CMS HL-LHC Detector Upgrades Project

Work Breakdown Structure


Planning Workshop, 26th – 30th Sept 2016, Fermilab
Lucas Taylor
Product-oriented Work Breakdown Structure
(as implemented in P6)

• 7 elements at L2, 41 at L3, 100 at L4 … + more down to L6

2 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


Work Breakdown Structure – Level 2

3 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.1 Project Management – WBS to Level 3

4 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.1 Project Management – WBS to Level 4

BoE BoE BoE BoE

5 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.1 Project Management – WBS to all levels

6 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.2 Outer Tracker – WBS to Level 3

7 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.2 Outer Tracker – WBS to Level 4

8 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.2 Outer Tracker – WBS to all levels

BoE

BoE BoE BoE

BoE
BoE BoE

BoE BoE

BoE BoE BoE BoE

BoE BoE

BoE BoE BoE

BoE
9 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016
BoE
402.3 Barrel Calorimetry – WBS to Level 3

10 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.3 Barrel Calorimetry – WBS to Level 4

BoE BoE

BoE BoE

BoE BoE

BoE BoE

BoE BoE

BoE

11 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.4 Endcap Calorimetry – WBS to Level 3

12 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.4 Endcap Calorimetry – WBS to Level 4

13 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.4 Endcap Calorimetry – WBS to all levels

14 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.5 Endcap Muons – WBS to Level 3

15 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.5 Endcap Muons – WBS to Level 4

BoE BoE

BoE BoE

16 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.6 Trigger and DAQ – WBS to Level 3

17 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.6 Trigger and DAQ – WBS to Level 4

BoE BoE BoE BoE BoE

BoE

BoE

BoE

BoE

BoE

18 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.7 Forward Pixels – WBS to Level 3

19 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016


402.7 Forward Pixels – WBS to Level 4

BoE BoE BoE BoE

BoE BoE BoE BoE

BoE BoE BoE BoE

BoE BoE BoE

BoE BoE

20 Lucas Taylor -- Work Breakdown Structure 26-30 September 2016