1 HEDCOR, Inc. Tudaya 1 Hydroelectric Power Plant Project Construction of Civil Works Brgy. Kapatagan, 656,859,329.00 14-Sep-12 13-Dec-13 100%
Sibulan, Sta. Cruz, Davao del component of 6.6 MW Sta. Cruz, Davao
Sur , Tel. Nos. (082) 2822177/ Hydroelectric Plant, Sta. Cruz, del Sur
2210429 Davao del Sur
Contract for the Construction of
Weir/ Intake, Desander,
Conveyance, Surge Tank,
Penstock, Powerhouse, and
Tailrace
2 HEDCOR, Inc. Tudaya 2 Hydroelectric Power Plant Project Construction of Civil Works Brgy. Astorga, Sta. 657964709 16-Jul-12 9 Sep-13 100%
Sibulan, Sta. Cruz, Davao del component of 7.0 MW Cruz, Davao del Sur
Sur , Tel. Nos. (082) 2822177/ Hydroelectric Plant
2210429
Contract for the Construction of
Weir/ Intake, Desander,
Conveyance, Surge Tank,
Penstock, Powerhouse, and
Tailrace
3 Leyte Metropolitan Water Design and Build 30,000cu.m/day Water Treatment Design and Construction of Brgy. Tingib, 436,777,789.00 27-Jan-12 13-Aug-13 100%
District Plant and related Works 30MLD WTP including river intake Pastrana, Leyte
Mabini St., Tacloban City Contract No.: CW-11-001NP structure and raw water
Tel. Nos. (053) 321-4312 / 325- conveyance pipeline
6859
4 Maynilad Water Services, Inc. Proposed Laying of 200mmØ PVC Pipe along Laying of 200mmØ PVC Pipe Along Aguinaldo 33,094,306.52 11-Jun-12 28-Dec-12 100%
MWSS Complex, Katipunan Aguinaldo Highway (Under Package 5 of proposed along Aguinaldo Highway Ave., from near
Ave., Balara Quezon City 1400mmØ SP) Taliba to Tirona
1105, Philippines Contract No.: OPS-09-WN-006A Highway, Cavite
Tel. Nos. (02) 981-3333
5 Maynilad Water Services, Inc. Proposed Laying of 200mmØ PVC Pipe along Laying of 200mmØ PVC Pipe Along Aguinaldo 35,361,374,.72 11-Jun-12 4-Jan-13 100%
MWSS Complex, Katipunan Aguinaldo Highway (Under Package 6 of proposed along Aguinaldo Highway Ave., from Tirona
Ave., Balara Quezon City 700mmØ SP) Highway to near Tia
1105, Philippines Contract No.: OPS-09-WN-007A Maria Townhouse
Tel. Nos. (02) 981-3333 Village, Cavite

6 Manila Water Company, Inc. Rodriguez Transmission Main Project Contract Construction of 700mmØ La Mesa Watershed 304,999,205.00 20-Oct-10 28-Feb-13 100%
MWSS Compound, 489 Package 3 transmission pipeline, pumping to Metro Hills Subd.,
Katipunan Road, Balara, Contract No.: E-WR-RW-TP-10-002C station and 10ml Concrete Rodriguez Rizal
Quezon City 1105, Philippines Reservoir
Tel. Nos. (02) 816-9067 / 816-
9068 / 816-9898
7 Maynilad Water Services, Inc. Proposed 700mmØSP Watermains for HA-36 under Laying of 700mmØ steel Along PNR Track 69, 915, 848.18 August 2, 2010 25-Mar-11 100%
MWSS Complex, Katipunan 2nd MLD 50MLD Projects of Muntinlupa B.A.- distribution pipeline along PNR, from Montillano to
Ave., Balara Quezon City Package 1 Muntinlupa City Concepcion,
1105, Philippines Contract No.: OP-11-WN-01 Muntinlupa City
Tel. Nos. (02) 981-3333
8 Maynilad Water Services, Inc. Proposed 700mmØ & 400mmØ Primary Laying of 700mmØ & Along Concepcion, Php41,032,575.18 2-Aug-10 25-Mar-11 100%
MWSS Complex, Katipunan Watermains for HA-36 under 2nd 50MLD Project of 400mmØsteel distribution pipeline PNR Track &
Ave., Balara Quezon City Muntinlupa B.A.-Package 2 along PNR, Muntinlupa City meralco Rd., from
1105, Philippines Contract No.: OP-11-WN-02 East Service Road
Tel. Nos. (02) 981-3333 to Sucat Rd.,
Muntinlupa City
9 Manila Water Company, Inc. South East Transmission Mains Project (Package1) Pipelaying of 1800mmØ Steel From Balara Filter 329,252,720.38 17-Jun-10 26-Aug-12 100%
MWSS Compound, 489 Contract No.: RWSPDPM-08-020A Pipeline From Balara Filter Plant Plant to Sumulong
Katipunan Road, Balara, to Sumulong Outfall Outfall, Sto. Nino,
Quezon City 1105, Philippines Marikina City
Tel. Nos. (02) 816-9067 / 816-
9068 / 816-9898

10 Manila Water Company, Inc. South East Transmission Mains Project (Package3) Pipelaying of 1200mmØ Steel From Marcos 195,646,803.40 17-Jun-10 30-Nov-12 100%
MWSS Compound, 489 Contract No.: RWSPDPM-08-020C Pipeline along Imelda Avenue Highway corner
Katipunan Road, Balara, from Marcos Highway to Ortigas Imelda Ave., to
Quezon City 1105, Philippines Avenue Imelda Ave. corner
Tel. Nos. (02) 816-9067 / 816- Cainta Junction
9068 / 816-9898

11 Maynilad Water Services, Inc. Proposed 1400mmØ Primary with Secondary Laying of 1400mmØ DI Pipeline Along Tirona 203,456,846.18 11-Apr-11 22-Apr-12 100%
MWSS Complex, Katipunan Watermains for HA-27 under Cavite Las Pinas B.A. including valves and Highway from
Ave., Balara Quezon City Package 1 appurtenances and service Aguinaldo to Vera
1105, Philippines Contract No.: OP-11-WN-09 connection along Tirona Highway Ville Arcade,
Tel. Nos. (02) 981-3333 Bacoor, Cavite
12 Maynilad Water Services, Inc. Proposed 1400/1000mmØ Primary with Secondary - Laying of 1000mmØ DI Pipeline Along Tirona 117,344,301.18 11-Apr-11 30-Oct-12 100%
MWSS Complex, Katipunan Watermains for HA-27 under Cavite Las Pinas B.A. including valves and Highway from Vera
Ave., Balara Quezon City Package 2 appurtenances and service Ville Arcade to
1105, Philippines Contract No.: OP-11-WN-10 connection along Tirona Highway Binakayan Road,
Tel. Nos. (02) 981-3333 Bacoor, Cavite
'- Construction of 1000mmØ Pipe
Bridge Crossing

13 Maynilad Water Services, Inc. Supply and Discharge Pipeline for New Pasay Laying of 1400mmØ steel Along Boardwalk & 289,477,866.00 2-Aug-10 31-Mar-12 100%
MWSS Complex, Katipunan Pumping Station Package 4 distribution Along Bradco and Macapagal Ave.,
Ave., Balara Quezon City Contract No.: OP-10-WN-19 Macapagal Boulevard, Paranaque from New Pasay
1105, Philippines City Pump Station to
Tel. Nos. (02) 981-3333 Sentosia,
Paranaque City
14 Manila Water Company, Inc. Rodriguez Water Treatment Plant Project Contract - Design and Build of the Treated La Mesa Reservoir 452,488,394.00 8-Apr-10 29-Feb-12
MWSS Compound, 489 Package 2 water main (150MLD cap.) from and Watershed,
Katipunan Road, Balara, Contract No.: E-WR-RW-TP-08-003B the treated water pumping station Payatas, Quezon
Quezon City 1105, Philippines within the water treatment facility City
Tel. Nos. (02) 816-9067 / 816- up to the service reservoir
9068 / 816-9898
- Construction of 1.80km of
1200mmØ transmission pipeline
from the Water Treatment Plant to
Concrete Ground Reservoir

15 Maynilad Water Services, Inc. Proposed 1400mmØ Primary Lines (Phase 3) along Laying of 1400mmØ steel Along PNR and 195,024,134.87 1-Feb-10 31-May-11 100%
MWSS Complex, Katipunan PNR, & Montillano St., Muntinlupa City-Package 2 distribution pipeline along PNR Montillano St., from
Ave., Balara Quezon City Contract No.: OP-10-WN-12 and Montillano St., from near near Bayanan Creek
1105, Philippines Bayanan Creek to near Corporate to near Corporate
Tel. Nos. (02) 981-3333 Road Road

16 Maynilad Water Services, Inc. Proposed 1400mmØ SP along Aguinaldo Highway Laying of 1400mmØ steel Along Longos 162,343,796.00 1-Feb-11 14-Dec-11 100%
MWSS Complex, Katipunan Ave. (Package 5) distribution pipeline along Coastal Rd., &
Ave., Balara Quezon City Contract No.: OPS-09-WN-006 Aguinaldo Highway from near Aguinaldo from near
1105, Philippines Talaba to Tirona Highway Bacoor Taliba to Tirona
Tel. Nos. (02) 981-3333 and Imus Cavite Highway
17 Maynilad Water Services, Inc. Proposed 700mmØ SP along Aguinaldo Highway Laying of 700mmØ steel Along Aguinaldo 53,859,799.00 1-Feb-11 October 11, 100%
MWSS Complex, Katipunan Ave. (Package 6) distribution pipeline along Highway from 2011
Ave., Balara Quezon City Contract No.: OPS-09-WN-007 Aguinlado Highway from near Tirona Highway to
1105, Philippines Tirona Highway to Tia Maria near Tia Maria
Tel. Nos. (02) 981-3333 Townhouse Village, Imus Cavite Towhouse Village

18 Maynilad Water Services, Inc. Proposed 2000mmØ SP Dedicated Line to Pasay Supply and installation of Along Roxas Blvd., 246,000,000.00 1-Apr-08 19-May-09 100%
MWSS Complex, Katipunan Pumping Station-Package 5 2000mmØ Steel pipeline along Service Rod., from
Ave., Balara Quezon City Contract No.: 3RS-08-WN-HA23-Z4-001 Roxas bldv., Service Road near Lancaster St.,
1105, Philippines including appurtenances to Cuneta Ave.; and
Tel. Nos. (02) 981-3333 Along Cuneta Ave.,
from Roxas Blvd.,
Service Road to
F.B. Harrison St.

19 Maynilad Water Services, Inc. Proposed 900mmØ SP & 250mmØ PVC Pipe for Supply and installation of Along SLEX ( West 71,948,391.00 9-Jan-08 06-Jun-08 100%
MWSS Complex, Katipunan Parañaque Zone 9-Package 2 900mmØ Steel Pipe and Service Road) & Dr.
Ave., Balara Quezon City Contract No.: 3RS-08-WN-HA29-Z9-002 250mmØ PVC Mainline along A. Santos Ave.,
1105, Philippines SLEX West Service Road Parañaque City
Tel. Nos. (02) 981-3333
20 Maynilad Water Services, Inc. Proposed 900mmØ SP & 200mmØ PVC Pipe with Supply and installation of Along SLEX (West 75,424,609.00 09-Jan-08 20-Jun-09 100%
MWSS Complex, Katipunan 3 Bridge Crossing Parañaque Zone 9 - Package 3 900mmØ Steel Pipe and Service Road),
Ave., Balara Quezon City Contract No.: 3RS-08-WN-HA29-Z9-003 200mmØ PVC Mainline along Parañaque City
1105, Philippines SLEX West Service Road
Tel. Nos. (02) 981-3333
21 Maynilad Water Services, Inc. Proposed Pipelaying of 400mmØ and 800mmØ SP Supply and installation of Binondo Area, Sta. 67,971, 618.00 11-Apr-07 20-Nov-07 100%
MWSS Complex, Katipunan (Primary Main) for Binondo Area-Package 1 400mmØ & 800mmØ Steel Pipe Cruz, Manila
Ave., Balara Quezon City Contract No.: S-HA17-SC01-013S-07
1105, Philippines
Tel. Nos. (02) 981-3333

22 Maynilad Water Services, Inc. Proposed Pipelaying of 800mmØ SP (Primary Supply and installation of Binondo Area, Sta. 65,741,018.00 11-Apr-07 14-Nov-07 100%
MWSS Complex, Katipunan Main) for Binondo Area-Package 2 800mmØ x 1,168 meters steel Cruz, Manila
Ave., Balara Quezon City Contract No.: S-HA17-SC01-014S-07 pipeline
1105, Philippines
Tel. Nos. (02) 981-3333
23 HEDCOR, Inc. Sibulan Hydro-electric Power Project Construction of all civil works Brgy. Sibulan, Sta. 2,540,000,000.00 26-Jun-07 16-Jul-10 100%
Sibulan, Sta. Cruz, Davo del Civil Works Contract Package 1, 2 & 3 component for two (2) hydro - Cruz, Davao del Sur
Sur, Tel. Nos. (082) 2822177/ electric plants with a combined
2210429 capacity of 42.5 MW