STRUCTURE
Checklist prefab column TC1 & corewall B, Part : 2.5, Part : 8.3+8.4, Part : 1.2+1.4,
1 09.00 - 10.00 Part : 3.2, Part : 1.3+8.1+8.2. lv 14 ~ lv 15 Gf & L15 Tower 2 & Midrise Sukir
3 10.00 - 11.00 Cheklist corewall C partial 13,14,15,16 & LB6 L14 ~ L15 Tower 2 Afif
7 15.30 - 16.30 Cheklist Column PC1, PC7, PC3 zone 5T L6 Podium Rendy
8 15.30 - 17.30 cheklist corewall C partial 14 15 16+ LB7 LB5 L14 ~ L15 Tower 2 Afif
ARCHITECTURE
1 09.30 - 11.00 Handover Opening Join Lixil L11 & L13 Midrise Ivan & Sawal
2 14.00 - 14.30 Checklist Plaster Guidance Area Balcony Unit A & B L7 Midrise Ivan
Nur suprapro
4 15.00 - 16.00 Cheklist horizontal guidance screed floor parsial 3 Gf Townhouse
(panca magran)
INTERIOR
MEP
NOTE :
1 Please don't carry anny kind of joint inspection unless TOTAL QC inspector signed off internal check list. Sub Contractor MAIN CONTRACTOR
2 TOTALBP CM team to prepare safe acces for planned inspection and fully cooperate during inspection. Perusahaan / Company PT. TOTAL BANGUN PERSADA, Tbk
Nama / Name
LEGEND : Jabatan / Position SM / CM
W ( Owner ) = Witness Point (Mengetahui)
Main Kont = Hold Point ( Menyetujui ) Tanda Tangan / Signature
Sub Contr. = Authority ( Pihak ke-3 )