Work Order - Club House
Work Order - Club House
WORK ORDER
To,
VG Infratech Pvt. Ltd.
4, Somwar Peth, Bhumkar Wada,
Kamala Nehru, Pune 411011
Sub :- Work Order for Construction of Club House for society Privie Selena, Pashan, Pune
Dear Sir,
With regard to your quotation and sub-sequent discussion held with yourselves, we are pleased
to issue you the work order for aforesaid works subjected to drawing, specifications, terms and
conditions and Engineer instructions issued from time to time.
The agreed contract sum is INR ***** / - (Indian Rupees )
1. Scope of Work
The scope of work broadly includes all the labour, supervision, tools and tackles, machinery
etc. required for administering and executing aforesaid works as per drawings and specification
laid down by Engineer in Charge. Contractor shall carry out aforesaid works and additionally if
required, Contractor shall carry out any additional item or miscellaneous works as per
instructions of Engineer in Charge. For items not included in this work order, the procedure of
prior rate approval for extra item shall be followed.
2. Mode of Measurement
All the works shall be measured on item-rate basis and the Contractor shall be paid for actual
quantities of work executed, jointly measured and approved by Engineer in Charge.
1
RG CONSTRUCTIONS
REGISTERED OFFICE : 2514, Platinum Complex, Aranyeshar, Pune. Phone 020-24476869
4. Mixing method
Contractor shall make use of half bag mixer and proper pharmas for batching of material and
mixing of concrete and Contractor shall observe quality control to the satisfaction of Engineer in
Charge.
6. Terms of Payment
Contractor shall be paid Auger Machine transportation charges as stated in the above schedule
on completion of the aforesaid works along with the final bill.
Payment shall be made within 15 days against invoice duly certified by Engineer in Charge. 5%
amount shall be retained from every RA bill and the same shall be released after 3 months from
the final bill with NOC from Engineer in Charge against invoice. Contractor Invoices shall be
subjected to recoveries which are in the view of EIC are appropriate.
7. Labour camp
If required, Employer shall provide space for labour. Contractor shall arrange for shifting of
material and erection of hutments at the same location for his workmen. Water and electricity
shall be provided to the Contractor by the Employer at one source point for labour camp and
execution of aforesaid works only. Contractor shall use only CFL bulbs in the labour camp.
Contractor shall maintain the labour camp and sanitation facilities in acceptable hygienic
condition.
8. Labour laws
Contractor shall not engage labour below 18 years of age and shall pay wages to his workmen
as per minimum wages act vide. circular issued by labour commissioner Mumbai from time to
time.
2
RG CONSTRUCTIONS
REGISTERED OFFICE : 2514, Platinum Complex, Aranyeshar, Pune. Phone 020-24476869
9. HSE
Contractor shall provide all the necessary PPE’s to his workmen and shall observe all the
safety measures at site. In the event of any accident shall be solely the Contractor’s
responsibility and shall be solely to the Contractor’s account.