METHOD DOCUMENT

5 Panel Attach Label


Style Product Operation Date Approved by:
Boxer to yoke
Operation
SAM 0.13 Machine Needle SPI
No. 07 B/T
Work Aids Attachments:

Previous Operation: Inseam Attach Sequence of Parts


Receive Ascending

Following Operation: Cleaning


Send Ascending

Bundle Handling before Operation Hand Used Frequency


1. Grasp the brief bundle. BH 1/65
2. Untie the bundle. BH 1/65
3. Place it on the right side of m/c table. BH 1/65

Operation Method
1. Pick up the brief from RH and simultaneously dispose previous from LH. RH - LH 1/1
2. LH reaches to grasp the brief for leg bartack. LH 1/1
3. Bartack done on first leg seam. BH 1/1
4. Stop the m/c and align brief for bartack at second leg. BH 1/1
5. Bartack completed on the second leg. BH 1/1
6. Dispose brief on the left side of the m/c table. LH 1/1

Bundle Handling after Operation


1. Collect all pcs from the table and tie the bundle. BH 1/65
2. Dispose the bundle on the centre table. BH 1/65
RH 1/65
Seam Diagram

Operation Diagram Operation Layout

Cen
ter
Tabl
e M/C

Pick Up Brief Dispose

Operator

Texport Industries Limited KSA Technopak


48
48
64
16
48
48
32
32
32
368 1.5 552
96
456