Professional Documents
Culture Documents
lower Raise lower Raise lower Raise Extend Retract Left Right
Luffing Telescoping
Main Winch Aux. Winch Swing
Main and Aux. Winch 4 pieces main relief Swing main relief
main relief Retract second relief pressure :25mpa
pressure :14mpa pressure :28mpa
pressure :22mpa
5 Luffing pressure : Luffing raising pressure :idling 18mpa, High speed :22mpa
6 Winch pressure: Independent Hoist pressure : idling 8mpa. High speed :17mpa
10 Slewing clearance:3mm-5mm
18 50tons crane ,only if the boom length is 18.9m~19.5m, you can switch
telescopic cylinder 1# and cylinder 2#
10 (aux) hoist down relief valve 21 3-way flow valve- 1st valve core
relief valve
F13 lamplet
电磁气阀
ECM---Relay---
electropneumatic valve--
-Butterfly valve
Take out the sensor ,and move the floater from uppermost position to lowest
position ,and the resistance should vary from 180Ω to 10Ω
Take out the sensor from gear box ,disconnect the wire and rotate the shifting
fork of sensor ,then you use tester to measure the resistance ,which should
alternate between 0--- infinite Ω
Take out the sensor , and disconnect one wire from sensor ,and to ground it
instantaneously , the pointer of gauge vary from 0Mpa to 0.5Mpa, it is normal
To Gauge
To Alarm