Case-Study
Clients
Shuttle Kiln
LPG
Fan
Compressors
Demand Management
DG Set
Cable Loss
ENERCO ENERGY SOLUTIONS LLP
(WWW.ECONSERVE.IN)
E NERGY A UDIT F INDINGS
Suggestions:
Suggestions:
Suggestions:
Suggestions:
Suggestions:
Suggestions:
Suggestions:
Suggestions:
Xxxxx
Rs / Year Rs Month
1Improving & Maintaining
combustion efficiency of tunnel kiln
at optimal level 6948100 xxxx 3.5
2Improving & Maintaining
performance of the Shuttle Kiln at
the optimal level 3040900 xxxxx 3.9
3Replacing LPG firing for ECS fans
(mould drying) with heat pump
based system. 7303100 xxxxxx 16.4
4Improving & Maintaining
performance of various Fans &
Blowers at optimal level 194200 Xxxxxxx 12.4
ENERCO ENERGY SOLUTIONS LLP
(WWW.ECONSERVE.IN)
O VERALL S AVING
P OTENTIAL
No Description Potential Investment Payback
Rs / Year Rs Month
5Eliminating unload loss by operating
VFD based compressor in place of fixed
speed compressors 44500 0 0.0
6Optimizing peak demand through
demand management & reducing the
contract demand 121000 xxxxx 4.8
7Reducing the cable losses by installing /
repairing xxxx 16800 10.7
xxxxxx
8Eliminating DG operation by installing
UPS (backed with existing DG set) for
the casting blower. 68900 xxxxxx 17.4
Overall 17651800 xxxxxx 9.2