You are on page 1of 4

The Reheating Furnace Control System Design Based On SIEMENS

PCS7

1
Pei Zhou, 2Wei He, 2Zhanglong Zhang
1. Chongqing Techology and Business University, Chongqing, 400067, China( zhoupei@ctbu.edu.cn)
2. State Key Laboratory of Power Transmission Equipment & System Security and New
TechnologyChongqing University,Chongqing,China

Abstract—This paper introduces that the method of continuous proportion, integral and differential control (PID
using Siemens process control system PCS7 V6.0 to control the control) via the difference between the measured values and
reheating furnace. It describes the configuration of both the set value of gas and air flow; then the opening degree of
software and hardware of control system, function the burner gun in each section will be adjusted to control
accomplished by the system and the difficulties along with the flow of gas so as to control the temperature, however,
solution. The reheating furnace control system is configurated
since it is not clear about the combustion of the gas, if this
with double CPU redundancy. It adopts industrial Ethernet ,
Europe popular PROFIBUS DP field bus and distributed I/O
method is adopted, the utilization efficiency of heat
ET200M structure. It adopts ET200M I/O station redundancy medium is very low and the energy consumption is very
communication interface and node with PROFIBUS DP large. Here one kind of improved dual-crossing amplitude
protocol to communicate with double controller(CPU). limiting full-auto combustion control will be introduced and
its basic principle is to carry out the control over
combustion at the upper part and lower part of each section
I INTRODUCTION in normal working time; if necessary, the temperature
adjustment signal of the upper part can be regarded as the
set control of the dual-crossing amplitude limiting loop and
INonthetheproduction process of hot mill strip, the requirement
temperature of incoming slab billet is relatively
the former temperature detection value of the lower part can
be used for monitoring the furnace condition. This principal
high; generally speaking, it shall be 1 350℃ or so. The
and subordinate control mode can better coordinate the
reheating furnace, as the equipment for reheating procedure,
balance of combustion and heat supply between the upper
can meet the requirements on continuous reliable
section and lower section to make the combustion of the
production only when the control over the temperature and
upper and lower section even; at the same time, it considers
the output quantity are well coordinated. The reheating
the combustion of gas, playing a good role in
furnace adopts moveable walking beam to move the cold
energy-saving.
slab billet to the exit side from the furnace enter side; when
In this project, PCS7 V6.0 developed by Siemens will
the slab billet is moving, it will be heated by the
be used to realize the above-mentioned control function.
combination gas of burner nozzle injection furnace and
coke furnace. When the slab billet enters the furnace from
the tail end of the furnace body, firstly it will be heated to
II BRIEF INTRODUCTION TO PCS7 SYSTEM
850℃ or so in the preheating section and then to about 1
300℃ in the reheating section; finally it will enter the heat PCS7 is an advanced process control system orientated
soak section to make the slab billet be heated evenly for to all process control applications based on S5, S6 and S7
rolling. series programmable logic controller and TELEPERM
The above-mentioned control process is commonly series cyborg system by Siemens combining with the most
accomplished by DCS (digital control system) of the advanced computer software and hardware technology,
instruments and the routine control strategy is to realize it which adopts replaceable operation station, strong relational
through continuous PID (proportion, integral and distributed database support platform, highly-reliable
differential). Several thermocouples are arranged process control station with large capacity redundancy and
respectively on the top or side wall of each control section distributed I/O control sub-system of PROFIBUS process
to respectively gather the actual temperature in each section field bus technology.
of the furnace and then the sampling values will be sent to PCS7 has been applied in more and more industry
PLC (programmable logic controller) so as to realize the control areas as a kind of procedure-oriented software
development platform. It has advanced a sort of
completely-integrated automatic solution and can provide

Authorized licensed use limited to: UNIVERSIDAD ROSARIO. Downloaded on May 18,2010 at 20:00:01 UTC from IEEE Xplore. Restrictions apply.
all kinds of automation applications with a uniform such as disturb,strong coupling,great pure lag etc. we
technical circumstance. The following items are included in discuss the design of dedicated control equipment of basis
it: unified data management, communication, configuration walking reheating furnace in detai1 including
and programming software. Based on the circumstance characteristic,correlative soft and hardware information
above, all kinds of technologies can be integrated in a and realization of control.
overall system with a global database on the same interface PID control is are comprehensive controlling rule in
with users. Engineers or technicians can configurate and meter controlling system,because of its mature, familiarity
program in the same platform for all kinds of applications.
in technician and operator, well effect,broad appliance in
The complicated engineering becomes simpler by using a
computer DDC data controlling equipment and especially
configuration platform. The PCS7 makes the PLC
complicated controlling system,practice proved it adapt
incorporated in the DCS system more easily, embodying the
genuine characteristics of the computerized automatic various industrial controlling process.
control. The key equipment of the reheating furnace: loader
machine,unloader machine,walking system,series transfer
III BRIEF INTRODUCTION TO CONTROL SYSTEM roll,control system of burning and tracking of slab. The
OF REHEATING FURNACE whole control system of the reheating furnace is
configurated with double CPU redundancy, redundancy ring
In the complex industrial process system,we always
industrial Ethernet, PROFIBUS DP bus and distributed I/O
meet such problems :multiple constraint conditions: multi
ET200M structure, with the detailed configuration shown in
variable system: strong coupling; nonlinear system: large
time delay; multi control target; and so on. Custom control Fig 1. Make use of the system,we can carry out the
technique can not solve above problems. But advanced function of transferring measuring and weighting ,
control technique can deal well with those problems. How detecting,loading and unloading tracking the slab,we can
to use advanced control technique in industrial process and control process of burning and exchange data each other to
generate practical utility is a urgent problem in the track slab and manage the process over all of product line.
industrial automate research realm. According as the Goals of reheating furnace’s producing process such as high
galloping of computer technique,hardware technique, yield,low consuming and pollution,automatic operating
network technique,industrialization of advanced control mode are achieved.
technique is realizable. A.1 Hardware configuration
This article put forward the useful and Shown as Fig. 1, the whole DCS control system of the
easily-realizable and reliable control way to realize the reheating furnace has two remarkable characteristics: the
automatic control system of walking reheating furnace,on first one is that the basic automation level adopts
the basis of including the theory of process control, redundancy ring structure so as to improve the reliability
technology of DCS and PLC,communication,field bus, and stability of the system; the second one is that the
and in term of the characteristic of the walking reheating information level adopts standard Ethernet structure to
furnace, also by using the electrical and instrument control make the whole system large capacity data communication
equipment with the practical and reliable technology and ability and convenient extensibility. Aiming at the
advanced quota. above-mentioned characteristics the following modes will
We can realize the instrument control system and be adopted to select the hardware:
electric control system by using DCS and PLC. The control (1)Selecting the process controller CPU414-H in
system of reheating furnace is divided into furnace area
S7-400 series made by Siemens as the core of the whole
PLC control system,roll PLC control system and reheating
control system of the reheating furnace to jointly form the
furnace DCS control system. The controller of instrument
redundancy system control station together with distributed
and electric connect to the server of the operater station by
I/O ET200M;
the IEEE Ethernet,by using DCS and PLC,the technology
(2)The monitoring system adopts YANHUA industrial
of network and field bus technology to combine the process
control computer and Philip 22” pure-flat color display as
control system and process computer , intelligent
the engineer station and operator station. The operation
instruments,drive system to realize the instrument and stations of the system are working in form of online and
electric control in one system. coordination and they are full-transparent and full
fault-tolerant, realizing the replacement with each other.
IV COMPOSITION OF CONTROL SYSTEM OF This mode makes this system advantageous in reliable
REHEATING FURNACE operation, reasonable data distribution, quick operation
speed, friendly man-machine interface and convenient use
A. Configuration Of Control System and so on.
In this article,based on walking reheating furnace (3)The three-level network system structure composing
controlling process , control system is a complicated of standard Ethernet (IEEE Ethernet 802.X), SIEMENS
transmit heat and character process,has many peculiarity SIMATIC NET industrial Ethernet network and PROFIBUS

Authorized licensed use limited to: UNIVERSIDAD ROSARIO. Downloaded on May 18,2010 at 20:00:01 UTC from IEEE Xplore. Restrictions apply.
process field bus (EN50170) guarantees the high reliability, the system. In addition, this system also establishes the loop
no blockage and high speed (10M~100M) of the data display picture and the centralized control over each loop
communication of the system, especially, it adopts can be realized in the loop picture. Click the detailed
double-ring fault-tolerant optical fiber network, more information including set value, process value, output value,
effectively guarantee the field anti-interference ability and manual and auto switch and upper and lower limit alarm of
high reliability of the data transmission of the network the process variables on the PID control panel. The analog
system. quantity displays value and flow accumulation of the analog
quantity in form of centralization. The thermometer
displays the main temperature parameters of the system.
Functions of control system is explained according to
program flow of loading automatic running. Fig.2

A.2 Software configuration

It adopts Microsoft WINDOWS2000 (English) as the


operating system software and PCS7 TOOL SET V6.3
made by Siemens will be configurated on engineer station
as the software to control the lower-position computer and
monitor the upper-position computer. In addition, it is
provided with Industry Ethernet S7-REDCONNECT
communication software and redundancy H system
software.
The operator station is provided with upper-position
computer monitoring software PCS7WinCC, which is
cooperatively developed by Siemens and Microsoft.
Besides the functions that can be realized by the common
monitoring software, PCS7WinCC can be added with
various controls and C script program, VB program to
accomplish more complicated functions.
B. Functions accomplished by control system
In order to make the operators master the operation
condition of the whole control system of the computer in
time, accurately control the stable operation of the system
and convenient in operation, this system establishes system
process flow assembly drawing, steam drum process flow
chart, process flow chart of reheating section and the one of
heat section.
The process flow chart is the process flow display C. Difficulties and realization
picture with industrial control parameters, vividly reflecting The fuel for the reheating furnace is the mixed gas of
the production process state of this system and providing blast furnace and coke oven, with unstable heat value,
the display of the measured values of the detection points of resulting in difficulty in control over the temperature. In this
project, the control method of reheating the furnace

Authorized licensed use limited to: UNIVERSIDAD ROSARIO. Downloaded on May 18,2010 at 20:00:01 UTC from IEEE Xplore. Restrictions apply.
temperature and coal gas flow as well as the air flow case that one just right PID block that can satisfy the need
cascade dual-crossing amplitude limiting is adopted to of control can be developed, the programming will be more
stabilize the control set value within ±10℃. convenient and perfect.
The detailed idea is as follows: taking the temperature HORN function of WinCC makes the voice alarm
of the reheating furnace as the main loop, the coal gas flow configuration easier and quicker. It is only necessary to
and air flow as the auxiliary loop, the output of the record the *.wav file of voice for alarm and connect the
temperature loop of the reheating furnace will be voice alarm and alarm event in HORN function.
transformed into the initial set value of the coal gas flow The combination of the WinCC and STEP7 shares
and air flow. The control over the coal gas flow will be some duties of the upper-position machine to monitor and
subject to high and low selection according to the air flow collect data on the spot reasonably, exerts respective
and will be subject to the amplitude limiting according to advantages of different facilities, and is supposed to be a
the higher and lower limit of the coal gas flow so as to characteristic and promising design of the computerized
determine the final set value of the coal gas flow loop. The control system.
control over air flow will be subject to the high and low In the process of system commissioning and being put
selection according to the coal gas flow and will be subject into operation, the diagnostic functions of the hardware of
to the amplitude limiting according to the higher and lower PCS7 are strong and they can help the onsite commissioning
limit of the air flow so as to determine the final set value of engineer settle the problems quickly.
the air flow loop. 。 The contents of information of PID panel are all-round.
The control principle of the temperature of reheating In the process of setting PID parameters, it can observe the
furnace, coal gas flow and air flow cascade dual-crossing change in PV value and OP value and the onsite operator
amplitude limiting is shown in Fig. 3: can operate the related parameters of the loop conveniently,
saving the a large quantity of time of the developers.

REFERENCES

[1]. PCS7 user Manual,SIEMENS AG,2003


[2]. Siemens AG.Configuration Hardware and Communication
Connections PCS7 v6.0 Manual,2002
[3]. Jaklic Anton.A simulation of heat transfer during billet
transport[J],Applied Thermal Engineering,2002,
[4]. Holland F.Development and performance of on-line computer control
in a 3-zone reheating furnace[J],Iron and Steel
engineer,1982,59(1),44-52
[5]. Fred Shenvar.Walking beam furnace supervisory control at Inlands
80-in hot strip mill[J], Iron and Steel Engineer,1987,64(3),23-24]
[6]. Tovar E,Vasques F.Real-Time Fieldbus Communications Using
PROFIBUS Networks.
[7]. B.Porter,A.H Jones.Genetic tuning of digital PID controllers
Electronics Letters,1992, vol.28:843-844
[8]. J.L.Tong,J.P Bobis.A model for designing digital PID controller
Industrial Electronics, Control ,Instrumentation and Automation,
proceedings of the 1992 International Conference, 1992, vol.3:
1157-1162
[9]. Y.Huang,S.YaSunbu.A general practical design method for PID
control from conventional PID controls. The Ninth IEEE
Where, μ is the air surplus coefficient, β is the International Conference on, 2000,vol.2:969-972
complementary coefficient of the flow measurement range, [10]. Paul Harmon. Etc .Expert System Tools and applications, John
the ratio of air to gas=μ×β and K1, K2, K3 and K4 are the Wiley&Sons.Inc, World Publishing Corporation,1990
difference coefficient. [11]. Astrom K J,Hagglund T.PID Controllers: Theory, Design and Tuning.
New York:ISA,1995
[12]. Mann G K I, HuB G, Gosing R G. Analysis of direct action fuzzy
V EXPERIENCE IN APPLICATION PID controller structures .IEEE Transaction on systems, Man,
&Cybernetics, 1999, 29B:371-388
[13]. SIEMENS AG.SIMATIC MicroComputing User Manual[Z].2000.
Nowadays there existing high-speed developments in [14]. Process Control system PCS7 Library.SIEMENSAG,2003
science and technology, to enhance automation level and [15]. Process Contro1System PCS7 Operator Station.SIEMENSAG,2003
reduce laboring intensity of the workers, the applications of [16]. Standard PID Control Manual SIEMENSAG,2003
computers and the process controls and monitors to some [17]. Software Redundancy or SIMATIC S7-300 and S7-400.
SIEMENSAG,2003
huge and complex industrial systems with process control
[18]. Polytechnic Institute of Porto,Report HURRAY-TR-9803,1998,4
software have come to an inexorable tendency. Dultra M L.Fieldbus Control System.ISA,1996-Paper
During the process of programming, the strong
function of control flow chart of PCS7 (CFC) enables the
programmers be convenient and rapid. The only shortage is
that there are too many options of the module parameters, in

Authorized licensed use limited to: UNIVERSIDAD ROSARIO. Downloaded on May 18,2010 at 20:00:01 UTC from IEEE Xplore. Restrictions apply.