Bridge Engineering

No. Phase/Task Methodology Deliverables Reference Independent Tech. Reviews Generic Q.C. Staff Assigned
Manuals Procedure Document
1. Familiarisation Review RFP/RFQ reports, -Recommendation N/a Review Check List Initials Project Manager, Engineer
(pdr, jr, condition survey, Request for
Design criteria, inspection) additional data (if
project data required)
2.1 Data Collection Survey, hydrology report, - Review of past Rehabilitation, Review Check List Initials Project Manager, Engineer,
environmental constraints, data / information Coating, Establish sufficiency of Technicians
navigational requirements, - Request for Cathodic data / recommendations
foundation report, bridge additional data (if Protection and
condition survey, required) Inspection
inspection, traffic geometry, Manuals
past drawings, structural
history including the past
rehabilitation
2.2 Field Field inspection of existing -Record of field -Structural Review Check List. Initials Engineer, Technicians
Investigations structures and related measurements. Inspection
measurements -Condition report. Manual,
-Request for -Temporary
additional Conditions
investigation if Manual,
required -Occupational
Health and
Safety Manual

3.1 External Correspondence, meetings, -Minutes Ensure adequate Initials Project Manager
Stakeholder -Records consultation / approvals
Consultation -Approvals obtained
(MTO, other
agencies, public,
etc.)
4.1 Conceptual Assess adequacy of Conceptual GA -Bridge code Check to ensure that the Initial Engineer, Technician
design highway and/or structure Drawing -Rehabilitation layout meets Activity
horizontal and vertical Manual requirements check list
alignments and clearances, -Preliminary
Traffic safety, cost, Design
aesthetics and meeting Report
environmental requirements. -Design criteria
Structural
Manual
-Planning
Guidelines
No. Phase/Task Methodology Deliverables Reference Independent Tech. Reviews Generic Q.C. Staff Assigned
Manuals Procedure Document
4.2 Design -Evaluate alternatives Report / -Bridge code -Ensure that MTO -Initials Project Manager, Engineer
Alternatives/ -Select preferred alternative Documentation Rehabilitation requirements are met. -Activity
Recommendatio -Prepare documentation. Design criteria Manual Check List
n Preliminary GA -Preliminary
Drawing Design Report
-Design Criteria,
-Structural
-Financial
Analysis Manual
4.3 Structure Layout Develop detailed design, Final GA drawings -Bridge code Ensure that layout and Initials Engineer
& Drawings structural configuration Rehabilitation configuration meet Activity
(Geometry, Material, Manual requirements Check List
Structural Articulation) -Preliminary
Design Report
-Design Criteria
-Structural
Manual
4.4 External Agency Correspondence, meeting Correspondence, Ensure all required Initials Project Manager
Approval Minutes, Approval approvals obtained Activity
documents Check List
5.1 Technical Reports /or Check List Initials Project manager, team leader
Reports recommendations Activity
(Design Report Check List
Rehabilitation
Report, Condition
Survey Report,
Inspection report)
Milestone Quality Review No. 1 Audit Memo/Report Review Procedures Memo/Report
& Checklists

6.1 Design -Evaluate load capacity, -Drawings -Bridge code Check Design Initials Design Engineer
Assessments -Design structural -Calculations Calculations for Activity
Components sheets accuracy. Check List
6.2 Staging/detours -Develop staging -Drawings Check for alignment, Initials Engineer, Technicians
-Integration with other clearances, traffic Activity
work. access requirements Check List
6.3 Constructability Confirm constructability Ensure constructability Initials Senior Construction
Review Activity Administration staff, Senior
check list Technician
6.4 Utility -Identify existing utilities -Utility Relocation Check relocation plan Initials Engineer, Technician
Relocations -Prepare Relocation Plan Plan to ensure that it meets Activity
-Utility Relocation requirements check list
No. Phase/Task Methodology Deliverables Reference Independent Tech. Reviews Generic Q.C. Staff Assigned
Manuals Procedure Document
Order
6.5 Bridge/Design, Sight distances Roadside safety Check safety elements Initials Engineer, Technician
Roadside safety Alignments documentation and integrate in bridge Activity
Hazards/ protection design. check list
Slope flattening, etc.
Milestone Quality Review No. 2 Audit Memo/Report Review Procedures Memo/Report
& Checklists
6.6 Contract Project Drawings, Standard Contract drawings Layering format Check all contract Initials Senior Technician,
Drawings details, Existing Structure Mylars & Digital Autocad Stds. drawings for Activity Design Engineer
Removal, Staging, OPSD, Structural conformance & Check List
Standards accuracy -All
drawings
signed /
stamped.
6.7 Contract -Electronic or Manual Calculations CDED Manual Mathematical check as Initials Technician,
Quantity Takeoffs Ops Spec., required. Activity Design Engineer
Calculations -Volume/Linear area / Mass Roadside Safety Computer takeoffs check list
Calculations Manual,
-Lump sum items Rehabilitation
Manual,
Estimating
Manual
Milestone Quality Review No. 3 Audit Memo/Report Review Procedures Memo/Report
& Checklists

7.1 Clearances and -Correspondence Check that all approval Initials Project Manager, Engineer
Approvals -Meeting Notes, requirements complete Activity
Approval check list
Documents
8.1 Final Contract -Q-sheets Tender & Special CPS Complete contract Activity Senior Technician, Engineer,
Tender -Tender, Provisions CDED Manual review check list
(c.p.s.) -Standards, Construction Cost OPSS Review by
-Specifications Estimate ERS geotechnical &
-Special Provisions Foundation hydrology,
-Hico and project specific traffic electrical staff
Milestone Quality Review No. 4 Audit Memo/Report Review Procedures Memo/Report
& Checklists
No. Phase/Task Methodology Deliverables Reference Independent Tech. Reviews Generic Q.C. Staff Assigned
Manuals Procedure Document
9.1 Design Turn RFP/RFQ Requirements Contract Drawings MTO Directive Check list Activity Project Manager,
Over Construction for design turn Check all RFP/RFQ check list Engineer, Technician
Specifications over requirements complete

10.1 Construction Adjustments to Design / -Turn Over Ensure all adjustments Memo Project manager, Technician,
Liaison Details or Clarifications. Requirements completed Engineer
-Clarification /
-Site monitoring, Confirmation
-Review of shop drawings Memo
and sketch
Milestone Quality Review No. 5 Audit Memo/Report Review Procedures Memo/Report
Checklists