You are on page 1of 6

DAILY WORK REPORT

S.no Date 9 am to 11am 11 am to 1 pm 1.30 pm to 4 pm

Apr-17
01.04.2017 Saturday

02.04.2017 Sunday

03.04.2017 simulation of p80 moving block with two sleeve simulation of moving block with two sleeve and preparation of ppts
for privious projects

4.04.2017 17" upper mould simulation simulation of 17" upper mould trail 2

05.04.2017 simulation of 17" lower ring simulation of 17" lower ring and guide block

06.04.2017 simulation of 17" side mould simulation of side mould with extra pad

7.4. 2017 simulation of imate connector simulation of moving block with two sleeve final model

8.4.17 saturday
9.04.17 sunday

10.04.2017 simulation of 17 upper 1 simulation of upper mold

11.04.2017 simulation of moving block simulation of 15 lower ring

12.04.2017 15 side mould simulation 16" flange 380 simulation


13.04.2017 preparation of ppt for previous projects simulation of 16" side mould
14.04.2017 tamil new year

15.04.2017 simulation of imate connector simulation of kei oo4

16.04.2017 Sunday

17.04.2017 simulation of 16 upper mould simulation of kei 004 trail 2 & ppt done

18.04.2017 discustion of yesco flow control models and other model for simulation 17" all cmd ppt done

19.04.2017 simulation of 700 disc simulation of 15 lower ring trail 2

20.04.2017 simulation of fine cast model simulation of mtc existing

21.04.2017 hub rear wheel direct pouring simulation hub rear wheel method card and discusstion with md sir

22.04.2017 Saturday

23.04.2017 Sunday

24.04.2017 simulation of 16 upper 1 and upper mould simulation of 16 upper mould and discussion of black plate

25.04.2017
simulation of karmen black plate existing simulation of 15 side mould

26.04.2017
preparation of ppt for previous projects simulation of 6" connetor

27.04.2017 simulation of open cap


simulation of 6" connector retrail

28.04.2017 inside floorshop inside floorshop for sample of 17 cmd models


29.04.2017 saturday

30.04.2017 Sunday
4pm to 5.30 pm

block with two sleeve and preparation of ppts


for privious projects

tion of 17" upper mould trail 2

of 17" lower ring and guide block

on of side mould with extra pad

oving block with two sleeve final model

mulation of upper mold

mulation of 15 lower ring

6" flange 380 simulation


mulation of 16" side mould
simulation of kei oo4

on of kei 004 trail 2 & ppt done

17" all cmd ppt done

ation of 15 lower ring trail 2

imulation of mtc existing

method card and discusstion with md sir

pper mould and discussion of black plate

mulation of 15 side mould

imulation of 6" connetor

simulation of open cap

shop for sample of 17 cmd models

You might also like