It must ensure the personnel safety and equipment safety in practice process.
During the period of observation at least one person is responsible for protecting.
②levelling
Leveling using S3 tilting level. Every group must measure two times for
checking on the same station. Two results difference are less than 6mm.
Begin ).
1
Engineering Survey Practice Report
level staff
Elevation Average Elevation
Level Station back sight fore sight
difference/mm difference/mm
reading reading
2
Engineering Survey Practice Report
5、Calculation
Start Point C1:HC1=48.978m
End Point B6:HB6=49.951m
misclosure:∑h=0.044+0.132+0.092+0.088-0.101+0.434+0.264=0.953m
fh=∑h-(HB6 -Hc1)= 0.953-(49.951-48.978)=-0.02m
v1=v2=v3 =v4 =v5 =v6= v7=0.003m
HBM1= Hc1+h1+v1+h2+v2= 48.978+0.047+0.135=49.160m
HBM2=HBM1+h3+v3+h4+v4+h5+v5=49.248m