Professional Documents
Culture Documents
m kg
4,215 kN PASS
7,250 kN PASS
Feb-20
TECHNICAL CALCULATION
TABLE OF CONTENT
I. PENDAHULUAN
II. CODES AND STANDARD
III. BASIC DESIGN
III. MATERIAL CHARACTERISTIC
III. LOADING TOWER CRANE
III. SPESIFICATION OF PILE
IV. DIMENSION FOUNDATION
V. ANALYSIS FOUNDATION
V.1.VOLUME & WEIGHT CONCRETE
V.2CHECKING OVERTUNING
V.3CHECKING RIGIDITY
V.4DISTRIBUTION LOAD PILE
V.5PILE CAP REINFORCEMENT
V.6PUNCHING SHEAR CHECK
I. PENDAHULUAN
Perhitungan teknis ini bertujuan untuk membuat desain pondasi Tower Crane. Desain pondasi me
Pondasi tiang bor dan pile cap. Bentuk pile cap nya square/kotak dan jumlah tiang bor/pile nya
adalah 8 titik
Perhitungan Pondasi Tower Crane ini untuk :
Project BCA Foresta
Location Jakarta
Code TC TC
Type TC SCM C7030
Daya Dukung Tiang Bor 300 ton =Qs kumulatif+(π.d pile.h.f)+(qb.A pile)
Jumlah Tiang bor 4 pile
Diameter bor/Pile 1.00 m
TECHNICAL CALCULATION
Bentuk Circle
Kedalaman (Df) 18 m
B1 = 5.00 m
B2 = 5.00 m
h = 1.50 m
Depth of Anchor TC = 0.85 m
Use Pile
Jumlah Pile = 4 pile
Diameter Pile = 1.00 m
Spacing Pil [s] = 3.00 m
M
B1 = 5 m
H
0m
h = 1.5 m
1.5 m
Dia 1 m
Circle
Depth of
B2 = 5 m
BoredPile
Dia 1 m
Circle
nx = 2
TECHNICAL CALCULATION
ny = 2
1 1.50 1.50 1
B1 = 5 m
V. ANALYSIS FOUNDATION
V.1. VOLUME & WEIGHT CONCRETE
M overtuning = H*h+M
= 318,728 kg.m
M resisting = (P + G ) * B1/2
= 525,935 kg.m
>> CHECK
�_𝑟𝑒𝑠𝑖𝑠𝑡𝑖𝑛𝑔/�_𝑜�
𝑒𝑟𝑡𝑢𝑛𝑖𝑛𝑔 >1.5 = 1.65 > 1.5 PASS
M overtuning = H*h+M
= 354,164 kg.m
M resisting = (P + G ) * B1/2
= 481,060 kg.m
>> CHECK
�_𝑟𝑒𝑠𝑖𝑠𝑡𝑖𝑛𝑔/�_𝑜�
𝑒𝑟𝑡𝑢𝑛𝑖𝑛𝑔 >1.35 = 1.36 > 1.35 PASS
Safety Factor are related to the actual crane design standard EN 14439 & EN 13001
EN 14439 " Cranes - Safety - Tower Cranes"
EN 13001 " Cranes - General Design"
Lw = B1 / 2 = 2.5 m
I = 1/12 * Lw * h 3
= 0.703 m3
Ec 4730 fc' = 27,983,057 kN/m2
s = [P / B12] + 6 [M / B13]
TECHNICAL CALCULATION
s = 20690.768 kN/m2
ks = 40 x 3 x s = 2482892.2 kN/m3
0.25
ks Lw = 0.53 m-1
l
4 Ec I
maxS = 1.75 / l = 3.30 m > B Mast = 2 m
PASS
>> PILE CAP DESIG
RIGID
In Operation
Distribution Permis Control
Pile Num Koordinat (P ≤ Pijin)
Loads Load
X Y X2 Y2 P ( ton ) Pijin ( ton )
1 1.500 1.500 2.250 2.250 127.718 300 OK
2 1.500 -1.500 2.250 2.250 52.594 300 OK
3 -1.500 -1.500 2.250 2.250 -22.531 300 OK
4 -1.500 1.500 2.250 2.250 52.594 300 OK
Ʃ 9.000 9.000
In Out Operation
Distribution Permis Control
Pile Num Koordinat (P ≤ Pijin)
Loads Load
X Y X2 Y2 P ( ton ) Pijin ( ton )
1 1.500 1.500 2.250 2.250 131.583 300 OK
2 1.500 -1.500 2.250 2.250 48.106 300 OK
3 -1.500 -1.500 2.250 2.250 -35.371 300 OK
4 -1.500 1.500 2.250 2.250 48.106 300 OK
Ʃ 9.000 9.000
Where :
X = Distance between As of Column and As of Pile (X-Axis)
Y = Distance between As of Column and As of Pile (Y-Axis)
P�_𝑢/𝑛_𝑝𝑖𝑙𝑒 =
+(�_𝑥+�𝐻)𝑌/(𝑛_𝑥.� 〖 (𝑌) 〗 ^2 )+(�_𝑦+�𝐻)𝑋/(𝑛_𝑦.� 〖 (𝑋) 〗 ^2 )
USE : D19-140
Concrete punching capacity is calculated based on SKSNI section 3.4.11 (ACI section 11.12.2
as follows:
Maximum pile's load
Uplift , Fpu = Quv = 35.37 ton
Compression , FPc = Qcv = 131.58 ton
Maximum , FP = max(( Fpu ,FPc )) 131.58 ton
1,290 kN
Distance of reinforcing bar centre to concrete side:
фv 0.60 [ SKSNI 3.2.3.2 (3) ]
b= 0.30 m (lebar kaki TC)
Perimeter :
radius of perimeter : r = (0.5 x dp)+(0.5 x dp1) = 1.213 m
Due to intersection of each radius perimeters, perimeter of punching shear is taken :
bo = ( 0.5 x Bc ) + ( 0.5 x space + b ) = 4300 mm
D19-140
D22-
450
0m -6.70
1.5 m 3 D 19
2m
Pile reinforcement
D22-140 must have
full bond in
pile cap
SECTION FOUNDATION TC
1 ### 1.50 1m
1m
TULANGAND19-140
5m
1.50
1m
5m
PLAN VIEW
GF
B1
9.5 m
B2
5m
3.5 m
Kesimpulan :
phi*Vc > V ultimate , maka Vs diambil tulangan sengkang minimum : min (D/4, 6db, So)
Sebagai faktor keamanan diambil jarak sengkang : 100 mm
KN-m
P ( Axial force) 779.67
M3 ( Momen ultimate) 976
X. SLENDERNESS CHECK
TECHNICAL CALCULATION
Member : C2 (D-1000)
Column
D = 1000 mm
lu = 14500 mm
M1 = 349.06 kNm (see picure)
M2 = 719.58 kNm (see picure)
k = 0.70 (grafic 1)
r = 300 mm
Check : k lu / r ≤ 34-12[M1/M2)
33.83 > 28.18 …….. COLUMN SLENDERNESS
Member : C2 (D-1000)
Column
D = 1000 mm
lu = 10000 mm
M1 = 349.06 kNm (see picure)
M2 = 719.58 kNm (see picure)
k = 0.70 (grafic 1)
r = 300 mm
Check : k lu / r ≤ 34-12[M1/M2)
23.33 ≤ 28.18 …….. NOT SLENDERNESS
TECHNICAL CALCULATION
oke!
Bore Pile
Kedalaman dr elv. 0 23 m
Dia. 1m
A (Luas penampang) 0.7875 m2
A Tulangan utama 0.007875 m2 ==> ( Ax1%)
A Tulangan utama 0.0063 m2 ==> ( Ax1%)*0,8
Tulangan utama
Sengkang Spiral
D19 - 150
0,5
1.70 1,2
D22 - 150
0.60 4.20 0.60
5.40
-6.70
- 8.40
5,0 m
15D16
D10-100
2m
12D16
D10-100
- 15.40
DIA. 0.6 BH-4
Elev. Depth Soil Type NSPT f (kPA) qb (kPA) f (t/m2) qb (t/m2) Qs (ton) Qb (ton) Qs kum (ton) Qult (ton) Qall (ton)
34.575 0
33.575 -1
32.575 -2
31.575 -3
30.575 -4 TC JIB 70
29.575 -5 27.5
28.575 -6
27.575 -7
26.575 -8 CH 6 33.00 540 3.3 54 6.22 15.27 6.22 21.49 5.20 `
25.575 -9 50 275.00 4500 27.5 450 51.84 127.23 58.06 185.29 44.71
24.575 -10 MH 50 275.00 4500 27.5 450 51.84 127.23 109.89 237.13 56.23
23.575 -11 50 275.00 4500 27.5 450 51.84 127.23 161.73 288.96 67.75
22.575 -12 10 55.00 450 5.5 45 10.37 12.72 172.10 184.82 41.42
21.575 -13 22 121.00 990 12.1 99 22.81 27.99 194.90 222.90 50.31 Blind Boring sblm grading 3.575
20.575 -14 30 165.00 1350 16.5 135 31.10 38.17 226.01 264.18 59.77 Blind Boring stlh grading lvl 33.3 2.3
19.575 -15 CH 50 275.00 2250 27.5 225 51.84 63.62 277.84 341.46 77.65
18.575 -16 35 192.50 1575 19.25 157.5 36.29 44.53 314.13 358.66 80.94
17.575 -17 37 203.50 3330 20.35 333 38.36 94.15 352.49 446.64 101.87
16.575 -18 34 187.00 3060 18.7 306 35.25 86.52 387.74 474.25 107.79
15.575 -19 36 198.00 3240 19.8 324 37.32 91.61 425.06 516.67 117.36
14.575 -20 37 203.50 3330 20.35 333 38.36 94.15 463.42 557.57 126.52
13.575 -21 38 209.00 3420 20.9 342 39.40 96.70 502.81 599.51 135.91
12.575 -22 45 247.50 4050 24.75 405 46.65 114.51 549.46 663.98 150.73
11.575 -23 50 275.00 4500 27.5 450 51.84 127.23 601.30 728.54 165.43
10.575 -24 50 275.00 4500 27.5 450 51.84 127.23 653.14 780.37 176.95
9.575 -25 42 231.00 3780 23.1 378 43.54 106.88 696.68 803.56 181.54
8.575 -26 37 203.50 3330 20.35 333 38.36 94.15 735.04 829.19 186.88
7.575 -27 50 275.00 4500 27.5 450 51.84 127.23 786.87 914.11 206.67
6.575 -28 50 275.00 4500 27.5 450 51.84 127.23 838.71 965.95 218.19
5.575 -29 50 275.00 4500 27.5 450 51.84 127.23 890.55 1017.78 229.71
4.575 -30 50 275.00 4500 27.5 450 51.84 127.23 942.38 1069.62 241.23
3.575 -31 50 275.00 4500 27.5 450 51.84 127.23 994.22 1121.45 252.75
2.575 -32 50 275.00 4500 27.5 450 51.84 127.23 1046.06 1173.29 264.27
1.575 -33 50 275.00 4500 27.5 450 51.84 127.23 1097.89 1225.13 275.78
0.575 -34 50 275.00 4500 27.5 450 51.84 127.23 1149.73 1276.96 287.30
-0.425 -35 50 275.00 4500 27.5 450 51.84 127.23 1201.56 1328.80 298.82
-1.425 -36 50 275.00 4500 27.5 450 51.84 127.23 1253.40 1380.64 310.34
-2.425 -37 MH 50 275.00 4500 27.5 450 51.84 127.23 1305.24 1432.47 321.86