1 Chapter 2: Phases of a Dredging Project; Page 15 Dredging Phases • Excavation of the in-situ material by – cutter head – draghead – cutting edge of a bucket • Main environmental aspects – Increase of suspended sediments – Mixing of soil layers – Dilution (in case of hydraulic dredging)
Guide 4: Machines, Methods and Mitigation;
2 Chapter 2: Phases of a Dredging Project; Page 15 Dredging Phases • Raising the material – mechanically backhoe, dipper, bucket ladder dredger – hydraulically cutter suction, trailing suction hopper, disc bottom, auger and sweep dredgers • Main environmental aspects – Release of suspended sediments – Loose and mobile spill layers – Density of material – Overflow during loading of hopper or barges Guide 4: Machines, Methods and Mitigation; 3 Chapter 2: Phases of a Dredging Project; Page 16 Dredging Phases • Horizontal transport by – hydraulic pipeline – hopper dredgers – barges – also: trucks or conveyor belts • Main environmental aspects – safety – dilution – spillage – noise and air pollution Guide 4: Machines, Methods and Mitigation; 4 Chapter 2: Phases of a Dredging Project; Page 16 Dredging Phases • Placement or further treatment – reclamation of a site – beach nourishment – wetland creation – relocation on land, in a pit or at sea (underwater) • Main environmental aspects – Occupation of space and surface – Dispersion of the deposited material – Noise and air pollution – Groundwater quality Guide 4: Machines, Methods and Mitigation; 5 Chapter 2: Phases of a Dredging Project; Page 17 Environmental Dredging • Often with normal equipment • Sometimes with adapted procedures • When required, with special tools