Professional Documents
Culture Documents
(Persero)
SURABAYA
Head Office
PT PAL INDONESIA (PERSERO)
Ujung Surabaya PO BOX 1134
East Java, Indonesia (60155).
• Established in 1980 as a State Owned
Enterprise (SOE) Company.
• 350 Ha Area, located in Surabaya, East
Java Indonesia.
• 1,200 Employees
JAKARTA
Representative Office
PT PAL INDONESIA (PERSERO)
Tanah Abang II no 27, Jakarta Pusat
© 2018 PT PAL INDONESIA (Persero) Rights Reserved
BUSINESS PORTFOLIO of PT PAL INDONESIA
NEW SHIP BUILDING GENERAL REPAIR & SUBMARINE: TECHNOLOGY &
ENGINEERING MAINTENANCE NEW BUILDING & DEVELOPMENT
MRO SUBMARINE Basic Design & Engineering:
• Naval Ship
• Commercial Ship
• Mid Life Modernization
• Overhaul Submarine
NAVAL SHIPS: OFFSHORE STRUCTURES: MID LIFE Research and Development
Our Own Product: Our Own Product : MODERNIZATION: • Improve Own Design
• KCR / OPV 60 m Various Fixed Platform up Malahayati Class Strategic Alliance • Development New product
• OPV 80-90 m to 3,000Ton
• LPD 125 m with DSME (Daewoo LPH 244 M
REPAIR & MAINTENANCE: Shipbuilding Marine
• SSV 123 m
Various KRI Engineering):
Various Commercial Ships
Strategic Alliance MRSS 163 M
i) Damen Schelde Naval Shipbuilding: Overhaul :
• Light Frigate 105 m. Submarine 209 Class
• KRI CAKRA 401 (tahun
POWER PLANT 1994-1996)
/ BALANCE OF PLANT • KRI NGL 402 (tahun 1997- LPD 143 M
Our Own Product: 1999)
• Main Condenser
• Heat Exchanger New Building
• HP Heater • Submarine 209Class
• Oil Cooler (1,500tones)
• Deaerator & Storage Tank LSV 100 M
COMMERCIAL SHIPS
• Pressure Vessel IT System
Our Own Product:
• Bulk Carrier 50K DWT/STAR 50 • Software design engineering
Strategic Alliance: CadMatic
• Tanker 30K LTDW
Mitsubishi: Steam & Gas Turbine NAPA
• Tanker 17,500 LTDW
General Electric: Stator Frame • Software Management
• Research Vessels, etc
KAR Power Ship Turkey: IFS
Floating Power Plant • Software Planning
© 2018 PT PAL INDONESIA (Persero) Rights Reserved Primavera 3
INDUSTRIAL COLLABORATION FLOW of PT PAL INDONESIA
LAW No. 16/2012
PTPAL
Indonesia as
Prime ALUTSISTA LEAD INTEGRATOR
(Main Equipment) Tier 1
Kep KKIP: Kep/12/KKIP/XII/2013
Lead Integrator Alutsista Matra Laut
CONTRACTUAL ROUTE
Global Strategic
Partners
Main Component/
Platform Tier 2
State Owned
Enterprises
Synergy
Global Suppliers
Component and
Support & Service Tier 3
National
Companies
Supplier
&
Contractor Raw Material
Tier 4
This scheme is in line with Indonesian Law UU 16/2012 & PP 54/2010
where PT PAL is in Tier 1 as a Main Equipment Producer → Direct Appointing is Optimizing CAPEX through synergy, complementary
applicable through PDN/RPM capability and capacity with local industries
PT PAL as a Lead Integrator grows together with (State Owned Enterprises + National Private Companies) and
other SOE and National Private Companies International Strategic Partners. 4
2. MERCHANT SHIPS
VARIOUS TYPE of SHIPS
1. NAVAL SHIPS
Chemical Tanker
STAR 50 DSBC 24,000 LTDW
50,000 DWT
Research 5
Container 1,600 TEUs
Vessel
SHIP DELIVERED from 1985 to 2017
80
76
Total = 234 Units
60
JUMLAH KAPAL
40
30
20 23 24
16 18
12 13
7 2 5
-
MERCHANT SHIPS
MERCHANT SHIP NAVAL SHIPS
WAR SHIP
GENERAL ENGINEERING 3. ELECTRICAL
OFFSHORE, ONSHORE
and ELECTRICAL
BMPP
1. OFFSHORE (Barge
EPCI WHP - Mounted Power
Topside Plant)
module Dimension 60(L) X 20(B) X 3.8(d)
Electrical Generator 55.75 MVA X 11 KV X 1 Set
TRANSFORMER 150/11 KV X 50 MVA
Fuel Tank 2,480 M3 (For 13 Operating Days)
Owner : CNOOC SES Ltd
Construction Location : PT PAL Indonesia’s Shop
Total Weight : 2,600 MT Floating
ProductionUnit
2. ONSHORE
Power – Grati,
Pasuruan Site
Construction
Chemical Tanker
Nuclear Power Plant Chasing DEAERATOR 24,000 DWT
REPAIR AND MAINTENANCE
1 Semarang GRAVING
DOCK
Dimension (Meter)
300 x 32 x 10,3
4&5
Pare Pare & Surabaya
Capacity = 50,000 DWT Floating Dock
2 Capacity = 5,000 TLC
Irian GRAVING DOCK
Dimension (Meter)
237 x 28 x 12
Ship Lift
Capacity = 20,000 DWT
Capacity = 1,500 TLC
6
3 Slip Way
Dimension (Meter)
150 x 100
Capacity = 40,000 DWT
TEKNOLOGI PRODUKSI
MODULAR
CONSTRUCTION
FULL OUTFITTING NOTE : FUNCTION TEST IS CARRIED OUT
BLOCK SYSTEM SEPARATELY IN EVERY MODULE
BLOCK (FOBS)
CONSTRUCTION
CURRENT
ACHIEVEMENT
INCREASE IN SPEED AND EFFICIENCY OF PRODUCTION
PRODUCT DEVELOPMENT
(FAST PATROL BOAT)
TEKNOLOGI
FPB 57 - PATROL BOAT FPB 57 - COMBATANT FAST ATTACK CRAFT MISSILE 60M FRIGATE CLASS
• 1x Bofors 57 mm • 1x Bofors 57 mm (KCR 60)
• 1x Bofors 40 mm • 1x Bofors 40 mm • FPB 57-COMBATANT
• 2x Rheinmetal 20 mm • 2x Rheinmetal 20 mm • Missile System
• Fire Control • Decoy • Stealth PT PAL INDONESIA
• SSM
• Fire Control DR 3000
FASE I : INTRODUCTION / FASE II : INTEGRATION FASE III : DESIGN FASE IV: BASIC INDUSTRIAL
LICENSE TECHNOLOGY DEVELOPMENT RESEARCH
PRODUCT DEVELOPMENT
(LANDING PLATFORM DOCK)
KRI BANJARMASIN KRI BANDA ACEH BRP TARLAC BRP DAVAO DEL SUR
Indonesian Navy Indonesian Navy Philippine Navy Philippine Navy
FASE IV : BASIC
INDUSTRIAL RESEARCH
…
143meter LPD
• Latest equipment & • LPD Building
Technology improvement expertise: 4 Ships
• Design/ Concept Design expertise 6 • Operational expertise 100meter LSV
Ships > 6 Years Feedback
163meter MRSS
PENGUASAAN TEKNOLOGI
KAPAL SELAM TYPE U-209
2014 - 2019 2020 - 2024 2025 - 2029 2030 - 2034
PHASE I PHASE II PHASE III PHASE IV
DEDICATED FOR :
CHANG BOGO TYPE U-209
DALAM PROSES
PENGUASAAN TEKNOLOGI
No ITEM FUNGSI
1 NAPA Ship Perfomance
2 CadMatic (Hull construction and Outfitting)
3 HTFS Heat Exchanger
4 Compress Pressure vessel
HTFS Software
NAPA Software
OHSAS 18001