KJO-3411-03X

AL-KHAFJI JOINT OPERATIONS

APPD.

AM
AM

AM
CERT.

NM
NM

NM
CHKD.

MV
MV

MV Vendor’s Name : Saudi Valves Manufacturing Co. Ltd.


ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

COMPANY Name : Al-Khafji Joint Operations


ISSUED FOR APPROVAL

Purchaser Name : JGC Gulf International Co. Ltd


DESCRIPTION

Plant Location : Al-Khafji


Project Name : Global Gas & NGL Recovery and Handling Project
Purchase Order No. : G-K092-0-P-216G-312-A10
Equipment/Material No. : Fire Water Service Valves
Document Title : Hydro Test Procedure QCL Reviewed Code-B
Vendor’s Document No. : HT-312-A10-8 - Please see comments at page-2.
- Please re-submit along with CRS
HQ824PC09

HQ824PC09

HQ824PC09

- Vendor to Submit Next Revision as


JO/EWO

GLOBAL GAS & NGL RECOVERY AND HANDLING PROJECT


Rev. 3 - Issued for Construction.
JGC GULF REVIEW STATUS
Nazeer
Nazeer

24th May, 2018 Nazeer

ISSUE PURPOSE TO JGC GULF : FI FA X FC AB


BY

RESULT CODE : A X B C D E
9th May, 2018
17th April, 2018

NEXT STATUS : FI FA X FC AB NA
DATE

RESUBMISSION DATE : 10-June-2018


RESP. DEPT./PERSON : QCL / MH
REVIEW DATE : 05-June-2018
NO

0
1

COMPANY REVIEW STATUS

REVISIONS ISSUE PURPOSE TO COMPANY : FI FA FC AB


DRAWN RESULT CODE : A B C D E

BY…………………… REVIEW DATE : 24th May, 2018

DATE……………..... A: Approved without Comment; B: Approved with Minor comment ; C: Revise & Resubmit
; D: Not Approved ; E: No Subject to Review
CHKD BY…………….

Approval or review hereunder shall not be construed to relieve Supplier / Subcontractor of


his responsibilities and liability under the Contract.
OPR'G DEPT
JGC GULF JOB No. G-K092-00-0000
BY……………………
ORIG. PURCHASE ORDER NO. SERIAL REV. TOTAL SHEETS
DATE……………...... JGC GULF DOC. NO.
V-216G-312-A-708 2 5
ENG. DEPT

BY……………………

DATE……………......
APPD. FOR. CONSTR

BY…………………… As per 04-SAMSS-048


DATE……………......
CERTIFIED
All steel valves NPS 6" and larger shall be pressure tested in a horizontal
BY……………………
position, i.e., with stem in vertical position.
DATE……………......

NOTE : THIS PRINT IS


OF A CONFIDENTIAL
NATURE AND IS THE
PROPERTY OF JGC
GULF INTERNATIONAL
CO. LTD. AND SHALL
NOT BE TRACED.
PHOTOGRAPHED,
PHOTOSTATED OR
REPRODUCED IN ANY
MANNER,NOR USED
FOR ANY PURPOSE
WHATSOEVER EXCEPT
BY WRITTEN
PERMISSION OF JGC.
Doc. No. : AVK:TP 00.01 Iss. : 7 Date : 08-05-2016
Prepared by : MV Approved By : BB. Page-1/3

Purpose : This procedure covers the hydrostatic pressure testing activity of Gate Valves.

Scope : This procedure defines the minimum requirements of testing activity of


Resilient Seated Gate Valves on test bench.

Reference: : API 598, AWWA C509, UL &FM, 04-SAMSS-048

Authority : The AVK Quality Assurance has the authority to change or modify this procedure
Until the final approval from the client/ CSD.

Test Position : 2” to 12” on the Test bench in Horizontal Position and 14” & above with blind flanges in
Vertical position.
All steel valves NPS 6” and larger shall be pressure tested in a horizontal position, i.e., with stem in vertical
position. (Please specify test position for less than NPS 6).

The test bench set up for hydrostatic pressure testing of valves


(as shown in page 3 diagram).

1) Place the Valve ‘V’ on the test bench.

2) Close both ends of the valve ‘V’ by operating hydraulic valve ‘Y’

3) Switch on the pumps and then open valve ‘A’ & ‘E’

Shell Test :

1) Open the valve ‘V’ fully by using hydraulic control valve ‘X’

2) Open valve ‘B’ and close valve ‘C’- fill the valve ‘V’ with water, after filling completely
it rises up and allow water to flow out by operating valve ‘C’ until all air escape out.
Water flows through ‘C’ and drains through the drain spout.

3) Raise the pressure to 2xRWP (500 PSI) the required using pressure regulating valve ‘F’.

4) Clean the external surface of the valve ‘V’ with air, by using air blower.

5) Pressure holding duration according to API 598 - 60 secs for 6" and below,
120 secs for 8" to 12", 300 sec's for 14" and above.

6) Check for pressure drop and any visual leakage in the valve.

7) Drop pressure to zero by closing valve ‘C’.

SEAT TEST - DOWN STREAM:

1) Close valve ‘V’ by using hydraulic valve ‘X’.

2) Allow excess water to drain out completely.


Doc. No. : AVK:TP 00.01 Iss. : 7 Date : 08-05-2016
Prepared by : MV Approved By : BB. Page-2/3

3) Operate valve ‘F’ to raise pressure to 1.5xRWP (375 PSI) the required.

4) Pressure holding duration according to API 598 - 60 secs for 6" and below,
120 secs for 8" to 12", 300 sec's for 14" and above.

5) Clean the external surface of valve ‘V’ with air, by using air blower.

6) Check for pressure drop and visual leakage in the valve.

SEAT TEST –UP STREAM :

1) Close valve ‘B’ and open valve ‘C’

2) Allow excess water to drain out completely.

3) Raise pressure to the required 1.5xRWP (375 PSI) by operating valve


‘F’ (Pressure regulating valve)

4) Pressure holding duration according to API 598 - 60 secs for 6" and below,
120 secs for 8" to 12", 300 sec's for 14" and above.

5) Clean the external surface of valve ‘V’ with air, using air blower.

6) Check for pressure drop and visual leakage in the valve.

7) Drop pressure to zero, by closing valve ‘C’.

8) Open the valve ‘V’ by hydraulic control valve ‘X’

9) Unclamp valve ‘V’ take out the valve and dry it with air blower.

Acceptance criteria : Zero leakage

CALLIBRATION

1. ALL THE GAUGES HAVE A RANGE SUCH THAT THE REST PRESSURE IS WITHIN
20% TO 80% OF THE FULL RANGE.

2. THE GAUGES SHALL BE CALIBRATED BEFORE TESTS AND SHALL BE VALID FOR
SIX MOTNHS.

QC Checks

QC has to do random monitoring of pressure testing to make sure the integrity of testing.
Doc. No. : AVK:TP 00.01 Iss. : 7 Date : 08-05-2016
Prepared by : MV Approved By : BB. Page-3/3

Valve Testing in Horizontal position on Test

bench (Sizes: 2” to 12”)

Pressure Gauge
Valve X & Y
3‐Way Valve

TOP CLAMP
Drain

3‐Way Valve
Needle Valve

Isolation Valves
RESTER

3‐Way Valve

Pump 
Check Valve
1 2
Water Tank

Drawn by MV
Approved by MB

Date 03‐08‐2016
Doc. No. : AVK:TP 00.01 Iss. : 7 Date : 08-05-2016
Prepared by : MV Approved By : BB. Page-4/3

Valve testing in Vertical position with blind flanges

(Sizes: 14” and above)