02 Malaysia Overview
First step in
Malaysia by
Signing PSC for
MTJDA
3
01 PTTEP’s Journey in Malaysia
02 Malaysia Overview
Peninsular
Peninsular Sarawak 19%
16%
3rd Largest by resource size Sarawak 35%
Sabah
58% Sabah
26%
46%
02 Malaysia Overview
Arthit
Sabah H
Bongkot
Expected 1st gas in 2020*
(Gas)
JDA PFLNG2
18 KBOED 2018
(Oil)
(Oil/Gas)
Sabah K
PM415
SK417
SK410B (Oil/Gas)
Sabah
(Gas)
Peninsular SK438
(Oil/Gas)
PM407 SK405B
MLNG
complex
(Oil/Gas) 30 KBOED 2018
(Oil/Gas) (Oil/Gas)
SK309 & SK311
Sarawak
SK314A
Status
(Oil/Gas)
Production
Development
Exploration
7
Producing Projects
Block K
General Information
Area Kikeh 247 sq.km
SNP 10.5 sq.km
GK 4 sq. km.
Location Deepwater,
Offshore Sabah
Product Start up August 2007
Production Type Oil
PTTEP’s Investment
Kikeh
PTTEP Sabah 56.0%
(Operator)
Kikeh FPSO
SNP
PTTEP Sabah 22.4% Key Activity in 2020-2021 : To maintain production
(Operator)
• Execute Kikeh Subsea Gas Lift – Phase 2, First Production Benefit in Q4 2020
GK
PTTEP Sabah 6.4% • Drill 4 development wells for Siakap North Petai (SNP) - Phase 2, First Production Benefit in Q1 2021
(Non-Operator) • Commence Field Development Plan for Kikeh Phase 3 in Q1 2020
Sales Volume (100%) in 1H 2019 • Complete Gumusut-Kakap (GK) (Non-Operated) Field Development Plan for Phase 3 Development in Q1 2020
Oil 22,300 BPD
(Operator)
Oil 125,600 BPD
(Non-Operator)
8
Producing Projects
9
Development Project
Block H
General Information
Area Rotan Field 17.6
sq.km.
Remaining 2,693.8
sq.km.
Location Deepwater,
Offshore Sabah
Product Type Gas
PTTEP’s Investment
Rotan Field
PTTEP Sabah 56.0%
(Operator)
Key Activity in 2020-2021 : To ensure 1st gas target in 2020
Remaining Area
PTTEP Sabah 42.0% • Drill 4 development wells in 1H 2020
(Operator)
• PFLNG2 sail-away from Samsung shipyard, Korea, arrive and moor-up at final location in Q1 2020
Expected Full Capacity (100%)
• Tie-in wells to subsea manifolds. Pull in dynamic riser to the PFLNG2 in Q2 2020
Gas 270 MMSCFD
• First gas targeted in Q3 2020
10
Malaysia Exploration Projects
Exploration project in 3 Clusters
Arthit
Sabah H
Bongkot
JDA
Sabah K
PM415
SK417
SK410B Sabah
Peninsular SK438
PM407 MLNG
SK405B complex
11
Malaysia Exploration Projects
Top 10th World Discovery in Lang Lebah Exploration Well – Block SK410B
Nour-1 ST Tuk-1
Wood Mackenzie, Aug 19
Brulpadda- Kali Berau Dalam-2X Lang Lebah
1AX (RepsolIOGCan) (PTTEP) (ENI)
(TOTAL)
12
Malaysia Exploration Projects
Discovery of Hidden Mountain 3,360m under sea bed
Upsize potential
13
Malaysia Exploration Projects
The most active exploration activity in Malaysia
SK410B SK417
Bongkot
PFLNG2 PTTEP HKO 42.5% PTTEP HKO
(Operator) (Operator) 80%
JDA
Block H
7 Sabah K
PM415 PM407
PM415
7 General Information General Information
SK417 Area 4,117 sq.km Area 6,742 sq.km.
SK410B Block K Sabah Location Shallow water of
offshore Location Shallow water of
offshore
Peninsular Peninsular
PSC March 2019 PSC March 2019
Peninsular PM407
5 SK438
Commencement Commencement
PTTEP’s Investment PTTEP’s Investment
SK405B MLNG
PTTEP HKO 70% PTTEP HKO
complex
(Operator) (Operator) 55%
SK309, 311
SK314A
Sarawak SK405B SK314A SK438
General Information General Information General Information
Status Area 2,305 sq.km. Area 1,975 sq.km. Area 1,462 sq.km.
Location Shallow water of Location Shallow water of Location Shallow water of
Production offshore Sarawak offshore Sarawak offshore Sarawak
Development PSC November 2017 PSC March 2018
Commencement PSC May 2013 Commencement
Exploration Commencement
PTTEP’s Investment PTTEP’s Investment PTTEP’s Investment
x No. of Exploration Well PTTEP Sarawak PTTEP Sarawak PTTEP HKO 80%
(Operator) 59.5% (Operator) 59.5% (Operator)
14
PSC SK410B
Speed up Lang Lebah Development Project
SK417
Exploration
Pearl A
Paprika
A Tetulang Baronai C Lang Lebah Development Strategy
Baronai Deep
Lang Lebah • Supply Gas to MLNG
B14
• 10-15 Years Production Plateau with 2C Resources
SK410B • Accelerate appraisal program in Q2’ 2020
Exploration
• Production Hub for exploration potentials and near-by stranded
gases
Distance
~160 km
50 km
Developing field
Lang Lebah
Exploration
Bintulu MLNG
15
LNG Value Chain Investment : MLNG Train 9
10% Investment by PTT Global LNG
16
01 PTTEP’s Journey in Malaysia
02 Malaysia Overview
18
Thank you and Q&A