You are on page 1of 1

11083-QLT-CL-F001 Rev 0.

0 26-Sep-17

ARCHIRODON - HUTA Hegerfeld SAIC NUMBER DATE APPROVED SHC-QR NUMBER

SHIC-Q-EW-
Compaction Test 0008
03-Dec-17 Civil
PROJECT TITLE BI No. CONTRACTOR / SUBCONTRACTOR
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES
AND SERVICES
25-00053-0003 SARCO-HUTA Consortium

LOCATION

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
PB4784-1001-MA-DR-0036 7.0 6600040118 N/A
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME DOC. REF. NO.
11083-QLT-ITP-001
SH ITP NUMBER SEQUENCE NO. WORK PERMIT REQUIRED?
SAR-HTA-001 3.0 (3.4)
MYDP INSPECTION LEVEL SARCO-HUTA INSPECTION LEVEL NO
W H

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

3.4 Compaction Test

Reclamation in Tuxedo Area and Zone D2.


PB4784-1001-MA-SP-0049
3.4a The top 500mm shall be compacted to achieve at least 98% of
Rev. 12 Sec.3.14.4
maximum dry density.

Reclamation excluding Tuxedo and zone D2.


PB4784-1001-MA-SP-0049
3.4b The top 600mm shall be compacted to achieve at least 95% of
Rev. 12 Sec 3.14.1
maximum dry density.

Top of sewage or drainage pipes.


PB4784-1001-MA-SP-0049
3.4c The top 300 mm shall be compacted to achieve at least 85% of
Rev. 12 Sec.3.18
maximum dry density and ± 3% of optimum moisture content

Maximum dry density and optimum moisture content of soil to


3.d Laboratory Test Result/ Report
be determined prior to start compaction

REMARKS:

REFERENCE DOCUMENTS:
3- PB4784-1001-MA-SP-0049 Rev. 12 - Dredging and Reclamation Works
SARCO-HUTA Consortium MYDP
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector Quality Inspector


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Quality Supervisor


Quality Record Approved: Quality Record Approved:
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test SHC=SARCO-HUTA Consortium, Y = YES N = NO F = FAILED

Page 1 of 1