ATS Rating:

Project:

PHYSICAL & OPERATIONAL INSPECTION

Sr # Check List Status Remarks


1 Check Metal sheet guage(14 SWG) OR guage as per approved plan

2 Check Water Proofing of Panel box by checking its channel presence and weld quality.
3 Panel box size
12 KVA --x ---
50 KVA -- X--
4 Check Paint of Metal Enclosure
Uniformity
Texture and shade
5 Check presence of Proper holes for wall hanging
6 Check Proper holes for power/control cable IN/OUT appropriate diameter for wires to pass through
7 Panel door with lock
8 Magnetic contactor brand & rating
9 MCB/MCCB brand & rating
10 Neutral BB, insulator & Screw
11 With/without ATS controller
12 Check Inter lock
13 Check Power wiring (Thimbles+Shrouds+rating)
14 Check control wiring for (taging, loos connection & interlocking)
15 Check for overvoltage/undervoltage/phase sequence protection
16 Check point for remote start
17 ATS control selector & Emergency switch
18 Check Mains/Gen. Set indication lights
19 Relay + relay base quality
20 Timer + timer base
21 Perform ATS operational test