BAHIRDAR UNIVERSITY

BAHIRDAR INSTITUTE OF TECHNOLOGY

FACULTY OF COMPUTING
COMPUTER SCIENCE PROGRAM-A

PROPOSAL ON

[Title]

SUBMITTED FOR THE COURSE SOFTWARE


ENGINEERING

BY
----------
---------

MARCH, 2016
BAHIR DAR, ETHIOPIA
Software Engineering Team project proposal Outline

Objectives:

 To develop a proposal for an appropriate area of your choice


 To provide an opportunity to apply the principles and knowledge of software engineering
gained in class
 To enhance learning through experience, and to benefit from discussions and interactions
with other class members.

Proposal Formats

1. Background of the Project/Introduction

 Background of the organization and introduction of the selected domain. Particularly the
area where your proposal is going to address

2. Existing System Study

2.1 Existing System functions

 Describe how the existing system functions (manual, semi –automated, automated

2.2 Problems of the Existing System

 List and describe the problems in the existing system

3. Proposed System
 Brief description of the proposed solutions for the problems mentioned in problem
statement
4. Objectives of the Project

4.1 General objective

 What is your general objective…should have a direct linkage with the title of the
proposal

4.2 Specific objectives

 List out specific objectives to attain your general objectives

5. Scope of the Project

 Clearly show the functions (boundary) of your system that is expected to cover

6. Methodology

6.1 Data Gathering Methods

 State how the requirements are gathered,

6.2 System Design and analysis Techniques

 What Design approach you will follow to design (structural or object oriented design
approach). specify the reason
 Which software process model you will employ. Why??

6.3 Development Environment and Programming Tools

7. Significance of the Project

 What is the contribution of the project?

8. Project Schedule and Work break down

 Assign time for each tasks you will carryout


Application Areas: Representative industries should be selected by the project
group. Some suggested project titles are given. The Title of each group should be
different
1. Online student registration system
2. Web based Department selection system
3. Fleet(vehicle) Management System for BIT
4. Online Tour Guide System for Bahir Dar City
5. Web based Store Management system
6. Administrative Staff Attendance Management System
7. Dormitory Allocation System
8. Library Management System
9. Online Abay Bus ticket reservation system
10. Drug inventory system (i.e Pharmacy management system)
11. Online shoping system
12. Online class Room schedualing system for BIT
13. Online Student project allocation and Management system
14. Bdu student union online voting system
15. Online chatting system
Content of Full document in any software Project
Chapter one: INTRODUCTION

1.1 Background
1.2 Existing System Study
1.2.1 Existing System Study
1.2.2 Problems of Existing system
1.3 Proposed System
1.4 Objectives of the Project
1.4.1 General objective
1.4.2 Specific Objectives
1.5 Scope of the project
1.6 Methodology
1.6.1 Data gathering Techniques
1.6.2 Software Implementation Tools
1.7 Significance of the Project
1.8 Organization of the Project

Chapter Two: SYSTEM FEATURES

2.1 Existing System Description


2.2 Proposed System Description
2.3 Requirement Specifications
2.3.1 Functional Requirements
2.3.2 Non Functional Requirements
2.4 Analysis Models
2.4.1 Use case diagram
2.4.1.1 Use case description
2.4.2 Activity Diagram
2.4.3 Sequence Diagram

Chapter Three: SYSTEM DESIGN

3.1 Deployment Diagram


3.2 Architectural Design
3.3 User Interface Design
3.4 Data Structure Design
3.5 Algorithm Design

Bibliography

Appendix