You are on page 1of 1

Chipman Design Architecture Inc.

Chick-fil-A Project Fee Schedule - PO FORMAT (Reimbursables are NOT included)

Project #:

Project Name:

Revision: Yes No

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18)

SUB-PHASE 1 5 10 15 20 25 30 35 40 45 50 55 60 Must = (18) Must = (15)


SPACE SCHEMATIC REAL ESTATE Mark-up
NON-INVASIVE INVASIVE DESIGN INTENT PRE-DESIGN CONSTRUCTION PERMITTING & CONSTRUCTION OWNER PERMIT OTHER Horizontal Consultant Contract Fee
UTILIZATION DESIGN DEVELOPMENT
SURVEY SURVEY PACKAGE PHASE DOCUMENTS TRACKING ADMINISTRATION CHANGES EXPEDITING SERVICES Sum Agreements Basis
Discipline PLAN PACKAGE PHASE 0%
Architectural - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Mech. Eng. - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ -

Elect. Eng. - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ -

Plumb. Eng - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ -

Struc. Eng. - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ -

Permit Exp. - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ -

Subtotal $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
% of Phased Fee #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

A. Put consultant name with correct discipline in Column (1)


B. Put consultant markup/contingency percent (%) in Column (17) Header
C. Put the consultant fees in Column (16)
D. Manually enter fees (including mark-up) in Columns (2) through (14)
E. Column (15) must equal Column (18) and 100%

Billing Manager Date

v1.0

You might also like