You are on page 1of 9

DESIGN FRL FRL FRL

S.NO REMARK TCS SPAN STRUCTURE


CHAINAGE LEFT CENTER RIGHT
1 320+170 NEW-CONSTRUCTION TCS-1 1X1.2 PIPE 195.258 195.533 195.258
2 326+765 NEW-CONSTRUCTION TCS-1 1X1.2 PIPE 198.289 198.564 198.289
GROUND( GROUND( PIPE CRUST+ CRUST+ CRUST+ ENCASING CAMBER
PIPE
IL THK. CUSHION CUSHION CUSHION 150mm
RHS) LHS) (m) DIA LEFT CENTER RIGHT THK. LHS %
193.113 193.854 192.813 0.12 1.200 1.125 1.400 1.125 NO -2.5
197.828 197.236 196.936 0.12 1.200 0.033 0.308 0.033 YES -2.5
CAMBER
RHS %
-2.5
-2.5
DESIGN FRL FRL FRL
S.NO REMARK TCS SPAN STRUCTURE
CHAINAGE LEFT CENTER RIGHT
1 320+371 RECONSTRUCTION TCS-2 1X1.2 PIPE 195.257 195.532 195.257
2 322+003 RECONSTRUCTION TCS-2 1X1.2 PIPE 193.851 194.126 193.851
GROUND( GROUND( PIPE CRUST+ CRUST+ CRUST+ ENCASING CAMBER
PIPE
IL THK. CUSHION CUSHION CUSHION 150mm
RHS) LHS) (m) DIA LEFT CENTER RIGHT THK. LHS %
193.398 194.174 193.098 0.12 1.200 0.839 1.114 0.839 YES -2.5
192.394 192.138 191.838 0.12 1.200 0.693 0.968 0.693 YES -2.5
CAMBER
RHS %
-2.5
-2.5
DESIGN FRL FRL FRL
S.NO REMARK TCS SPAN STRUCTURE
CHAINAGE LEFT CENTER RIGHT
1 320+670 NEW-CONSTRUCTION TCS-3 1X1.2 PIPE 195.279 195.659 195.279
2 321+645 RE-CONSTRUCTION TCS-3 1X1.2 PIPE 194.282 194.662 194.282
GROUND( GROUND( PIPE CRUST+ CRUST+ CRUST+ ENCASING CAMBER
PIPE
IL THK. CUSHION CUSHION CUSHION 150mm
RHS) LHS) (m) DIA LEFT CENTER RIGHT THK. LHS %
193.504 193.926 193.204 0.12 1.200 0.755 1.135 0.755 YES -2
192.904 193.022 192.604 0.12 1.200 0.358 0.738 0.358 YES -2
CAMBER
RHS %
-2
-2