m m ton m m kg.

m kg

Type TC C Mast Base Load Max R Jib H free Stand MT P

SCM C7030 1 + 14 + 1 2.0 7.65 3 70 51.70 35,000 120,374


LIEBHERR 245-EC 1 + 10 + 1 2.0 56.00 39,768 96,054
SCM H3.36B 1 + 14 + 1 2.0 51.70 35,000 103,012
SPEINER SK200 1 + 12 + 1 2.0 56.40 30,590 80,045
LIEBHERR 132-EC 1 + 12 + 1 2.0 8.85 1.75 55 61.00 22,433 75,864
SCM Luffing D 1601 + 13 + 1 2.0 48.66 90,316
TOPKIT MC 265 1 + 17 + 1 2.0 59.5 100,000
MC 310 1 + 12 + 1 2.0 7.65 3.2 70 52.4 28,374 116,000
G328 1 + 17 + 1 2.0 59.5 35,000 86,000
SYBQ 6520 1 + 17 + 1 2.0 7.5 2 65 60 94900
SCM C6520 2.0 65 59.68 94000
TC7030-12 2.0 70 51.3 104000

SCM C7030 XXX 1 + 14 + 1 2.0 7.65 3 70 51.70 35,000 120,374


MC 310 XXX 1 + 12 + 1 2.0 7.65 3.2 70 52.4 28,374 116,000
SCM FO 23B 1 + 17 + 1 2.0 59.8 30,000 80,000
kg.m kg kg kg kg kg.m kg kg kg

M H Uplift Compress P2 M2 H2 Uplift2 Compress2

308,102 7,084 85,918 145,130 102,424 330,746 15,612 90,590 141,802


354,033 6,424 93,709 499,235 9,993
274,985 4,427 84,942 132,540 91,012 285,925 15,277 84,447 129,953
331,498 3,355 97,175 137,249 64,240 365,657 12,063 113,184 145,304
260,120 5,200 74,029 441,012 9,789
368,754 4,969 115,738 160,896 74,530 687,620 20,565 239,289 276,554
246,000 98,000 148,000 88,000 366,000 161,000 205,000
288,859 7,084 90,000 148,000 100,000 330,746 15,698 97,000 147,000
215,000 6,450 86,000 129,000 76,000 328,000 11,400 145,000 183,000
313200 4900 93700 141200 92700 372600 14900 116500 162900
211000 5640 82000 129000 84000 308000 13020 133000 175000
302000 6240 125000 177000 92000 268000 14260 111000 157000

308,102 4,636 85,918 145,130 102,424 309,895 15,612 90,590 141,802


288,859 7,084 90,000 148,000 100,000 330,746 15,698 97,000 147,000
176,000 6,000 68,000 108,000 70,000 349,000 10,500 157,000 192,000
Original
FOUNDATION TOWER CRANE ATURAN MAIN Isi / Fill in
PILE CAP & TIANG BOR Pilih / Select
Automatic
Nama Proyek BCA Foresta fill
Lokasi Jakarta fill
Kode TC TC fill
Type TC SCM C7030 select

RESULT & CHECK


Date Issue 15-Feb-20 V.1 26-Jan-18
Date REV.1 V.1.0
Date REV.2 Daya Dukung P1 =
Date REV.3 P2 =
Date REV.4 P3 =
P4 =
Desain P5 =
Material P6 =
Mutu beton (fc') 35 Mpa fill P7 =
Mutu Tulangan (fy) 400 Mpa fill P8 =
Concrete Density 2400 kg/m3 Overtuning
Dimensi Pile Cap
Lebar Pile Cap B1 5m fill
Lebar Pile Cap B2 5m fill Rigidity
Tinggi Pile Cap h Cap 1.5 m fill
Penulangan Reinforcement Reinforcement Pile Cap
Top Pile Cap 19 mm Top Rebar
Bottom Pile Cap 22 mm Bottom Rebar

Spesifikasi bor/Pile Punching Check


Diameter bor/Pile 1m fill One Way
bor/Pile BoredPile Two Way
Bentuk Circle
Daya Dukung bor 300 ton fill INFORMATION PILE
Jumlah Tiang bor 4 pcs * Compression: SF
Jarak antar bor 3m fill
Kedalaman tanah keras (if any) 18 m fill Tension: SF

* Untuk sementara konfigurasi 4 pile


DESIGN OK !!!
In Service Out Service
127.72 OK 131.58 OK PASS
52.59 OK 48.11 OK
-22.53 OK -35.37 OK
52.59 OK 48.11 OK
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

1.65 PASS 1.36 PASS PASS add


1
1.65 RIGID 2

D19-140 usahakan jarak tulangan atas dan bawah sama


D22-140 jika belum sama, tambah jumlah tulangan disamping

4,215 kN PASS
7,250 kN PASS

0.00 < 2 14050.68948486


4600
Vu > 3 PASS
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR
PROJECT NAME
LOCATION
SCM C7030

Prepare By : Acknowledge by : Approve by :


PT. TOTAL BP OWNER CONSULTANT

(…………………………..) (…………………………..) (…………………………..)

Feb-20
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR
PROJECT NAME 0
LOCATION 0

TABLE OF CONTENT

I. PENDAHULUAN
II. CODES AND STANDARD
III. BASIC DESIGN
III. MATERIAL CHARACTERISTIC
III. LOADING TOWER CRANE
III. SPESIFICATION OF PILE
IV. DIMENSION FOUNDATION
V. ANALYSIS FOUNDATION
V.1.VOLUME & WEIGHT CONCRETE
V.2CHECKING OVERTUNING
V.3CHECKING RIGIDITY
V.4DISTRIBUTION LOAD PILE
V.5PILE CAP REINFORCEMENT
V.6PUNCHING SHEAR CHECK

VII. FINAL DESIGN (DRAWING PLAN)


TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

I. PENDAHULUAN
Perhitungan teknis ini bertujuan untuk membuat desain pondasi Tower Crane. Desain pondasi me
Pondasi tiang bor dan pile cap. Bentuk pile cap nya square/kotak dan jumlah tiang bor/pile nya
adalah 8 titik
Perhitungan Pondasi Tower Crane ini untuk :
Project BCA Foresta
Location Jakarta
Code TC TC
Type TC SCM C7030

II. CODES AND STANDARD

a Indonesian regulation, SKNI


b ACI
C EN

III. BASIC DESIGN


III.1 MATERIAL CHARACTERISTIC
Pile Cap comp strengt fc' 35 Mpa
Bore Pile comp streng fc' 25 Mpa
Steel yield strength fy 400 Mpa
Concrete density gc 2400 kg/m3
III.2 LOADING TOWER CRANE

1 Type Tower Crane = SCM C7030


Base tower section = 7.65 m
Tower section = 2.00 m
Load Max = 3.00 ton
H (free stand) = 51.70 m
R (jib) = 70 m

Support Reaction Tower Crane max free stand 51.70 m


TC SCM C7030 Unit In Service Out Service
Corner Force TC
Max Compress [Fc] kg 145,130 141,802
Max Uplift [Fu] kg 85,918 90,590
Resultant Force TC
Axial Load [P] kg 120,374 102,424
Moment [M] kg.m 308,102 330,746
Horizontal [H] kg 7,084 15,612

III.3 SPESIFICATION OF PILE

Daya Dukung Tiang Bor 300 ton =Qs kumulatif+(π.d pile.h.f)+(qb.A pile)
Jumlah Tiang bor 4 pile
Diameter bor/Pile 1.00 m
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

Bentuk Circle
Kedalaman (Df) 18 m

IV. DIMENSION FOUNDATION

B1 = 5.00 m
B2 = 5.00 m
h = 1.50 m
Depth of Anchor TC = 0.85 m
Use Pile
Jumlah Pile = 4 pile
Diameter Pile = 1.00 m
Spacing Pil [s] = 3.00 m

M
B1 = 5 m
H
0m
h = 1.5 m
1.5 m

Dia 1 m
Circle

Depth of

B2 = 5 m
BoredPile
Dia 1 m
Circle

nx = 2
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

ny = 2

1 1.50 1.50 1

B1 = 5 m
V. ANALYSIS FOUNDATION
V.1. VOLUME & WEIGHT CONCRETE

Volume Pile Cap Vc 37.5 m3


Weight of Concrete Pile Cap 90,000 kg
G 90 ton
Pu = G + P 210,374 kg In Operation
192,424 kg In Out Operation

V.2 CHECKING OVERTUNING

Asumsi : Pile tidak menerima gaya tarik


Condition 1 : TC in operation

M overtuning = H*h+M
= 318,728 kg.m
M resisting = (P + G ) * B1/2
= 525,935 kg.m
>> CHECK
�_𝑟𝑒𝑠𝑖𝑠𝑡𝑖𝑛𝑔/�_𝑜�
𝑒𝑟𝑡𝑢𝑛𝑖𝑛𝑔 >1.5 = 1.65 > 1.5 PASS

Condition 2 : TC in out operation

M overtuning = H*h+M
= 354,164 kg.m
M resisting = (P + G ) * B1/2
= 481,060 kg.m
>> CHECK
�_𝑟𝑒𝑠𝑖𝑠𝑡𝑖𝑛𝑔/�_𝑜�
𝑒𝑟𝑡𝑢𝑛𝑖𝑛𝑔 >1.35 = 1.36 > 1.35 PASS

Safety Factor are related to the actual crane design standard EN 14439 & EN 13001
EN 14439 " Cranes - Safety - Tower Cranes"
EN 13001 " Cranes - General Design"

V.3 CHECKING RIGIDITY

Lw = B1 / 2 = 2.5 m
I = 1/12 * Lw * h 3
= 0.703 m3
Ec  4730  fc' = 27,983,057 kN/m2
s = [P / B12] + 6 [M / B13]
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

s = 20690.768 kN/m2
ks = 40 x 3 x s = 2482892.2 kN/m3

0.25
 ks  Lw  = 0.53 m-1
l  
 4  Ec  I 
maxS = 1.75 / l = 3.30 m > B Mast = 2 m
PASS
>> PILE CAP DESIG
RIGID

V.4 DISTRIBUTION LOAD PILE


Asumsi :
Berat Pile Cap dan P Axial di tumpu oleh tiang [Tanah dibawah pile cap asumsi lunak)
Mx = My = √(M^2 / 2)
MH = H * h= 10,626 kg.m In Operation
23,418 kg.m In Out Operation
MHx = MHy = √(MH^2 / 2)

In Operation
Distribution Permis Control
Pile Num Koordinat (P ≤ Pijin)
Loads Load
X Y X2 Y2 P ( ton ) Pijin ( ton )
1 1.500 1.500 2.250 2.250 127.718 300 OK
2 1.500 -1.500 2.250 2.250 52.594 300 OK
3 -1.500 -1.500 2.250 2.250 -22.531 300 OK
4 -1.500 1.500 2.250 2.250 52.594 300 OK
Ʃ 9.000 9.000
In Out Operation
Distribution Permis Control
Pile Num Koordinat (P ≤ Pijin)
Loads Load
X Y X2 Y2 P ( ton ) Pijin ( ton )
1 1.500 1.500 2.250 2.250 131.583 300 OK
2 1.500 -1.500 2.250 2.250 48.106 300 OK
3 -1.500 -1.500 2.250 2.250 -35.371 300 OK
4 -1.500 1.500 2.250 2.250 48.106 300 OK
Ʃ 9.000 9.000

Where :
X = Distance between As of Column and As of Pile (X-Axis)
Y = Distance between As of Column and As of Pile (Y-Axis)
P�_𝑢/𝑛_𝑝𝑖𝑙𝑒 =
+(�_𝑥+�𝐻)𝑌/(𝑛_𝑥.� 〖 (𝑌) 〗 ^2 )+(�_𝑦+�𝐻)𝑋/(𝑛_𝑦.� 〖 (𝑋) 〗 ^2 )

Pile Uplift Capacity

DDT = Qs/SF1 + WP/SF2

Qs = 720.18 t SF1 = 3 for skin friction


WP= 0.25 П D^2 * Df x gc SF2=1,5 (for weight)
= 90.47787 t
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

DDT= 189.27 ton > 35.371 ton PASS


V.5 PILE CAP REINFORCEMENT

Mutu Betonfc' 35 Mpa Umur : 7 hr --> 0.65


fc' 22.75 Mpa
Bc = B1 =B2
cover 75 mm
dp1 = h - cover = 1.425 m
Jarak antar Pile = 3m
Uplift , Fpu = Quv = 35.37 ton
Compression , FPc = Qcv = 131.58 ton
Maximum , FP = max(( Fpu FPc )) 131.58 ton
Lower Reinforcement distance
distance
Compression condition : M co 
Mco 2FPc
 2FPc 2
394.75 t.m 3871.311
2
fc  2  2.35 x 
x
  fc Bc
2
AsReq ( x)( x
AsReq ) 0.85
0.85  Bc  dp
dp11  dp
dp 1
1  2.35 
fyfy  fc 
fc  BcBc

AsReq ( Mco) = 6851 mm2


AsMin = 0.0018 x Bc x dp1 = 12825 mm2
AstReq = max ( AsMin,AsReq(Mc 12825 mm2
Using D22 round bar , number of bars
n = AstReq= 35.74 take n = 36
As(22)
Bc  2cover1
sp ace 
n2  1 = 140 mm
USE : D22-140
Upper Reinforcement
W Pile Cap = 882.63 kN

Uplift Condition : M up  2FPu    Wcap  Bc   Wsoil  Bc 


distance
   W Soil = 0
 2  8  8 

distance  Bc  Bc 
fc  M up dp
AsReq ( x)  0.85  Bc dp 1  =
 2FPu
2 x   Wcap 
657.8 kNm
 Wsoil   2
 fc2 Bc 
1  2.35  8  As ( D  4  ( D mm)
8) 
fy  
fc  2 x 
AsReq ( x)  0.85  Bc  dp 1  dp 1  2.35 
fy  fc Bc 
AsReq ( Mup) = 1154 mm2
AsMin = 0.0013 x Bc x dp1 = 9263 mm2
AstReq = max ( AsMin,AsReq(Mup)) = 9263 mm2
Using D19 round bar , number of bars
n = AstReq= 33.67 take n = 34
As(19)
Bc  2cover1
sp ace  = 140 mm
n2  1

USE : D19-140

RESUME REINFORCEMENT PILE CAP


TOP BAR D19-140
BOTTOM BAR D22-140
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

V.6 PUNCHING SHEAR CHECK

Concrete punching capacity is calculated based on SKSNI section 3.4.11 (ACI section 11.12.2
as follows:
Maximum pile's load
Uplift , Fpu = Quv = 35.37 ton
Compression , FPc = Qcv = 131.58 ton
Maximum , FP = max(( Fpu ,FPc )) 131.58 ton
1,290 kN
Distance of reinforcing bar centre to concrete side:
фv 0.60 [ SKSNI 3.2.3.2 (3) ]
b= 0.30 m (lebar kaki TC)
Perimeter :
radius of perimeter : r = (0.5 x dp)+(0.5 x dp1) = 1.213 m
Due to intersection of each radius perimeters, perimeter of punching shear is taken :
bo = ( 0.5 x Bc ) + ( 0.5 x space + b ) = 4300 mm

One way shear ,


Tu = 2FP = 2,581 kN
fc1
Vu  fv  Bc dp 2 ( M Pa) [ SKSNI 3.4.3.1 (1) ]
6

Vu = 4,215 kN > Tu PASS


Two way shear ,
Tu = 3FP = 3,871 kN
fc1
Vu  fv   bo  dp 2 ( M Pa) [ SKSNI 3.4.11.2 (1) ]
3

Vu = 7,250 kN > Tu PASS

Gaya Geser Vu = 2 * pumax - Wcap = 1,698.24 kN


Lebar bidang geser untuk tinjauan b=L= 5000 mm
Tebal efektif pilecap, d= 1425 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = b x / b y = 1.00
Kuat geser pilecap, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 21,076.03 kN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3 = 47,069.81 kN
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 14,050.69 kN
Diambil, kuat geser pilecap, ® Vc = 14,050.69 kN
Faktor reduksi kekuatan geser, f = 0.75 kN
Kuat geser pilecap, f * Vc = 10,538.02 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vu
10,538.02 ≥ 1,698.24 ® PASS

VII. FINAL DESIGN (DRAWING PLAN)


Mutu Beton fc' 35 Mpa
Mutu Tulangan 4000 kg/cm2
5m
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

D19-140
D22-
450

0m -6.70

1.5 m 3 D 19

2m

Pile reinforcement
D22-140 must have
full bond in
pile cap

1m 3.00 1m Daya Dukung Pile


300 ton

SECTION FOUNDATION TC

1 ### 1.50 1m

1m

TULANGAND19-140

TULANGAN BD22-140 1.50

5m

1.50

1m

5m
PLAN VIEW

VIII. EXCAVATION PHASE

- Galian dari B2 s/d B1 sedalam 9.5 m


- Top pilecap rata dengan pelat GF
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

- Boredpile standing 9.5 m

GF

B1
9.5 m

B2

5m

3.5 m

IX. PILE CAPACITY CHECK


TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

Kesimpulan :
phi*Vc > V ultimate , maka Vs diambil tulangan sengkang minimum : min (D/4, 6db, So)
Sebagai faktor keamanan diambil jarak sengkang : 100 mm

Tulangan sengkang kolom D13-100

Tulangan utama kolom 15 D32


Cek kapasitas tiang dengan design tulangan 1.99% : 20 D32

KN-m
P ( Axial force) 779.67
M3 ( Momen ultimate) 976

X. SLENDERNESS CHECK
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

Member : C2 (D-1000)
Column
D = 1000 mm
lu = 14500 mm
M1 = 349.06 kNm (see picure)
M2 = 719.58 kNm (see picure)
k = 0.70 (grafic 1)
r = 300 mm
Check : k lu / r ≤ 34-12[M1/M2)
33.83 > 28.18 …….. COLUMN SLENDERNESS

--------> diberi stiffener IWF 250

Member : C2 (D-1000)
Column
D = 1000 mm
lu = 10000 mm
M1 = 349.06 kNm (see picure)
M2 = 719.58 kNm (see picure)
k = 0.70 (grafic 1)
r = 300 mm
Check : k lu / r ≤ 34-12[M1/M2)
23.33 ≤ 28.18 …….. NOT SLENDERNESS
TECHNICAL CALCULATION

FOUNDATION TOWER CRANE


PILE CAP & TIANG BOR

oke!
Bore Pile
Kedalaman dr elv. 0 23 m
Dia. 1m
A (Luas penampang) 0.7875 m2
A Tulangan utama 0.007875 m2 ==> ( Ax1%)
A Tulangan utama 0.0063 m2 ==> ( Ax1%)*0,8

Tulangan utama

-8,00 s.d. -13,00


Dia. 16 mm
Jumlah 15 bh ==> 15D16 7m
A Tulangan utama 0.0030144 m2

-13,00 s.d. -15,00


Dia. 16 mm
Jumlah 12 bh ==> 12D16
A Tulangan utama 0.0024115 m2

Sengkang Spiral

-8,00 s.d. -13,00


Dia. 10 mm ==> D10-100
Jarak 100 mm
0,6 m
-13,00 s.d. -15,00
Dia. 10 mm ==> D10-100
Jarak 100 mm

D19 - 150
0,5
1.70 1,2

D22 - 150
0.60 4.20 0.60

5.40
-6.70

- 8.40

5,0 m

15D16
D10-100

2m

12D16
D10-100
- 15.40
DIA. 0.6 BH-4
Elev. Depth Soil Type NSPT f (kPA) qb (kPA) f (t/m2) qb (t/m2) Qs (ton) Qb (ton) Qs kum (ton) Qult (ton) Qall (ton)
34.575 0
33.575 -1
32.575 -2
31.575 -3
30.575 -4 TC JIB 70
29.575 -5 27.5
28.575 -6
27.575 -7
26.575 -8 CH 6 33.00 540 3.3 54 6.22 15.27 6.22 21.49 5.20 `
25.575 -9 50 275.00 4500 27.5 450 51.84 127.23 58.06 185.29 44.71
24.575 -10 MH 50 275.00 4500 27.5 450 51.84 127.23 109.89 237.13 56.23
23.575 -11 50 275.00 4500 27.5 450 51.84 127.23 161.73 288.96 67.75
22.575 -12 10 55.00 450 5.5 45 10.37 12.72 172.10 184.82 41.42
21.575 -13 22 121.00 990 12.1 99 22.81 27.99 194.90 222.90 50.31 Blind Boring sblm grading 3.575
20.575 -14 30 165.00 1350 16.5 135 31.10 38.17 226.01 264.18 59.77 Blind Boring stlh grading lvl 33.3 2.3
19.575 -15 CH 50 275.00 2250 27.5 225 51.84 63.62 277.84 341.46 77.65
18.575 -16 35 192.50 1575 19.25 157.5 36.29 44.53 314.13 358.66 80.94
17.575 -17 37 203.50 3330 20.35 333 38.36 94.15 352.49 446.64 101.87
16.575 -18 34 187.00 3060 18.7 306 35.25 86.52 387.74 474.25 107.79
15.575 -19 36 198.00 3240 19.8 324 37.32 91.61 425.06 516.67 117.36
14.575 -20 37 203.50 3330 20.35 333 38.36 94.15 463.42 557.57 126.52
13.575 -21 38 209.00 3420 20.9 342 39.40 96.70 502.81 599.51 135.91
12.575 -22 45 247.50 4050 24.75 405 46.65 114.51 549.46 663.98 150.73
11.575 -23 50 275.00 4500 27.5 450 51.84 127.23 601.30 728.54 165.43
10.575 -24 50 275.00 4500 27.5 450 51.84 127.23 653.14 780.37 176.95
9.575 -25 42 231.00 3780 23.1 378 43.54 106.88 696.68 803.56 181.54
8.575 -26 37 203.50 3330 20.35 333 38.36 94.15 735.04 829.19 186.88
7.575 -27 50 275.00 4500 27.5 450 51.84 127.23 786.87 914.11 206.67
6.575 -28 50 275.00 4500 27.5 450 51.84 127.23 838.71 965.95 218.19
5.575 -29 50 275.00 4500 27.5 450 51.84 127.23 890.55 1017.78 229.71
4.575 -30 50 275.00 4500 27.5 450 51.84 127.23 942.38 1069.62 241.23
3.575 -31 50 275.00 4500 27.5 450 51.84 127.23 994.22 1121.45 252.75
2.575 -32 50 275.00 4500 27.5 450 51.84 127.23 1046.06 1173.29 264.27
1.575 -33 50 275.00 4500 27.5 450 51.84 127.23 1097.89 1225.13 275.78
0.575 -34 50 275.00 4500 27.5 450 51.84 127.23 1149.73 1276.96 287.30
-0.425 -35 50 275.00 4500 27.5 450 51.84 127.23 1201.56 1328.80 298.82
-1.425 -36 50 275.00 4500 27.5 450 51.84 127.23 1253.40 1380.64 310.34
-2.425 -37 MH 50 275.00 4500 27.5 450 51.84 127.23 1305.24 1432.47 321.86