 250 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ232 Transport


184 Mnikeni New Gravel Road Road 01-062017 30-082017 Equitable Share – 1 500 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ254 Transport


185 D1322 New Causeway Road 01-052017 31-082017 Equitable Share – 3 500 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


186 D276 New Causeway Road 01-052017 31-082017 Equitable Share – 3 000 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


187 L1123 New Causeway Road 03-072017 30-102017 Equitable Share – 3 500 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


188 L1864 New Causeway Road 01-052017 31-082017 Equitable Share – 3 500 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


189 L2038 New Causeway Road 03-042017 30-062017 Equitable Share – 2 500 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


190 L2068 New Causeway Road 01-052017 31-082017 Equitable Share – 3 500 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


191 L2788 New Causeway Road 01-052017 31-082017 Equitable Share – 3 500 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


192 Headwall Materials Greytown Road 03-042017 30-032018 Equitable Share – 200 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


193 Headwall Materials Nquthu Road 03-042017 30-032018 Equitable Share – 350 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


194 A1288 New Gravel Road Road 03-042017 30-062017 Equitable Share – 1 500 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


195 D2288 New Gravel Road Road 02-102017 30-012018 Equitable Share – 800 – –
Documentation Dannhauser LM Infrastructure

Igoqwana Road New Gravel Gate 6 Design KZ254 Transport


196 Road 03-072017 31-102017 Equitable Share – 1 000 – –
Road Documentation Dannhauser LM Infrastructure

L1338 Extension New Gravel Gate 6 Design KZ254 Transport


197 Road 03-042017 30-062017 Equitable Share – 1 850 – –
Road Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


198 L3045 New Gravel Road Road 02-102017 30-012018 Equitable Share – 1 500 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


199 L3046 New Gravel Road Road 03-042017 30-062017 Equitable Share – 1 300 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


200 Mhlopheni New Gravel Road Road 03-042017 30-062017 Equitable Share – 2 150 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


201 Stradford Farm New Gravel Road Road 03-042017 30-062017 Equitable Share – 1 750 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


202 Ntabenzima New Gravel Road Road 03-072017 31-102017 Equitable Share – 1 800 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


203 Odadeni New Gravel Road Road 03-072017 31-102017 Equitable Share – 1 200 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


204 P549 New Sidewalk Road 03-042017 30-062017 Equitable Share – 2 000 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ254 Transport


205 P291 New Sidewalk Road 03-072017 15-122017 Equitable Share – 5 000 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ252 Newcastle Transport


206 New Causeway Material Road 01-082017 30-102017 Equitable Share – 100 – –
Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
207 D279 New Causeway Road 01-062017 30-082017 Equitable Share – 1 680 – –
Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
208 L1431 A New Causeway Road 31-012017 31-032017 Equitable Share – 400 – –
Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
209 L1431 B New Causeway Road 01-102017 30-122017 Equitable Share – 400 – –
Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
210 L1561 New Causeway Road 01-052017 30-072017 Equitable Share – 680 – –
Documentation LM Infrastructure

142
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ252 Newcastle Transport


211 L2416 A New Causeway Road 01-052017 30-072017 Equitable Share – 400 – –
Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
212 L2416 B New Causeway Road 01-052017 30-072017 Equitable Share – 400 – –
Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
213 L2848 New Causeway 1 Road 01-052017 30-072017 Equitable Share – 400 – –
Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
214 L2848 New Causeway 2 Road 01-062017 30-082017 Equitable Share – 400 – –
Documentation LM Infrastructure
L2872 (Thuthuka ) New Gate 6 Design KZ252 Newcastle Transport
215 Road 31-012017 31-032017 Equitable Share – 859 – –
Causeway Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
216 P 376/1 New Causeway Road 01-062017 30-082017 Equitable Share – 1 359 – –
Documentation LM Infrastructure

L3171 Manzana New Gravel Gate 6 Design KZ254 Transport


217 Road 01-082017 30-102017 Equitable Share – 2 365 – –
Road Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ252 Newcastle Transport


218 L1431 Ext New Gravel Road Road 01-062017 30-082017 Equitable Share – 1 375 – –
Documentation LM Infrastructure
L3173 (Kheshe) New Gravel Gate 6 Design KZ252 Newcastle Transport
219 Road 31-012017 31-032017 Equitable Share – 1 257 – –
Road Documentation LM Infrastructure
L3174 (Shisampama) New Gravel Gate 6 Design KZ252 Newcastle Transport
220 Road 01-102017 30-122017 Equitable Share – 2 200 – –
Road Documentation LM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
221 L3197 (Stotoni) New Gravel Road Road 01-052017 30-072017 Equitable Share – 3 139 – –
Documentation LM Infrastructure
Gate 6 Design KZ261 eDumbe Transport
222 Bucangose New Gravel Road Road 01-062017 30-092017 Equitable Share – 1 600 – –
Documentation LM Infrastructure
Efefe School New Gravel Road Gate 6 Design KZ265 Nongoma Transport
223 Road 01-062017 31-012018 Equitable Share – 2 100 – –
(Lic) Documentation LM Infrastructure
Gate 6 Design KZ262 Transport
224 Esigqumeni New Gravel Road Road 01-062017 30-092017 Equitable Share – 1 100 – –
Documentation uPhongolo LM Infrastructure
Gate 6 Design KZ263 Abaqulusi Transport
225 Ezinkanjini New Gravel Road (Lic) Road 01-062017 31-012018 Equitable Share – 2 600 – –
Documentation LM Infrastructure
Godlumkhonto School Access Gate 6 Design Transport
226 KZ266 Ulundi LM Road 01-062017 30-092017 Equitable Share – 650 – –
New Gravel Road Documentation Infrastructure
Silanda School Access New Gate 6 Design Transport
227 KZ266 Ulundi LM Road 01-042017 31-072017 Equitable Share – 1 700 – –
Gravel Road Documentation Infrastructure
Gate 6 Design Transport
228 Sqobelo New Gravel Road KZ266 Ulundi LM Road 01-082017 30-112017 Equitable Share – 1 450 – –
Documentation Infrastructure
Gate 6 Design KZ275 Mtubatuba Transport
229 Buzezweni New Gravel Road Road 01-042017 31-072017 Equitable Share – 1 950 – –
Documentation LM Infrastructure
Gate 6 Design KZ274 Hlabisa Transport
230 Kwalanga New Gravel Road Road 01-062017 30-092017 Equitable Share – 800 – –
Documentation LM Infrastructure
Gate 6 Design KZ274 Hlabisa Transport
231 Majindi New Gravel Road (Lic) Road 01-062017 31-012018 Equitable Share – 1 400 – –
Documentation LM Infrastructure

Malolini (L2926) Phase 2 New Gate 6 Design KZ273 The big Transport
232 Road 01-042017 31-072017 Equitable Share – 2 000 – –
Gravel Road Documentation five false bay LM Infrastructure

Manqayini School Access New Gate 6 Design Transport


233 KZ272 Jozini LM Road 01-042017 31-072017 Equitable Share – 550 – –
Gravel Road Documentation Infrastructure
KZ271
Mboma Primary School Access Gate 6 Design Transport
234 Umhlabuyalingan Road 01-042017 31-072017 Equitable Share – 650 – –
New Gravel Road Documentation Infrastructure
a LM
Gate 6 Design Transport
235 Mpondwana New Gravel Road KZ272 Jozini LM Road 01-082017 30-112017 Equitable Share – 1 500 – –
Documentation Infrastructure
KZ271
Gate 6 Design Transport
236 Mqobela New Gravel Road Umhlabuyalingan Road 01-082017 30-112017 Equitable Share – 1 250 – –
Documentation Infrastructure
a LM
Gate 6 Design KZ275 Mtubatuba Transport
237 Ngwane New Gravel Road Road 01-082017 30-112017 Equitable Share – 1 500 – –
Documentation LM Infrastructure

Nkomo Primary School Access Gate 6 Design KZ273 The big Transport
238 Road 01-062017 30-092017 Equitable Share – 650 – –
New Gravel Road Documentation five false bay LM Infrastructure

Gate 6 Design KZ273 The big Transport


239 Nqobizizwe Phase 1 Gravel Road Road 01-082017 30-112017 Equitable Share – 1 550 – –
Documentation five false bay LM Infrastructure

Gate 6 Design KZ275 Mtubatuba Transport


240 Nsabalele School Gravel Road Road 01-062017 30-092017 Equitable Share – 650 – –
Documentation LM Infrastructure
KZ271
Pepane (L2799) New Gravel Gate 6 Design Transport
241 Umhlabuyalingan Road 01-062017 30-092017 Equitable Share – 1 500 – –
Road Documentation Infrastructure
a LM
Gate 6 Design KZ274 Hlabisa Transport
242 Qalindlela New Gravel Road Road 01-042017 31-072017 Equitable Share – 800 – –
Documentation LM Infrastructure

Sambane School Access Access Gate 6 Design Transport


243 KZ272 Jozini LM Road 01-062017 31-012018 Equitable Share – 1 350 – –
New Gravel Road (Lic) Documentation Infrastructure

Buildings Constuction Major And Gate 6 Design DC28 UThungulu Transport


244 Road 01-042017 31-032020 Equitable Share – 5 000 5 000 5 000
Minor Works Documentation DM Infrastructure
KZ281
Gate 6 Design Transport
245 A2200 New Gravel Road Mbonambi/Mfoloz Road 01-062017 30-092017 Equitable Share – 1 600 – –
Documentation Infrastructure
i LM

Corridale School (L1240) Access Gate 6 Design KZ286 Nkandla Transport


246 Road 01-062017 30-092017 Equitable Share – 1 900 – –
New Gravel Road (Lic) Documentation LM Infrastructure

Gate 6 Design KZ282 Transport


247 Ezinsimbini New Gravel Road Road 01-042017 31-072017 Equitable Share – 520 – –
Documentation uMhlathuze LM Infrastructure

143
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ285 Transport


248 Mgojane New Gravel Road Road 01-042017 31-072017 Equitable Share – 1 200 – –
Documentation Mthonjaneni LM Infrastructure

Gate 6 Design KZ283 Transport


249 Mhlushwa New Gravel Road Road 01-062017 30-092017 Equitable Share – 2 000 – –
Documentation Ntambanana LM Infrastructure

Ntabebomvu Phase 4 New Gravel Gate 6 Design KZ283 Transport


250 Road 01-042017 31-072017 Equitable Share – 1 250 – –
Road Documentation Ntambanana LM Infrastructure

Gate 6 Design KZ284 Umlalazi Transport


251 Sgodo (L627) New Gravel Road Road 01-062017 30-092019 Equitable Share – 1 900 1 150 –
Documentation LM Infrastructure

Gate 6 Design KZ282 Transport


252 Sigawula New Gravel Road Road 01-062017 30-092019 Equitable Share – 880 650 –
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ285 Transport


253 Soqiwe New Gravel Road Road 01-062017 30-092017 Equitable Share – 700 – –
Documentation Mthonjaneni LM Infrastructure

Gate 6 Design KZ294 Transport


254 A2867 Structure Road 01-042017 31-032018 Equitable Share – 2 000 – –
Documentation Maphumulo LM Infrastructure

Gate 6 Design KZ294 Transport


255 D1661 Structure Road 01-042017 31-032018 Equitable Share – 2 000 – –
Documentation Maphumulo LM Infrastructure

Gate 6 Design KZ293 Transport


256 L1039 Structure 1 Road 01-042017 31-032018 Equitable Share – 2 000 – –
Documentation NdwedweLM Infrastructure
Gate 6 Design KZ293 Transport
257 L1039 Structure 2 Road 01-042017 31-032018 Equitable Share – 2 000 – –
Documentation NdwedweLM Infrastructure

Gate 6 Design KZ292 Transport


258 Materials New Gravel Road Road 01-042017 31-032018 Equitable Share – 1 658 – –
Documentation KwaDukuza LM Infrastructure

Gate 6 Design KZ294 Transport


259 A2520 Gravel New Gravel Road Road 01-042017 31-032018 Equitable Share – 2 000 – –
Documentation Maphumulo LM Infrastructure

A3957 Mavundla New Gravel Gate 6 Design KZ293 Transport


260 Road 01-042017 31-032018 Equitable Share – 2 000 – –
Road Documentation NdwedweLM Infrastructure

Gate 6 Design KZ292 Transport


261 Fuels New Gravel Road Road 01-042017 31-032018 Equitable Share – 87 – –
Documentation KwaDukuza LM Infrastructure

Gate 6 Design KZ293 Transport


262 Mpanza New Gravel Road Road 01-042017 31-032018 Equitable Share – 2 000 – –
Documentation NdwedweLM Infrastructure
Ol01929 Ndabakhathaza Rd New Gate 6 Design KZ293 Transport
263 Road 01-042017 31-032018 Equitable Share – 2 000 – –
Gravel Road Documentation NdwedweLM Infrastructure
Gate 6 Design KZ291 Mandeni Transport
264 Ol03643 Embo New Gravel Road Road 01-042017 31-032018 Equitable Share – 2 000 – –
Documentation LM Infrastructure

A1655 Road Pipes & Headwalls Gate 6 Design KZ294 Transport


265 Road 01-042017 31-032018 Equitable Share – 195 – –
Contract 1 Documentation Maphumulo LM Infrastructure

A1655 Road Pipes & Headwalls Gate 6 Design KZ294 Transport


266 Road 01-042017 31-032018 Equitable Share – 195 – –
Contract 2 Documentation Maphumulo LM Infrastructure

A3957 Mavundla Road Pipes & Gate 6 Design KZ293 Transport


267 Road 01-042017 31-032018 Equitable Share – 195 – –
Headwall Contract 7 Documentation NdwedweLM Infrastructure
A3957 Mavundla Road Pipes & Gate 6 Design KZ293 Transport
268 Road 01-042017 31-032018 Equitable Share – 195 – –
Headwall Contract 8 Documentation NdwedweLM Infrastructure
A3957 Mavundla Road Pipes & Gate 6 Design KZ293 Transport
269 Road 01-042017 31-032018 Equitable Share – 195 – –
Headwall Contract 9 Documentation NdwedweLM Infrastructure
Mpanza Rd Pipes & Headwall Gate 6 Design KZ293 Transport
270 Road 01-042017 31-032018 Equitable Share – 195 – –
Contract 1 Documentation NdwedweLM Infrastructure
Mpanza Rd Pipes & Headwall Gate 6 Design KZ293 Transport
271 Road 01-042017 31-032018 Equitable Share – 195 – –
Contract 2 Documentation NdwedweLM Infrastructure

Gate 6 Design KZ294 Transport


272 New Gravel Road Road 01-042017 31-032018 Equitable Share – 2 000 – –
Documentation Maphumulo LM Infrastructure

Ol01929 Ndabakhathaza Rd
Gate 6 Design KZ293 Transport
273 Road Pipes & Headwall Contract Road 01-042017 31-032018 Equitable Share – 195 – –
Documentation NdwedweLM Infrastructure
2

Ol01929 Ndabakhathaza Road Gate 6 Design KZ293 Transport


274 Road 01-042017 31-032018 Equitable Share – 195 – –
Pipes & Headwall Contract 1 Documentation NdwedweLM Infrastructure

Ol01929 Ndabakhathaza Road Gate 6 Design KZ293 Transport


275 Road 01-042017 31-032018 Equitable Share – 195 – –
Pipes & Headwall Contract 3 Documentation NdwedweLM Infrastructure

Ol03643 Embo Road Pipes & Gate 6 Design KZ291 Mandeni Transport
276 Road 01-042017 31-032018 Equitable Share – 195 – –
Headwall Contract 1 Documentation LM Infrastructure
Ol03643 Embo Road Pipes & Gate 6 Design KZ291 Mandeni Transport
277 Road 01-042017 31-032018 Equitable Share – 195 – –
Headwall Contract 2 Documentation LM Infrastructure

Gate 6 Design KZ292 Transport


278 Plant New Gravel Road Road 01-042017 31-032018 Equitable Share – 685 – –
Documentation KwaDukuza LM Infrastructure

Gate 6 Design Transport


279 Causeway A1614 ETH Metro Road 01-042017 31-032018 Equitable Share – 1 500 – –
Documentation Infrastructure
Gate 6 Design Transport
280 Causeway D991 ETH Metro Road 01-042017 31-032018 Equitable Share – 1 500 – –
Documentation Infrastructure
Gate 6 Design Transport
281 Causeway L2842(Phikelela ETH Metro Road 01-042017 31-032018 Equitable Share – 1 500 – –
Documentation Infrastructure

144
Annexure Table B5 – Vote 12 : Transport

Inanda Post Office New Gravel Gate 6 Design Transport


282 ETH Metro Road 01-042017 31-032018 Equitable Share – 1 840 – –
Road Documentation Infrastructure
Gate 6 Design Transport
283 Khanyisani New Gravel Road ETH Metro Road 01-042017 31-032018 Equitable Share – 1 400 – –
Documentation Infrastructure
Gate 6 Design Transport
284 Mfanyana New Gravel Road ETH Metro Road 01-042017 31-032018 Equitable Share – 1 500 – –
Documentation Infrastructure
Gate 6 Design Transport
285 Ngonyameni New Gravel Road ETH Metro Road 01-042017 31-032018 Equitable Share – 1 500 – –
Documentation Infrastructure
Gate 6 Design Transport
286 Ntuthuko New Gravel Road ETH Metro Road 01-042017 31-032018 Equitable Share – 1 150 – –
Documentation Infrastructure
Gate 6 Design Transport
287 Masomini New Gravel Road ETH Metro Road 01-042017 31-032018 Equitable Share – 1 500 – –
Documentation Infrastructure

Gate 6 Design KZ435 Transport


288 Mgazi Causeway On L2299 Road 01-042017 31 June 2018 Equitable Share – 4 500 – –
Documentation Umzimkhulu LM Infrastructure

Stc3898 Mt.Sheba Malenge Gate 6 Design KZ435 Transport


289 Road 01-042017 31 June 2018 Equitable Share – 200 – –
B/River Causeway Documentation Umzimkhulu LM Infrastructure

D483 Causeway-Erosion Gate 6 Design KZ434 Transport


290 Road 01-082017 31-102018 Equitable Share – 1 000 – –
Protection Documentation Ubuhlebezwe LM Infrastructure

Kwamawela Box Culvert On Gate 6 Design KZ434 Transport


291 Road 01-062017 01-092018 Equitable Share – 3 000 – –
L2816 @ Km0.8 Documentation Ubuhlebezwe LM Infrastructure

Mazazini Causeway On L1529 Gate 6 Design KZ434 Transport


292 Road 01-082017 31-102018 Equitable Share – 400 – –
@Km 1.9 Documentation Ubuhlebezwe LM Infrastructure

Repairs To Mahlubini Causeway Gate 6 Design KZ434 Transport


293 Road 01-062017 01-092018 Equitable Share – 1 500 – –
On L2821 Documentation Ubuhlebezwe LM Infrastructure

Chancele-Mahawini Rd (0-6Km) Gate 6 Design KZ435 Transport


294 Road 01-072017 31-102018 Equitable Share – 2 250 – –
6Km New Gravel Road Documentation Umzimkhulu LM Infrastructure

Dumisa/Thembalilhle New Gravel Gate 6 Design KZ435 Transport


295 Road 01-072017 31-102018 Equitable Share – 1 500 – –
Road - (0-4.8Km) 4.8Km Documentation Umzimkhulu LM Infrastructure

Ezitendeni Rd L3204 (0-


Gate 6 Design Transport
296 0.771Km) (0.771Km) New Gravel KZ431 Ingwe LM Road 01-072017 31 Nov 2018 Equitable Share – 350 – –
Documentation Infrastructure
Road

Gearbox New Gravel Rd L3208 Gate 6 Design Transport


297 KZ431 Ingwe LM Road 01-072017 31 Nov 2018 Equitable Share – 1 200 – –
(0-1.898Km) (1.898Km) Documentation Infrastructure

Gate 6 Design KZ435 Transport


298 Gijima New Gravel Road Road 01-072017 31-102018 Equitable Share – 1 500 – –
Documentation Umzimkhulu LM Infrastructure

Machobeni New Gravel Rd L909 Gate 6 Design Transport


299 KZ431 Ingwe LM Road 01-072017 31 Nov 2018 Equitable Share – 650 – –
(0-2.593Km) (2.593Km) Documentation Infrastructure

Mafabela New Gravel Road - Gate 6 Design KZ435 Transport


300 Road 01-042017 31 June 2018 Equitable Share – 1 500 – –
L2254 Phase 2 (0-5Km) 5Km Documentation Umzimkhulu LM Infrastructure

Mthoko Gwala New Gravel Road Gate 6 Design Transport


301 KZ431 Ingwe LM Road 01-072017 31 Nov 2018 Equitable Share – 600 – –
L2059 (0-1.625Km) (1.625Km) Documentation Infrastructure

Nolangeni/Marhwaqa (0-4.3Km) Gate 6 Design KZ435 Transport


302 Road 01-072017 31-102018 Equitable Share – 1 500 – –
4.3Km New Gravel Road Documentation Umzimkhulu LM Infrastructure

Ntlambamasoka/Mvubukazi (0- Gate 6 Design KZ435 Transport


303 Road 01-072017 31-102018 Equitable Share – 2 200 – –
6.6Km) 6.6Km New Gravel Road Documentation Umzimkhulu LM Infrastructure

Okhetheni New Gravel Road Gate 6 Design Transport


304 KZ431 Ingwe LM Road 01-072017 31 Nov 2018 Equitable Share – 500 – –
L3205 (0-1.029Km) (1.029Km) Documentation Infrastructure

Sdungeni /Nazareth (0-2.8Km) Gate 6 Design KZ435 Transport


305 Road 01-072017 31-102018 Equitable Share – 1 400 – –
2.8Km New Gravel Road Documentation Umzimkhulu LM Infrastructure

Skhulu/Mnceba (0-3.3Km) 3.3Km Gate 6 Design KZ435 Transport


306 Road 01-072017 31-102018 Equitable Share – 1 800 – –
New Gravel Road Documentation Umzimkhulu LM Infrastructure

Sondondo Rd L3206 (0-


Gate 6 Design Transport
307 2.411Km) (2.411Km) New Gravel KZ431 Ingwe LM Road 01-072017 31 Nov 2018 Equitable Share – 1 300 – –
Documentation Infrastructure
Road

Teekloof/Mfundweni (0-4Km) Gate 6 Design KZ435 Transport


308 Road 01-042017 31 June 2018 Equitable Share – 1 800 – –
4Km New Gravel Road Documentation Umzimkhulu LM Infrastructure

Old Khethokuhle Rd L3207 (0-


Gate 6 Design Transport
309 1.028Km) (1.028Km) New Gravel KZ431 Ingwe LM Road 01-072017 31 Nov 2018 Equitable Share – 600 – –
Documentation Infrastructure
Road

Diphini Rd L3042 (0-2.5Km) Gate 6 Design KZ434 Transport


310 Road 01-042017 01-062018 Equitable Share – 2 000 – –
2.5Km New Gravel Road Documentation Ubuhlebezwe LM Infrastructure

Gate 6 Design KZ434 Transport


311 Ext. Of D309 New Gravel Road Road 01-042017 01-062018 Equitable Share – 1 500 – –
Documentation Ubuhlebezwe LM Infrastructure

145
Annexure Table B5 – Vote 12 : Transport

L3043 Ngamazini Rd (0-


Gate 6 Design KZ434 Transport
312 2.125Km) 2.125Km New Gravel Road 01-082017 31-102018 Equitable Share – 700 – –
Documentation Ubuhlebezwe LM Infrastructure
Road

Matatane Rd(0-2.4Km) (2.4Km) Gate 6 Design KZ434 Transport


313 Road 01-062017 01-092018 Equitable Share – 860 – –
New Gravel Road Documentation Ubuhlebezwe LM Infrastructure

Gate 4 Concept
KZ213 Umzumbe Transport
314 A2333 New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 454 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ212 UmdoniI Transport
315 A2712 New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 500 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ216 Hibuscus Transport
316 Bhudubhudu New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 100 –
Coast LM Infrastructure
Feasibility

Gate 4 Concept
KZ211 Vulamehlo Transport
317 L2900 New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 100 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ211 Vulamehlo Transport
318 D2386 New Gravel Road And Viability Or Road 01-062019 30-112019 Equitable Share – – 3 000 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ212 UmdoniI Transport
319 A2712 New Gravel Road And Viability Or Road 01-062019 30-112019 Equitable Share – – 2 500 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ215 Transport
320 Khuthu New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 100 –
Ezinqolweni LM Infrastructure
Feasibility

Gate 4 Concept
KZ215 Transport
321 L1027 New Gravel Road And Viability Or Road 01-062019 30-092019 Equitable Share – – 1 100 –
Ezinqolweni LM Infrastructure
Feasibility

Gate 4 Concept
KZ216 Hibuscus Transport
322 L1815 New Gravel Road And Viability Or Road 01-072019 30-112019 Equitable Share – – 1 100 –
Coast LM Infrastructure
Feasibility

Gate 4 Concept
L2445 (Bhomela) New Gravel KZ216 Hibuscus Transport
323 And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 100 –
Road Coast LM Infrastructure
Feasibility

Gate 4 Concept
KZ215 Transport
324 L2777 New Gravel Road And Viability Or Road 01-062019 30-112019 Equitable Share – – 1 550 –
Ezinqolweni LM Infrastructure
Feasibility

Gate 4 Concept
KZ211 Vulamehlo Transport
325 L3199 New Gravel Road And Viability Or Road 01-072019 30-112019 Equitable Share – – 1 200 –
LM Infrastructure
Feasibility

Gate 4 Concept KZ214


Transport
326 Mvula New Gravel Road And Viability Or uMuziwabantu Road 01-062019 30-112019 Equitable Share – – 2 500 –
Infrastructure
Feasibility LM

Gate 4 Concept
KZ211 Vulamehlo Transport
327 Ncabela New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 300 –
LM Infrastructure
Feasibility

Gate 4 Concept KZ214


Transport
328 Ol 3293 New Gravel Road And Viability Or uMuziwabantu Road 01-042018 31-032019 Equitable Share – – 2 500 –
Infrastructure
Feasibility LM

Gate 4 Concept KZ214


Transport
329 Ol 3436 New Gravel Road And Viability Or uMuziwabantu Road 01-042018 31-032019 Equitable Share – – 1 100 –
Infrastructure
Feasibility LM

Gate 4 Concept
KZ211 Vulamehlo Transport
330 Ezivandeni New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 200 –
LM Infrastructure
Feasibility

Gate 4 Concept
Geothec,Design,Eia New Gravel KZ216 Hibuscus Transport
331 And Viability Or Road 01-042018 31-032019 Equitable Share – – 5 500 –
Road Coast LM Infrastructure
Feasibility

Gate 4 Concept
L2692 Extension New Gravel KZ213 Umzumbe Transport
332 And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 200 –
Road LM Infrastructure
Feasibility

146
Annexure Table B5 – Vote 12 : Transport

Gate 4 Concept
KZ211 Vulamehlo Transport
333 Mandlalathi New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 3 000 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ211 Vulamehlo Transport
334 Ndabeni New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 3 000 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ213 Umzumbe Transport
335 Off D859 New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 200 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ213 Umzumbe Transport
336 Off Gebhasi New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 500 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ215 Transport
337 Thenjani New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 550 –
Ezinqolweni LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
338 Madlala Causeway And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 800 –
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
339 Mantanta Causeway And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 800 –
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ221 Transport
340 Shange New Gravel Road And Viability Or Road 01-062018 31-102018 Equitable Share – – 800 –
uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
341 Mantimbane New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 300 –
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
Ntombela New Gravel Road (Off KZ225 Msunduzi Transport
342 And Viability Or Road 01-042018 31-032019 Equitable Share – – 954 –
D1125) LM Infrastructure
Feasibility

Gate 4 Concept
KZ221 Transport
343 Eskhotho New Gravel Road And Viability Or Road 01-062018 27-102018 Equitable Share – – 800 –
uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
Ext D87 - D2051 Emthizane New KZ221 Transport
344 And Viability Or Road 01-062018 28-102018 Equitable Share – – 1 400 –
Gravel Road Phase 2 uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
KZ221 Transport
345 L1645 New Gravel Road And Viability Or Road 01-062018 30-102018 Equitable Share – – 400 –
uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
Mbalenhle New Gravel Road KZ221 Transport
346 And Viability Or Road 01-062018 26-102018 Equitable Share – – 800 –
Phase 2 uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
Olo1162 Trustfeed New Hanover KZ221 Transport
347 And Viability Or Road 01-062018 29-102018 Equitable Share – – 1 200 –
New Gravel Road uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
Hadebe New Gravel Road KZ226 Transport
348 And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 800 –
(Extension) Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
349 Madlala New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 000 –
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
350 Mjondolo New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 300 –
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
351 Mpandlana New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 600 –
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ227 Richmond Transport
352 Number 4 New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 600 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
353 Phungula New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 300 –
Mkhambathini LM Infrastructure
Feasibility

147
Annexure Table B5 – Vote 12 : Transport

Gate 4 Concept
Genye New Gravel Road (Off KZ225 Msunduzi Transport
354 And Viability Or Road 01-042018 31-032019 Equitable Share – – 795 –
D1126 Loop Back To D1126) LM Infrastructure
Feasibility

Gate 4 Concept
KZ223 Mooi Transport
355 Makhuzeni New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 650 –
Mpofana LM Infrastructure
Feasibility

Gate 4 Concept
KZ224 Impende Transport
356 Mlaba New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 060 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ225 Msunduzi Transport
357 Nxamalala New Gravel Road 3 And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 060 –
LM Infrastructure
Feasibility

Gate 4 Concept
Shobalensimbi New Gravel Road KZ225 Msunduzi Transport
358 And Viability Or Road 01-042018 31-032019 Equitable Share – – 795 –
Ext. LM Infrastructure
Feasibility

Gate 4 Concept
Zondi New Gravel Road (Off KZ225 Msunduzi Transport
359 And Viability Or Road 01-042018 31-032019 Equitable Share – – 1 060 –
Ezakhiweni New Gravel Road) LM Infrastructure
Feasibility

Gate 2 Strategic KZ234 Umtshezi Transport


360 D1244 New Causeway Road 01-042018 01-072018 Equitable Share – – 2 500 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ232 Transport


361 D1281 New Causeway Repair Road 01-062018 30-092018 Equitable Share – – 2 000 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


362 D1298 New Causeway Repair Road 01-062018 30-092018 Equitable Share – – 2 000 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


363 D1371 New Causeway Repair Road 01-062018 30-092018 Equitable Share – – 2 000 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


364 Majola New Causeway Road 01-072018 01-102018 Equitable Share – – 2 500 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


365 Mbatha New Causeway Road 01-042018 01-072018 Equitable Share – – 2 500 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


366 Mswenya New Causeway Road 01-042018 01-072018 Equitable Share – – 2 500 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ232 Transport


367 L2469 New Bridge Vehicle Bridge 01-062018 30-092018 Equitable Share – – 8 000 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


368 Madondo New Bridge Vehicle Bridge 01-072018 01-102018 Equitable Share – – 8 500 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ232 Transport


369 Amaswazi New Gravel Road Road 01-042018 01-062018 Equitable Share – – 2 250 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


370 Buphofini New Gravel Road Road 01-042018 01-062018 Equitable Share – – 1 000 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


371 Mathenga New Gravel Road Road 01-042018 01-062018 Equitable Share – – 3 000 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ232 Transport


372 Ntambose New Gravel Road Road 01-042018 01-062018 Equitable Share – – 1 000 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


373 Ugomba New Gravel Road Road 01-042018 01-062018 Equitable Share – – 1 000 –
Resourcing eMnambhithi LM Infrastructure

D 1277 Extention New Gravel Gate 2 Strategic KZ232 Transport


374 Road 01-062018 30-082018 Equitable Share – – 1 750 –
Road Resourcing eMnambhithi LM Infrastructure

D444 Glenrust School New Gate 2 Strategic KZ235 Transport


375 Road 01-052018 30-072018 Equitable Share – – 1 350 –
Gravel Road Resourcing Okhahlamba LM Infrastructure

Dabe Extension New Gravel Gate 2 Strategic KZ232 Transport


376 Road 01-072018 01-092018 Equitable Share – – 1 750 –
Road Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


377 Gomala New Gravel Road Road 01-062018 30-082018 Equitable Share – – 1 500 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


378 Hlathini New Gravel Road Road 01-062018 30-082018 Equitable Share – – 1 500 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


379 Kopleegte New Gravel Road Road 01-072018 01-092018 Equitable Share – – 1 800 –
Resourcing eMnambhithi LM Infrastructure

148
Annexure Table B5 – Vote 12 : Transport

Gate 2 Strategic KZ232 Transport


380 Mabhomane New Gravel Road Road 01-062018 30-082018 Equitable Share – – 1 250 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


381 Magebulini New Gravel Road Road 01-042018 01-062018 Equitable Share – – 1 000 –
Resourcing eMnambhithi LM Infrastructure

Malandela Extension New Gravel Gate 2 Strategic KZ235 Transport


382 Road 01-052018 30-072018 Equitable Share – – 1 000 –
Road Resourcing Okhahlamba LM Infrastructure

Gate 2 Strategic KZ232 Transport


383 Mangedini New Gravel Road Road 01-072018 01-092018 Equitable Share – – 1 500 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


384 Mbatha New Gravel Road Road 01-072018 01-092018 Equitable Share – – 2 000 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


385 Mkhono New Gravel Road Road 01-062018 30-082018 Equitable Share – – 1 400 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


386 Mugani New Gravel Road Road 01-072018 01-092018 Equitable Share – – 1 900 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


387 Mziyonke New Gravel Road Road 01-062018 30-082018 Equitable Share – – 1 800 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


388 Okhalweni New Gravel Road Road 01-062018 30-082018 Equitable Share – – 1 500 –
Resourcing eMnambhithi LM Infrastructure

Sibhukuza Extention New Gravel Gate 2 Strategic KZ235 Transport


389 Road 01-052018 30-072018 Equitable Share – – 1 000 –
Road Resourcing Okhahlamba LM Infrastructure

Gate 2 Strategic KZ235 Transport


390 Gazaneni New Causeway Road 01-082018 30-112018 Equitable Share – – 5 000 –
Resourcing Okhahlamba LM Infrastructure

Gate 2 Strategic KZ235 Transport


391 L1182 New Causeway Road 01-082018 30-112018 Equitable Share – – 5 000 –
Resourcing Okhahlamba LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


392 L2525 New Causeway Road 01-052017 31-082017 Equitable Share – – 3 500 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


393 L2723 New Causeway Road 01-052017 31-082017 Equitable Share – – 300 –
Resourcing LM Infrastructure

Haladu Extension New Gravel Gate 2 Strategic KZ234 Umtshezi Transport


394 Road 01-042018 31-032019 Equitable Share – – 4 000 –
Road Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


395 L1867 New Gravel Road Road 01-042018 30-032019 Equitable Share – – 100 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ235 Transport


396 Mankomane New Gravel Road Road 01-072018 31-102018 Equitable Share – – 1 500 –
Resourcing Okhahlamba LM Infrastructure

Gate 2 Strategic KZ236 Transport


397 Mnqunyeni New Gravel Road Road 01-072018 30-092018 Equitable Share – – 1 500 –
Resourcing Imbabazane LM Infrastructure

Gate 2 Strategic KZ235 Transport


398 Msawenkosi New Gravel Road Road 01-072018 31-102018 Equitable Share – – 1 794 –
Resourcing Okhahlamba LM Infrastructure

Gate 2 Strategic KZ235 Transport


399 Odlongo New Gravel Road Road 01-072018 31-102018 Equitable Share – – 2 340 –
Resourcing Okhahlamba LM Infrastructure

Gate 2 Strategic KZ232 Transport


400 Estulwa New Gravel Road Road 01-072018 31-102018 Equitable Share – – 900 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


401 Gambushe New Gravel Road Road 01-072018 31-102018 Equitable Share – – 2 886 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


402 L1859 New Gravel Road Road 01-072018 31-102018 Equitable Share – – 1 500 –
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


403 Biskop New Causeway Road 01-042018 30-032019 Equitable Share – – 2 886 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


404 New Causeway Materials Road 01-042018 30-032019 Equitable Share – – 1 560 –
Resourcing LM Infrastructure

L2848 Gcwabazal New Gate 2 Strategic KZ252 Newcastle Transport


405 Road 01-042018 30-032019 Equitable Share – – 2 340 –
Causeway No 1 Resourcing LM Infrastructure

L2848 Gcwabaza New Causeway Gate 2 Strategic KZ252 Newcastle Transport


406 Road 01-042018 30-032019 Equitable Share – – 2 340 –
No 2 Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


407 L2416 A New Causeway Road 01-072017 30-092017 Equitable Share – – 200 –
Resourcing LM Infrastructure

149
Annexure Table B5 – Vote 12 : Transport

Gate 2 Strategic KZ252 Newcastle Transport


408 L2416 B New Causeway Road 01-072017 30-092017 Equitable Share – – 200 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


409 L3172 Biskop New Gravel Road Road 01-042018 30-062018 Equitable Share – – 200 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


410 D423 Ext New Gravel Road Road 01-072018 30-102018 Equitable Share – – 200 –
Resourcing LM Infrastructure

Emanantshini Road New Gravel Gate 2 Strategic KZ252 Newcastle Transport


411 Road 01-042018 30-062018 Equitable Share – – 200 –
Road Resourcing LM Infrastructure

Kwamancamane New Gravel Gate 2 Strategic KZ252 Newcastle Transport


412 Road 01-042018 30-062018 Equitable Share – – 532 –
Road Resourcing LM Infrastructure

Gate 2 Strategic KZ263 Abaqulusi Transport


413 Mkholokotho New Causeway Road 01-042018 31-032019 Equitable Share – – 2 750 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ265 Nongoma Transport


414 A996 New Gravel Road Road 01-042018 31-032019 Equitable Share – – 950 –
Resourcing LM Infrastructure

Gate 2 Strategic Transport


415 Donga New Gravel Road KZ266 Ulundi LM Road 01-042018 31-032019 Equitable Share – – 1 800 –
Resourcing Infrastructure

Gate 2 Strategic Transport


416 Kwabayeni New Gravel Road KZ266 Ulundi LM Road 01-042018 31-032019 Equitable Share – – 1 000 –
Resourcing Infrastructure

Gate 2 Strategic KZ261 eDumbe Transport


417 Kwandlela New Gravel Road Road 01-042018 31-032019 Equitable Share – – 1 700 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ265 Nongoma Transport


418 L2639 New Gravel Road Road 01-042018 31-032019 Equitable Share – – 1 300 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ262 Transport


419 Makhwabi New Gravel Road Road 01-042018 31-032019 Equitable Share – – 1 200 –
Resourcing uPhongolo LM Infrastructure

Gate 2 Strategic Transport


420 Ntontiyane New Gravel Road KZ266 Ulundi LM Road 01-042018 31-032019 Equitable Share – – 1 300 –
Resourcing Infrastructure

Gate 2 Strategic KZ274 Hlabisa Transport


421 Ngoqongweni New Causeway Road 01-042018 31-032019 Equitable Share – – – –
Resourcing LM Infrastructure

Bangizwe Primary School Access Gate 2 Strategic KZ273 The big Transport
422 Road 01-042018 31-032019 Equitable Share – – 650 –
New Gravel Road Resourcing five false bay LM Infrastructure

KZ271
Bhevula School Access New Gate 2 Strategic Transport
423 Umhlabuyalingan Road 01-042018 31-032019 Equitable Share – – 3 050 –
Gravel Road Resourcing Infrastructure
a LM

Gate 2 Strategic Transport


424 Jp New Gravel Road KZ272 Jozini LM Road 01-042018 31-032019 Equitable Share – – 1 550 –
Resourcing Infrastructure

Gate 2 Strategic KZ275 Mtubatuba Transport


425 Mshaya New Gravel Road Road 01-042018 31-032019 Equitable Share – – 1 900 –
Resourcing LM Infrastructure

Mthekelezi School Access New Gate 2 Strategic KZ274 Hlabisa Transport


426 Road 01-042018 31-032019 Equitable Share – – 500 –
Gravel Road Resourcing LM Infrastructure

Ngotweni School Access New Gate 2 Strategic KZ275 Mtubatuba Transport


427 Road 01-042018 31-032019 Equitable Share – – 650 –
Gravel Road Resourcing LM Infrastructure

Nqobizizwe School Access Phase Gate 2 Strategic KZ273 The big Transport
428 Road 01-042018 31-032019 Equitable Share – – 1 850 –
2 New Gravel Road Resourcing five false bay LM Infrastructure

Nyathini Road Phase 3 New Gate 2 Strategic KZ273 The big Transport
429 Road 01-042018 31-032019 Equitable Share – – 2 000 –
Gravel Road Resourcing five false bay LM Infrastructure

Othobothini Primary Access New Gate 2 Strategic Transport


430 KZ272 Jozini LM Road 01-042018 31-032019 Equitable Share – – 650 –
Gravel Road Resourcing Infrastructure

KZ271
Gate 2 Strategic Transport
431 Othungwini New Gravel Road Umhlabuyalingan Road 01-042019 31-032020 Equitable Share – – – 2 350
Resourcing Infrastructure
a LM

Qunwane School Access New Gate 2 Strategic KZ274 Hlabisa Transport


432 Road 01-042018 31-032019 Equitable Share – – 650 –
Gravel Road Resourcing LM Infrastructure

Gate 2 Strategic KZ275 Mtubatuba Transport


433 Shikishshela New Gravel Road Road 01-042018 31-032019 Equitable Share – – 1 900 –
Resourcing LM Infrastructure

Gate 2 Strategic Transport


434 Siziba Senkosi New Gravel Road KZ272 Jozini LM Road 01-042018 31-032019 Equitable Share – – 1 500 –
Resourcing Infrastructure

Gate 2 Strategic KZ285 Transport


435 Soqiwi New Gravel Road Road 01-042018 31-032019 Equitable Share – – 1 200 –
Resourcing Mthonjaneni LM Infrastructure

150
Annexure Table B5 – Vote 12 : Transport

Corridale School Access (L1240) Gate 2 Strategic KZ286 Nkandla Transport


436 Road 01-042018 31-032019 Equitable Share – – 1 200 –
New Gravel Road Resourcing LM Infrastructure

Gate 2 Strategic KZ282 Transport


437 Enjinini Gravel Road Road 01-042018 31-032019 Equitable Share – – 900 –
Resourcing uMhlathuze LM Infrastructure

Gate 2 Strategic KZ284 Umlalazi Transport


438 L797 New Gravel Road Road 01-042018 31-032019 Equitable Share – – 850 –
Resourcing LM Infrastructure

Gate 2 Strategic KZ286 Nkandla Transport


439 Masolosolo New Gravel Road Road 01-042018 31-032019 Equitable Share – – 850 –
Resourcing LM Infrastructure

KZ281
Gate 2 Strategic Transport
440 Mnqagayi New Gravel Road Mbonambi/Mfoloz Road 01-042018 31-032019 Equitable Share – – 1 700 –
Resourcing Infrastructure
i LM

Gate 2 Strategic KZ285 Transport


441 Ndiyaza New Gravel Road Road 01-042018 31-032019 Equitable Share – – 850 –
Resourcing Mthonjaneni LM Infrastructure

Gate 2 Strategic KZ283 Transport


442 Ndondwane New Gravel Road Road 01-042018 31-032019 Equitable Share – – 900 –
Resourcing Ntambanana LM Infrastructure

Gate 4 Concept
KZ294 Transport
443 A3911 Structure And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
444 D1517 Structure And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ294 Transport
445 L3064 Structure And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
446 Mpanza Structure And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ292 Transport
447 Materials New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 3 096 –
KwaDukuza LM Infrastructure
Feasibility

Gate 4 Concept
KZ294 Transport
448 A2520 New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ292 Transport
449 Fuels New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 87 –
KwaDukuza LM Infrastructure
Feasibility

Gate 4 Concept
KZ294 Transport
450 A3911 Structure And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
451 D1517 Structure And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ294 Transport
452 L3064 Structure And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
453 Mpanza Structure And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ292 Transport
454 Materials New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 3 096 –
KwaDukuza LM Infrastructure
Feasibility

Gate 4 Concept
KZ294 Transport
455 A2520 New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ292 Transport
456 Fuels New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 87 –
KwaDukuza LM Infrastructure
Feasibility

Gate 4 Concept
KZ291 Mandeni Transport
457 Ol03643 Embo New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 2 000 –
LM Infrastructure
Feasibility

Gate 4 Concept
A1655 Road Pipes & Headwalls KZ294 Transport
458 And Viability Or Road 01-042018 31-032019 Equitable Share – – 195 –
Contract 1 Maphumulo LM Infrastructure
Feasibility

151
Annexure Table B5 – Vote 12 : Transport

Gate 4 Concept
A1655 Road Pipes & Headwalls KZ294 Transport
459 And Viability Or Road 01-042018 31-032019 Equitable Share – – 195 –
Contract 2 Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
Ol03643 Embo Road Pipes & KZ291 Mandeni Transport
460 And Viability Or Road 01-042018 31-032019 Equitable Share – – 195 –
Headwall Contract 1 LM Infrastructure
Feasibility

Gate 4 Concept
Ol03643 Embo Road Pipes & KZ291 Mandeni Transport
461 And Viability Or Road 01-042018 31-032019 Equitable Share – – 195 –
Headwall Contract 2 LM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
462 Pipes & Headwall Contract 1 And Viability Or Road 01-042018 31-032019 Equitable Share – – 585 –
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
463 Pipes & Headwall Contract 2 And Viability Or Road 01-042018 31-032019 Equitable Share – – 585 –
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
464 Pipes & Headwall Contract 3 And Viability Or Road 01-042018 31-032019 Equitable Share – – 390 –
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ292 Transport
465 Plant New Gravel Road And Viability Or Road 01-042018 31-032019 Equitable Share – – 685 –
KwaDukuza LM Infrastructure
Feasibility

Gate 4 Concept
Transport
466 A3614 Causeway And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 500 –
Infrastructure
Feasibility

Gate 4 Concept
Transport
467 Mqeku Causeway And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 700 –
Infrastructure
Feasibility

Gate 4 Concept
Transport
468 Nduduzo Causeway And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 778 –
Infrastructure
Feasibility

Gate 4 Concept
Transport
469 Bivane New Gravel Road And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 500 –
Infrastructure
Feasibility

Gate 4 Concept
Transport
470 Eshowe New Gravel Road And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 500 –
Infrastructure
Feasibility

Gate 4 Concept
Transport
471 Gova New Gravel Road And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 840 –
Infrastructure
Feasibility

Gate 4 Concept
Transport
472 Maplangwe New Gravel Road And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 400 –
Infrastructure
Feasibility

Gate 4 Concept
Transport
473 Mntungwa New Gravel Road And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 450 –
Infrastructure
Feasibility

Gate 4 Concept
Transport
474 Umlambo New Gravel Road And Viability Or ETH Metro Road 01-042018 31-032019 Equitable Share – – 1 500 –
Infrastructure
Feasibility

Gate 4 Concept
KZ434 Transport
475 L1885 Causeway And Viability Or Road 01-042018 31 June 2018 Equitable Share – – 2 275 –
Ubuhlebezwe LM Infrastructure
Feasibility

Gate 4 Concept
Maxhini New Gravel Road (0- Transport
476 And Viability Or KZ431 Ingwe LM Road 31 June 2018 31 Sep 2018 Equitable Share – – 600 –
1.5Km)1.5Km Infrastructure
Feasibility

Gate 4 Concept
KZ435 Transport
477 Lukholweni New Gravel Road And Viability Or Road 01-072017 31-102017 Equitable Share – – 1 500 –
Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Gearbox (0-2Km)(2Km) New Transport
478 And Viability Or KZ431 Ingwe LM Road 31 June 2018 31 Sep 2018 Equitable Share – – 800 –
Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Hopewell/Magaqa New Gravel KZ435 Transport
479 And Viability Or Road 01-072017 31-102017 Equitable Share – – 1 100 –
Road Umzimkhulu LM Infrastructure
Feasibility

152
Annexure Table B5 – Vote 12 : Transport

Gate 4 Concept
Kiti Rd - (0-1.5Km) (1.5Km) New KZ432 Kwa Sani Transport
480 And Viability Or Road 01-042018 31 June 2018 Equitable Share – – 800 –
Gravel Road LM Infrastructure
Feasibility

Gate 4 Concept
Lugawini/Chamtu New Gravel KZ435 Transport
481 And Viability Or Road 01-042017 31 June 2017 Equitable Share – – 1 400 –
Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Lukhetheni/Ndlovini New Gravel KZ435 Transport
482 And Viability Or Road 01-072017 31-102017 Equitable Share – – 1 500 –
Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Makhaya/Gwijendlini New Gravel KZ435 Transport
483 And Viability Or Road 01-042017 31 June 2017 Equitable Share – – 300 –
Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Makhwapheni/Zwelisha New KZ435 Transport
484 And Viability Or Road 01-072017 31-102017 Equitable Share – – 1 200 –
Gravel Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
KZ435 Transport
485 Masamini New Gravel Road And Viability Or Road 01-072017 31-102017 Equitable Share – – 1 230 –
Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Mdayane Rd - (0-2Km) (2Km) Transport
486 And Viability Or KZ431 Ingwe LM Road 31 June 2018 31 Sep 2018 Equitable Share – – 800 –
New Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Memeza-Ngunjini New Gravel KZ435 Transport
487 And Viability Or Road 01-072017 31-102017 Equitable Share – – 2 000 –
Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Mqulela -(0-2Km(2Km) New Transport
488 And Viability Or KZ431 Ingwe LM Road 31 June 2018 31 Sep 2018 Equitable Share – – 800 –
Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Ndomshilwane New Gravel Road Transport
489 And Viability Or KZ431 Ingwe LM Road 31 June 2018 31 Sep 2018 Equitable Share – – 450 –
- (0-1Km)(1Km) Infrastructure
Feasibility

Gate 4 Concept
Nonguqa Extension Rd - (0-1Km) Transport
490 And Viability Or KZ431 Ingwe LM Road 31 June 2018 31 Sep 2018 Equitable Share – – 450 –
(1Km) New Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Vuka/Sneezwood New Gravel KZ435 Transport
491 And Viability Or Road 01-072017 31-102017 Equitable Share – – 950 –
Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Malephula Rd (0-2Km) (2Km) Transport
492 And Viability Or KZ431 Ingwe LM Road 31 June 2018 31 Sep 2018 Equitable Share – – 800 –
New Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Sigwedleni Rd (0-2Km)(2Km) KZ434 Transport
493 And Viability Or Road 01-042018 31 June 2018 Equitable Share – – 1 430 –
New Gravel Road Ubuhlebezwe LM Infrastructure
Feasibility

Gate 4 Concept
Bhekabelungu (0-1.2Km)(1.2Km) KZ434 Transport
494 And Viability Or Road 01-042018 31 June 2018 Equitable Share – – 1 625 –
New Gravel Road Ubuhlebezwe LM Infrastructure
Feasibility

Gate 4 Concept
Mdunge Rd (0-2Km) (2Km) New KZ434 Transport
495 And Viability Or Road 01-042018 31 June 2018 Equitable Share – – 900 –
Gravel Road Ubuhlebezwe LM Infrastructure
Feasibility

Safety Improvement Of P7- Gate 4 Concept


KZ225 Msunduzi Transport
496 2/D1128 Intersection (Widening And Viability Or Road 01-042018 31-032019 Equitable Share – – 500 –
LM Infrastructure
With Right Turn Refuge) Feasibility

Gate 4 Concept
KZ216 Hibuscus Transport
497 Bhudubhudu New Gravel Road And Viability Or Road 01-062019 30-112019 Equitable Share – – – 220
Coast LM Infrastructure
Feasibility

Gate 4 Concept
KZ211 Vulamehlo Transport
498 2900 New Gravel Road And Viability Or Road 01-082019 30-112019 Equitable Share – – – 6 050
LM Infrastructure
Feasibility

Gate 4 Concept
KZ211 Vulamehlo Transport
499 D2386 New Gravel Road And Viability Or Road 01-062019 30-112019 Equitable Share – – – 220
LM Infrastructure
Feasibility

Gate 4 Concept
KZ212 UmdoniI Transport
500 A2712 New Gravel Road And Viability Or Road 01-062019 30-112019 Equitable Share – – – 1 221
LM Infrastructure
Feasibility

153
Annexure Table B5 – Vote 12 : Transport

Gate 4 Concept
KZ215 Transport
501 L1027 New Gravel Road And Viability Or Road 01-062019 30-092019 Equitable Share – – – 220
Ezinqolweni LM Infrastructure
Feasibility

Gate 4 Concept
KZ216 Hibuscus Transport
502 L1815 New Gravel Road And Viability Or Road 01-072019 30-112019 Equitable Share – – – 691
Coast LM Infrastructure
Feasibility

Gate 4 Concept
KZ215 Transport
503 L2777 New Gravel Road And Viability Or Road 01-062019 30-112019 Equitable Share – – – 605
Ezinqolweni LM Infrastructure
Feasibility

Gate 4 Concept
KZ211 Vulamehlo Transport
504 L3199 New Gravel Road And Viability Or Road 01-072019 30-112019 Equitable Share – – – 3 300
LM Infrastructure
Feasibility

Gate 4 Concept KZ214


Transport
505 Mvula New Gravel Road And Viability Or uMuziwabantu Road 01-062019 30-112019 Equitable Share – – – 220
Infrastructure
Feasibility LM

Gate 4 Concept
KZ211 Vulamehlo Transport
506 Ncabela New Gravel Road And Viability Or Road 01-082019 31-032020 Equitable Share – – – 3 300
LM Infrastructure
Feasibility

Gate 4 Concept KZ214


Transport
507 Ol 3436 New Gravel Road And Viability Or uMuziwabantu Road 01-062019 30-112019 Equitable Share – – – 220
Infrastructure
Feasibility LM

Gate 4 Concept
KZ211 Vulamehlo Transport
508 Ndabeni New Gravel Road And Viability Or Road 01-062019 30-112019 Equitable Share – – – 220
LM Infrastructure
Feasibility

Gate 4 Concept
Gatsheni New Gravel Road Off KZ221 Transport
509 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 400
P9 Phase 2 uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
Eluthela New Gravel Road Off KZ221 Transport
510 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 1 000
D1025 To P423 uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
KZ221 Transport
511 Ext D1018 New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 1 200
uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
KZ221 Transport
512 Ezinqaweni New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 1 400
uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
Hlwemini School Off D1019 New KZ221 Transport
513 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 800
Gravel Road uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
KZ221 Transport
514 Madelifudi New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 800
uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
Pondo New Gravel Road Off KZ221 Transport
515 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 800
P423 uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
KZ221 Transport
516 Xhosha New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 800
uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
517 Banqobile New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
518 Doncabe New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
519 Gengeshe New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
520 Lombe New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 33 000
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
521 Mangwaneni New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

154
Annexure Table B5 – Vote 12 : Transport

Gate 4 Concept
KZ226 Transport
522 Mantungweni New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
523 Manyeleni New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
Mkhize New Gravel Road Phase KZ226 Transport
524 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
2 Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
525 Mthunyelwa New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
526 Muhali New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
527 Ngcongo New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
528 Nxumalo New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
529 Phatheni New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
530 Shangase New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
KZ226 Transport
531 Zakhiweni New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 450
Mkhambathini LM Infrastructure
Feasibility

Gate 4 Concept
Emapanekeni New Gravel Road KZ225 Msunduzi Transport
532 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 1 740
(Off D1226) LM Infrastructure
Feasibility

Gate 4 Concept
KZ225 Msunduzi Transport
533 Ezakhiweni New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 1 160
LM Infrastructure
Feasibility

Gate 4 Concept
Kwashange Rd (Off L1835) New KZ225 Msunduzi Transport
534 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 1 044
Gravel Road LM Infrastructure
Feasibility

Gate 4 Concept
Meya New Gravel Road (Off P7-2 KZ225 Msunduzi Transport
535 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 870
Lhs Just Before I/S P137&P402) LM Infrastructure
Feasibility

Gate 4 Concept
KZ225 Msunduzi Transport
536 Newkama New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 1 160
LM Infrastructure
Feasibility

Gate 4 Concept
Nyembe Rd (Off Shobalensimbi KZ225 Msunduzi Transport
537 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 870
Rd) New Gravel Road LM Infrastructure
Feasibility

Rocky Drift New Gravel Road Gate 4 Concept


KZ225 Msunduzi Transport
538 Phase 3 (Mid Section Of Phase 1 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 696
LM Infrastructure
& 2) Feasibility

Gate 2 Strategic KZ234 Umtshezi Transport


539 D343 New Causeway Repairs Road 01-062019 30-082019 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


540 D799 New Causeway Repairs Road 01-062019 30-082019 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


541 L474 New Causeway Repairs Road 01-062019 30-082019 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


542 Madlala New Causeway Road 01-042019 30-062019 Equitable Share – – – 2 500
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


543 Mpembe New Causeway Road 01-042019 30-062019 Equitable Share – – – 2 900
Resourcing LM Infrastructure

155
Annexure Table B5 – Vote 12 : Transport

Gate 2 Strategic KZ234 Umtshezi Transport


544 Ntshaba New Causeway Road 01-042019 30-062019 Equitable Share – – – 2 500
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


545 P182 New Causeway Road 01-062019 30-082019 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ232 Transport


546 P349 New Bridge Vehicle Bridge 01-062019 30-092019 Equitable Share – – – 10 000
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ232 Transport


547 Emagcekeni New Gravel Road Road 01-062019 30-082019 Equitable Share – – – 1 800
Resourcing eMnambhithi LM Infrastructure

Ganehoek Phase 3 New Local Gate 2 Strategic KZ234 Umtshezi Transport


548 Road 01-042019 30-062019 Equitable Share – – – 2 760
Road Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


549 Mabhekazi New Gravel Road Road 01-062019 30-082019 Equitable Share – – – 1 800
Resourcing LM Infrastructure

Madakaneni Ext New Gravel Gate 2 Strategic KZ234 Umtshezi Transport


550 Road 01-042019 30-062019 Equitable Share – – – 1 740
Road Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


551 Madlala Ext New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 1 500
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


552 Mazibuko New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 2 160
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


553 Mgazongaziwa Newgravel Road Road 01-062019 30-082019 Equitable Share – – – 1 500
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


554 Mkhize New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 2 280
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


555 Mpembe New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 1 740
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


556 Mthweni New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 1 920
Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


557 Munendlweni New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 1 920
Resourcing LM Infrastructure

Ncuijane Phase 3 New Gravel Gate 2 Strategic KZ234 Umtshezi Transport


558 Road 01-042019 30-062019 Equitable Share – – – 4 080
Road Resourcing LM Infrastructure

Gate 2 Strategic KZ232 Transport


559 Ngcongwane New Gravel Road Road 01-062019 30-082019 Equitable Share – – – 1 500
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


560 Ngunjini New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 2 040
Resourcing LM Infrastructure

Ntandabantu Ext New Gravel Gate 2 Strategic KZ234 Umtshezi Transport


561 Road 01-042019 30-062019 Equitable Share – – – 2 100
Road Resourcing LM Infrastructure

Gate 2 Strategic KZ234 Umtshezi Transport


562 Nungu New Gravel Road Road 01-062019 30-082019 Equitable Share – – – 1 800
Resourcing LM Infrastructure

Gate 2 Strategic KZ232 Transport


563 Umndeni New Gravel Road Road 01-062019 30-082019 Equitable Share – – – 1 800
Resourcing eMnambhithi LM Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


564 Gazaneni New Causeway Road 01-072019 30-102019 Equitable Share – – – 6 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


565 Ngabayena New Casueway Road 01-072019 30-102019 Equitable Share – – – 6 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


566 Songela Causeway Road 01-082019 30-112019 Equitable Share – – – 6 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ245 Umvoti Transport


567 L2525 New Causeway Road 01-042018 31-032019 Equitable Share – – – 200
Resourcing LM Infrastructure

Gate 2 Strategic KZ245 Umvoti Transport


568 L3097 New Causeway Road 01-072019 2019/09/31 Equitable Share – – – 6 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


569 Headwall Materials Msinga Road 01-042019 31-032020 Equitable Share – – – 1 000
Resourcing LM Infrastructure

Gate 2 Strategic Transport


570 Headwall Materials Nquthu KZ242 Nqutu LM Road 01-062019 28-022020 Equitable Share – – – 700
Resourcing Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


571 Cence Road New Gravel Road Road 01-082019 31-102020 Equitable Share – – – 1 500
Resourcing LM Infrastructure

156
Annexure Table B5 – Vote 12 : Transport

Chibide Extension New Gravel Gate 2 Strategic Transport


572 KZ242 Nqutu LM Road 01-072019 30-092019 Equitable Share – – – 2 250
Road Resourcing Infrastructure

Haladu Extension New Gravel Gate 2 Strategic Transport


573 KZ242 Nqutu LM Road 01-042019 31-032020 Equitable Share – – – 200
Road Resourcing Infrastructure

Gate 2 Strategic Transport


574 L1867 New Gravel Road KZ242 Nqutu LM Road 01-042019 30-032020 Equitable Share – – – 1 200
Resourcing Infrastructure

Gate 2 Strategic Transport


575 Magogo New Gravel Road KZ242 Nqutu LM Road 01-072019 30-092019 Equitable Share – – – 2 250
Resourcing Infrastructure

Gate 2 Strategic Transport


576 Mnqunyeni New Gravel Road KZ242 Nqutu LM Road 01-072019 30-092019 Equitable Share – – – 2 600
Resourcing Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


577 Nasoni New Gravel Road Road 01-082019 31-102020 Equitable Share – – – 1 500
Resourcing LM Infrastructure

Gate 2 Strategic KZ245 Umvoti Transport


578 Ntababomvu New Gravel Road Road 01-072019 30-092019 Equitable Share – – – 2 475
Resourcing LM Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


579 Onyoka New Gravel Road Road 01-082019 31-102020 Equitable Share – – – 1 125
Resourcing LM Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


580 Esihlabeni New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 3 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ244 Msinga Transport


581 Mpahlasini New Gravel Road Road 01-042019 30-062019 Equitable Share – – – 2 250
Resourcing LM Infrastructure

Thwaleyakhe Extension New Gate 2 Strategic KZ245 Umvoti Transport


582 Road 01-042019 30-062019 Equitable Share – – – 4 500
Gravel Road Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


583 New Causeway Material Road 01-042019 30-032020 Equitable Share – – – 200
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


584 D423 New Causeway Road 01-072019 30-092019 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


585 Kwamancamane New Causeway Road 01-072019 30-092019 Equitable Share – – – 1 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


586 L1566 New Causeway Road 01-072019 30-092019 Equitable Share – – – 1 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


587 L2415 New Causeway Road 01-072019 30-092019 Equitable Share – – – 1 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


588 L3171 New Causeway Road 01-072019 30-092019 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


589 L3174 New Causeway Road 01-072019 30-092019 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


590 Ogodweni New Causeway Road 01-072019 30-092019 Equitable Share – – – 1 000
Resourcing LM Infrastructure

L3170 Nkululeko New Gravel Gate 2 Strategic KZ252 Newcastle Transport


591 Road 01-072019 30-092019 Equitable Share – – – 3 057
Road Resourcing LM Infrastructure

D100 Ext / Stotoni New Gravel Gate 2 Strategic KZ252 Newcastle Transport
592 Road 01-072019 30-092019 Equitable Share – – – 935
Road Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


593 D377 Ext New Gravel Road Road 01-102019 31-122020 Equitable Share – – – 2 125
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


594 D378 Ext New Gravel Road Road 01-072019 30-092019 Equitable Share – – – 1 700
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


595 D459 Ext New Gravel Road Road 01-102019 31-122020 Equitable Share – – – 2 125
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


596 D514 Ext New Gravel Road Road 01-072019 30-092019 Equitable Share – – – 2 125
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


597 D538 Ext New Gravel Road Road 01-102019 31-122020 Equitable Share – – – 2 125
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


598 L 1563 Ext New Gravel Road Road 01-072019 30-092019 Equitable Share – – – 1 275
Resourcing LM Infrastructure

Gate 2 Strategic KZ252 Newcastle Transport


599 L2415Ext New Gravel Road Road 01-072019 30-092019 Equitable Share – – – 2 125
Resourcing LM Infrastructure

157
Annexure Table B5 – Vote 12 : Transport

Gate 2 Strategic KZ252 Newcastle Transport


600 Ndwakazane New Gravel Road Road 01-072019 30-092019 Equitable Share – – – 2 125
Resourcing LM Infrastructure

Gate 2 Strategic KZ265 Nongoma Transport


601 A1046 New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 1 100
Resourcing LM Infrastructure

Gate 2 Strategic Transport


602 Bhodlu Udaka New Gravel Road KZ266 Ulundi LM Road 01-042019 31-032020 Equitable Share – – – 1 300
Resourcing Infrastructure

Esikhaleni School Access New Gate 2 Strategic KZ261 eDumbe Transport


603 Road 01-042019 31-032020 Equitable Share – – – 1 800
Gravel Road Resourcing LM Infrastructure

Gate 2 Strategic KZ263 Abaqulusi Transport


604 Gushede New Causeway Road 01-042019 31-032020 Equitable Share – – – 2 900
Resourcing LM Infrastructure

Gate 2 Strategic KZ265 Nongoma Transport


605 Mampiyampiya New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 1 250
Resourcing LM Infrastructure

Gate 2 Strategic Transport


606 Mqawe New Gravel Road KZ266 Ulundi LM Road 01-042019 31-032020 Equitable Share – – – 1 650
Resourcing Infrastructure

Gate 2 Strategic KZ262 Transport


607 Somkhanda New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 1 250
Resourcing uPhongolo LM Infrastructure

Gate 2 Strategic KZ275 Mtubatuba Transport


608 Thulasibone New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic KZ273 The big Transport


609 Isaac (L1869) New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 2 100
Resourcing five false bay LM Infrastructure

Khathazile School Access New Gate 2 Strategic KZ273 The big Transport
610 Road 01-042019 31-032020 Equitable Share – – – 650
Gravel Road Resourcing five false bay LM Infrastructure

KZ271
Malangabi School Access New Gate 2 Strategic Transport
611 Umhlabuyalingan Road 01-042019 31-032020 Equitable Share – – – 650
Gravel Road Resourcing Infrastructure
a LM

Gate 2 Strategic KZ275 Mtubatuba Transport


612 Mambuka New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 2 000
Resourcing LM Infrastructure

Gate 2 Strategic Transport


613 Mangwenya New Gravel Road KZ272 Jozini LM Road 01-042019 31-032020 Equitable Share – – – 1 500
Resourcing Infrastructure

Gate 2 Strategic Transport


614 Manqayini New Gravel Road KZ272 Jozini LM Road 01-042019 31-032020 Equitable Share – – – 1 700
Resourcing Infrastructure

KZ271
Gate 2 Strategic Transport
615 Mapipini New Gravel Road Umhlabuyalingan Road 01-042019 31-032020 Equitable Share – – – 1 500
Resourcing Infrastructure
a LM

Gate 2 Strategic KZ274 Hlabisa Transport


616 Mbizimbelwe New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 1 500
Resourcing LM Infrastructure

Mbopha School Access New Gate 2 Strategic KZ274 Hlabisa Transport


617 Road 01-042019 31-032020 Equitable Share – – – 650
Gravel Road Resourcing LM Infrastructure

Mdungandlovu School Access Gate 2 Strategic KZ275 Mtubatuba Transport


618 Road 01-042019 31-032020 Equitable Share – – – 650
New Gravel Road Resourcing LM Infrastructure

Nansindlela School Access New Gate 2 Strategic Transport


619 KZ272 Jozini LM Road 01-042019 31-032020 Equitable Share – – – 650
Gravel Road Resourcing Infrastructure

Gate 2 Strategic KZ274 Hlabisa Transport


620 Ngenwayini New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 1 150
Resourcing LM Infrastructure

Thuthuka Phase 2 New Gravel Gate 2 Strategic KZ273 The big Transport
621 Road 01-042019 31-032020 Equitable Share – – – 2 000
Road Resourcing five false bay LM Infrastructure

Gate 2 Strategic KZ285 Transport


622 Fankomo New Causeway Road 01-042019 31-032020 Equitable Share – – – 1 500
Resourcing Mthonjaneni LM Infrastructure

Gate 2 Strategic KZ283 Transport


623 L701 New Causeway Road 01-042019 31-032020 Equitable Share – – – 1 500
Resourcing Ntambanana LM Infrastructure

Gate 2 Strategic KZ286 Nkandla Transport


624 Mevana P707 New Causeway Road 01-042019 31-032020 Equitable Share – – – 2 150
Resourcing LM Infrastructure

Gate 2 Strategic KZ282 Transport


625 P1555 New Causeway Road 01-042019 31-032020 Equitable Share – – – 1 600
Resourcing uMhlathuze LM Infrastructure

Gate 2 Strategic KZ284 Umlalazi Transport


626 P218 Mamba New Causeway Road 01-042019 31-032020 Equitable Share – – – 1 150
Resourcing LM Infrastructure

Gate 2 Strategic KZ283 Transport


627 L631 New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 750
Resourcing Ntambanana LM Infrastructure

158
Annexure Table B5 – Vote 12 : Transport

Gate 2 Strategic KZ284 Umlalazi Transport


628 Matimovu New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 900
Resourcing LM Infrastructure

Gate 2 Strategic KZ285 Transport


629 Mbomboshe New Gravel Road Road 01-042019 31-032020 Equitable Share – – – 650
Resourcing Mthonjaneni LM Infrastructure

KZ281
Gate 2 Strategic Transport
630 Nkukhwana New Gravel Road Mbonambi/Mfoloz Road 01-042019 31-032020 Equitable Share – – – 1 800
Resourcing Infrastructure
i LM

Gate 4 Concept
KZ294 Transport
631 Embangweni Structure And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
632 L1038 Sontshenge Structure 1 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 4 000
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ294 Transport
633 Ngofela Rd Structure And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ292 Transport
634 Materials New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 3 717
KwaDukuza LM Infrastructure
Feasibility

Gate 4 Concept
KZ294 Transport
635 A2520 Gravel New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
KZ292 Transport
636 Fuels New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 87
KwaDukuza LM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
637 Mahlalela Rd New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ293 Transport
638 Mhlongo New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
Nhlabanikhosi Rd New Gravel KZ293 Transport
639 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
Road NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
KZ291 Mandeni Transport
640 Ol03643 Embo New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
LM Infrastructure
Feasibility

Gate 4 Concept
KZ294 Transport
641 A1756 New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
A2520 Road Pipes & Headwalls KZ294 Transport
642 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Contract 1 Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
A2520 Road Pipes & Headwalls KZ294 Transport
643 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Contract 2 Maphumulo LM Infrastructure
Feasibility

Gate 4 Concept
Mahlalela Rd Pipes & Headwall KZ293 Transport
644 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Contract 1 NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
Mahlalela Rd Pipes & Headwall KZ293 Transport
645 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Contract 2 NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
Mahlalela Rd Pipes & Headwall KZ293 Transport
646 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Contract 3 NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
Mhlongo Road Pipes & Headwall KZ293 Transport
647 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Contract 1 NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
Mhlongo Road Pipes & Headwall KZ293 Transport
648 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Contract 2 NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
Nhlabanikhosi Rd Pipes & KZ293 Transport
649 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Headwall Contract 1 NdwedweLM Infrastructure
Feasibility

159
Annexure Table B5 – Vote 12 : Transport

Gate 4 Concept
Nhlabanikhosi Rd Pipes & KZ293 Transport
650 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Headwall Contract 2 NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
Nhlabanikhosi Rd Pipes & KZ293 Transport
651 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Headwall Contract 3 NdwedweLM Infrastructure
Feasibility

Gate 4 Concept
Ol03643 Embo Road Pipes & KZ291 Mandeni Transport
652 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Headwall Contract 1 LM Infrastructure
Feasibility

Gate 4 Concept
Ol03643 Embo Road Pipes & KZ291 Mandeni Transport
653 And Viability Or Road 01-042019 31-032020 Equitable Share – – – 195
Headwall Contract 2 LM Infrastructure
Feasibility

Gate 4 Concept
KZ292 Transport
654 Plant New Gravel Road And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 685
KwaDukuza LM Infrastructure
Feasibility

Gate 4 Concept
KZ435 Transport
655 Bhuqwini Causeway And Viability Or Road 01-072019 31-102020 Equitable Share – – – 200
Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
KZ435 Transport
656 Chancele Causeway And Viability Or Road 01-042019 31 June 2020 Equitable Share – – – 200
Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
KZ435 Transport
657 Ndlovini Causeway And Viability Or Road 01-042019 31 June 2020 Equitable Share – – – 200
Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
KZ435 Transport
658 St Augustin Causeway And Viability Or Road 01-042019 31 June 2020 Equitable Share – – – 200
Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Saxube New Gravel Road (0- Transport
659 And Viability Or KZ431 Ingwe LM Road 31 June 2019 31 Sep 2020 Equitable Share – – – 500
1Km)1Km Infrastructure
Feasibility

Gate 4 Concept
Constr Of Khayelisha/Korinte (0- KZ435 Transport
660 And Viability Or Road 01-072019 31-102020 Equitable Share – – – 2 000
7Km) (7Km) New Gravel Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Chancele/Mahhawini (0-3Km) KZ435 Transport
661 And Viability Or Road 01-072019 31-102020 Equitable Share – – – 1 500
(3Km) New Gravel Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Dumabezwe Rd - (0-1Km) (1Km) Transport
662 And Viability Or KZ431 Ingwe LM Road 31 June 2019 31 Sep 2020 Equitable Share – – – 500
New Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Khayeka/Bhuqwini (0-10Km) KZ435 Transport
663 And Viability Or Road 01-072019 31-102020 Equitable Share – – – 2 000
(10Km) New Gravel Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Lugawini/Chamntu (0-9Km) KZ435 Transport
664 And Viability Or Road 01-072019 31-102020 Equitable Share – – – 2 000
(9Km) New Gravel Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Lukhetheni/Ndlovini (0-7Km) KZ435 Transport
665 And Viability Or Road 01-072019 31-102020 Equitable Share – – – 2 000
(7Km) New Gravel Road Umzimkhulu LM Infrastructure
Feasibility

Gate 4 Concept
Mbhodleni (0-3.5Km)(3.5Km) Transport
666 And Viability Or KZ431 Ingwe LM Road 31 June 2018 31 Sep 2020 Equitable Share – – – 1 200
New Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Ndayimane New Gravel Road - Transport
667 And Viability Or KZ431 Ingwe LM Road 31 June 2019 31 Sep 2020 Equitable Share – – – 900
(0-2Km)(2Km) Infrastructure
Feasibility

Gate 4 Concept
Seli Rd - (0-2Km) (2Km) New Transport
668 And Viability Or KZ431 Ingwe LM Road 31 June 2019 31 Sep 2020 Equitable Share – – – 900
Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Sharp Rd-(0-1Km(1Km) New Transport
669 And Viability Or KZ431 Ingwe LM Road 31 June 2019 31 Sep 2020 Equitable Share – – – 500
Gravel Road Infrastructure
Feasibility

Gate 4 Concept
St Augustin/Mt Shepa (0-5Km) KZ435 Transport
670 And Viability Or Road 01-072019 31-102020 Equitable Share – – – 2 000
(5Km) New Gravel Road Umzimkhulu LM Infrastructure
Feasibility

160
Annexure Table B5 – Vote 12 : Transport

Gate 4 Concept
Tafuleni Rd - (0-2Km) (2Km) New Transport
671 And Viability Or KZ431 Ingwe LM Road 01-042019 31 June 2020 Equitable Share – – – 900
Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Nhlangulela Rd (0-1Km) (1Km) Transport
672 And Viability Or KZ431 Ingwe LM Road 31 June 2019 31 Sep 2020 Equitable Share – – – 500
New Gravel Road Infrastructure
Feasibility

Gate 4 Concept
Smenge Rd (0-1Km)(1Km) New KZ434 Transport
673 And Viability Or Road 01-042019 31 June 2020 Equitable Share – – – 500
Gravel Road Ubuhlebezwe LM Infrastructure
Feasibility

Gate 4 Concept
Ext Xhawulani Rd (0-4Km) (4Km) KZ434 Transport
674 And Viability Or Road 01-042019 31 June 2020 Equitable Share – – – 1 600
New Gravel Road Ubuhlebezwe LM Infrastructure
Feasibility

Gate 4 Concept
Smirnorf (0-3Km)(3Km) New KZ434 Transport
675 And Viability Or Road 01-042019 31 June 2020 Equitable Share – – – 1 200
Gravel Road Ubuhlebezwe LM Infrastructure
Feasibility

Gate 4 Concept
Zethembe Rd (0-2Km) (2Km) KZ434 Transport
676 And Viability Or Road 01-042019 31 June 2020 Equitable Share – – – 900
New Gravel Road Ubuhlebezwe LM Infrastructure
Feasibility

Transport
677 Public Transport Infrastructure Construction Umzimkhulu Taxi Rank 01-042017 31-032020 Equitable Share – 37 520 39 734 41 959
Infrastructure
KZ225 Msunduzi Transport
678 New Building For Head Office Planning Office Building 01-042017 31-032020 Equitable Share – 50 000 52 950 55 915
LM Infrastructure
Epwp Integrated Transport
679 D1613 Construction eThekwini Road 01-042017 31-032020 – 20 000 – –
Grant Infrastructure
Epwp Integrated Transport
680 D894 Construction eThekwini Road 01-042017 31-032020 – 545 – –
Grant Infrastructure
Epwp Integrated Transport
681 D1531 Construction eThekwini Road 01-042017 31-032020 – 4 000 – –
Grant Infrastructure
Epwp Integrated Transport
682 D2490 Construction eThekwini Road 01-042017 31-032020 – 2 000 – –
Grant Infrastructure
Epwp Integrated Transport
683 Efefe Road Construction eMpangeni Road 01-042017 31-032020 – 2 100 – –
Grant Infrastructure
Epwp Integrated Transport
684 P549 Construction Ladysmith Road 01-042017 31-032020 – 2 000 – –
Grant Infrastructure
UMGUNGUNDL Epwp Integrated Transport
685 Themba Road Construction Road 01-042017 31-032020 – 3 000 – –
OVU Grant Infrastructure
Epwp Integrated Transport
686 Cross-Boarder Wall Construction uMkhanyakude Road 01-042017 31-032020 – 48 000 – –
Grant Infrastructure
Transport
687 New Blacktop Road Various New Infrastructure Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
688 New Gravel Road Various New Infrastructure Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
689 New Causeway Various New Infrastructure Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
690 New Vehicular Bridge Various New Infrastructure Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
691 New Pedestrian Bridge Various New Infrastructure Ongoing Ongoing Equitable Share – – – –
Infrastructure
New Public Transport Transport
692 Various New Infrastructure Ongoing Ongoing Equitable Share – – – –
Infrastructure Infrastructure
Transport
693 New Infrastructure Other Various New Infrastructure Ongoing Ongoing Equitable Share – – – –
Infrastructure
Total New infrastructure assets 782230 586962,68 552754,966
2. Upgrades and additions

Gate 7 Works KZ434 Transport


1 P73 Upgrade (Dc43) Road 01-032012 31-032020 Equitable Share – 10 000 10 590 23 940
(26%-50%) Ubuhlebezwe LM Infrastructure

Gate 7 Works KZ221 Transport


2 D457 Upgrade Road 01-042016 31-032020 Equitable Share – 10 000 10 590 23 940
(1%-25%) uMshwathi LM Infrastructure
Gate 7 Works KZ221 Transport
3 D599 Upgrade Road 01-072016 01-072018 Equitable Share – 10 000 10 590 23 940
(1%-25%) uMshwathi LM Infrastructure
Gate 7 Works KZ225 Msunduzi Transport
4 P390 Upgrade Road 01-022016 01-022018 Equitable Share – 10 000 10 590 23 940
(1%-25%) LM Infrastructure

Gate 7 Works KZ435 Transport


5 P112 Upgrade Road 01-012014 01-012019 Equitable Share – 10 000 10 590 23 940
(1%-25%) Umzimkhulu LM Infrastructure

Gate 7 Works KZ432 Kwa Sani Transport


6 P419 Upgrade Road 01-052015 01-052020 Equitable Share – 10 000 10 590 23 940
(1%-25%) LM Infrastructure

Gate 7 Works KZ435 Transport


7 P417 Upgrade Road 01-012014 01-012020 Equitable Share – 10 000 16 166 16 974
(1%-25%) Umzimkhulu LM Infrastructure

Gate 7 Works KZ435 Transport


8 P602 Upgrade Road 01-012013 01-012020 Equitable Share – 10 000 10 590 11 970
(1%-25%) Umzimkhulu LM Infrastructure

Gate 5 Design KZ435 Transport


9 P8-3 Upgrade Road 01-042018 31-032025 Equitable Share – – 1 000 7 500
Development Umzimkhulu LM Infrastructure

Gate 7 Works KZ435 Transport


10 P601 Upgrade Road 01-042008 31-032025 Equitable Share – 10 000 10 590 11 970
(1%-25%) Umzimkhulu LM Infrastructure

161
Annexure Table B5 – Vote 12 : Transport

Gate 7 Works KZ435 Transport


11 P749 Upgrade Road 01-062011 01-062020 Equitable Share – 10 000 10 590 11 970
(26%-50%) Umzimkhulu LM Infrastructure

Gate 7 Works KZ435 Transport


12 P416 Upgrade Road 01-012013 01-012020 Equitable Share – 10 000 10 590 11 970
(1%-25%) Umzimkhulu LM Infrastructure

Gate 6 Design Transport


13 L1633 Upgrade KZ431 Ingwe LM Road 01-042017 31-032018 Equitable Share – 10 000 – –
Documentation Infrastructure

Msunduzi/Willowfontein Roads:
Mkhize Obomvu, Shange Clinic Gate 7 Works KZ221 Transport
14 Road 01-012018 01-092018 Equitable Share – 20 905 – –
Road Road, Thandokuhle Creche (1%-25%) uMshwathi LM Infrastructure
Upgrade

Gate 7 Works KZ221 Transport


15 P127-2 Upgrade Road 01-012007 01-122007 Equitable Share – 20 000 21 180 23 940
(26%-50%) uMshwathi LM Infrastructure

Gate 5 Design KZ254 Transport


16 P27-2 Upgrade Road 01-042018 31-032030 Equitable Share – – 500 500
Development Dannhauser LM Infrastructure

Gate 7 Works KZ221 Transport


17 D1357 Upgrade Road 01-012012 30-042021 Equitable Share – 20 000 21 180 23 940
(26%-50%) uMshwathi LM Infrastructure

Gate 7 Works KZ283 Transport


18 P130 Upgrade Road 01-042014 01-012020 Equitable Share – 20 000 21 180 23 940
(76%-99%) Ntambanana LM Infrastructure

Gate 7 Works KZ221 Transport


19 P129 Upgrade Road 01-042016 30-032017 Equitable Share – – 21 180 23 940
(1%-25%) uMshwathi LM Infrastructure
Gate 7 Works Transport
20 D168 Upgrade KZ431 Ingwe LM Road 01-012007 01-032021 Equitable Share – 20 000 21 180 23 940
(26%-50%) Infrastructure
Gate 7 Works KZ432 Kwa Sani Transport
21 P125 Upgrade Road 01-082016 01-122020 Equitable Share – 20 000 21 180 23 940
(1%-25%) LM Infrastructure
Gate 7 Works Transport
22 P28-1 Upgrade KZ431 Ingwe LM Road 01-082013 01-032018 Equitable Share – 20 000 21 180 23 940
(1%-25%) Infrastructure
Gate 5 Design KZ221 Transport
23 P178 Upgrade Road 01-042014 01-082018 Equitable Share – 1 000 – –
Development uMshwathi LM Infrastructure
Gate 6 Design KZ221 Transport
24 P489 Upgrade Road 01-072015 01-072021 Equitable Share – 20 000 1 500 1 500
Documentation uMshwathi LM Infrastructure
Gate 7 Works Transport
25 P318-1 Upgrade KZ431 Ingwe LM Road 01-042015 01-032020 Equitable Share – 20 000 21 180 23 940
(1%-25%) Infrastructure
Gate 5 Design KZ221 Transport
26 D1230 Upgrade Road 01-072016 01-072021 Equitable Share – 1 000 3 244 3 442
Development uMshwathi LM Infrastructure
Gate 5 Design KZ221 Transport
27 P9 Upgrade Road 01-042018 31-032028 Equitable Share – – 500 500
Development uMshwathi LM Infrastructure
Gate 5 Design KZ221 Transport
28 P115 Upgrade Road 01-042018 31-032028 Equitable Share – – 500 500
Development uMshwathi LM Infrastructure
1613 Sterkspruit River Bridge Gate 7 Works KZ221 Transport
29 Vehicle Bridge 01/01/2017 01-092017 Equitable Share – 5 000 – –
Widening On P385 (1%-25%) uMshwathi LM Infrastructure
Gate 7 Works Transport
30 P255 Upgrade ETH Metro Road 23-072012 01-072022 Equitable Share – – 10 590 11 400
(51%-75%) Infrastructure

Gate 6 Design KZ292 Transport


31 P415 Upgrade Road 01-092016 01-092017 Equitable Share – 10 000 10 590 11 400
Documentation KwaDukuza LM Infrastructure

Gate 7 Works KZ292 Transport


32 D883 Upgrade Road 01/04/2014 01-032020 Equitable Share – 10 000 10 590 11 400
(1%-25%) KwaDukuza LM Infrastructure

Gate 5 Design Transport


33 P1-1 Upgrade ETH Metro Road 01-072016 01-072018 Equitable Share – – 10 590 11 400
Development Infrastructure

Gate 7 Works KZ292 Transport


34 D1514 Upgrade Road 01-102008 01-032017 Equitable Share – 13 933 10 590 11 400
(76%-99%) KwaDukuza LM Infrastructure

Gate 6 Design Transport


35 L1159 Upgrade ETH Metro Road 01-072016 01-032018 Equitable Share – 20 000 – –
Documentation Infrastructure
Gate 7 Works Transport
36 L1578 Upgrade ETH Metro Road 01-102008 01-032017 Equitable Share – 10 000 – –
(1%-25%) Infrastructure
Gate 7 Works Transport
37 P725 Upgrade ETH Metro Road 01-072016 01-032018 Equitable Share – 20 000 10 590 22 800
(Handover) Infrastructure
Gate 7 Works KZ293 Transport
38 P713 Upgrade Road 01-042018 01/03/2020 Equitable Share – 10 752 10 590 11 400
(1%-25%) NdwedweLM Infrastructure
Gate 7 Works KZ211 Vulamehlo Transport
39 P57 Upgrade Road 01-122015 01-032018 Equitable Share – 4 500 10 590 22 378
(1%-25%) LM Infrastructure
Gate 7 Works KZ211 Vulamehlo Transport
40 P58 Upgrade Road 01-082007 01-032019 Equitable Share – 10 100 10 590 11 400
(51%-75%) LM Infrastructure
Gate 7 Works KZ211 Vulamehlo Transport
41 P732 Upgrade Road 01-082007 01-012018 Equitable Share – 5 000 – –
(76%-99%) LM Infrastructure
Gate 7 Works KZ211 Vulamehlo Transport
42 P383 Upgrade Road 01-082007 01-032022 Equitable Share – 5 000 10 590 22 800
(76%-99%) LM Infrastructure
Gate 7 Works KZ211 Vulamehlo Transport
43 P73 Upgrade (Dc21) Road 01-082007 31-032022 Equitable Share – 16 960 10 590 11 400
(26%-50%) LM Infrastructure
Gate 7 Works KZ211 Vulamehlo Transport
44 P728 Upgrade Road 01-082008 01-032023 Equitable Share – 10 000 10 590 11 400
(1%-25%) LM Infrastructure
Gate 7 Works Transport
45 P740 Upgrade ETH Metro Road 01-042016 01/03/2020 Equitable Share – 8 500 9 002 11 400
(1%-25%) Infrastructure
Gate 7 Works Transport
46 D985 Upgrade ETH Metro Road 01-042016 01/03/2020 Equitable Share – 8 500 9 002 11 400
(1%-25%) Infrastructure
Gate 7 Works KZ211 Vulamehlo Transport
47 P75 Upgrade Road 01-022016 01-032021 Equitable Share – 11 000 10 590 11 400
(1%-25%) LM Infrastructure
Gate 6 Design KZ211 Vulamehlo Transport
48 P254 Upgrade Road 01-042016 01-032021 Equitable Share – 9 000 10 590 11 400
Documentation LM Infrastructure

162
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ211 Vulamehlo Transport


49 D1095 Upgrade Road 01-022016 01-032021 Equitable Share – 10 000 10 590 11 400
Documentation LM Infrastructure
Gate 6 Design Transport
50 D1533 Upgrade ETH Metro Road 01-042017 31-03-2018 Equitable Share – 10 000 10 590 11 400
Documentation Infrastructure
Gate 6 Design Transport
51 L1707 Upgrade ETH Metro Road 01-042017 31-03-2018 Equitable Share – 10 000 10 590 11 400
Documentation Infrastructure

Gate 7 Works KZ292 Transport


52 P104 Upgrade Road 01-092013 01-092020 Equitable Share – 20 000 10 590 11 430
(26%-50%) KwaDukuza LM Infrastructure

Gate 7 Works KZ294 Transport


53 P711 Upgrade Road 01-042011 01-032020 Equitable Share – 10 000 10 590 22 800
(26%-50%) Maphumulo LM Infrastructure

Gate 7 Works KZ293 Transport


54 P712 Upgrade Road 01-102015 01-102019 Equitable Share – 10 000 10 590 22 800
(1%-25%) NdwedweLM Infrastructure
Gate 6 Design Transport
55 P2-1 Upgrade ETH Metro Road 01-012016 01-032020 Equitable Share – – 11 400 11 400
Documentation Infrastructure
Gate 7 Works KZ293 Transport
56 P714 Upgrade Road 01-072012 01-032021 Equitable Share – 10 000 10 590 22 800
(1%-25%) NdwedweLM Infrastructure
Gate 7 Works KZ293 Transport
57 P100 Upgrade Road 01-042003 01-032020 Equitable Share – 10 000 10 590 22 800
(51%-75%) NdwedweLM Infrastructure
Gate 6 Design KZ212 UmdoniI Transport
58 P77 Upgrade Road 01-052016 01-082020 Equitable Share – – 22 800 22 800
Documentation LM Infrastructure

Gate 6 Design KZ292 Transport


59 D865 Upgrade Road 01-042003 01-032020 Equitable Share – 10 000 10 590 11 400
Documentation KwaDukuza LM Infrastructure

Gate 7 Works Transport


60 P577 Upgrade ETH Metro Road 01-042003 01-112019 Equitable Share – – 22 800 –
(76%-99%) Infrastructure
Gate 7 Works KZ284 Umlalazi Transport
61 P230 Upgrade Road 01-082005 01-082016 Equitable Share – – – –
(76%-99%) LM Infrastructure

Gate 7 Works KZ282 Transport


62 P231 Upgrade Road 01-032016 01-062016 Equitable Share – 2 450 27 000 11 400
(Handover) uMhlathuze LM Infrastructure

Gate 7 Works KZ263 Abaqulusi Transport


63 P258 Upgrade Road 01-112013 01-112019 Equitable Share – 15 000 24 000 11 400
(1%-25%) LM Infrastructure
Gate 7 Works KZ265 Nongoma Transport
64 P52-3 Upgrade Road 01-032015 20-082016 Equitable Share – 24 386 52 950 11 400
(26%-50%) LM Infrastructure

Gate 7 Works KZ235 Transport


65 D135 Upgrade Road 01-112015 01-112019 Equitable Share – 10 000 18 300 11 400
(1%-25%) Okhahlamba LM Infrastructure

Gate 7 Works KZ262 Transport


66 D1867 Upgrade Road 01-042015 01-032020 Equitable Share – 12 000 7 000 11 400
(1%-25%) uPhongolo LM Infrastructure

Paulpietersburg Pongola Link -


D1873, D1925, D1862, L1309, Gate 6 Design KZ263 Abaqulusi Transport
67 Road 01-042016 03-032021 Equitable Share – 13 000 10 500 11 400
D1869, D1867, 2 New Roads Documentation LM Infrastructure
Upgrade

D1925 (Paulpietersburg Pongola Gate 6 Design KZ263 Abaqulusi Transport


68 Road 01-042017 01-012020 Equitable Share – 500 5 500 11 400
Link) Upgrade Documentation LM Infrastructure
Gate 7 Works KZ261 eDumbe Transport
69 D1880 Upgrade Road 01-042014 01-012020 Equitable Share – 2 500 45 880 11 400
(1%-25%) LM Infrastructure
Gate 7 Works KZ263 Abaqulusi Transport
70 L1063 Upgrade Road 01-042017 01-032021 Equitable Share – 500 5 500 11 400
(1%-25%) LM Infrastructure
Gate 7 Works KZ263 Abaqulusi Transport
71 Mondlo Roads : Mcozi Road Road 01-042016 03-032017 Equitable Share – 2 000 – –
(1%-25%) LM Infrastructure
Mondlo Roads : Khondlo Cc &
Gate 7 Works KZ263 Abaqulusi Transport
72 Cm Roads Mondlo Roads : Road 01-042016 03-032017 Equitable Share – 6 000 – –
(1%-25%) LM Infrastructure
Matsho Tshomba Road
Gate 7 Works KZ263 Abaqulusi Transport
73 Mondlo Roads : Nkotleni Road Road 01-042016 03-032017 Equitable Share – 2 000 – –
(1%-25%) LM Infrastructure
Mondlo Roads - Znb2940 (Mcozi Gate 6 Design KZ263 Abaqulusi Transport
74 Road 01-042017 03-032018 Equitable Share – 200 – –
And Nkotleni) Documentation LM Infrastructure
Gate 7 Works KZ265 Nongoma Transport
75 P234 Upgrade Road 01-042015 03-032018 Equitable Share – 400 13 000 11 400
(1%-25%) LM Infrastructure
Gate 7 Works KZ261 eDumbe Transport
76 P303 Upgrade Road 01-012015 01-012020 Equitable Share – 10 000 10 590 11 400
(1%-25%) LM Infrastructure
Gate 7 Works KZ261 eDumbe Transport
77 P425 Upgrade Road 01-042016 01-012018 Equitable Share – 500 1 500 11 400
(1%-25%) LM Infrastructure
KZ271
Gate 7 Works Transport
78 P447 Upgrade Umhlabuyalingan Road 01-042017 31-032021 Equitable Share – 4 700 1 000 11 400
(Handover) Infrastructure
a LM

KZ281
Gate 6 Design Transport
79 P444 Upgrade Mbonambi/Mfoloz Road 01-042017 31-032021 Equitable Share – 2 000 1 000 11 400
Documentation Infrastructure
i LM

KZ281
Gate 6 Design Transport
80 Edumbe Roads Mbonambi/Mfoloz Road 01-042017 31-032019 Equitable Share – 3 000 1 000 –
Documentation Infrastructure
i LM
KZ263 Abaqulusi Transport
81 P271 Upgrade Tender Road 01-042017 31-032019 Equitable Share – 1 000 3 000 –
LM Infrastructure
Gate 7 Works KZ265 Nongoma Transport
82 P49-2 Upgrade Road 01-112004 01-032020 Equitable Share – 7 876 9 000 11 400
(51%-75%) LM Infrastructure
Gate 7 Works KZ263 Abaqulusi Transport
83 P735 Upgrade Road 01-082012 01-032020 Equitable Share – 20 000 16 500 11 400
(1%-25%) LM Infrastructure
Gate 7 Works KZ263 Abaqulusi Transport
84 P494 Upgrade Road 01-112010 01-122020 Equitable Share – 39 390 5 000 11 400
(26%-50%) LM Infrastructure
Gate 7 Works Transport
85 P497 Upgrade KZ266 Ulundi LM Road 01-052011 01-032020 Equitable Share – 10 000 2 500 11 400
(1%-25%) Infrastructure

163
Annexure Table B5 – Vote 12 : Transport

KZ281
Gate 7 Works Transport
86 P700 Upgrade Mbonambi/Mfoloz Road 01-042003 01-112020 Equitable Share – 31 000 10 590 12 200
(51%-75%) Infrastructure
i LM

Mthonjaneni Roads L237 Gate 7 Works KZ285 Transport


87 Road 01-042016 01-072020 Equitable Share – 500 1 000 6 400
Upgrade (51%-75%) Mthonjaneni LM Infrastructure

D579 & D2442 Mbhudula Roads Gate 7 Works KZ263 Abaqulusi Transport
88 Road 01-112009 31-032020 Equitable Share – 3 000 7 000 11 400
Louwsberg Upgrade (1%-25%) LM Infrastructure
KZ281
Gate 7 Works Transport
89 P484 Upgrade Mbonambi/Mfoloz Road 01-052015 30-112020 Equitable Share – 11 600 19 163 11 400
(1%-25%) Infrastructure
i LM
Gate 7 Works KZ263 Abaqulusi Transport
90 P451/P470/P475 Upgrade Road 01-072011 01-032020 Equitable Share – 1 600 5 000 11 400
(26%-50%) LM Infrastructure

Gate 7 Works KZ283 Transport


91 D130 Upgrade Road 01-032004 01-032020 Equitable Share – 850 2 000 11 400
(51%-75%) Ntambanana LM Infrastructure

Gate 7 Works Transport


92 D1841 Upgrade KZ272 Jozini LM Road 01-082016 01-102020 Equitable Share – 10 000 10 590 11 400
(1%-25%) Infrastructure
Gate 7 Works Transport
93 D1886 Upgrade KZ272 Jozini LM Road 01-082016 01-072020 Equitable Share – 2 046 15 500 11 400
(Handover) Infrastructure
Gate 7 Works KZ263 Abaqulusi Transport
94 P537 Upgrade Road 01-092016 01-092020 Equitable Share – 11 405 15 500 11 400
(Handover) LM Infrastructure
Gate 7 Works KZ275 Mtubatuba Transport
95 P237 Upgrade Road 01-092016 01-022020 Equitable Share – 100 1 000 11 400
(1%-25%) LM Infrastructure
Gate 7 Works Transport
96 P435 Upgrade KZ272 Jozini LM Road 01-112010 01-122019 Equitable Share – 50 1 500 –
(76%-99%) Infrastructure
Gate 7 Works Transport
97 P232 Upgrade KZ266 Ulundi LM Road 01-012014 01-072020 Equitable Share – 10 000 10 590 11 400
(26%-50%) Infrastructure
Gate 7 Works KZ284 Umlalazi Transport
98 P218/P710 Upgrade Road 01-042005 01-122020 Equitable Share – 2 106 31 318 –
(1%-25%) LM Infrastructure
Gate 6 Design DC28 UThungulu Transport
99 P223 Upgrade Road 01-042017 31-032019 Equitable Share – – 1 000 –
Documentation DM Infrastructure
Gate 6 Design DC28 UThungulu Transport
100 P706 Upgrade Road 01-042017 31-032020 Equitable Share – 1 000 2 500 11 400
Documentation DM Infrastructure

Gate 7 Works
(Practical DC28 UThungulu Transport
101 P525 Upgrade Road 01-092012 31-032020 Equitable Share – 15 000 1 000 11 400
Completion DM Infrastructure
100%)

Gate 6 Design DC28 UThungulu Transport


102 P569 Upgrade Road 01-042017 31-032019 Equitable Share – – 1 000 –
Documentation DM Infrastructure
Gate 6 Design DC28 UThungulu Transport
103 D880 Upgrade Road 01-042017 31-032020 Equitable Share – 15 000 1 000 11 400
Documentation DM Infrastructure
KZ271
Gate 7 Works Transport
104 D9 Upgrade Umhlabuyalingan Road 01-042011 31-032020 Equitable Share – 1 000 13 500 1 500
(26%-50%) Infrastructure
a LM
Gate 5 Design KZ261 eDumbe Transport
105 P738 Upgrade Road 01-042016 31-032021 Equitable Share – – 3 500 11 400
Development LM Infrastructure

Gate 6 Design KZ235 Transport


106 P90 Upgrade Road 01-042016 31-032021 Equitable Share – – – 32 000
Documentation Okhahlamba LM Infrastructure

DC27
Gate 6 Design Transport
107 P274 Upgrade Umkhanyakude Road 01-042017 31-032020 Equitable Share – – 19 500 11 400
Documentation Infrastructure
DM
Gate 5 Design Transport
108 D1840 Upgrade KZ272 Jozini LM Road 01-042016 31-032023 Equitable Share – – 13 500 –
Development Infrastructure
Gate 5 Design Transport
109 D1842 Upgrade KZ272 Jozini LM Road 01-042016 31-032021 Equitable Share – 1 000 6 000 1 500
Development Infrastructure
Gate 6 Design KZ244 Msinga Transport
110 D1562 Upgrade Road 01-062014 31-032019 Equitable Share – – 2 500 –
Documentation LM Infrastructure
Gate 6 Design Transport
111 D1851 Upgrade KZ272 Jozini LM Road 01-032017 30-042018 Equitable Share – – 19 200 –
Documentation Infrastructure
DC27
Bhekabantu Access Rd (Off Gate 6 Design Transport
112 Umkhanyakude Road 01-042017 31-032019 Equitable Share – – 10 590 11 400
D1851) Documentation Infrastructure
DM

Gate 7 Works KZ282 Transport


113 D887 Road 01-112013 30-112020 Equitable Share – 1 000 1 000 1 500
(26%-50%) uMhlathuze LM Infrastructure

KZ271
Pongola (Mboza) Bridge Link Gate 6 Design Transport
114 Umhlabuyalingan Road 1/04/2017 31-032020 Equitable Share – 1 000 8 000 –
Road From D1836 To D1834 Documentation Infrastructure
a LM
Gate 6 Design DC26 Zululand Transport
115 Bhekuzulu Roads Road 01-042017 31-032019 Equitable Share – 500 500 –
Documentation DM Infrastructure
Gate 6 Design KZ252 Newcastle Transport
116 P483 Upgrade Road 01-042017 30-062019 Equitable Share – 14 200 2 737 –
Documentation LM Infrastructure

Gate 6 Design KZ236 Transport


117 D1252 Upgrade Road 01-092014 31/03/2018 Equitable Share – 3 200 – –
Documentation Imbabazane LM Infrastructure

Gate 6 Design KZ283 Transport


118 D1263 Upgrade Road 01-042014 31-032019 Equitable Share – 1 600 2 662 –
Documentation Ntambanana LM Infrastructure

Gate 7 Works KZ234 Umtshezi Transport


119 D489 Upgrade Road 01-062012 30-092018 Equitable Share – 15 000 – –
(26%-50%) LM Infrastructure

Gate 7 Works KZ236 Transport


120 D69 Upgrade Road 01-112010 01-092018 Equitable Share – 6 794 – –
(76%-99%) Imbabazane LM Infrastructure

164
Annexure Table B5 – Vote 12 : Transport

Gate 7 Works KZ232 Transport


121 L1524 Upgrade Road 01-052016 31-032018 Equitable Share – 5 000 – –
(Handover) eMnambhithi LM Infrastructure

Gate 6 Design KZ283 Transport


122 P187 Upgrade Road 01-072016 01-032020 Equitable Share – 5 000 7 047 2 500
Documentation Ntambanana LM Infrastructure

Gate 7 Works KZ234 Umtshezi Transport


123 P263 Upgrade Road 01-072012 31-032020 Equitable Share – 13 000 5 000 5 000
(26%-50%) LM Infrastructure
Gate 7 Works Transport
124 P36/2 Upgrade KZ242 Nqutu LM Road 01-062005 01-032018 Equitable Share – 6 300 – –
(51%-75%) Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


125 D1269 Upgrade Road 01-042017 31-032020 Equitable Share – 5 000 10 590 350
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


126 D2264 Upgrade Road 01-042017 31-032020 Equitable Share – 5 000 10 590 800
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


127 L1969 (Wolwane Road) Upgrade Road 01-042017 31-032020 Equitable Share – 5 000 10 590 7 400
Documentation DM Infrastructure

Gate 7 Works KZ245 Umvoti Transport


128 P549 Upgrade Road 01-032011 31-122020 Equitable Share – 14 000 11 770 1 000
(26%-50%) LM Infrastructure
Gate 7 Works KZ245 Umvoti Transport
129 P6-3 Kwa Kopi Upgrade Road 01-092015 01-122018 Equitable Share – 10 000 – –
(26%-50%) LM Infrastructure

Gate 7 Works
(Practical KZ244 Msinga Transport
130 D1284 Upgrade Road 01-012011 31-032019 Equitable Share – 1 649 17 965 –
Completion LM Infrastructure
100%)

Gate 6 Design KZ236 Transport


131 Draycott Roads Upgrade Road 01-032011 31-032018 Equitable Share – 12 000 – –
Documentation Imbabazane LM Infrastructure

Gate 7 Works KZ244 Msinga Transport


132 P373/280 Upgrade Road 01-042011 31-122020 Equitable Share – 16 586 22 000 12 275
(51%-75%) LM Infrastructure
Gate 7 Works Transport
133 P752 Upgrade KZ242 Nqutu LM Road 01-112009 01-092018 Equitable Share – 10 000 2 000 –
(1%-25%) Infrastructure
Gate 6 Design DC23 Uthukela Transport
134 D1259 Upgrade Road 01-042017 31-032020 Equitable Share – – 10 590 11 400
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
135 D1271 Upgrade Road 01-042017 31-032020 Equitable Share – – 10 590 11 400
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
136 D1316 Upgrade Road 01-042017 31-032020 Equitable Share – – 10 590 11 400
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
137 D1376 Upgrade Road 01-042019 31-032020 Equitable Share – – – 6 000
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
138 D181 Upgrade Road 01-042019 31-032020 Equitable Share – – – 11 400
Documentation DM Infrastructure
Gate 7 Works KZ234 Umtshezi Transport
139 D280 Upgrade Road 01/04/2016 31-032019 Equitable Share – 10 000 12 800 –
(1%-25%) LM Infrastructure
Gate 6 Design DC23 Uthukela Transport
140 D44 Upgrade Road 01-042019 31-032020 Equitable Share – – – 1 500
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
141 D51 Upgrade Road 01-042019 31-032020 Equitable Share – – – 11 400
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
142 D751 Upgrade Road 01-042019 31-032020 Equitable Share – – – 11 400
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
143 D797 Upgrade Road 01-042018 31-032020 Equitable Share – – 2 000 11 400
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
144 L1364 Upgrade Road 01-042019 31-032020 Equitable Share – – – 11 400
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
145 L1867 Upgrade Road 01-042019 31-032020 Equitable Share – – – 11 400
Documentation DM Infrastructure
Gate 6 Design DC23 Uthukela Transport
146 L2136 Upgrade Road 01-042019 31-032020 Equitable Share – – – 11 400
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


147 P161 Upgrade Road 01-042019 31-032020 Equitable Share – – – 1 500
Documentation DM Infrastructure

Gate 7 Works Transport


148 P16-2 Upgrade KZ242 Nqutu LM Road 01-042016 31/03/2028 Equitable Share – 10 000 10 590 22 800
(1%-25%) Infrastructure
Gate 7 Works Transport
149 P16-3 Upgrade KZ242 Nqutu LM Road 01-042013 31-032029 Equitable Share – 10 000 10 590 22 800
(1%-25%) Infrastructure
Gate 7 Works KZ245 Umvoti Transport
150 P17 Upgrade Road 01-042011 31-032020 Equitable Share – 10 000 10 590 22 800
(1%-25%) LM Infrastructure
Gate 7 Works KZ234 Umtshezi Transport
151 P179 Upgrade Road 03-042016 01-042020 Equitable Share – 14 500 10 590 22 800
(1%-25%) LM Infrastructure
Gate 7 Works KZ244 Msinga Transport
152 P280 Upgrade Road 01-042011 31-122020 Equitable Share – – 10 590 11 400
(51%-75%) LM Infrastructure
Gate 7 Works Transport
153 P281 Upgrade KZ233 Indaka LM Road 03-042015 01-012021 Equitable Share – 5 000 10 590 22 800
(1%-25%) Infrastructure

Gate 7 Works KZ254 Transport


154 P296 Upgrade Road 01-042011 31-032020 Equitable Share – 10 000 10 590 22 800
(1%-25%) Dannhauser LM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


155 P321 Upgrade Road 01-042017 31-032019 Equitable Share – – 10 590 11 400
Documentation DM Infrastructure

Gate 7 Works KZ244 Msinga Transport


156 P368 Upgrade Road 01-012011 01-012020 Equitable Share – 10 000 10 590 22 800
(26%-50%) LM Infrastructure
Gate 6 Design KZ253 Utrecht Transport
157 P420 Upgrade Road 01-042019 31-032020 Equitable Share – – – 1 500
Documentation LM Infrastructure

165
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design DC24 Umzinyathi Transport


158 P191 Upgrade Road 01-042019 31-032020 Equitable Share – – – 1 500
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


159 P91 Upgrade Road 01-042019 31-032020 Equitable Share – – – 1 500
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


160 D1331 Upgrade Road 01-042018 31-032020 Equitable Share – – 10 590 11 400
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


161 D343 Upgrade Road 01-042019 31-032020 Equitable Share – – – 1 500
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


162 D798 Upgrade Road 01-042019 31-032020 Equitable Share – – – 1 500
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


163 L1864 Upgrade Road 01-042018 31/03/2019 Equitable Share – – 1 400 –
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


164 D1335 Upgrade Road 1/04/2017 31-032020 Equitable Share – – 1 400 –
Documentation DM Infrastructure

Gate 6 Design DC24 Umzinyathi Transport


165 P233 Upgrade Road 1/04/2017 31-032020 Equitable Share – – 10 590 17 468
Documentation DM Infrastructure

Gate 6 Design KZ227 Richmond Transport


166 Re-Alignment Of D604 Road 01-082017 31-032018 Equitable Share – 3 200 – –
Documentation LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
167 Re-Alignment Of D606/D617 Road 01-082017 31-032018 Equitable Share – 1 500 – –
Documentation LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
168 Re-Alignment Of P608-0.3M Road 01-082017 31-032018 Equitable Share – 600 – –
Documentation LM Infrastructure

Gate 6 Design KZ254 Transport


169 L1182 New Concrete Road Road 03-072017 31-012018 Equitable Share – 3 000 – –
Documentation Dannhauser LM Infrastructure

Gate 5 Design KZ225 Msunduzi Transport


170 D2217 Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 500 – –
Development LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
171 D2398 Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 500 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
172 L1521 Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 2 000 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
173 L3032 Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 2 000 – –
Documentation LM Infrastructure
Gate 6 Design KZ224 Impende Transport
174 L743 Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 500 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
175 L781 Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 5 000 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
176 L787 Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 500 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
177 L808 Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 5 240 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
178 Masawuzana Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 500 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
179 Susu Concrete Upgrade Road 01-062017 30-082017 Equitable Share – 500 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
180 P402 Upgrade Road 01-042016 31-032024 Equitable Share – 30 000 31 770 12 000
Documentation LM Infrastructure
Gate 6 Design KZ221 Transport
181 Upgrading Of D348 Road 01-122015 30-012017 Equitable Share – 5 000 – –
Documentation uMshwathi LM Infrastructure
Upgrading Of Various Roads- Gate 6 Design KZ225 Msunduzi Transport
182 Road 01-042015 31-032020 Equitable Share – – 6 000 6 000
Design And Supervision Documentation LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
183 D2169 Concrete Upgrade Road 01-052017 30-092017 Equitable Share – 1 000 – –
Documentation LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
184 D977 Concrete Upgrade Road 01-052017 30-092017 Equitable Share – 1 000 – –
Documentation LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
185 D1126 Upgrade Road 01-012017 31-032020 Equitable Share – 10 000 10 590 20 000
Documentation LM Infrastructure

Safety Improvement Of P7-


Gate 6 Design KZ225 Msunduzi Transport
186 2/D1122/D1124 Intersection Road 01-042017 31-032018 Equitable Share – 200 – –
Documentation LM Infrastructure
(Widening With Cross Rd Refuge)

Safety Improvement Of P7-


Gate 6 Design KZ225 Msunduzi Transport
187 2/D1127/D2342 Intersection Road 01-042017 31-032018 Equitable Share – 200 – –
Documentation LM Infrastructure
(Widening With Cross Rd Refuge)

Safety Improvement On P135


Gate 6 Design KZ225 Msunduzi Transport
188 Km12 (2 X Bus Bays Road 01-042017 31-032018 Equitable Share – 200 – –
Documentation LM Infrastructure
Construction)

Safety Improvement On P399 Gate 6 Design KZ225 Msunduzi Transport


189 Road 01-042017 31-032018 Equitable Share – 100 – –
Km12 Bus Bay Construction Documentation LM Infrastructure

Safety Improvement On P7-2


Gate 6 Design KZ225 Msunduzi Transport
190 Km18 (2 X Bus Bays Road 01-042017 31-032018 Equitable Share – 200 – –
Documentation LM Infrastructure
Construction)

L1883 And L1765 Concrete Gate 6 Design KZ434 Transport


191 Road 01-102016 31-032017 Equitable Share – 2 000 3 000 –
Upgrade Documentation Ubuhlebezwe LM Infrastructure

166
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ434 Transport


192 D1232 Concrete Upgrade Road 01-102016 31-032017 Equitable Share – 4 000 – –
Documentation Ubuhlebezwe LM Infrastructure

Gate 6 Design KZ432 Kwa Sani Transport


193 D2-Km5-5.7 Upgrade Road 01-102016 31-032017 Equitable Share – 554 – –
Documentation LM Infrastructure

Gate 6 Design KZ434 Transport


194 P165 Upgrade Road 01-042013 31-032020 Equitable Share – 500 19 373 23 159
Documentation Ubuhlebezwe LM Infrastructure

Gate 4 Concept
KZ224 Impende Transport
195 D1350 Concrete Upgrade And Viability Or Road 01-042018 31-032019 Equitable Share – – 500 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ225 Msunduzi Transport
196 L1485 Concrete Upgrade And Viability Or Road 01-042018 31-032019 Equitable Share – – 300 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ224 Impende Transport
197 L1895 Concrete Upgrade And Viability Or Road 01-042018 31-032019 Equitable Share – – 300 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ224 Impende Transport
198 L1896 Concrete Upgrade And Viability Or Road 01-042018 31-032019 Equitable Share – – 300 –
LM Infrastructure
Feasibility

Gate 4 Concept
KZ225 Msunduzi Transport
199 L2309 Concrete Upgrade And Viability Or Road 01-042018 31-032019 Equitable Share – – 300 –
LM Infrastructure
Feasibility

Gate 4 Concept
Mooi River Bridge On P164 KZ223 Mooi Transport
200 And Viability Or Road 01-042017 31-122017 Equitable Share – – 2 000 –
Rehabilitation Mpofana LM Infrastructure
Feasibility

Gate 4 Concept
Bakers Bridge No.3091 On P167 KZ223 Mooi Transport
201 And Viability Or Road 01-042017 31-122017 Equitable Share – – 2 000 –
Widening Mpofana LM Infrastructure
Feasibility

Gate 4 Concept
KZ221 Transport
202 D348 Upgrade And Viability Or Road 01-122015 30-012017 Equitable Share – – 8 000 –
uMshwathi LM Infrastructure
Feasibility

Gate 4 Concept
KZ434 Transport
203 D1232 Upgrade And Viability Or Road 01-102016 31-032018 Equitable Share – – 3 000 –
Ubuhlebezwe LM Infrastructure
Feasibility

Gate 4 Concept
KZ433 Greater Transport
204 Re-Alignment Of D616 (2.5Km) And Viability Or Road 01-062019 31 Nov 2020 Equitable Share – – – 5 000
Kokstad LM Infrastructure
Feasibility

Gate 4 Concept
KZ224 Impende Transport
205 D1350 Concrete Upgrade And Viability Or Road 01-042019 31-032020 Equitable Share – – – 13 000
LM Infrastructure
Feasibility

Gate 4 Concept
KZ225 Msunduzi Transport
206 L1485 Concrete Upgrade And Viability Or Road 01-042019 31-032020 Equitable Share – – – 5 500
LM Infrastructure
Feasibility

Gate 4 Concept
KZ224 Impende Transport
207 L1895 Concrete Upgrade And Viability Or Road 01-042019 31-032020 Equitable Share – – – 6 000
LM Infrastructure
Feasibility

Gate 4 Concept
KZ224 Impende Transport
208 L1896 Concrete Upgrade And Viability Or Road 01-042019 31-032020 Equitable Share – – – 8 000
LM Infrastructure
Feasibility

Gate 4 Concept
KZ225 Msunduzi Transport
209 L2309 Concrete Upgrade And Viability Or Road 01-042019 31-032020 Equitable Share – – – 4 000
LM Infrastructure
Feasibility

Safety Improvement Of P7- Gate 4 Concept


KZ225 Msunduzi Transport
210 2/D1128 Intersection (Widening And Viability Or Road 01-042019 31-032020 Equitable Share – – – 2 000
LM Infrastructure
With Right Turn Refuge) Feasibility

Sanral Co-Payment N3 Epwp Integrated Transport


211 Construction Ladysmith Road 01-042017 31-032020 – 261 281 160 659 102 090
Interchange Grant Infrastructure
Transport
212 Safety Engineering Various Upgrades And Additions Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
213 Upgrade Roads Various Upgrades And Additions Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
214 Upgrade Structure Various Upgrades And Additions Ongoing Ongoing Equitable Share – – – –
Infrastructure
Upgrade Public Transport Transport
215 Various Upgrades And Additions Ongoing Ongoing Equitable Share – – – –
Facilities Infrastructure
Total Upgrades and additions – 1 470 913 1 629 987 1 821 706
3. Refurbishment and rehabilitation
3846 Lovu River Bridge P197--3 Gate 7 Works Transport
1 ETH Metro Vehicle Bridge 01-042017 31-032018 Equitable Share – 13 755 – –
At Km 2.40 (1%-25%) Infrastructure

167
Annexure Table B5 – Vote 12 : Transport

2946 Tugela River Bridge P15-1


Gate 6 Design DC26 Zululand Transport
2 Middledrift (Presidential Task Vehicle Bridge 01-042019 31-032020 Equitable Share – – – 5 700
Documentation DM Infrastructure
Team)

KZ223/KZ234
Gate 6 Design Transport
3 P1-8 Rehab Umtshezi/Mpofan Road 01-042017 31-032018 Equitable Share – 25 116 – –
Documentation Infrastructure
a LM
Gate 6 Design KZ244 Msinga Transport
4 P6-4 Rehab Road 01-042017 31-032018 Equitable Share – 16 106 – –
Documentation LM Infrastructure

KZ234/KZ235/KZ
236
Gate 6 Design Transport
5 P10-1 Rehab Umtshezi/Imbaba Road 01-042017 31-032018 Equitable Share – 9 791 – –
Documentation Infrastructure
zane/Okhahlamb
a LM

Gate 6 Design KZ234 Umtshezi Transport


6 P1-9 Rehab Road 01-042017 31-032018 Equitable Share – 28 829 – –
Documentation LM Infrastructure
Gate 6 Design KZ245 Umvoti Transport
7 P16-1 Rehab Road 01-042017 31-032018 Equitable Share – 13 174 – –
Documentation LM Infrastructure

Gate 6 Design KZ254 Transport


8 P272 Rehab Road 01-042017 31-032018 Equitable Share – 38 994 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ252 Newcastle Transport


9 P39-1 Rehab Road 01-042017 31-032018 Equitable Share – 26 926 – –
Documentation LM Infrastructure

Gate 6 Design KZ253 Transport


10 P41 Rehab Road 01-042017 31-032018 Equitable Share – 57 398 – –
Documentation Emadlangeni LM Infrastructure

Gate 6 Design KZ245 Umvoti Transport


11 P12-1 Rehab Road 01-042017 31-032018 Equitable Share – 21 921 – –
Documentation LM Infrastructure
KZ223/KZ245
Gate 6 Design Transport
12 P14-2 Rehab Mpofana/Umvoti Road 01-042017 31-032018 Equitable Share – 18 462 – –
Documentation Infrastructure
LM
Gate 6 Design Transport
13 P54-0 Rehab KZ242 Nqutu LM Road 01-042017 31-032018 Equitable Share – 11 232 – –
Documentation Infrastructure
Gate 6 Design KZ241 Endumeni Transport
14 P192 Rehab Road 01-042017 31-032018 Equitable Share – 25 321 – –
Documentation LM Infrastructure

Gate 6 Design KZ235 Transport


15 P181 Rehab Road 01-042017 31-032018 Equitable Share – 22 846 – –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ235 Transport


16 P212 Rehab Road 01-042017 31-032018 Equitable Share – 32 637 – –
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ253 Transport


17 P308 Rehab Road 01-042017 31-032018 Equitable Share – 25 169 – –
Documentation Emadlangeni LM Infrastructure

Gate 6 Design KZ234 Umtshezi Transport


18 P29 Rehab Road 01-042017 31-032018 Equitable Share – 12 606 – –
Documentation LM Infrastructure

Gate 6 Design KZ236 Transport


19 P331 Rehab Road 01-042017 31-032018 Equitable Share – 22 846 – –
Documentation Imbabazane LM Infrastructure

Gate 6 Design KZ245 Umvoti Transport


20 P6-2 Rehab Road 01-042017 31-032018 Equitable Share – 16 525 – –
Documentation LM Infrastructure

Gate 6 Design KZ254 Transport


21 P35-1 Rehab Road 01-042017 31-032018 Equitable Share – 19 582 – –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ245 Umvoti Transport


22 P160 Rehab Road 01-042017 31-032018 PRMG – 10 123 – –
Documentation LM Infrastructure

Gate 6 Design KZ226 Transport


23 P21-1 Rehab Road 01-042017 31-032018 Equitable Share – 51 664 – –
Documentation Mkhambathini LM Infrastructure

KZ225/KZ226/KZ
227
Gate 6 Design Transport
24 P338 Rehab Richmond/Msund Road 01-042017 31-032018 Equitable Share – 44 925 – –
Documentation Infrastructure
uziI/Mkhambathin
i LM

Gate 6 Design KZ227 Richmond Transport


25 P24 Rehab Road 01-042017 31-032018 Equitable Share – 35 161 – –
Documentation LM Infrastructure
Gate 6 Design KZ222 uMngeni Transport
26 P141 Rehab Road 01-042017 31-032018 Equitable Share – 30 575 – –
Documentation LM Infrastructure

Gate 6 Design KZ434 Transport


27 P5-1 Rehab Road 01-042017 31-032018 Equitable Share – 28 895 – –
Documentation Ubuhlebezwe LM Infrastructure

Gate 6 Design KZ226 Transport


28 P418 Rehab Road 01-042017 31-032018 Equitable Share – 9 105 – –
Documentation Mkhambathini LM Infrastructure

KZ221/KZ245
Gate 6 Design Transport
29 P6-2 Rehab uMshwathiI/Umvo Road 01-042017 31-032018 Equitable Share – 16 525 – –
Documentation Infrastructure
ti LM
Gate 6 Design KZ284 Umlalazi Transport
30 P50-1 Rehab Road 01-042017 31-032018 Equitable Share – 33 000 – –
Documentation LM Infrastructure
Gate 6 Design Transport
31 P443 Rehab KZ272 Jozini LM Road 01-042017 31-032018 Equitable Share – 77 000 – –
Documentation Infrastructure
Gate 6 Design KZ263 Abaqulusi Transport
32 P34-3 Rehab Road 01-042017 31-032018 Equitable Share – 33 000 – –
Documentation LM Infrastructure
Gate 6 Design Transport
33 P52-1 Rehab KZ266 Ulundi LM Road 01-042017 31-032018 Equitable Share – 27 500 – –
Documentation Infrastructure

168
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ285 Transport


34 P227 Rehab Road 01-042017 31-032018 Equitable Share – 27 500 – –
Documentation Mthonjaneni LM Infrastructure

KZ262/KZ272
Gate 6 Design Transport
35 P522-1 Rehab uPhongolo, Jozini Road 01-042017 31-032018 Equitable Share – 28 500 – –
Documentation Infrastructure
LM
Gate 6 Design Transport
36 P449 Rehab KZ272 Jozini LM Road 01-042017 31-032018 Equitable Share – 33 000 – –
Documentation Infrastructure

Gate 6 Design KZ292 Transport


37 P403 Rehab Road 01-042017 31-032018 PRMG – 10 000 – –
Documentation KwaDukuza LM Infrastructure

KZ245/KZ294
Gate 6 Design Transport
38 P20-2 Rehab Maphumulo/Umv Road 01-042017 31-032018 Equitable Share – 10 000 – –
Documentation Infrastructure
oti LM

KZ245/KZ294
Gate 6 Design Transport
39 P20-2 Rehab Maphumulo/Umv Road 01-042017 31-032018 Equitable Share – 12 000 – –
Documentation Infrastructure
oti LM

Gate 6 Design KZ292 Transport


40 P20-1 Rehab Road 01-042017 31-032018 Equitable Share – 11 366 – –
Documentation KwaDukuza LM Infrastructure

Gate 6 Design KZ292 Transport


41 P20-1 Rehab Road 01-042017 31-032018 Equitable Share – 12 000 – –
Documentation KwaDukuza LM Infrastructure

ETH/KZ212/KZ21
3/KZ216
Gate 6 Design Transport
42 P3-1 Rehab Hibuscus/Umzum Road 01-042017 31-032018 Equitable Share – 12 615 – –
Documentation Infrastructure
be/Umdoni/eThek
winiI LM

ETH/KZ212
Gate 6 Design Transport
43 P197-3 Rehab UmdoniI/ Road 01-042017 31-032018 Equitable Share – 10 000 – –
Documentation Infrastructure
eThekwini LM

ETH/KZ212
Gate 6 Design Transport
44 P530-2 Rehab UmdoniI/ Road 01-042017 31-032018 Equitable Share – 22 250 – –
Documentation Infrastructure
eThekwini LM

KZ214
Gate 6 Design Transport
45 P59 Rehab uMuziwabantu Road 01-042017 31-032018 PRMG – 10 000 – –
Documentation Infrastructure
LM

KZ434/KZ213
Gate 6 Design Transport
46 P73 Rehab Umzumbe/Ubuhl Road 01-042017 31-032018 PRMG – 4 815 – –
Documentation Infrastructure
ebezwe LM

Gate 6 Design KZ216 Hibuscus Transport


47 D202 Rehab Road 01-042017 31-032018 PRMG – 10 000 – –
Documentation Coast LM Infrastructure

ETH/KZ212
Gate 6 Design Transport
48 P197-3 Rehab eThekwini/Umdo Road 01-042017 31-032018 Equitable Share – 2 499 – –
Documentation Infrastructure
ni LM

Gate 6 Design KZ292 Transport


49 P103-1 Rehab Road 01-042017 31-032018 Equitable Share – 3 366 – –
Documentation KwaDukuza LM Infrastructure

KZ292/KZ293
Gate 6 Design Transport
50 P104 Rehab KwaDukuza/Ndw Road 01-042017 31-032018 Equitable Share – 2 292 – –
Documentation Infrastructure
edweLM

Gate 6 Design KZ292 Transport


51 P467 Rehab Road 01-042017 31-032018 Equitable Share – 1 949 – –
Documentation KwaDukuza LM Infrastructure

Gate 6 Design Transport


52 D995 Rehab ETH Metro Road 01-042017 31-032018 Equitable Share – 20 000 – –
Documentation Infrastructure
Gate 6 Design Transport
53 D776 Rehab ETH Metro Road 01-042017 31-032018 Equitable Share – 20 000 – –
Documentation Infrastructure
KZ214
Gate 6 Design Transport
54 P61 Rehab uMuziwabantu Road 01-042017 31-032018 Equitable Share – 20 000 – –
Documentation Infrastructure
LM

ETH/KZ212
Gate 6 Design Transport
55 P197-3 Rehab eThekwini/Umdo Road 01-042017 31-032018 Equitable Share – 15 000 – –
Documentation Infrastructure
ni LM

KZ221/KZKZ293/
ETH
Gate 6 Design Transport
56 P25-3 Rehab uMshwathi/Ndwe Road 01-042017 31-032018 PRMG – 7 320 – –
Documentation Infrastructure
dwe/eThekwni
LM

KZ214/KZ435
Gate 6 Design Transport
57 P417 Rehab UuMuziwabantu/ Road 01-042017 31-032018 Equitable Share – 4 361 – –
Documentation Infrastructure
Umzimkhulu LM

Gate 6 Design KZ245 Umvoti Transport


58 P12-1 Rehab Road 01-042018 31-032019 Equitable Share – – 44 013 –
Documentation LM Infrastructure
Gate 6 Design KZ223 Mooi Transport
59 P14-2 Rehab Road 01-042018 31-032019 Equitable Share – – 14 501 –
Documentation Mpofana LM Infrastructure
Gate 6 Design KZ245 Umvoti Transport
60 P6-2 Rehab Road 01-042018 31-032019 PRMG – – 7 318 –
Documentation LM Infrastructure

Gate 6 Design KZ254 Transport


61 P272 Rehab Road 01-042018 31-032019 Equitable Share – – 8 806 –
Documentation Dannhauser LM Infrastructure

Gate 6 Design KZ223 Mooi Transport


62 P19 Rehab Road 01-042018 31-032019 Equitable Share – – 13 565 –
Documentation Mpofana LM Infrastructure

169
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ245 Umvoti Transport


63 P160 Rehab Road 01-042018 31-032019 Equitable Share – – 17 913 –
Documentation LM Infrastructure
Gate 6 Design KZ245 Umvoti Transport
64 P151 Rehab Road 01-042018 31-032019 Equitable Share – – 20 472 –
Documentation LM Infrastructure
Gate 6 Design KZ241 Endumeni Transport
65 P36-1 Rehab Road 01-042018 31-032019 Equitable Share – – 35 826 –
Documentation LM Infrastructure
Gate 6 Design KZ241 Endumeni Transport
66 P33-2 Rehab Road 01-042018 31-032019 PRMG – – 11 605 –
Documentation LM Infrastructure
KZ241/KZ254
Gate 6 Design Transport
67 P34-1 Rehab Dannhauser/End Road 01-042018 31-032019 Equitable Share – – 26 356 –
Documentation Infrastructure
umeni LM

Gate 6 Design KZ232 Transport


68 P189 Rehab Road 01-042018 31-032019 PRMG – – 28 393 –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ434 Transport


69 P246 Rehab Road 01-042018 31-032019 PRMG – – 11 605 –
Documentation Ubuhlebezwe LM Infrastructure

Gate 6 Design KZ432 Kwa Sani Transport


70 P316-1 Rehab Road 01-042018 31-032019 PRMG – – 8 865 –
Documentation LM Infrastructure
Gate 6 Design Transport
71 P419 Rehab KZ431 Ingwe LM Road 01-042018 31-032019 PRMG – – 4 352 –
Documentation Infrastructure
Gate 6 Design Transport
72 P7-3 Rehab KZ431 Ingwe LM Road 01-042018 31-032019 PRMG – – 10 719 –
Documentation Infrastructure
Gate 6 Design KZ221 Transport
73 P25-1 Rehab Road 01-042018 31-032019 Equitable Share – – 54 024 –
Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ221 Transport
74 P141 Rehab Road 01-042018 31-032019 Equitable Share – – 15 731 –
Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ221 Transport
75 D457 Rehab Road 01-042018 31-032019 Equitable Share – – 5 004 –
Documentation uMshwathi LM Infrastructure

Gate 6 Design KZ282 Transport


76 P230 Rehab Road 01-042018 31-032019 PRMG – – 11 220 –
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ285 Transport


77 P227 Rehab Road 01-042018 31-032019 PRMG – – 13 464 –
Documentation Mthonjaneni LM Infrastructure

Gate 6 Design KZ262 Transport


78 P52-3 Rehab Road 01-042018 31-032019 PRMG – – 35 640 –
Documentation uPhongolo LM Infrastructure

Gate 6 Design KZ282 Transport


79 P744 Rehab Road 01-042018 31-032019 PRMG – – 3 802 –
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ262 Transport


80 P46-3 Rehab Road 01-042018 31-032019 PRMG – – 23 408 –
Documentation uPhongolo LM Infrastructure

Gate 6 Design KZ285 Transport


81 P574 Rehab Road 01-042018 31-032019 PRMG – – 13 090 –
Documentation Mthonjaneni LM Infrastructure

KZ282/KZ283
Gate 6 Design Transport
82 P517 Rehab uMhlathuze/Mfolo Road 01-042018 31-032019 PRMG – – 4 928 –
Documentation Infrastructure
ziLM

Gate 6 Design KZ282 Transport


83 P230 Rehab Road 01-042018 31-032019 Equitable Share – – 39 600 –
Documentation uMhlathuze LM Infrastructure

KZ282/KZ284
Gate 6 Design Transport
84 P2-4 Rehab Umlalazi/uMhlath Road 01-042018 31-032019 Equitable Share – – 44 000 –
Documentation Infrastructure
uze LM
Gate 6 Design KZ275 Mtubatuba Transport
85 P235-1 Rehab Road 01-042018 31-032019 Equitable Share – – 55 000 –
Documentation LM Infrastructure
KZ262/KZ272
Gate 6 Design Transport
86 P2-9 Rehab uPhongolo/Jozini Road 01-042018 31-032019 Equitable Share – – 33 000 –
Documentation Infrastructure
LM

KZ245/KZ294
Gate 6 Design Transport
87 P20-2 Rehab Maphumulo/Umv Road 01-042018 31-032019 Equitable Share – – 94 000 –
Documentation Infrastructure
oti LM
Gate 6 Design Transport
88 P21-2 Rehab ETH Metro Road 01-042018 31-032019 Equitable Share – – 268 000 –
Documentation Infrastructure

Gate 6 Design KZ216 Hibuscus Transport


89 P69 Rehab Road 01-042018 31-032019 Equitable Share – – 202 500 –
Documentation Coast LM Infrastructure

KZ291/KZ292/KZ
Gate 6 Design 293/ Mandeni/ Transport
90 P110 Rehab Road 01-042018 31-032019 PRMG – – 12 400 –
Documentation KwaDukuza/Ndw Infrastructure
edwe LM

Gate 6 Design KZ292 Transport


91 P387 Rehab Road 01-042018 31-032019 PRMG – – 6 000 –
Documentation KwaDukuza LM Infrastructure

Gate 6 Design KZ292 Transport


92 Retention Rehab Road 01-042018 31-032019 Equitable Share – – 10 000 –
Documentation KwaDukuza LM Infrastructure

Gate 6 Design KZ222 uMngeni Transport


93 P367 Rehab Road 01-042019 31-032020 Equitable Share – – – 17 581
Documentation LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
94 P8-1 Rehab Road 01-042019 31-032020 Equitable Share – – – 72 126
Documentation LM Infrastructure

Gate 6 Design KZ282 Transport


95 P6-1 Rehab Road 01-042019 31-032020 Equitable Share – – – 23 950
Documentation uMhlathuze LM Infrastructure

170
Annexure Table B5 – Vote 12 : Transport

ETH/KZ226
Gate 6 Design Transport
96 P1-3 Rehab eThekwini/Mkha Road 01-042019 31-032020 Equitable Share – – – 16 089
Documentation Infrastructure
mbathini LM

Gate 6 Design KZ226 Transport


97 P1-4 Rehab Road 01-042019 31-032020 PRMG – – – 10 814
Documentation Mkhambathini LM Infrastructure

Gate 6 Design KZ225 Msunduzi Transport


98 P1-5 Rehab Road 01-042019 31-032020 Equitable Share – – – 6 082
Documentation LM Infrastructure

Gate 6 Design KZ435 Transport


99 P8-3 Rehab Road 01-042019 31-032020 PRMG – – – 5 863
Documentation Umzimkhulu LM Infrastructure

Gate 6 Design KZ226 Transport


100 P502 Rehab Road 01-042019 31-032020 Equitable Share – – – 7 966
Documentation Mkhambathini LM Infrastructure

Gate 6 Design KZ227 Richmond Transport


101 P117 Rehab Road 01-042019 31-032020 PRMG – – – 2 282
Documentation LM Infrastructure
Gate 6 Design KZ221 Transport
102 P6-2 Rehab Road 01-042019 31-032020 Equitable Share – – – 4 289
Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ222 uMngeni Transport
103 P1-6 Rehab Road 01-042019 31-032020 Equitable Share – – – 5 665
Documentation LM Infrastructure
KZ226/KZ227
Gate 6 Design Transport
104 P116 Rehab RIichmond/Mkha Road 01-042019 31-032020 Equitable Share – – – 34 445
Documentation Infrastructure
mbathini LM

KZ226/KZ227
Gate 6 Design Transport
105 D1273 Rehab RIichmond/Mkha Road 01-042019 31-032020 Equitable Share – – – 52 292
Documentation Infrastructure
mbathini LM
Gate 6 Design KZ245 Umvoti Transport
106 P490 Rehab Road 01-042019 31-032020 Equitable Share – – – 71 760
Documentation LM Infrastructure

Gate 6 Design KZ235 Transport


107 P180 Rehab Road 01-042019 31-032020 Equitable Share – – – 31 326
Documentation Okhahlamba LM Infrastructure

Gate 6 Design KZ236 Transport


108 P29 Rehab Road 01-042019 31-032020 PRMG – – – 35 229
Documentation Imbabazane LM Infrastructure

Gate 6 Design KZ294 Transport


109 P20-2Rehab Road 01-042019 31-032020 PRMG – – – 39 251
Documentation Maphumulo LM Infrastructure

Gate 6 Design KZ232 Transport


110 P1-10 Rehab Road 01-042019 31-032020 Equitable Share – – – 19 949
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ263 Abaqulusi Transport


111 P49-1 Rehab Road 01-042019 31-032020 PRMG – – – 44 640
Documentation LM Infrastructure
Gate 6 Design KZ263 Abaqulusi Transport
112 P46-1 Rehab Road 01-042019 31-032020 PRMG – – – 12 320
Documentation LM Infrastructure
Gate 6 Design KZ263 Abaqulusi Transport
113 P289 Rehab Road 01-042019 31-032020 PRMG – – – 10 560
Documentation LM Infrastructure
KZ265/KZ274
Gate 6 Design Transport
114 P235-2 Rehab Hlabisa/Nongoma Road 01-042019 31-032020 PRMG – – – 43 560
Documentation Infrastructure
LM

KZ262/KZ272
Gate 6 Design Transport
115 P236 Rehab uPhongolo, Jozini Road 01-042019 31-032020 Equitable Share – – – 33 000
Documentation Infrastructure
LM

Gate 6 Design KZ282 Transport


116 P2-4 Rehab Road 01-042019 31-032020 Equitable Share – – – 37 730
Documentation uMhlathuze LM Infrastructure

Gate 6 Design Transport


117 P244-1 Rehab KZ266 Ulundi LM Road 01-042019 31-032020 Equitable Share – – – 27 500
Documentation Infrastructure
Gate 6 Design KZ261 eDumbe Transport
118 P34-5 Rehab Road 01-042019 31-032020 Equitable Share – – – 33 000
Documentation LM Infrastructure

Gate 6 Design KZ282 Transport


119 P456 Rehab Road 01-042019 31-032020 Equitable Share – – – 11 000
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ263 Abaqulusi Transport


120 P220 Rehab Road 01-042019 31-032020 Equitable Share – – – 44 000
Documentation LM Infrastructure

Gate 6 Design KZ282 Transport


121 P517 Rehab Road 01-042019 31-032020 Equitable Share – – – 27 500
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ262 Transport


122 P51 Rehab Road 01-042019 31-032020 Equitable Share – – – 33 000
Documentation uPhongolo LM Infrastructure
KZ262/KZ272
Gate 6 Design Transport
123 P522-1 Rehab uPhongolo, Jozini Road 01-042019 31-032020 Equitable Share – – – 22 000
Documentation Infrastructure
LM

ETH/KZ292eThe
Gate 6 Design Transport
124 P398-2 Rehab kwini/KwaDukuza Road 01-042019 31-032020 Equitable Share – – – 31 500
Documentation Infrastructure
LM

KZ292/KZ93/KZ2
94
Gate 6 Design Transport
125 P20-1 Rehab KwaDukuza/Ndw Road 01-042019 31-032020 Equitable Share – – – 231 000
Documentation Infrastructure
edwe/Maphumulo
LM

Gate 6 Design Transport


126 P197 Rehab ETH Metro Road 01-042019 31-032020 Equitable Share – – – 112 500
Documentation Infrastructure
ETH/KZ226
Gate 6 Design Transport
127 P489 Rehab eThekwini/Mkha Road 01-042019 31-032020 Equitable Share – – – 21 000
Documentation Infrastructure
mbathini LM

171
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ216 Hibuscus Transport


128 Retention Road 01-042019 31-032020 Equitable Share – – – 5 000
Documentation Coast LM Infrastructure

Bridge Replacement On Mlaza R Gate 6 Design KZ226 Transport


129 Road 01-052017 31-102017 Equitable Share – 4 000 – –
Bridge On P117-Km7.8 Documentation Mkhambathini LM Infrastructure

Refurbishment And Transport


130 Rehabilitation Various Ongoing Ongoing Equitable Share – – – –
Rehabilitation Infrastructure
Refurbishment And Transport
131 Structure Rehablitation Various Ongoing Ongoing Equitable Share – – – –
Rehabilitation Infrastructure
Total Refurbishment and rehabilitation – 1 171 542 1 209 120 1 243 469
4. Maintenance and repairs

KZ232/KZ233
Gate 6 Design Transport
1 P32 Reseal eMnambithi/Lady Road 01-042017 31-032018 PRMG – – – –
Documentation Infrastructure
smith/Indaka

Gate 6 Design KZ232 Transport


2 P275 Reseal Road 01-042017 31-032018 PRMG – 35 161 – –
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ244 Msinga Transport


3 P6-5 Reseal Road 01-042017 31-032018 PRMG – – – –
Documentation LM Infrastructure
Gate 6 Design KZ245 Umvoti Transport
4 P305 Reseal Road 01-042017 31-032018 PRMG – 29 895 – –
Documentation LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
5 P5-3 Reseal Road 01-042017 31-032018 PRMG – – – –
Documentation LM Infrastructure

Gate 6 Design KZ434 Transport


6 P22-2 Reseal Road 01-042017 31-032018 PRMG – 28 500 – –
Documentation Ubuhlebezwe LM Infrastructure

Gate 6 Design KZ225 Msunduzi Transport


7 P399 Reseal Road 01-042017 31-032018 PRMG – 22 000 – –
Documentation LM Infrastructure

KZ225/KZ431/KZ
Gate 6 Design 224 Transport
8 P7-2 Reseal Road 01-042017 31-032018 PRMG – – – –
Documentation MsunduziI/Ingwe/ Infrastructure
Impendle LM

Gate 6 Design KZ222 uMngeni Transport


9 P134 Reseal Road 01-042017 31-032018 PRMG – – – –
Documentation LM Infrastructure
Gate 6 Design Transport
10 D457 Reseal ETH Metro Road 01-042017 31-032018 PRMG – 7 320 – –
Documentation Infrastructure
Gate 6 Design KZ222 uMngeni Transport
11 P147 Reseal Road 01-042017 31-032018 PRMG – 14 758 – –
Documentation LM Infrastructure
Gate 6 Design KZ224 Impende Transport
12 P127 Reseal Road 01-042017 31-032018 PRMG – 3 499 – –
Documentation LM Infrastructure
KZ221/KZ225
Gate 6 Design Transport
13 P26 Reseal Msunduzi/uMshw Road 01-042017 31-032018 PRMG – 3 366 – –
Documentation Infrastructure
athi LM
Gate 6 Design KZ261 eDumbe Transport
14 P221 Reseal Road 01-042017 31-032018 PRMG – 14 280 – –
Documentation LM Infrastructure

Gate 6 Design KZ282 Transport


15 P535 Reseal Road 01-042017 31-032018 PRMG – 2 949 – –
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ263 Abaqulusi Transport


16 P49-1 Reseal Road 01-042017 31-032018 PRMG – 22 000 – –
Documentation LM Infrastructure
Gate 6 Design KZ262 Transport
17 P52-3 Reseal Road 01-042017 31-032018 PRMG – – – –
Documentation uPhongolo LM Infrastructure
Gate 6 Design Transport
18 P52-2 Reseal KZ266 Ulundi LM Road 01-042017 31-032018 PRMG – – – –
Documentation Infrastructure
KZ263/KZ262
Gate 6 Design Transport
19 P46-3 Reseal Abaqulusi/uPhon Road 01-042017 31-032018 PRMG – 26 000 – –
Documentation Infrastructure
golo LM

KZ282/KZ283/KZ
284
Gate 6 Design Transport
20 P230 Reseal Umlalazi/Ntamba Road 01-042017 31-032018 PRMG – – – –
Documentation Infrastructure
nana/uMhlathuze
LM

KZ221/KZKZ293/
ETH
Gate 6 Design Transport
21 P25-3 Reseal uMshwathi/Ndwe Road 01-042017 31-032018 Equitable Share – – – –
Documentation Infrastructure
dwe/eThekwni
LM

KZ221/KZKZ293/
ETH
Gate 6 Design Transport
22 P25-3 Reseal uMshwathi/Ndwe Road 01-042017 31-032018 Equitable Share – – – –
Documentation Infrastructure
dwe/eThekwni
LM

Gate 6 Design Transport


23 P504 Reseal ETH Metro Road 01-042017 31-032018 PRMG – – – –
Documentation Infrastructure
KZ292/KZ293
Gate 6 Design Transport
24 P103-2 Reseal KwaDukuza/Ndw Road 01-042017 31-032018 PRMG – – – –
Documentation Infrastructure
edweLM

Gate 6 Design KZ294 Transport


25 D892 Reseal Road 01-042017 31-032018 PRMG – 7 156 – –
Documentation Maphumulo LM Infrastructure

Gate 6 Design Transport


26 P530-2 Reseal ETH Metro Road 01-042017 31-032018 Equitable Share – – – –
172 Documentation Infrastructure
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ244 Msinga Transport


27 P373 Reseal Road 01-042018 31-032019 Equitable Share – – 32 628 –
Documentation LM Infrastructure
KZ291/KZ262
Gate 6 Design Transport
28 P54 Reseal eMadlangeni/Aba Road 01-042018 31-032019 Equitable Share – – 13 509 –
Documentation Infrastructure
qulusi LM

KZ241/KZ242
Gate 6 Design Transport
29 P36-1 Reseal Endumeni, Nqutu Road 01-042018 31-032019 Equitable Share – – 20 186 –
Documentation Infrastructure
LM

KZ234/KZ235
Gate 6 Design Transport
30 P11-1 Reseal Umtshezi/Okhahl Road 01-042018 31-032019 Equitable Share – – 35 826 –
Documentation Infrastructure
amba LM

Gate 6 Design KZ254 Transport


31 P488 Reseal Road 01-042018 31-032019 Equitable Share – – 9 098 –
Documentation Dannhauser LM Infrastructure

Gate 6 Design Transport


32 P8-3 Reseal KZ431 Ingwe LM Road 01-042018 31-032019 Equitable Share – – 27 976 –
Documentation Infrastructure
Gate 6 Design KZ241 Endumeni Transport
33 P34-2 Reseal Road 01-042018 31-032019 PRMG – – 4 439 –
Documentation LM Infrastructure

Gate 6 Design KZ236 Transport


34 P28-1 Reseal Road 01-042018 31-032019 PRMG – – – –
Documentation Imbabazane LM Infrastructure

Gate 6 Design KZ241 Endumeni Transport


35 P34-2 Reseal Road 01-042018 31-032019 PRMG – – 5 802 –
Documentation LM Infrastructure
Gate 6 Design KZ227 Richmond Transport
36 P24 Reseal Road 01-042018 31-032019 Equitable Share – – 28 100 –
Documentation LM Infrastructure
Gate 6 Design KZ222 uMngeni Transport
37 P134 Reseal Road 01-042018 31-032019 Equitable Share – – – –
Documentation LM Infrastructure
Gate 6 Design KZ222 uMngeni Transport
38 P147 Reseal Road 01-042018 31-032019 Equitable Share – – 10 237 –
Documentation LM Infrastructure

Gate 6 Design KZ226 Transport


39 P418 Reseal Road 01-042018 31-032019 Equitable Share – – 7 722 –
Documentation Mkhambathini LM Infrastructure

Gate 6 Design KZ434 Transport


40 P22-2 Reseal Road 01-042018 31-032019 Equitable Share – – 21 752 –
Documentation Ubuhlebezwe LM Infrastructure

Gate 6 Design KZ434 Transport


41 P5-2 Reseal Road 01-042018 31-032019 PRMG – – – –
Documentation Ubuhlebezwe LM Infrastructure

Gate 6 Design KZ435 Transport


42 P416 Reseal Road 01-042018 31-032019 PRMG – – 18 569 –
Documentation Umzimkhulu LM Infrastructure

Gate 6 Design KZ221 Transport


43 P158 Reseal Road 01-042018 31-032019 Equitable Share – – 10 237 –
Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ225 Msunduzi Transport
44 P478 Reseal Road 01-042018 31-032019 Equitable Share – – 15 982 –
Documentation LM Infrastructure
KZ431/KZ224
Gate 6 Design Transport
45 P127-1 Reseal Impendle/Ingwe Road 01-042018 31-032019 PRMG – – 27 752 –
Documentation Infrastructure
LM
Gate 6 Design KZ433 Greater Transport
46 P603 Reseal Road 01-042018 31-032019 PRMG – – 1 451 –
Documentation Kokstad LM Infrastructure
Gate 6 Design KZ433 Greater Transport
47 P603 Reseal Road 01-042018 31-032019 PRMG – – 2 176 –
Documentation Kokstad LM Infrastructure
Gate 6 Design KZ433 Greater Transport
48 P601 Reseal Road 01-042018 31-032019 PRMG – – 3 830 –
Documentation Kokstad LM Infrastructure
Gate 6 Design KZ221 Transport
49 P25-1 Reseal Road 01-042018 31-032019 PRMG – – 17 916 –
Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ221 Transport
50 P63 Reseal Road 01-042018 31-032019 PRMG – – 2 611 –
Documentation uMshwathi LM Infrastructure
Gate 6 Design KZ433 Greater Transport
51 P601 Reseal Road 01-042018 31-032019 PRMG – – 22 050 –
Documentation Kokstad LM Infrastructure
Gate 6 Design KZ433 Greater Transport
52 P603 Reseal Road 01-042018 31-032019 PRMG – – – –
Documentation Kokstad LM Infrastructure
Gate 6 Design Transport
53 P702 Reseal KZ266 Ulundi LM Road 01-042018 31-032019 PRMG – – 7 128 –
Documentation Infrastructure
Gate 6 Design Transport
54 P702 Reseal KZ266 Ulundi LM Road 01-042018 31-032019 PRMG – – 4 277 –
Documentation Infrastructure
KZ266/KZ285
Gate 6 Design Transport
55 P47-3 Reseal Ulundi/Mthonjane Road 01-042018 31-032019 Equitable Share – – – –
Documentation Infrastructure
ni LM

KZ283/KZ284/KZ
285
Gate 6 Design Transport
56 P393 Reseal Umlalazi/Ntamba Road 01-042018 31-032019 Equitable Share – – – –
Documentation Infrastructure
nana/uMhlathuze
LM

KZ262/KZ263
Gate 6 Design Transport
57 P46-3 Reseal uPhongolo/Abaq Road 01-042018 31-032019 Equitable Share – – – –
Documentation Infrastructure
ulusi LM

Gate 6 Design KZ282 Transport


58 P479 Reseal Road 01-042019 31-032020 Equitable Share – – – 25 116
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ236 Transport


59 P28-1 Reseal Road 01-042019 31-032020 Equitable Share – – – 11 482
Documentation Imbabazane LM Infrastructure

Gate 6 Design KZ227 Richmond Transport


60 P24-0 Reseal Road 01-042019 31-032020 Equitable Share – – – 26 063
Documentation LM Infrastructure

173
Annexure Table B5 – Vote 12 : Transport

Gate 6 Design KZ282 Transport


61 P26 Reseal Road 01-042019 31-032020 Equitable Share – – – 37 917
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ234 Umtshezi Transport


62 P12-3 Reseal Road 01-042019 31-032020 Equitable Share – – – 40 996
Documentation LM Infrastructure
Gate 6 Design KZ245 Umvoti Transport
63 P16-2 Reseal Road 01-042019 31-032020 Equitable Share – – – 36 989
Documentation LM Infrastructure
Gate 6 Design Transport
64 P36-2 Reseal KZ242 Nqutu LM Road 01-042019 31-032020 Equitable Share – – – 47 640
Documentation Infrastructure

Gate 6 Design KZ235 Transport


65 P340 Reseal Road 01-042019 31-032020 Equitable Share – – – 27 742
Documentation Okhahlamba LM Infrastructure

KZ263/KZ242
Gate 6 Design Transport
66 P54 Reseal Abaqulusi/Nqutu Road 01-042019 31-032020 Equitable Share – – – 33 988
Documentation Infrastructure
LM
Gate 6 Design KZ241 Endumeni Transport
67 P36-1 Reseal Road 01-042019 31-032020 Equitable Share – – – 37 950
Documentation LM Infrastructure

Gate 6 Design KZ232 Transport


68 P1-10 Reseal Road 01-042019 31-032020 PRMG – – – 25 229
Documentation eMnambhithi LM Infrastructure

Gate 6 Design KZ245 Umvoti Transport


69 P160 Reseal Road 01-042019 31-032020 PRMG – – – 16 819
Documentation LM Infrastructure
Gate 6 Design KZ263 Abaqulusi Transport
70 P463 Reseal Road 01-042019 31-032020 Equitable Share – – – 33 000
Documentation LM Infrastructure

Gate 6 Design KZ282 Transport


71 P535 Reseal Road 01-042019 31-032020 Equitable Share – – – 33 000
Documentation uMhlathuze LM Infrastructure

Gate 6 Design KZ292 Transport


72 P403 Reseal Road 01-042019 31-032020 PRMG – – – 2 775
Documentation KwaDukuza LM Infrastructure

Gate 6 Design KZ216 Hibuscus Transport


73 P71 Reseal Road 01-042019 31-032020 PRMG – – – 4 650
Documentation Coast LM Infrastructure

Packaged Transport
74 Maintenance Administration Kzn Operational 01-042017 31-032020 Equitable Share – 664 938 672 685 694 148
Programme Infrastructure
Packaged Transport
75 Mechanical Kzn Operational 01-042017 31-032020 Equitable Share – 67 411 71 388 75 386
Programme Infrastructure
Preventative Maintenance Packaged Transport
76 DC21 Ugu DM Road 01-042017 31-032020 PRMG – 70 134 74 272 78 431
(Regravelling) Dc21 Programme Infrastructure
Packaged Transport
77 Routine Maintenance Dc21 DC21 Ugu DM Road 01-042017 31-032020 Equitable Share – 34 790 36 843 38 906
Programme Infrastructure
Safety Maintenance (Blacktop Packaged Transport
78 DC21 Ugu DM Road 01-042017 31-032020 PRMG – 30 450 32 247 34 052
Patching) Dc21 Programme Infrastructure
Packaged Transport
79 Safety Maintenance Dc21 DC21 Ugu DM Road 01-042017 31-032020 Equitable Share – 14 847 15 723 16 603
Programme Infrastructure
Packaged Transport
80 Special Maintenance Dc21 DC21 Ugu DM Road 01-042017 31-032020 Equitable Share – 3 070 3 251 3 433
Programme Infrastructure
DC22
Preventative Maintenance Packaged Transport
81 uMgungundlovu Road 01-042017 31-032020 PRMG – 56 550 59 886 63 240
(Regravelling) Dc22 Programme Infrastructure
DM

DC22
Packaged Transport
82 Routine Maintenance Dc22 uMgungundlovu Road 01-042017 31-032020 Equitable Share – 131 300 139 047 146 833
Programme Infrastructure
DM

DC22
Safety Maintenance (Blacktop Packaged Transport
83 uMgungundlovu Road 01-042017 31-032020 PRMG – 34 250 36 271 38 302
Patching) Dc22 Programme Infrastructure
DM

DC22
Packaged Transport
84 Safety Maintenance Dc22 uMgungundlovu Road 01/04/2017 31/3/2018 Equitable Share – 5 500 5 825 6 151
Programme Infrastructure
DM

DC22
Packaged Transport
85 Special Maintenance Dc22 uMgungundlovu Road 01-042017 31-032020 Equitable Share – 1 500 1 589 1 677
Programme Infrastructure
DM
Preventative Maintenance Packaged DC23 Uthukela Transport
86 Road 01-042017 31-032020 PRMG – 74 008 78 374 82 763
(Regravelling) Dc23 Programme DM Infrastructure
Packaged DC23 Uthukela Transport
87 Routine Maintenance Dc23 Road 01-042017 31-032020 Equitable Share – 26 657 28 230 29 811
Programme DM Infrastructure
Safety Maintenance (Blacktop Packaged DC23 Uthukela Transport
88 Road 01-042017 31-032020 PRMG – 21 300 22 557 23 820
Patching) Dc23 Programme DM Infrastructure
Packaged DC23 Uthukela Transport
89 Safety Maintenance Dc23 Road 01-042017 31-032020 Equitable Share – 14 600 15 461 16 327
Programme DM Infrastructure
Packaged DC23 Uthukela Transport
90 Special Maintenance Dc23 Road 01-042017 31-032020 Equitable Share – 11 300 11 967 12 637
Programme DM Infrastructure

Preventative Maintenance Packaged DC24 Umzinyathi Transport


91 Road 01-042017 31-032020 PRMG – 59 000 62 481 65 980
(Regravelling) Dc24 Programme DM Infrastructure

Packaged DC24 Umzinyathi Transport


92 Routine Maintenance Dc24 Road 01-042017 31-032020 Equitable Share – 25 910 27 439 28 975
Programme DM Infrastructure

Safety Maintenance (Blacktop Packaged DC24 Umzinyathi Transport


93 Road 01-042017 31-032020 PRMG – 12 839 13 597 14 358
Patching) Dc24 Programme DM Infrastructure

Packaged DC24 Umzinyathi Transport


94 Safety Maintenance Dc24 Road 01-042017 31-032020 PRMG – 4 615 4 887 5 161
Programme DM Infrastructure

174
Annexure Table B5 – Vote 12 : Transport

Packaged DC24 Umzinyathi Transport


95 Special Maintenance Dc24 Road 01-042017 31-032020 Equitable Share – 8 515 9 017 9 522
Programme DM Infrastructure

Preventative Maintenance Packaged DC25 Amajuba Transport


96 Road 01-042017 31-032020 PRMG – 78 016 82 619 87 246
(Regravelling) Dc25 Programme DM Infrastructure
Packaged DC25 Amajuba Transport
97 Routine Maintenance Dc25 Road 01-042017 31-032020 Equitable Share – 26 446 28 006 29 575
Programme DM Infrastructure
Safety Maintenance (Blacktop Packaged DC25 Amajuba Transport
98 Road 01-042017 31-032020 PRMG – 17 226 18 242 19 264
Patching) Dc25 Programme DM Infrastructure
Packaged DC25 Amajuba Transport
99 Safety Maintenance Dc25 Road 01-042017 31-032020 PRMG – 16 429 17 398 18 373
Programme DM Infrastructure
Packaged DC25 Amajuba Transport
100 Special Maintenance Dc25 Road 01-042017 31-032020 Equitable Share – 23 509 24 896 26 290
Programme DM Infrastructure
Preventative Maintenance Packaged DC26 Zululand Transport
101 Road 01-042017 31-032020 PRMG – 119 400 126 445 133 525
(Regravelling) Dc26 Programme DM Infrastructure
Packaged DC26 Zululand Transport
102 Routine Maintenance Dc26 Road 01-042017 31-032020 Equitable Share – 47 810 50 631 53 466
Programme DM Infrastructure
Safety Maintenance (Blacktop Packaged DC26 Zululand Transport
103 Road 01-042017 31-032020 PRMG – 13 820 14 635 15 455
Patching) Dc26 Programme DM Infrastructure
Packaged DC26 Zululand Transport
104 Safety Maintenance Dc26 Road 01-042017 31-032020 Equitable Share – 11 180 11 840 12 503
Programme DM Infrastructure
Packaged DC26 Zululand Transport
105 Special Maintenance Dc26 Road 01-042017 31-032020 Equitable Share – 8 450 8 949 9 450
Programme DM Infrastructure
DC27
Preventative Maintenance Packaged Transport
106 Umkhanyakude Road 01-042017 31-032020 PRMG – 80 800 85 567 90 359
(Regravelling) Dc27 Programme Infrastructure
DM

DC27
Packaged Transport
107 Routine Maintenance Dc27 Umkhanyakude Road 01-042017 31-032020 Equitable Share – 36 660 38 823 40 997
Programme Infrastructure
DM

DC27
Safety Maintenance (Blacktop Packaged Transport
108 Umkhanyakude Road 01-042017 31-032020 PRMG – 9 060 9 595 10 132
Patching) Dc27 Programme Infrastructure
DM

DC27
Packaged Transport
109 Safety Maintenance Dc27 Umkhanyakude Road 01-042017 31-032020 PRMG – 9 940 10 526 11 116
Programme Infrastructure
DM

DC27
Packaged Transport
110 Special Maintenance Dc27 Umkhanyakude Road 01-042017 31-032020 Equitable Share – 5 150 5 454 5 759
Programme Infrastructure
DM
Preventative Maintenance Packaged DC28 UThungulu Transport
111 Road 01-042017 31-032020 Equitable Share – 119 800 126 868 133 973
(Regravelling) Dc28 Programme DM Infrastructure
Packaged DC28 UThungulu Transport
112 Routine Maintenance Dc28 Road 01-042017 31-032020 PRMG – 52 340 55 428 58 532
Programme DM Infrastructure
Safety Maintenance (Blacktop Packaged DC28 UThungulu Transport
113 Road 01-042017 31-032020 PRMG – 14 440 15 292 16 148
Patching) Dc28 Programme DM Infrastructure
Packaged DC28 UThungulu Transport
114 Safety Maintenance Dc28 Road 01-042017 31-032020 Equitable Share – 10 860 11 501 12 145
Programme DM Infrastructure
Packaged DC28 UThungulu Transport
115 Special Maintenance Dc28 Road 01-042017 31-032020 Equitable Share – 6 100 6 460 6 822
Programme DM Infrastructure
Preventative Maintenance Packaged Transport
116 DC29 Ilembe DM Road 01-042017 31-032020 PRMG – 51 456 54 492 57 543
(Regravelling) Dc29 Programme Infrastructure
Packaged Transport
117 Routine Maintenance Dc29 DC29 Ilembe DM Road 01-042017 31-032020 Equitable Share – 25 990 27 523 29 065
Programme Infrastructure
Safety Maintenance (Blacktop Packaged Transport
118 DC29 Ilembe DM Road 01-042017 31-032020 PRMG – 15 620 16 542 17 468
Patching) Dc29 Programme Infrastructure
Packaged Transport
119 Safety Maintenance Dc29 DC29 Ilembe DM Road 01-042017 31-032020 PRMG – 11 600 12 284 12 972
Programme Infrastructure
Packaged Transport
120 Special Maintenance Dc29 DC29 Ilembe DM Road 01-042017 31-032020 Equitable Share – 5 310 5 623 5 938
Programme Infrastructure
Preventative Maintenance Packaged Transport
121 ETH Metro Road 01-042017 31-032020 PRMG – 37 843 40 076 42 320
(Regravelling) Eth Programme Infrastructure
Packaged Transport
122 Routine Maintenance Eth ETH Metro Road 01-042017 31-032020 Equitable Share – 34 525 36 562 38 609
Programme Infrastructure
Safety Maintenance (Blacktop Packaged Transport
123 ETH Metro Road 01-042017 31-032020 PRMG – 30 755 32 570 34 393
Patching) Eth Programme Infrastructure
Packaged Transport
124 Safety Maintenance Eth ETH Metro Road 01-042017 31-032020 PRMG – 37 241 39 438 41 647
Programme Infrastructure
Packaged Transport
125 Special Maintenance Eth ETH Metro Road 01-042017 31-032020 Equitable Share – 3 138 3 323 3 509
Programme Infrastructure
Preventative Maintenance Packaged DC43 Harry Transport
126 Road 01-042017 31-032020 PRMG – 102 800 108 865 114 962
(Regravelling) Dc43 Programme Gwala DM Infrastructure
Packaged DC43 Harry Transport
127 Routine Maintenance Dc43 Road 01-042017 31-032020 Equitable Share – 149 700 158 532 167 410
Programme Gwala DM Infrastructure
Safety Maintenance (Blacktop Packaged DC43 Harry Transport
128 Road 01-042017 31-032020 PRMG – 33 300 35 265 37 240
Patching) Dc43 Programme Gwala DM Infrastructure
Packaged DC43 Harry Transport
129 Safety Maintenance Dc43 Road 01-042017 31-032020 Equitable Share – 5 500 5 825 6 151
Programme Gwala DM Infrastructure
Packaged DC43 Harry Transport
130 Special Maintenance Dc43 Road 01/04/2017 31/3/2018 Equitable Share – 2 700 2 859 3 019
Programme Gwala DM Infrastructure
Packaged KZN Whole Transport
131 Uamp Office Building 01-042017 31-032020 Equitable Share – 28 660 30 351 32 051
Programme Province Infrastructure
Transport
132 Weighbridge Complete Kokstad Weighbridge 01-042017 31-032020 Equitable Share – 12 890 13 651 14 415
Infrastructure
Technology Transfer Packaged KZN Whole Transport
133 Road 01-042017 31-032020 Equitable Share – 27 460 29 080 30 709
Maintenance Programme Province Infrastructure
Blacktop Patching Pilot Packaged KZN Whole Transport
134 Road 01-042017 31-032020 Equitable Share – 9 250 9 796 10 344
Programme Programme Province Infrastructure

175
Annexure Table B5 – Vote 12 : Transport

Transport
135 Maintenance Administration Various Maintenance Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
136 Mechanical Various Maintenance Ongoing Ongoing Equitable Share – – – –
Infrastructure
Preventative Maintenance Transport
137 Various Maintenance Ongoing Ongoing PRMG – – – –
(Regravelling) Infrastructure
Preventative Maintenance Transport
138 Various Maintenance Ongoing Ongoing Equitable Share – – – –
(Reseal) Infrastructure
Transport
139 Routine Maintenance Various Maintenance Ongoing Ongoing PRMG – – – –
Infrastructure
Safety Maintenance (Blacktop Transport
140 Various Maintenance Ongoing Ongoing PRMG – – – –
Patching) Infrastructure
Transport
141 Safety Maintenance Various Maintenance Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
142 Special Maintenance Various Maintenance Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
143 Routine Maintenance (Zibambele) Various Maintenance Ongoing Ongoing PRMG – – – –
Infrastructure
Transport
144 Uamp Various Maintenance Ongoing Ongoing Equitable Share – – – –
Infrastructure
Transport
145 Public Transport Maintenance Various Maintenance Ongoing Ongoing Equitable Share – – – –
Infrastructure
4. Maintenance and repairs 0 – 2 923 542 3 186 119 3 418 767
5. Infrastructure transfers - current – – – –
6. Infrastructure transfers - capital – – – –
7. Infrastructure payments for financial assets – – – –
8. Infrastructure leases – – – –
9. Non infrastructure
Routine Maintenance (Zibambele) Packaged Transport
1 DC21 Ugu DM Road 01-042017 31-032020 PRMG – 37 500 39 713 41 936
Dc21 Programme Infrastructure
DC22
Routine Maintenance (Zibambele) Packaged Transport
2 uMgungundlovu Road 01-042017 31-032020 PRMG – 19 030 20 153 21 281
Dc22 Programme Infrastructure
DM
Routine Maintenance (Zibambele) Packaged DC23 Uthukela Transport
3 Road 01-042017 31-032020 PRMG – 37 200 39 395 41 601
Dc23 Programme DM Infrastructure

Routine Maintenance (Zibambele) Packaged DC24 Umzinyathi Transport


4 Road 01-042017 31-032020 PRMG – 36 500 38 654 40 818
Dc24 Programme DM Infrastructure

Routine Maintenance (Zibambele) Packaged DC25 Amajuba Transport


5 Road 01-042017 31-032020 PRMG – 27 281 28 891 30 508
Dc25 Programme DM Infrastructure
Routine Maintenance (Zibambele) Packaged DC26 Zululand Transport
6 Road 01-042017 31-032020 PRMG – 51 990 55 057 58 141
Dc26 Programme DM Infrastructure
DC27
Routine Maintenance (Zibambele) Packaged Transport
7 Umkhanyakude Road 01-042017 31-032020 PRMG – 37 740 39 967 42 205
Dc27 Programme Infrastructure
DM
Routine Maintenance (Zibambele) Packaged DC28 UThungulu Transport
8 Road 01-042017 31-032020 PRMG – 49 460 52 378 55 311
Dc28 Programme DM Infrastructure
Routine Maintenance (Zibambele) Packaged Transport
9 DC29 Ilembe DM Road 01-042017 31-032020 PRMG – 23 056 24 416 25 784
Dc29 Programme Infrastructure
Routine Maintenance (Zibambele) Packaged Transport
10 ETH Metro Road 01-042017 31-032020 PRMG – 9 895 10 479 11 066
Eth Programme Infrastructure
Routine Maintenance (Zibambele) Packaged DC43 Harry Transport
11 Road 01-042017 31-032020 PRMG – 33 840 35 837 37 843
Dc43 Programme Gwala DM Infrastructure
12 Zibambele 0 Non Infrastructure 00-011900 00-011900 0 0 – – – –
13 Equipment 0 Non Infrastructure 00-011900 00-011900 0 0 – 135 019 140 763 148 648
Total Non infrastructure – 498 511 525 701 555 143
Total Transport Infrastructure – 6 846 738 7 137 890 7 591 840

176
Annexure Table B5 – Vote 13 : Social Development

Table B.5: Social Development - Payments of infrastructure by category


MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands
1. New Infrastructure Assets
Programme 5: 8 817 1 392 4 425 – –
Ndumo Inkululeko Community Construction 51- Youth
1 Youth Care Centre 75% complete Jozini Community Care Centre 13/08/2015 02/05/2016 Equitable Share Development

Programme 3: 7 238 1 567 3 071 – –


Construction 0- Early Childhood Ecd And Partial
2 Ndumo Inkululeko Ecd 10% complete Jozini Development Centre 13/08/2015 02/05/2016 Equitable Share Care
8 764 3 498 1 066 – –
Ndumo Inkululeko Elderly Day Construction 0- Programme 2:
3 Care Centre 10% complete Jozini Elderly Day Care Centre 21/01/2016 21/10/2016 Equitable Share Older Persons

Programme 3: 4 578 – 2 160 – –


Construction 0- Early Childhood Ecd And Partial
4 Jerusalem Ecd 10% complete Mtubabtuba Development Centre 01/03/2016 01/11/2016 Equitable Share Care
– – Programme 3: 4 782 210 2 772 1 000 –
Construction 0- Early Childhood Ecd And Partial
5 Inkanyezi Ecd 10% complete Mondlo Development Centre Equitable Share Care
18 385 20 485 1 782 – –
Programme 2:
Construction 76- Management
6 Ndumo Inkululeko Service Centre 100% complete Jozini Service Office 22/10/2014 22/03/2016 Equitable Share And Support
17 000 – – – 500
Programme 2:
Management
7 Mbazwana Service Office Identified Mhlabuyalingana Service Office 01/04/2019 31/03/2021 Equitable Share And Support
16 600 774 7 000 4 743 1 683
Programme 2:
Construction Of New Babanango Management
8 Service Office Design Nkandla Service Office 01/ 07/2016 31/09/2017 Equitable Share And Support
15 000 – 500 2 281 8 000
Programme 2:
Construction Of New Mondlo Management
9 Service Office Pre-feasibility Mondlo Service Office 01/04/2017 31/03/2018 Equitable Share And Support

Programme 3: 5 318 3 037 – – –


Construction Of Bambanani Construction 51- Early Childhood Ecd And Partial
10 Malota Ecd 75% complete Okhahlamba Development Centre 31/03/2015 03/05/2016 Equitable Share Care

Programme 3: 5 318 2 396 – – –


Construction Of Bethany- Ora Et Construction 51- Early Childhood Ecd And Partial
11 Labora Ecd 75% complete Okhahlamba Development Centre 31/03/2015 03/05/2016 Equitable Share Care

Programme 3: 5 700 484 3 556 500 –


Early Childhood Ecd And Partial
12 Ramaphosa Ecd Tender Dannhauser Development Centre 01/08/2016 01/04/2017 Equitable Share Care

Programme 3: 5 700 267 2 500 2 483 –


Early Childhood Ecd And Partial
13 Dlamlemze Ecd Planning Madlangeni Development Centre 01/08/2016 01/04/2017 Equitable Share Care

Programme 3: 5 986 1 568 1 218 – –


Construction 11- Early Childhood Ecd And Partial
14 Lindokuhle Ecd 25% complete Okhahlamba Development Centre 31/03/2015 03/10/2016 Equitable Share Care
14 000 – – – 908
Programme 2:
Management
15 Imbabazane New Service Office Identified Imbabazane Service Office 01/04/2017 31/03/2019 Equitable Share And Support
– – 21 000 – – – 500
Programme 2:
Management
16 Ladysmith Service Office Indentified Mnambithi Service Office Equitable Share And Support
– – 16 000 – – – 500
Programme 2:
Management
17 Ekuvukeni New Office Indentified Indaka Service Office Equitable Share And Support
– – 13 500 – – – 500
Programme 2:
Management
18 Dukuza New Service Office Identified Okhahlamba Service Office Equitable Share And Support
– – 55 374 – 7 000 5 800 3 000
Programme 2:
Management
19 Osizweni New Service Office Design Newcastle Service Office Equitable Share And Support
– – Programme 5: 26 505 18 – – –
Blaawbosch Youth Development Construction 76- Construction Of New Youth Youth
20 Centre And Ecd: New 100% complete Newcastle Development Centre Equitable Share Development
21 000 – – 200 3 000
Programme 2:
Construction Of New Management
21 Newcastle Service Office Identified Newcastle Service Office 01/04/2018 31/03/2020 Equitable Share And Support
16 600 627 6 000 7 573 2 000
Programme 2:
Construction Of New Management
22 Kranskop Service Office New Design Umvoti Service Office 01/09/2016 31/03/2019 Equitable Share And Support

Construction Of New Early – – Programme 3: 5 700 3 183 – – –


Construction 90- Childhood Development Ecd And Partial
23 Mtshongweni Nquthu Ecd 100% complete Nquthu Centre Equitable Share Care

Construction Of New Early Programme 3: 9 500 – – 500 4 257


Childhood Development Ecd And Partial
24 Msinga Inkululeko Ecd Feasilility Msinga Centre 01/04/2018 31/03/2019 Equitable Share Care

177
Annexure Table B5 – Vote 13 : Social Development

Programme 3: 10 500 – – 500 2 500


Child And Youth
25 Msinga Inkululeko Cycc Feasilility Msinga Community Care Centre 01/04/2018 31/03/2019 Equitable Share Care
11 500 – – 500 2 000
Msinga Inkululeko Elderly Day Construction Of Elderly Programme 2:
26 Care Centre Feasilility Msinga Day Care Centre 01/04/2016 31/03/2019 Equitable Share Older Persons
2 800 – 2 000 500 –
Programme 2:
Msinga Service Office Staff Parkhome For Staff Management
27 Accomodation Parkhome Planning Msinga Accommodation 01/04/2016 31/03/2017 Equitable Share And Support
14 976 3 313 5 463 3 100 –
Programme 2:
Construction 0- Construction Of Service Management
28 Gamalakhe Service Office 10% complete Hibiscus Office 12/02/2016 31/03/2017 Equitable Share And Support

Programme 5: 17 000 324 500 3 000 5 000


Construction Of Youth Youth
29 Hibscus Coast Youth Academy Design Hibiscus Academy 01/09/2016 31/03/2018 Equitable Share Development
16 900 3 752 2 148 238 –
Programme 2:
Construction 0- Construction Of Service Management
30 Umzimkhulu Service Office 10% complete Umzimkhulu Office 12/01/2016 31/03/2017 Equitable Share And Support
17 000 1 053 500 4 440 5 006
Programme 2:
Construction Of New Management
31 Hlanganani Service Office Design Buhlebezwe Service Office 25/05/2016 25/05/2017 Equitable Share And Support
3 800 161 2 539 1 000 –
Programme 2:
Construction Of New Management
32 Underberg Service Office Tender Kwasani Service Office 01/09/2016 31/01/2017 Equitable Share And Support
17 000 – – – 500
Programme 2:
Construction Of New Management
33 Impendle Service Office Identified Impendle Service Office 01/04/2018 31/03/2019 Equitable Share And Support

Construction Of New Early Programme 3: 5 600 3 030 – – –


Construction 26- Childhood Development Ecd And Partial
34 Inchanga/Manunu Ecd 50% complete Ethekwini Centre 01/08/2016 31/04/2016 Equitable Share Care

Construction Of New Early Programme 3: 5 700 – 200 500 3 800


Childhood Development Ecd And Partial
35 Siyathuthuka Ecd Planning Impendle Centre 01/10/206 31/07/2017 Equitable Share Care

Construction Of New Early Programme 3: 7 400 2 171 – – –


Construction 26- Childhood Development Ecd And Partial
36 Ngubeni Ecdc 50% complete Umsunduzi Centre 28/11/2015 28/05/2016 Equitable Share Care
4 500 – – – 528
Programme 2:
Construction Of New Management
37 Bhamshela Service Office New Identified Ethekwini Service Office Parkhomes 01/04/2019 31/03/2020 Equitable Share And Support

Programme 3: 5 700 – 3 700 – –


Construction Of New Ecd And Partial
38 Kwamashu Ecd Planning Ethekwini Service Office Parkhomes 01/12/2016 01/12/2017 Equitable Share Care

Programme 5: 18 000 – 500 2 500 9 494


Wentworth Youth Development Construction Of Youth Youth
39 Centre Identified Ethekwini Academy Centre 01/04/2019 31/03/2020 Equitable Share Development
18 000 – – – 3 333
Programme 2:
Construction Of New Management
40 Mpumalanga Service Office New Identified Ethekwini Service Office Parkhomes 01/04/2017 31/03/2019 Equitable Share And Support
4 500 – 280 3 000 3 696
Programme 2:
Construction Of New Management
41 Nsimbini Service Office Identified Ethekwini Service Office Parkhomes 01/04/2017 31/03/2020 Equitable Share And Support
3 990 – – – –
Programme 2:
Purchase Of New Service Management
42 Uitrecht Service Office Planning Madlangeni Office Parkhomes 01/04/2016 31/03/2017 Equitable Share And Support
14 820 – – – –
Programme 2:
Greytown Service Office Purchase Of New Service Management
43 Acqusition Planning Mvoti Office Parkhomes 01/04/2016 31/03.2017 Equitable Share And Support

Construction Of New Early – – Programme 3: 7 300 4 077 322 – –


Construction 51- Childhood Development Ecd And Partial
44 Franklin Ecdc 75% complete Greater Centre Equitable Share Care
– – 20 372 17 555 – – –
Programme
Construction Of New 3:Management
45 Mandeni Service Office 100% Complete Mandeni Service Office Equitable Share And Support

Construction Of New Early – – Programme 3: 5 485 2 706 1 279 – –


Construction 51- Childhood Development Ecd And Partial
46 Esinamfini Ecd 75% complete Maphumulo Centre Equitable Share Care
– – 1 100 – 600 – –
Programme 2:
Ray Nkonyeni District Office Management
47 Parkhome Planning Hibiscus Purchase Of Parkhomes Equitable Share And Support

178
Annexure Table B5 – Vote 13 : Social Development

– – 3 500 – 3 200 – –
Programme 2:
Zakheni Service Office Management
48 Parkhomes Planning Okhahlamba Purchase Of Parkhomes Equitable Share And Support
Total New Infrastructure Assets 565 808 77 648 66 281 44 358 60 705
2. Upgrades And Additions
Programme 3: 9 500 –
Child And Youth
1 Inanda Service Office Tender Ethekwini Service Office 31/03/2016 31/03/2017 Equitable Share Care 720 5880 500
9 500 – –
Programme 2:
Contract 0-10% Management
2 Maphumulo Service Office complete Maphumulo Service Office 01/03/2016 31/03/2017 Equitable Share And Support 1053 4887
16 600
Programme 2 :
Management
3 Ndwedwe Service Office Tender Ndwedwe Service Office 31/05/2016 31/05/2017 Equitable Share And Support 1422 8397 5081 1000
12 500 –
Programme 2:
KwaMashu Service Office: Management
4 Rydavale Clinic Tender Ethekwini Service Office 01/04/2017 31/03/2018 Equitable Share And Support 2000 5732 3368
Programme 5: 31 186 –
Construction 76- Youth
5 Vuma Youth Development Centre 100% complete Mlalazi Youth Deveopment Centre 13/03/2013 11/07/2016 Equitable Share Development 24051 2923 3262
25 602 – –
Construction 76- Programme 2:
6 Osizweni Handicraft Centre 100% complete Newcastle Handcraft centre 02/09/2013 02/03/2016 Equitable Share Special Needs 24501 301
Prgramme: 4 48 347 – –
Construction 76- Substance
7 Madadeni Rehabililitation Centre 100% complete Newcastle Rehabilitation Centre 12/10/2013 03/06/2017 Equitable Share Abuse 44389 958
15 000 – – –
Programme 2:
Management
8 Pinetown Service Office Identified Ethekwini Service Office 01/04/2018 31/03/2021 Equitable Share And Support 500
9 000 – – –
Programme 2:
Management
9 Vryheid Service Office Identified Abaqulusi Service Office 01/04/2018 31/03/2020 Equitable Share And Support 500
20 000 –
Programme 2:
Management
10 Zakheni Service Office Identified Mnambithi Service Office 01/04/2017 31/03/2019 Equitable Share And Support 200 1242 7919
– – 25 000 –
Programme 2:
11 Nduduzweni Centre For The Blind Planning Stage Ethekwini Service Office Equitable Share Special Needs 200 1500 5000
– – Programme 3: 18 000 – –
Child And Youth
12 Excelsior Place of Safety Phase 2 Planning Stage Ethekwini Place of safety Equitable Share Care 200 2000
Total Upgrades And Additions 240 235 96136 25946 19317 18287
3. Refurbishment And Rehabilitation
– – Programme 3: 13 079
Construction 11- Child And Youth
1 Umlazi Place of Safety 25% complete Ethekwini Place of safety Equitable Share Care 2565 4623 891 0
– – Programme 3: 17 000
Construction 0- Child And Youth
2 Ocean View Place of Safety 10% complete Ethekwini Place of safety Equitable Share Care 0 7029 4371 2000
11 500
Programme 2:
Management
3 Ubombo Service Office Tender Jozini Service Office 01/05/2016 31/03/2017 Equitable Share And Support 1014 1500 4926 933
11 500
Programme 2:
Uthungulu District And So Management
4 Ngwelezane Building Tender Mfolozi Service Office 31/05/2016 31/03/2018 Equitable Share And Support 1236 1500 5894 2770
70 000
Programme 2:
Ethekwini Cluster Government Management
5 Garage Tender Ethekwini Offices 01/09/2016 31/03/2018 Equitable Share And Support 6518 1016 1133 7648
Programme 3: 17 987
Child And Youth
6 Valley View Place of Safety Tender Ethekwini Place of safety 31/03/2016 31/31/2016 Equitable Share Care 2129 7498 4412 1000
1 500
Programme 2:
Management
7 Phoenix Service Office Feasibility Ethekwini Service Office 01/04/2016 31/03/2017 Equitable Share And Support 0 1000 0 0
Programme 3: 17 000
Pata Place of safety: Renovations Child And Youth
8 t Planning Msunduzi Place of safety 01/03/2017 31/03/2018 Equitable Share Care 0 500 2000 5474
15 000
Ethekwini South and SO Programme 2:
Amawele Buidling : Management
9 Refurbishments Feasibility Ethekwini Offices 01/04/2017 31/03/2019 Equitable Share And Support 0 0 0 1000
Total Refurbishment And Rehabilitation 174 566 13 462 24 666 23 627 20 825
4. Maintenance And Repairs
1 Maintainance 0 Various – – – Equitable Share Various – – 26 860 26 812 29 378
2 Maintainance 0 Various ECD Grant for Maintenance
Various 12 955 14 845 15 671
– –
Total Maintenance and repairs 39 815 41 657 45 049
Total Social Development Infrastructure 156 708 128 959 144 866

179
Annexure Table B5 – Vote 14 : Public Works

Table B.5:Public Works - Payments of infrastructure by category


MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands
1. New Infrastructure Assets
Richmond Development Construction Of Ablution – 20 000 – – –
1 Community Project Construction Richmond Facilities 2014-04-01 2015-03-31 Equitable Share Programme 3
16 000 – – – –
2 Umgungundlovu District Offices Hand Over Msunduzi Construction Of New Office 2010-11-01 2014-06-01 Equitable Share Programme 3
Umgungundlovu New Office – – – – –
3 Precint Construction Msunduzi Construction Of Office Park 2016-04-01 2020-03-31 Equitable Share Programme 3
Construction Of New Sub – – – – –
4 Sub Office Greytown Hand Over Umvoti Office - - Equitable Share Programme 3
25 630 25 078 – – –
Office - Dept Provincial Public New Office
5 Works Sisonke District Office First Delivery Sisonke Accommodation 2009-02-28 2012-07-27 Equitable Share Programme 3
Richmond Nip Site - Con.Of 650 1 020 – – –
6 Richmnd Nip Site Design Richmond Construction Of New Office 2010-04-01 2013-07-30 Equitable Share Programme 3
Construction Of New Sub – 4 890 – – –
7 Tugela Ferry Depot Hand Over Msinga Office - - Equitable Share Programme 3

Completion Contract: 11 138 9 148 556 – –


Umzinyathi Sub-District Office Construction Emnambithi/Lady Construction Of New Sub
8 (Tugela Ferry) Stage smith Office 2015-06-02 2015-12-03 Equitable Share Programme 3

New Admin Wing: 5 069 57 4 662 – –


Office Public Works Southern Completion Of Contract
9 Region Pre Design Msunduzi No.2 (038518) 2017-01-01 2017-09-30 Equitable Share Programme 3
Umgungundlovu - New Admin Construction Of New 8 500 – – – –
10 Wing Design Msunduzi Admin Wing 2013-04-01 2015-03-30 Equitable Share Programme 3
11 Ilembe District Office Design Kwadukuza New Office Building 2016-10-31 2017-10-31 Equitable Share Programme 3 44 536 1 305 5 506 17 863 888
– 8 080 – – –
12 Mtubatuba Depot - Offices Hand Over Mtubatuba Construction Of New Office - - Equitable Share Programme 3
Umhlabuyalingan – 5 474 – – –
13 Umkhanyakude District Office Tender a Construction Of New Office 2010-04-01 2015-03-30 Equitable Share Programme 3
Ethekwini Regional Offices Construction Ethekwini Replacement Of 2 Lifts 2015-01-15 2015-10-12 Equitable Share Programme 3 1 800 – – – –
Project On 5 000 – 1 155 3 595 –
1 Umgungundlovu District Office Record List Msunduzi New Canteen 2017-01-12 2018-03-12 Equitable Share Programme 3

Construction Of New 99 – – – –
Southern Regional Office Guardhouse Entrance And
2 Pietermaritzburg First Delivery Msunduzi Bin Store 2014-05-15 2016-06-15 Equitable Share Programme 3
Richmond Nip Site - Con.Of 5 000 – – – –
3 Richmnd Nip Site Construction Richmond Construction Of Nip Site 2014-03-14 2014-08-11 Equitable Share Programme 3
Southern Regional Office- Construction Of New 11 658 – – 3 858 7 800
4 Pietermaritzburg Identified Msunduzi Parkings 2018-04-15 2020-08-15 Equitable Share Programme 3
Project On Construction Of New Cibd 9 517 – – – 7 667
5 Newcastle Offices Record List Newcastle Offices 2018-04-15 2020-08-15 Equitable Share Programme 3
Construction Of A New 500 – 100 – –
6 Uthukela District Office Identified Midlands Guardhouse 2016-09-30 2017-10-31 Equitable Share Programme 3

Replacement Of 3 745 – 3 133 312 –


Porject On Airconditioning - South
7 Ethekwini Regional Office Record List Ethekwini Wing 2017-02-09 2017-08-09 Equitable Share Programme 3
Replacement Of Lift-South 1 459 1 260 – – –
8 Ethekwini Regional Office First Delivery Ethekwini Wing 2014-09-10 2015-05-07 Equitable Share Programme 3
Total New Infrastructure Assets 150 301 76 312 15 112 25 628 16 355
2. Upgrades And Additions
1 Ethekwini Regional Office Construction Ethekwini Upgrades And Additions 2013-04-01 2014-03-30 Equitable Share Programme 3 – – – – –
4 093 24 372 350 –
Upgrade Of Underground
2 Ethekwini Regional Office Design Ethekwini Water Services 2016-05-23 2018-02-23 Equitable Share Programme 3
8 451 7 280 501 – –
Emnambithi/Lady Phase 2: Uthukela District
3 Uthukela District Office Construction smith Extension Of Office 2014-06-30 2017-06-30 Equitable Share Programme 3
Cibd Satellite Office & Umgungun. 14 760 2 362 – – –
4 D/O Hand Over Msunduzi Upgrades And Additions 2010-04-01 2016-03-31 Equitable Share Programme 3
– – – – –
Arbitration Gvk Siyazama &
5 Edendale Hospital Hand Over Msunduzi Dpt Of Public Works 2011-04-01 2016-03-01 Equitable Share Programme 3
6 Southern Region Offices Hand Over Msunduzi New Admin Wing - - Equitable Share Programme 3 – 232 – – –
5 500 212 – – –
7 Umgungundlovu District Offices Hand Over Msunduzi Replacement Of Roof 2015-01-05 2015-09-08 Equitable Share Programme 3
– 448 – – –
Upgrading /Replacement
8 Southern Region Offices Construction Msunduzi Of Security Lighting 2010-04-01 2016-03-01 Equitable Share Programme 3
184 925 165 063 3 262 – –
Offices Public Works -19 Prince Phase 3 Office Block,
9 Alfred Street Hand Over Msunduzi Alterations And Additions 2012-07-17 2015-11-17 Equitable Share Programme 3
Reconfigure Ex Stores – 96 – – –
10 Works District Office - Ugu 0 Port Shepstone Buidling To Offices - - Equitable Share Programme 3
– 1 165 – – –
11 Southern Region Offices Hand Over Msunduzi Additions And Upgrades - - Equitable Share Programme 3
Upgrades - Carports 21 3 131 4 337 – – –
12 Umzinyathi District Offices Construction Umvoti And 04393 - - Equitable Share Programme 3
– 298 – – –
Emnambithi/Lady Completion Of Outstanding
13 Offices - Rem Of 1494 - Dundee Hand Over smith Works For Office Extension - - Equitable Share Programme 3
Uthukela District Office - Emnambithi/Lady Upgrading The Existing – 1 041 – – –
14 Ladysmith Hand Over smith Registry - - Equitable Share Programme 3
Emnambithi/Lady – 814 – – –
15 Public Works Offices Construction smith Additions And Upgrades 2009-02-02 2016-01-15 Equitable Share Programme 3

181
Annexure Table B5 – Vote 14 : Public Works

3 091 – 1 888 – –
Security Measure:
Upgrading Of The
Perimetre Fence Of The
16 Umzinyathi District Office Identified Umvoti District Office 2016-09-01 2017-03-02 Equitable Share Programme 3
Emnambithi/Lady Additions To Existing 9 000 4 011 – – –
17 Uthukela District Offices Construction smith Offices/Space Planning 2014-06-30 2015-06-30 Equitable Share Programme 3

Completion Of Adds And 34 432 23 678 – – –


Emnambithi/Lady Alts/Renovations:
18 Midlands Regional Offices Tender smith Completion Of Contract 2014-01-15 2014-09-12 Equitable Share Programme 3

Upgrades Of Existing 3 311 2 650 – – –


Emnambithi/Lady Offices Into Canteen And
19 Midlands Regional Offices Hand Over smith Upgrades - - Equitable Share Programme 3
Midlands Regional Offices Emnambithi/Lady Extension Of The Existing 900 – 630 – –
20 (Shepstone Road) Identified smith Parking Area 2016-10-03 2017-08-09 Equitable Share Programme 3

Provision Of Stand-By 1 400 – 700 – –


Midlands Regional Offices Emnambithi/Lady Generator For The
21 (Shepstone Road) Identified smith Regional Office 2016-10-03 2017-04-04 Equitable Share Programme 3
District Public Works District - Additions To Existing – 1 416 – – –
22 Newcastle Hand Over Newcastle Offices - - Equitable Share Programme 3

Master Plan For The 10 500 1 742 – – –


Changes Of Carpenter
23 Public Works - Vryheid Hand Over Abaqulusi Shop 2014-10-30 2015-10-30 Equitable Share Programme 3
Umkhanyakude Works District Umhlabuyalingan – – – – –
24 Office Hand Over a Completion Of Contract - - Equitable Share Programme 3
– 1 786 – – –
Public Works District Office - Master Planning, Additions
25 Nongoma Hand Over Nongoma And Alterations - - Equitable Share Programme 3
– 164 – – –
26 Administration Campus - Ulundi Hand Over Ulundi Drywall Partitioning - - Equitable Share Programme 3
Installation Of Water – 406 – – –
27 Ulundi Flats Hand Over Ulundi Meters - - Equitable Share Programme 3
– 824 – – –
28 Ulundi Flats Construction Ulundi Fencing Of Of Complex 2008-08-26 2014-12-03 Equitable Share Programme 3
15 600 9 532 – – –
29 Nongoma D/O - La Building Construction Nongoma Nongoma D/O - La Building 2013-11-01 2014-04-30 Equitable Share Programme 3

Upgrade 1St Floor 850 – 760 – –


Boardroom/Space
30 La Complex - Ulundi Campus Identified Ulundi Planning Requirements 2016-06-01 2016-11-30 Equitable Share Programme 3
Zululand District Office (Vryheid 10 168 2 156 2 400 799 –
31 Depot) Design Ulundi Upgrade And Additions 2016-08-01 2017-07-30 Equitable Share Programme 3
Revamp Of A Block & – – – – –
32 Zululand District Office Hand Over Ulundi Boardroom 2014-04-01 2015-03-30 Equitable Share Programme 3
Installation Of Standby 1 206 2 154 – – –
33 Zululand District Office Hand Over Ulundi Generator 2013-02-06 2013-06-21 Equitable Share Programme 3

Upgrade Electricity Supply 1 300 2 553 – – –


To Campus From
34 La Complex - Ulundi Campus Hand Over Ulundi Municipal Supply 2013-11-14 2014-02-28 Equitable Share Programme 3
Uthungulu District Offices - Installation Of Standby 774 1 390 – – –
35 Eshowe Construction Umlalazi Generator 2013-01-30 2013-06-27 Equitable Share Programme 3
Installation Of Standby – 161 – – –
36 Offices - Wombe Street Design Ulundi Generator 2014-04-01 2014-09-28 Equitable Share Programme 3
Construction Of Undecover – 195 – – –
37 Offices - Wombe Street Hand Over Ulundi Parking 2012-04-01 2013-03-30 Equitable Share Programme 3
Acquisition Of Additional 5 – 331 – – –
38 Maphumulo Depot Construction Kwadukuza Park Home 2012-04-01 2015-03-31 Equitable Share Programme 3
Ethekwini Region Conference Upgrade & Additions To 14 285 15 913 – – –
39 Hall Construction Ethekwini Existing Registry 2013-05-23 2013-11-19 Equitable Share Programme 3
Construction Of – 1 144 – – –
40 Ilembe District Office Construction Kwadukuza Kwadukuza Hall - - Equitable Share Programme 3
Upgrading Existing 1 458 4 416 – – –
41 Ethekwini Regional Offices Construction Ethekwini Registry 2013-08-16 2014-02-21 Equitable Share Programme 3
Installation Of Security 3 150 10 955 – – –
42 Ethekwini Regional Offices Construction Ethekwini Infrastructure 2014-09-29 2015-03-27 Equitable Share Programme 3
– 196 – – –

Conversion Of The Existing


Upholstery, Painting &
Plumbing Workshop Into
43 Ethekwini D/O Construction Ethekwini Office Space 2013-08-16 2014-02-21 Equitable Share Programme 3
Upgrade & Additions To 23 050 114 4 776 – –
44 Ethekwini D/O - Conf. Centre Construction Ethekwini Existing Registry 2009-05-11 2015-12-16 Equitable Share Programme 3
Replacement Of Lift - – 1 260 – – –
45 Ethekwini Region Construction Ethekwini South Wing 2008-07-12 2014-06-27 Equitable Share Programme 3

Upgrade And Additions To 2 793 2 666 – – –


The Mec'S Office At
46 Ethekwini Regional Office Construction Ethekwini Mayville 2014-03-24 2015-03-24 Equitable Share Programme 3
4 000 – 1 100 1 100 6 473
Space Planing, Provision
Of The Infrastructure
47 Amawele Building Umlalzi Construction Ethekwini Master Plan 2016-06-01 2020-03-31 Equitable Share Programme 3
Provision Of A Stand-By 1 700 – 700 – –
48 Uthukela District Office Identified Midlands Generator 2016-10-03 2017-04-04 Equitable Share Programme 3
Provision Of A Stand-By 1 200 – 700 – –
49 Umzinyathi District Office Identified Midlands Generator 2016-10-03 2017-04-04 Equitable Share Programme 3
Provision Of A Stand-By 1 200 – 700 – –
50 Umzinyathi Sub-District Office Identified Midlands Generator 2016-10-03 2017-04-05 Equitable Share Programme 3

182
Annexure Table B5 – Vote 14 : Public Works

Provision Of A Stand-By 1 200 – 700 – –


51 Amajuba District Office Identified Midlands Generator 2015-11-01 2016-02-28 Equitable Share Programme 3
Construction Of A – – – – –
52 Umzinyathi Sub-District Offices Identified Midlands Guardhouse 2015-07-30 2015-11-30 Equitable Share Programme 3

Repairs For Entrance – – – – –


Gates, Booms And
53 Amajuba District Offices Identified Midlands Overhead Shelter 2015-06-01 2015-11-30 Equitable Share Programme 3
– – – – –
54 Various Projects Identified Southern Upgrades And Additions 2016-06-02 2017-06-02 Equitable Share Programme 3
55 La Building - Ulundi Campus First Delivery Ulundi Upgrade 8 Lifts 2015-01-15 2015-05-26 Equitable Share Programme 3 5 627 5 013 – – –
2 100 – 290 500 –

Upgrade Office Ablutions,


Upgrade And Paint Office,
Improve Waiting Area,
Gatehouse And Improve
56 Uthungulu District Office Identified Uthungulu Signage 2016-11-01 2017-07-01 Equitable Share Programme 3
590 – 450 – –

Provision Of A Standby
Press Steel Water Tank,
Tank Stand And
57 Uthungulu District Office Priority List Zululand Construction Of A Borehole 2016-04-01 2016-03-31 Equitable Share Programme 3
590 – 450 – –

Provision Of A Standby
Press Steel Water Tank,
Tank Stand And
58 Vryheid Sub District Office Priority List Zululand Construction Of A Borehole 2016-04-01 2016-03-31 Equitable Share Programme 3
590 – 450 – –
Construction Of A Borehole
59 Umkhanyakude District Office Priority List Zululand To Feed Existing Tank 2016-04-01 2016-03-31 Equitable Share Programme 3
590 – 450 – –
Construction Of A Borehole
60 Umtubatuba Sub District Office Priority List Zululand To Feed Existing Tank 2016-04-01 2016-03-31 Equitable Share Programme 3

Installation Of Backup 2 961 – 110 – –


Generator For Regional
61 Ethekwini Regional Office Identified Ethekwini Office 2016-07-25 2016-09-26 Equitable Share Programme 3
800 – 271 – –
62 Ethekwini Regional Office Priority List Ethekwini Biometrics Access Control 2017-01-10 2017-03-10 Equitable Share Programme 3
Extension To Existing 411 398 – – –
63 Amajuba District Office Identified Midlands Boardroom 2016-04-01 2017-03-31 Equitable Share Programme 3
500 – 250 – –

Provision Of A Standby
Press Steel Water Tank,
Tank Stand And
64 Amajuba District Office Identified Midlands Construction Of A Borehole 2016-04-01 2017-03-31 Equitable Share Programme 3
500 – 250 – –

Provision Of A Standby
Press Steel Water Tank,
Tank Stand And
65 Uthukela District Office Identified Midlands Construction Of A Borehole 2016-04-01 2017-03-31 Equitable Share Programme 3
500 – 250 – –

Provision Of A Standby
Press Steel Water Tank,
Tank Stand And
66 Umzinyathi District Office Identified Midlands Construction Of A Borehole 2016-04-01 2017-03-31 Equitable Share Programme 3
500 – 250 – –

Provision Of A Standby
Press Steel Water Tank,
Tank Stand And
67 Umzinyathi Sub-District Offices Identified Midlands Construction Of A Borehole 2016-04-01 2017-03-31 Equitable Share Programme 3
1 500 – 1 000 – –
68 Tugela Ferry House Identified Midlands Repairs And Renovations 2016-04-04 2017-04-04 Equitable Share Programme 3
Upgrading Of Existing 8 200 – – 1 200 6 700
69 Vryheid Sub District Office Priority List Zululand Workshop 2018-04-01 31/11/2019 Equitable Share Programme 3
Project On 8 600 – – 1 100 7 500
70 Ethekwini Regional Office Record List Ethekwini Upgrade Of Existing Sheds 2018-04-01 2020-07-01 Equitable Share Programme 3
Project On Upgrade Of Existing 11 300 – – 3 500 7 800
71 Eshowe District Office Record List King Cetshwayo Offices 2018-04-01 2020-07-01 Equitable Share Programme 3
Total Upgrades And Additions 413 287 280 596 23 660 8 549 28 473
3. Refurbishment And Rehabilitation
– – – – –

Ulundi Royal Household Palace,


La Building Ministerial Houses
And Temporary Residential Units Painting And Fitting
1 For Royal Household Construction Ulundi Carperts In The Old Block - - Equitable Share Programme 3
– 291 – – –
Painting And Fitting
2 Southern Region Offices Hand Over Msunduzi Carperts In The Old Block - - Equitable Share Programme 3
– – – – –
Maintenance Of Electrical
3 La Complex - Ulundi Campus Construction Ulundi Wiring And Appliances 2012-04-30 2015-04-30 Equitable Share Programme 3
External Maintenance Of 10 664 10 219 – – –
4 La Complex - Ulundi Campus Construction Ulundi Landscape 2013-01-02 2016-12-31 Equitable Share Programme 3
Maintenance Contract For 11 008 24 602 – – –
5 La Complex - Ulundi Campus Hand Over Ulundi Air Conditioning 2012-06-01 2015-05-31 Equitable Share Programme 3

183
Annexure Table B5 – Vote 14 : Public Works

La Building - Ulundi 11 500 10 726 – – –


6 La Complex - Ulundi Campus Hand Over Ulundi Campus 2015-06-30 2018-06-30 Equitable Share Programme 3
La Building - Ulundi 11 000 1 351 – – –
7 La Complex - Ulundi Campus Tender Ulundi Campus 2015-03-01 2018-02-28 Equitable Share Programme 3
La Building - Ulundi 20 228 8 879 – – –
8 La Complex - Ulundi Campus Construction Ulundi Campus 2012-04-01 2015-03-31 Equitable Share Programme 3
– – – – –
Preventation Maintenance
9 La Complex - Ulundi Campus Priority List Ulundi Contract For Electrical 2015-03-01 2018-02-28 Equitable Share Programme 3
347 392 – – –
La Building - Ulundi
10 La Complex - Ulundi Campus Hand Over Ulundi Campus-Dopw Partitioning 2013-12-29 2014-03-30 Equitable Share Programme 3
La Building - Ulundi – – – – –
11 La Complex - Ulundi Campus Hand Over Ulundi Campus 2014-04-01 2015-03-29 Equitable Share Programme 3
La Building - Ulundi – – – – –
12 La Complex - Ulundi Campus Hand Over Ulundi Campus 2014-04-01 2015-03-28 Equitable Share Programme 3

Upgrade Water Valves, 13 200 728 – – –


Toilet Revamp, Roofs
13 La Complex - Ulundi Campus Hand Over Ulundi Proofs 2015-01-20 2015-01-20 Equitable Share Programme 3
2 128 2 010 1 470 1 100 –
14 La Building - Ulundi Campus Final Account Ulundi Renew Palisade Fencing 2014-04-01 30/3/2015 Equitable Share Programme 3
– 77 – – –
La Building -Electrical
Maintenance, Renovations,
15 La Complex - Ulundi Campus Tender Ulundi Repaires To New Wing 2014-01-15 2014-09-12 Equitable Share Programme 3
– – – – –
Rehabitlitation Of Gravel
16 Nkonjeni Hospital Construction Ulundi Road To Pump Station 2009-05-11 2016-03-01 Equitable Share Programme 3
– 331 – – –
17 House-Erf Of 1494 7 Tathas Str Construction Ulundi Fencing Of State House 2008-07-12 2016-03-01 Equitable Share Programme 3
– 969 – – –
Replace Roof Of Old To
18 Dundee - Offices Construction Umzinyathi Match New Extension 2009-03-12 2016-03-01 Equitable Share Programme 3
Emnambithi/Lady Rehabilitation And 5 000 – – – –
19 Umzinyathi District Office Construction smith Refurbishment 2012-04-01 2016-03-01 Equitable Share Programme 3
Emnambithi/Lady 4 849 8 507 – – –
20 Umzinyathi District Office Construction smith Repair To Leaking Roof 2013-03-28 2014-03-14 Equitable Share Programme 3
Eplanade Government Building- – 814 – – –
21 Durban Construction Ethekwini Repairs To Lights - 2017-03-16 Equitable Share Programme 3
Eplanade Government Building- – 381 – – –
22 Durban Construction Ethekwini Lift Repairs - 2017-03-17 Equitable Share Programme 3
Eplanade Government Building- Plumbing & Ablutions – 1 106 – – –
23 Durban Construction Ethekwini Repairs - 2017-03-18 Equitable Share Programme 3

Replacement Of – – – – –
Porject On Airconditioning I- South
24 Ethekwini Regional Office Record List Ethekwini Wing 2017-02-09 2017-08-09 Equitable Share Programme 3

Installation Of Back Up – – – – –
Generator For The Mayville
25 Ethekwini Regional Office Construction Ethekwini Complex 2016-01-19 2016-01-19 Equitable Share Programme 3
675 1 495 – – –
26 Ethekwini Regional Office Construction Ethekwini Rehab And Renovations 2013-03-07 2013-08-20 Equitable Share Programme 3
1 950 2 320 – – –

New Store: To House An


Electrical, Bricklayeers
Workshop & Flame Proof
27 Amajuba District Office Construction Newcastle Of Painters 2013-11-05 2014-05-21 Equitable Share Programme 3
Rehabilitation Of Existing 60 – – – –
28 La Building - Ulundi Campus Identified Ulundi Borehole 2016-07-01 2016-09-30 Equitable Share Programme 3

Space Planning And 3 000 1 427 1 435 – –


Master Paln For
29 La Building - Ulundi Campus Re-Design Ulundi Maintenance
Urgent Building Related 2016-04-01 2016-03-31 Equitable Share Programme 3
Emergency: Repair To 8 232 715 3 060 1 277 –
Cracked Glass Atrium,
Repair Loose Roof
30 La Building - Ulundi Campus Pre-Design Ulundi Flasings, Roof Stormwater 2016-11-01 2017-11-01 Equitable Share Programme 3
3 200 – – – –
Repair All Cracked Glass
31 La Building - Ulundi Campus Identified Ulundi And Atrium Skylight 2016-10-01 2018-03-30 Equitable Share Programme 3
6 800 – 1 660 750 1 050
Upgrade Water Supply
Sytsem, Borehole And
Removal Of
Irrigationscheme From
32 La Building - Ulundi Campus Identified Ulundi Main Supply 2016-11-01 2018-07-01 Equitable Share Programme 3
7 740 – 1 530 1 560 1 500
Repairs To Internal Roads
33 La Building - Ulundi Campus Identified Ulundi And Parking Facilities 2016-11-01 2017-07-01 Equitable Share Programme 3

Stuctural Repairs-External 2 640 – 1 740 1 200 –


To Movement Joints And
34 La Building - Ulundi Campus Identified Ulundi Ballustrades 2016-11-01 2017-07-01 Equitable Share Programme 3
5 500 – 1 932 306 –
Refurbishment Of Existing
Building Into New Kzn
Construction
Offices Public Works - Entrepreneurial
Umgungundlovu District Office - Development Centre And
35 Pietermaritzburg Pre Design Msunduzi Roof 2016-10-11 2017-10-11 Equitable Share Programme 3

Rehabilitation And 7 052 – – – 6 088


Project On Refurbishment Of Existing
36 Ethekwini Regional Office Record List Ethekwini Facility 2018-04-11 2020-10-11 Equitable Share Programme 3

Rehabilitation And 1 000 – 100 – –


Project On Renovations To Lecture
37 Ethekwini Regional Office Record List Ethekwini Hall 2016-11-01 2018-02-28 Equitable Share Programme 3
Project On Conference Hall Dining 10 794 – 754 5 500 3 500
38 Ethekwini Regional Office Record List Ethekwini Facility 2017-01-16 2019-04-17 Equitable Share Programme 3
Total Refurbishment And Rehabilitation 148 567 77 340 13 681 11 693 12 138
4. Maintenance And Repairs
1 Maintenance And Repairs Construction Ethekwini Various ongoing ongoing Equitable Share Programme 3 11 244 1 405 2 200 3 600 3 664
2 Maintenance And Repairs Construction Msunduzi Various ongoing ongoing Equitable Share Programme3 6 038 1 099 1 000 1 200 1 164
3 Maintenance And Repairs Construction Ulundi Various ongoing ongoing Equitable Share Programme 3 79 369 43 374 10 629 8 869 7 448
4 Maintenance And Repairs Construction Emnambithi/Ladysmith
Various ongoing ongoing Equitable Share Programme 3 8 726 3 587 1 000 1 600 1 164
Total Maintenance And Repairs 105 377 49 465 14 829 15 269 13 440
5. Infrastructure Transfers - Current
Total Infrastructure Transfers - Capital – – – – –
7. Infrastructure Payments For Financial Assets
Total Infrastructure Payments For Financial Assets – – – – –
8. Infrastructure Leases
Total Infrastructure Leases – – – – –
9. Non Infrastructure
Total Non Infrastructure – – – – –
Total Public Works Infrastructure 817 532 483 713 67 282 61 139 70 406

184
Annexure Table B5 – Vote 15 : Arts and Culture

Table B.5: Arts and Culture - Payments of infrastructure by category


MTEF
Expenditure Total
Project Duration Forward
Source Budget Total To Date From Available
Project Municipality / Estimates
No. Project Name Type of Infrastructure Of Programme Project Previous
Status Region MTEF MTEF
Funding Name Cost Years 2017/18
Date: Start Date: Finish 2018/19 2019/20
R Thousands
1. New Infrastructure Assets

Construction Of Vulamehlo Library and


1 0 Mdoni New Construction 20/01/2014 30/03/2017 Condtional Grant 28 197 16 271 1 000 – –
Library Archive Services

Library and
2 Construction Of Manyiseni Library 0 Jozini New Construction 01/09/2014 30/03/2017 Condtional Grant 42 853 28 852 1 000 – –
Archive Services

Construction Of Port Shepstone Library and


3 0 Ray Nkonyeni New Construction 01/10/2015 30/06/2018 Condtional Grant 73 258 16 137 38 689 7 663 –
Library Archive Services

Construction Of Ingwavuma Library and


4 0 Jozini New Construction 01/07/2014 30/03/2018 Condtional Grant 20 203 4 203 11 000 5 000 –
Library Archive Services

Library and
5 Construction Of Bilanyoni Library 0 Edumbe New Construction 01/06/2014 30/03/2018 Condtional Grant 27 746 5 746 12 000 11 000 –
Archive Services

Library and
6 Construction Of Umzumbe Library 0 Umzumbe New Construction 10/01/2017 30/03/2019 Condtional Grant 29 100 – 1 000 10 000 18 000
Archive Services

Library and
7 Construction Of Kwaxolo Library 0 Ray Nkonyeni New Construction 10/01/2017 30/03/2019 Condtional Grant 14 400 – – – –
Archive Services

Library and
8 Construction Of Nzimakwe Library 0 Ray Nkonyeni New Construction 10/01/2017 30/03/2019 Condtional Grant 14 400 – – – –
Archive Services

Construction Of Kwamdakane Library and


9 0 Dannhauser New Construction 10/01/2017 30/03/2019 Condtional Grant 29 100 – 1 000 10 000 18 000
Library Archive Services

Library and
10 Construction Of Cwaka Library 0 Msinga New Construction 10/01/2017 30/03/2019 Condtional Grant 12 100 – – – –
Archive Services

Library and
11 Construction Of Imbali Library 0 Msunduzi New Construction 01/10/2014 30/03/2020 Condtional Grant 89 706 – 2 000 27 889 16 100
Archive Services

Library and
12 Modular Libraries 0 Mzimkhulu Modular Libraries 10/01/2017 30/06/2017 Condtional Grant 2 000 – – – –
Archive Services

Dr Nkosazane Library and


13 Modular Libraries 0 Modular Libraries 10/01/2017 30/03/2017 Condtional Grant 2 000 – – – –
Dlamini-Zuma Archive Services

Library and
14 Modular Libraries 0 Ndwedwe Modular Libraries 10/01/2017 30/03/2017 Condtional Grant 2 000 – – – –
Archive Services

Library and
15 Modular Libraries 0 Mandeni Modular Libraries 10/01/2017 30/03/2017 Condtional Grant 2 000 – – – –
Archive Services

Library and
16 Modular Libraries 0 Kwambonambi Modular Libraries 10/01/2017 30/06/2017 Condtional Grant 2 000 – – – –
Archive Services

Library and
17 Modular Libraries 0 Nkandla Modular Libraries 10/01/2017 30/03/2017 Condtional Grant 2 000 – 1 300 – –
Archive Services

Library and
18 Modular Libraries 0 Abaqulusi Modular Libraries 10/01/2017 30/06/2017 Condtional Grant 2 000 – 1 300 – –
Archive Services

Library and
19 Modular Libraries 0 Nquthu Modular Libraries 10/01/2017 30/06/2017 Condtional Grant 2 000 – 1 300 – –
Archive Services

Library and
20 Modular Libraries 0 Endumeni Modular Libraries 10/01/2017 30/06/2017 Condtional Grant 2 000 – 1 300 – –
Archive Services

Library and
21 Modular Libraries 0 Endumeni Modular Libraries 10/01/2017 30/06/2017 Condtional Grant 2 000 – – – –
Archive Services

Construction Of New Library and


22 Archive Respository 0 Msunduzi - - Equitable Share 169 350 – – 52 925 93 543
Archives Archive Services

23 Arts And Culture Academy 0 Umgeni New Infrastructure Assets 01/012017 31/03/2018 Equitable Share Cultural Affairs 42 500 – 33 500 – –

25 Contruction Of Martime Museum 0 Ugu New Infrastructure Assets - - Equitable Share Cultural Affairs 9 362 – 20 881 – –

Library and
26 Construction Of Bruntville Library 0 Mpofana New Construction 20/01/2014 30/03/2017 Condtional Grant – – – – –
Archive Services

Library and
27 Construction Of Qhudeni Library 0 Nkandla New Construction 01/09/2014 30/03/2017 Condtional Grant – – – – –
Archive Services

Library and
28 Construction Of Ndumo Library 0 Ngwavuma New Construction 01/10/2015 30/06/2018 Condtional Grant – – – – –
Archive Services

Construction Of Nkungumathe Library and


29 0 Nkandla New Construction 01/07/2014 30/03/2018 Condtional Grant – – – – –
Library Archive Services

185
Annexure Table B5 – Vote 15 : Arts and Culture

Construction Of Maphumulo Library and


30 0 Maphumulo New Construction 01/06/2014 30/03/2018 Condtional Grant – – – – –
Library Archive Services

Construction Of Mkhambathini Library and


31 0 Msunduzi New Construction 10/01/2017 30/03/2019 Condtional Grant – – – – –
Library Archive Services

Condtional
32 Construction Of Harding Library 0 Umuziwabantu New Construction 10/01/2018 30/03/2020 Condtional Grant – – – – –
Grant
Condtional
33 Construction Of Vulindlela Library 0 Msunduzi New Construction 10/01/2019 30/03/2021 Condtional Grant – – – – –
Grant
Construction Of Clemont Art
34 0 Ethekwini New Construction - - Equitable Share arts and culture – – – – –
Centre
Construction Of Isandlwana
35 0 Endumeni New Construction - - Equitable Share Museum – – – – –
Museum

36 New Building Maritime Museum 0 Msunduzi New Construction 10/01/2018 30/03/2020 Equitable Share Museum New infrastructure
– assets – – –

Construction Of Charlestown Library and


37 0 Newcastle New Construction 01/10/2014 30/03/2020 Condtional Grant – – – – –
Library Archive Services

Library and
38 Construction Of Ndwedwe Library 0 Ilembe New Construction 01/10/2015 30/03/2021 Condtional Grant – – – – –
Archive Services

Library and
39 Construction Of Highflats Library 0 Ubuhlebezwe New Construction 01/10/2016 30/03/2022 Condtional Grant – – – – –
Archive Services

Construction Of Msinga Top Library and


40 0 Msinga New Construction 01/10/2017 30/03/2023 Condtional Grant – – – – –
Library Archive Services

Construction Of Dannhauser Library and


41 0 Newcastle New Construction 01/10/2018 30/03/2024 Condtional Grant – – – – –
Library Archive Services

Library and
42 Construction Of Mkuze Library 0 Jozini New Construction 20/01/2014 30/03/2017 Equitable Share – – – – –
Archive Services

Library and
43 Construction Of Ulundi Library 0 Ulundi New Construction - - Condtional Grant – – 1 000 8 000 5 300
Archive Services

Library and
44 Construction Of Nongoma Library 0 Nongoma New Construction - - Condtional Grant – – 1 000 8 000 5 300
Archive Services

Library and
45 Construction Of Nquthu Library 0 Nquthu New Construction - - Condtional Grant – – 1 000 8 000 5 300
Archive Services

Library and
46 Construction Of Nkandla Library 0 Nkandla New Construction - - Condtional Grant – – – 1 000 13 300
Archive Services

Construction Of Library - Library and


47 0 Umzinyathi New Construction - - Condtional Grant – – – 1 000 13 300
Umzinyathi District Archive Services

Total New Infrastructure Assets 622 275 71 209 130 270 150 477 188 143
2. Upgrades and additions

Library and
1 Upgrade Of Umzimkhulu Library 0 Mzimkhulu Upgrade And Additions 10/01/2017 30/03/2018 Conditional Grant 2 000 – 1 900 – –
Archive Services

Library and
2 Upgrade Of Utrecht Library 0 Newcastle Upgrade And Additions 10/01/2017 30/03/2018 Conditional Grant 3 000 – 2 900 – –
Archive Services

Library and
3 Upgrade Of Shayamoya Library 0 Ugu Upgrade And Additions 06/07/2017 30/03/2019 Conditional Grant 2 100 – 100 2 000 –
Archive Services

Library and
4 Upgrade Of Wasbank Library 0 Mzinyathi Upgrade And Additions 06/07/2017 30/03/2019 Conditional Grant 2 100 – 100 2 000 –
Archive Services

Library and
5 Upgrade Of Nseleni Library 0 Uthungulu Upgrade And Additions 30/10/2018 30/03/2020 Conditional Grant 2 600 – – 100 2 500
Archive Services

Library and
6 Upgrade Of Winterton Library 0 Uthukela Upgrade And Additions 30/10/2018 30/03/2020 Conditional Grant 2 600 – – 100 2 500
Archive Services

Library and
7 Upgrade Of Maqonqo Library 0 Mkhambathini Upgrade And Additions 30/10/2019 30/03/2021 Conditional Grant – – – – –
Archive Services

8 Upgrade Of Uthungulu Art Centre 0 Uthungulu Upgrade And Additions 01-042017 31/03/2020 Equitable Share Cultural Affairs – – 7 383 10 000 –

9 Current Maintananve And Repairs 0 Various Various 00-011900 00-011900 Various Various – – – – –

Upgrade Of Uthungulu Arts


10 0 Uthungulu Upgrade And Additions - - Equitable Share Arts And Culture – – – – –
Centure

11 Upgrade Of Bulwer Arts Centure 0 Impendle Upgrade And Additions - - Equitable Share Arts And Culture – – – – –

Upgrade Of Osizweni Arts


12 0 Newcastle Upgrade And Additions - - Equitable Share Arts And Culture – – – – 5 561
Centure

Upgrade Of Mkhambathini Library And


13 0 Maqonqo Upgrade And Additions - - Condtional Grant – – – – –
Library Archive Services

186
Annexure Table B5 – Vote 15 : Arts and Culture

Upgrade Of Mbazwana Arts


14 0 Umkhanyakude Upgrade And Additions - - Equitable Share Arts And Culture – – – – 5 000
Centre
15 Upgrade Of Museum 0 Uthungulu Upgrade And Additions - - Equitable Share Museum – – – – –
Total Upgrades And Additions 14 400 – 12 383 14 200 15 561
3. Refurbishment And Rehabilitation

Library and
1 Renovation Of Hluhlwe Library 0 Big 5 Hlabisa Renovations 11-012015 30/05/2016 Condtional Grant 172 398 – – –
Archive Services

Renovation Of Hibberdene Library and


2 0 Ray Nkonyeni Renovations 11-012015 30/06/2016 Condtional Grant 339 339 – – –
Library Archive Services

Library and
3 Renovations Of Howick Library 0 Mngeni Renovations 01-102015 30/01/2017 Condtional Grant 500 294 – – –
Archive Services

Library and
4 Renovation Of Sunnydale Library 0 King Cetshwayo Renovations 10/01/2017 30/03/2017 Condtional Grant 400 – – – –
Archive Services

Library and
5 Renovations Of Uvongo Library 0 Ugu Renovations 10/01/2017 30/03/2017 Condtional Grant 400 – – – –
Archive Services

Renovations Of Mooi River Library and


6 0 Umgungundlovu Renovations 10/01/2017 30/03/2017 Condtional Grant 400 – – – –
Library Archive Services

Library and
7 Renovations - Sezela Roof 0 Ugu Renovations 10/06/2017 30/03/2018 Condtional Grant 600 – 600 – –
Archive Services

Library and
8 Renovations - Hlabisa Roof 0 Mkhanyakude Renovations 30/05/2017 30/03/2018 Condtional Grant 600 – 600 – –
Archive Services

Renovations Paul Pietersburg Library and


9 0 Zululand Renovations 30/05/2017 30/03/2018 Condtional Grant 800 – 800 – –
Library Archive Services

Renovations Of Ngwelezane Library and


10 0 King Cetshwayo Renovations 30/05/2018 30/03/2019 Condtional Grant 800 – – 800 –
Library Archive Services

Renovations Of Mtubatuba Library and


11 0 Mkhanyakude Renovations 30/05/2018 30/03/2019 Condtional Grant 800 – – 800 –
Library Archive Services

Renovations Of Bhongweni Library and


12 0 Harry Gwala Renovations 30/10/2018 30/06/2019 Condtional Grant 1 200 – – 400 800
Library Archive Services

Library and
13 Renovations Of Sibongile Library 0 Mzinyathi Renovations 30/06/2019 30/06/2020 Condtional Grant 1 200 – – – 1 200
Archive Services

Renovations To Library Head Library and


14 0 Msunduzi Renovations 10-012017 20/03/2020 Equitable Share 20 000 – – – –
Office Archive Services

Renovations To Library Head Library and


15 0 Msunduzi Renovations 10-012017 20/03/2020 Equitable Share 20 000 – 7 211 5 000 5 000
Office Archive Services

Library and
16 Archive Respository 0 Msunduzi Renovations - - Equitable Share – – – – –
Archive Services

Library and
17 Renovation Of Escourt Library 0 Thukela Renovations - - Condtional Grant – – – – –
Archive Services

Renovation Of Kwambonambi Library and


18 0 Uthungulu Renovations - - Condtional Grant – – – – –
Library Archive Services

Library and
19 Renovation Of Mthunzini Library 0 Uthungulu Renovations - - Condtional Grant – – – – –
Archive Services

Library and
20 Renovation Of Nondweni Library 0 Nquthu Renovations - - Condtional Grant – – – – –
Archive Services

Library and
21 Renovation Of Howick Library 0 Umngeni Renovations - - Condtional Grant – – – – –
Archive Services

Library and
22 Renovation Of Mbazwana Library 0 Renovations - - Condtional Grant – – – – –
Archive Services

Refurbishment And
23 Renovation Of Museum Building 0 Msunduzi 10/01/2017 30/03/2019 Equitable Share Museum – – – – –
Rehabilitation
Refurbishment And
24 Renovation Of Leisure Bay 0 Hibiscus Coast 10/01/2019 30/03/2021 Equitable Share Arts And Culture – – – – –
Rehabilitation
Refurbishment And
25 Renovation Of Bulwer 0 Impendle 10/01/2020 30/03/2022 Equitable Share Arts And Culture – – – – –
Rehabilitation
Refurbishment And
26 Renovation Of Skinner Camp 0 Msunduzi 10/01/2021 30/03/2023 Equitable Share Arts And Culture – – – – –
Rehabilitation
Rehabilitation Of Offices Margaret Refurbishment And
27 0 Ethekwini 10/01/2022 30/03/2024 Equitable Share Arts And Culture – – – – –
Mncadi Rehabilitation

Library And
28 Renovations To Dundee Depot 0 Mzinyathi Renovations 10-012017 20/03/2020 Equitable Share – – – – –
Archive Services

Library And
29 Renovations To Pinetown Depot 0 Ethekwini Renovations - - Equitable Share – – – – –
Archive Services

Total Refurbishment and rehabilitation 48 211 1 031 9 211 7 000 7 000


4. Maintenance and repairs

Library And
1 Upgrade of Bruntville library 0 Umngeni Upgrade And Additions 01/10/2014 30/03/2017 Conditional Grant 14 954 11 615 – – –
Archive Services

Total Infrastructure transfers - current – – – – –


6. Infrastructure transfers - capital

187
Annexure Table B5 – Vote 15 : Arts and Culture

Library And
1 eThekwini Mega Library 0 Ethekwini Capital Infrastructure - - Condtional Grant – – 11 000 – –
Archive Services

Library And
2 Newcastle Upgrade 0 Newcastle Upgrade And Additions - - Condtional Grant 5 425 – – – –
Archive Services

Total Infrastructure transfers - capital 5 425 – 11 000 – –


7. Infrastructure Payments For Financial Assets
Total Infrastructure Payments For Financial Assets – – – – –
8. Infrastructure Leases
Total Infrastructure Leases – – – – –
9. Non Infrastructure
Total Non Infrastructure – – – – –
Total Sport, Recreation, Arts And Culture Infrastructure 705 265 83 855 162 864 171 677 210 704

188