You are on page 1of 48

AL-FISH CONSTRUCTION TEL 0911218876 P.O.

BOX 170539 Addis Ababa

PROGRESS STATEMENT No 6

Main Contract
PROJECT : - B+G+7 Mixed Use Building Variation 1
EMPLOYER : - Dejenne Mekonnen Variation 2
LOCATION : - Addis Ababa
CONTRACTOR :- Al-fish Construction
CONSULTANT : -Bitalico Consulting A & E plc 15% VAT
TOTAL SUM

According to the supervisor of the Works the work


Previous payment executed and/or materials supplied up to date is:
No Date Net Payment VAT
1 28-Mar-16 517,241.38 82,758.62 Less 0% rebate on -
2 26-Apr-16 957,463.19 153,194.11
3 1-Jul-16 229,071.86 36,651.50 Executed amount
4 Aug-5-16 341,004.99 54,560.80
5 oct-24-16 356,354.83 57,016.77
6
7 Deductions:- Amount
8 (Birr)
9 1. Total Previous payment 2,401,136.25
10
11 2. Retention 5% on: 184,511.77
12
3. Advance repayment- 20% 738,047.06
Total 2,401,136.25 384,181.80
Total Deduction 3,323,695.07
Net sum due to Contractor

VAT PAYMENT

Amount of advance Birr (including VAT) 1,270,000.00 Total executed amount


Amount of advance taken Birr 1,270,000.00 Total 15% VAT
Amount of advance repaid Birr 738,047.06 Previous VAT payment

Outstanding advance repayment Birr 531,952.94 Net VAT payable on this certificate

Total payment to the Contractor including 15%


VAT

We certify that the Contractor is entitled to the sum of Birr:


Four Hundred Tweenty One Thousand One Hundred Ninty Eight Birr and
64/100 Cents.

Date: December 5, 2016

_____________________ ________________________
Certified By Approved By
X 170539 Addis Ababa

No 6

Amount (Birr)
5,522,035.00

828,305.25
6,350,340.25

Amount (Birr)

3,690,235.30

3,690,235.30

3,323,695.07
366,540.23

2,952,188.24
442,828.24
384,181.80

58,646.44

425,186.67

413,371.60
11,815.06
entitled to the sum of Birr:
Thousand One Hundred Ninty Eight Birr and

_____________________ ________________________
Certified By Approved By
Project :- B+G+7 Mixed Use Building
Employer :- Dejenne Mekonnen
Location :- Addis Ababa
Contractor :- AL-FISH CONSTRUCTION
CONSULTANT :- Bitalico Consulting A E plc

SUMMARY SHEET - No. 6


EXECUTED AMOUNT

ITEM DESCRIPTION CONTRACT PREVIOUS THIS PAYMENT TODATE

A. SUB STRUCTURE

1 Excavation and Earth Works 783,966.00 787,759.25 - 787,759.25

2 Concrete Works 1,154,194.00 1,023,456.68 - 1,023,456.68

Total A 1,938,160.00 1,811,215.93 - 1,811,215.93

B SUPER STRUCTURE

1 Concrete Works 3,373,661.00 1,390,299.07 488,720.31 1,879,019.38

2 Masonry Works 35,063.00 -

3 Water Proofing Works 175,151.00 -

Sub Total B 3,583,875.00 1,390,299.07 488,720.31 1,879,019.38

Grand Total "A+B" 5,522,035.00 3,201,515.00 488,720.31 3,690,235.30

_____________________ __________________________
Contractor Consultant
Project :- B+G+7 Mixed Use Building
Employer :- Dejenne Mekonnen
Page 4 of 3
Location :- Addis Ababa
Contractor :- AL-FISH CONSTRUCTION
CONSULTANT :- Bitalico Consulting A E plc

CERTFICATE OF MEASUREMENT-No.4
contract Previous excuted This period excuted Total cumulative
Item No Description Unit Unit price
Quantity Amount Quantity Amount Quantity Amount Quantity Amount
A. SUBSTRUCTURE
1. EXCAVATION AND EARTH WORK
- - - -
Clear of the site to remove top soil to an average depth of 460.63 9,212.55
1.1
20cm. m2 20.00 413.72 8,274.40 - 460.63 9,212.55
Bulk Excavation in ordinary soil to reduce level from the natural 690.94 82,912.98
1.2
ground level to a depth not exceeding 150cm . m3 120.00 620.58 74,469.60 - 690.94 82,912.98
Bulk excavation in ordinary soil to reduse level from 150cm to 681.73 109,076.63
1.3
300cm. m3 160.00 620.58 99,292.80 - 681.73 109,076.63

Trench excavation in ordinary soil to a depth up to 50cm from - -


1.4
reduced level . m3 160.00 51.00 8,160.00 - - -

pit excavation for isolated footing in ordinary soil from reduced - -


1.5
level to a depth not exceeding of 100cm. m3 160.00 693.00 110,880.00 - - -

Back fill around foundation with non expansive geranilra selcted


1.6 material from quarry west and well compacted in layer of 372.99 52,218.55
200mmby spriking water to ensure a proctor density of 95%
m3 140.00 683.50 95,690.00 - 372.99 52,218.55

Back fill under hard core with non expansive granular selected
1.7 material from quarry west and well compacted in layer of - -
200mm by sprinkling water to ensure a protor density of 95%.
m2 140.00 413.72 57,920.80 - - -

1.8 care away all surplus excavated soil. 1,437.80 172,535.51


m3 120.00 2,068.54 248,224.80 - 1,437.80 172,535.51
25cm thick basailtic or equivalent stone approved by the
1.9 consultant hard-core well rolled consolidated and blinded with - -
crushed stones. m2 110.00 413.72 45,509.20 - - -
1.10 40cm fill around retaining wall with 0.4 aggregate m3 140.00 37.14 5,199.60 - - - - -

1.11 30cm fill around retaining wall with 0.3aggregate - -


m3 140.00 27.86 3,900.40 - - -
1.12 500cm granular fill around retaining wall m3 120.00 220.37 26,444.40
- - - - -
Bulk excavation for septick tanck ,Lift & boundry m3 282.70 339.90 96,090.73 - 339.90 96,090.73
cart away m3 308.40 339.90 104,826.25 - 339.90 104,826.25
demolishing of concrete ls 38,854.70 1.00 38,854.70 - 1.00 38,854.70
protection for perifery m2 253.44 481.50 122,031.36 - 481.50 122,031.36

- - - - -
Total Carried to Summary………………… 783,966.00 4,806.39 787,759.25 - 787,759.25

2. CONCRETE WORK

2.1 5cm think lean concrete in c-5,360kg cement/m3 under :

a) Mat foundation m2 60.00 - 803.42 48,205.13 - 803.42 48,205.13


b) Lift shaft foundation m2 60.00 - - - - - -
a) Footing m2 60.00 277.45 16,647.00 -
b) Basement beams m2 60.00 37.25 2,235.00 - - - - -
c) Masonery walls m2 60.00 42.50 2,550.00 - - - - -
d)Basement floor m2 60.00 413.72 24,823.20 - - - - -

Reinforced concreted in c_25 ,360kg cement/m3 filled in to


2.2 formworks and vibrated around rod reinforcement .steel
and formworks measured separately.
- - - - -
a) Mat foundation. m3 525.00 - 367.15 192,754.61 - 367.15 192,754.61
b) Retaining wall. m3 525.00 - 34.99 18,371.92 - 34.99 18,371.92
c) Basement columns. m3 525.00 28.05 14,726.25 18.47 9,694.36 - 18.47 9,694.36
h) Lift shaft m3 525.00 30.76 16,149.00 11.53 6,052.64 - 11.53 6,052.64
i) Stair case m3 525.00 2.73 1,433.25 3.64 1,911.36 - 3.64 1,911.36
Ramp m3 525.00 14.70 7,717.40 - 14.70 7,717.40
a) Footing pads m3 525.00 281.46 147,766.50 - - - - -
b) Foundation columns m3 525.00 10.13 5,318.25 - - - - -
d) Grade beams m3 525.00 14.20 7,455.00 - - - - -
e) Ground floor slab m3 525.00 361.22 189,640.50 52.12 27,363.42 - 52.12 27,363.42
f) Ground floor beams m3 525.00 14.90 7,822.50 21.03 11,042.70 - 21.03 11,042.70
g) 1st Basement slab m3 525.00 413.72 217,203.00

2.3 provid,cut and fix in position sawn zigba formworks:


- - - - -
a) Mat foundation. m2 280.00 - 80.51 22,542.24 - 80.51 22,542.24
b) Retaining wall. m2 280.00 - 488.39 136,750.38 - 488.39 136,750.38
a) Footing pads m2 280.00 284.11 79,550.80 -
b) Foundation columns m2 280.00 68.16 19,084.80 -

_____________________ __________________________
Contractor Consultant
Project :- B+G+7 Mixed Use Building
Employer :- Dejenne Mekonnen
Page 5 of 3
Location :- Addis Ababa
Contractor :- AL-FISH CONSTRUCTION
CONSULTANT :- Bitalico Consulting A E plc
Item No Description Unit Unit price
Quantity Amount Quantity Amount Quantity Amount Quantity Amount
c) Basement columns. m2 280.00 215.58 60,362.40 103.62 29,012.42 - 103.62 29,012.42
d) Gread beam m2 280.00 113.60 31,808.00 - - - - -
e) Ground floor slab. m2 280.00 361.22 101,141.60 356.39 99,789.75 - 356.39 99,789.75
f) Ground beams. m2 280.00 156.45 43,806.00 145.35 40,696.82 - 145.35 40,696.82
h) Lift shaft. m2 280.00 122.30 34,244.00 116.46 32,608.80 - 116.46 32,608.80
i) Sides and soffites of stair case and landing. m2 280.00 13.27 3,715.60 26.05 7,293.22 - 26.05 7,293.22
Ramp m2 280.00 93.85 26,279.12 - 93.85 26,279.12

steel reinfocement according to drawing price shall including


2.4 cutting bending,placing in position and using tying wires and
spacers.
- - - -
a) Dia 6mm.deformed bar. kg 4.60 - - - - - - -
b) Dia. 8mm. Deformed bar. kg 4.60 3,265.00 15,019.00 1,485.22 6,832.03 - 1,485.22 6,832.03
C) Dia .10mm.ditto. kg 4.60 2,936.00 13,505.60 7,535.82 34,664.79 - 7,535.82 34,664.79
d) Dia 12mm.ditto. kg 4.60 2,105.00 9,683.00 7,000.90 32,204.15 - 7,000.90 32,204.15
e) Dia.14mm ditto kg 4.60 2,175.00 10,005.00 11,608.13 53,397.38 - 11,608.13 53,397.38
f) Dia. 16mm.ditto. kg 4.60 3,165.00 14,559.00 4,600.01 21,160.03 - 4,600.01 21,160.03
g) Dia. 20mm.ditto kg 4.60 11,769.00 54,137.40 17,805.89 81,907.08 - 17,805.89 81,907.08
h) Dia. 24mm.ditto. kg 4.60 2,131.00 9,802.60 16,348.90 75,204.94 - 16,348.90 75,204.94
Total Carried to Summary………………… 1,154,194.25 69,122.54 1,023,456.68 - - 69,122.54 1,023,456.68

3. MASONRY WORK -

Construct 50cm think basaltic or equivalent ston approveed by


3.1 the consultant masonry foundation bedded and jointed in
cement and sand mortar(1.4)
m3 550.00 63.75 35,062.50 - - -
Total Carried to Summary………………… 35,062.50 - - -

4. WATER PROOFING WORKS -


3.1 Damp proof membrane around retaining wall. m2 200.00 526.26 105,252.00 - - -
3.20 Sloted dia 200 PVC perforated pipe around retaininge wall m2 90.00 104.21 9,378.90 - - -
3.30 10cm HCB around retaining wall. m2 115.00 526.26 60,519.90 - - -
- - - -
Total Carried to Summary………………… 175,150.80 - - - - -

B. SUPERSTRUCTURE
1. CONCRETE WORK

Reintorced concrete in class C- 25 ( with a 28- day 15cm


cube crushing strength of 25MPa), cast in to formwork
1.1
&reinforcement bars are measured separately ) in Type of
cement to ordinary portland cement (OPC)

a) Elevation column. m3 525.00 129.24 67,851.00 42.34 22,228.50 36.48 19,154.10 78.82 41,382.60
b) Sides and soffites of stair case and landing . m3 525.00 24.54 12,884 7.61 3,995.25 5.10 2,677.50 12.71 6,672.75
c) Beams. m3 525.00 121.51 63,793 53.01 27,830.25 35.76 18,774.95 88.77 46,605.20
d) Ribbed slab m2 300.00 3,077.60 923,280 592.42 177,726.00 302.31 90,693.51 894.73 268,419.51
e) Solid slab (18cm thick) m2 125.00 69.25 8,656 21.20 2,650.00 3.60 449.81 24.80 3,099.81
f) Top tied beam m3 525.00 21.01 11,030 - - - - -
g) Roof slab m3 525.00 7.71 4,048 - - - - -
h) Lift shaft m3 525.00 276.12 144,963 20.34 10,678.50 9.89 5,191.67 30.23 15,870.17

1.2 Provide, cut and fix in position sawe zigba formworks to ;-


- - - - -
a) Elevation clumn. m2 280.00 1,584.00 443,520.00 317.01 88,762.80 165.79 46,420.92 482.80 135,183.72
b) Sides and soffites of stair case and landing . m2 280.00 119.43 33,440.40 59.61 16,690.80 25.32 7,089.04 84.93 23,779.84
C) Ribbed slabs m2 280.00 3,077.60 861,728.00 780.96 218,668.80 473.17 132,487.60 1,254.13 351,156.40
d) Solid slab m2 280.00 384.70 107,716.00 45.51 12,742.80 18.29 5,121.20 63.80 17,864.00
e) Top tied beam m2 280.00 220.50 61,740.00 78.43 21,960.96 - 78.43 21,960.96
f) Roof slab m2 280.00 51.39 14,389.20 - - - - -
h) Lift shaft m2 280.00 572.00 160,160.00 187.87 52,603.60 111.83 31,313.52 299.70 83,917.12
additonal work solid slab m2 280.00 55.81 15,625.40 - 55.81 15,625.40

Steel reinforcement according to drawing. Price includes,


1.3
bending , Placing in position and tying wires
- - - - -
a) Dia. 6mm deformed bar kg 4.60 5,915.00 27,209.00 910.46 4,188.12 146.52 673.99 1,056.98 4,862.11
b) Dia. 8mm. Deformed bar. kg 4.60 8,882.56 40,859.78 8,379.39 38,545.19 3,440.46 15,826.11 11,819.85 54,371.30
c) Dia. 10mm. Deformed bar kg 4.60 14,282.50 65,699.50 3,225.62 14,837.85 1,319.74 6,070.80 4,545.36 20,908.65
d) Dia 12mm.ditto kg 4.60 11,956.25 54,998.75 4,710.47 21,668.16 3,774.11 17,360.89 8,484.58 39,029.05
e) Dia 14mm.ditto kg 4.60 4,796.25 22,062.75 5,143.62 23,660.65 3,476.64 15,992.53 8,620.26 39,653.18
f) Dia 16mm. Ditto . kg 4.60 6,060.00 27,876.00 22.26 102.40 279.04 1,283.59 301.30 1,385.98

_____________________ __________________________
Contractor Consultant
Project :- B+G+7 Mixed Use Building
Employer :- Dejenne Mekonnen
Page 6 of 3
Location :- Addis Ababa
Contractor :- AL-FISH CONSTRUCTION
CONSULTANT :- Bitalico Consulting A E plc
Item No Description Unit Unit price
Quantity Amount Quantity Amount Quantity Amount Quantity Amount
g) Dia 20mm. Ditto. kg 4.60 46,903.75 215,757.25 28,199.01 129,715.45 14,432.00 66,387.19 42,631.01 196,102.63
g) Dia 24mm. Ditto. kg 4.60 - 2,233.50 10,274.10 1,250.30 5,751.40 3,483.80 16,025.50
Total Carried to Summary 3,373,661.13 915,155.58 488,720.31 1,403,875.88

_____________________ __________________________
Contractor Consultant
Project :-B+G+7 Mixed Use Building
Employer :- Dejenne Mekonnen
Location :- Addis Ababa
Contractor :- AL-FISH CONSTRUCTION
CONSULTANT :- Bitalico Consulting A E plc

Summary of re-bar quantity


Qty
Sn. Description Unit
Dia. 6 Dia. 8 Dia. 10 Dia. 12 Dia. 14 Dia. 16 Dia. 20
B.SUB-STRUCTURE
2 THIRD FLOOR
2.3 Column m 1,995.00 1,056.00
2.4 Stair case m 344.12 - 74.16 84.96 244.80
2.5 lift saft m 2,115.16 426.00 352.00
2 FOURTH FLOOR
2.1 beam m 5,720.10 23.80 3,446.46 88.87 176.72 3,685.82
2.2 slab m 660.00 650.80 - 729.50 2,275.80 - 511.40
Sub-total 660.00 8,710.02 2,138.96 4,250.12 2,875.63 176.72 5,850.02

Unit Weight kg/m 0.22 0.40 0.62 0.89 1.21 1.58 2.47

Total Weight kg 146.52 3,440.46 1,319.74 3,774.11 3,476.64 279.04 14,432.00

_____________________ _______________________
Contractor Consultant
Project :-B+G+7 Mixed Use Building
Employer :- Dejenne Mekonnen
Location :- Addis Ababa
Contractor :- AL-FISH CONSTRUCTION
CONSULTANT :- Bitalico Consulting A E plc

Dia. 24

352.00

-
-
352.00

3.55

1,250.30

_____________________ _______________________
Contractor Consultant
T D R Description T D R Description
B. SUPER STRUCTURE 1 0.20 beam
1) C-25 CONCRETE WORK 4.20
1.1 (a) Elevation Columns 2.00
Second Floor Elevation Columns
1.68 m3
sec2-2
Column type C-1
Total Number=5 1 4.01 soffit
size= 0.40m*0.80m 1.50
5 0.80 0.16
0.40 location 0.96 m3
3.27 (A,2) (A,1),(C',1'') (A',2') (A'.1'')
5.23 m3 10 1.50 riser

Column type C-2 0.17


Total Number=4 0.15
size= 0.30m*0.70m 0.38 m3
4 0.70
0.30 location 5.10 m3 Sub-total 2.2 (e)
3.27 (A/3,B/1'',B/3,B,1 A',3'
2.75 m3
Column type C-3
1.1 (h) Lift Shaft
Total Number=7
Lift shaft
size= 0.40m*0.90m
7 0.90 1 4.60 W-1/1
0.40 location 0.20
3.27 (B/2,D'/2',C/2,C'/2',D/2,E/3' & E/2) D/3' 3.57
8.24 m3 3.28 m3
Column type C-2 2 0.75 dduct for door
Total Number=1 0.20
size=0.4*0.9 3.57
1 0.40 1.07 m3
0.90 location 3 1.85 W-1/2

3.27 (C,3)' 0.20


1.18 m3 3.57

Column type C-2 3.96 m3


Total Number=1 2 1.10 W-1/3
size=0.35*0.9 0.20
1 0.35 3.57
0.90 location 1.57 m3
3.27 (D,3)
1.03 m3
9.89 m3 Sub-total 2.2 (d)
1.1 (d) FOURTH floor ribbed slab
Column type C-2
Total Number=1
size= 0.4*0.8
1 0.40 1 6.70 on axis 3-1
0.80 location 1.32
3.27 (E/3) 8.84 m2
1.05 m3
1 4.03 on axis (3A-2D),(3B-2B)
Column type C-2 4.36
Total Number=1 17.55 m2
size= 2.6*2.9
1 2.60 1 4.55 on axis from(2A-1A),2B-1B)
3.27 location 4.46
(F,A) 20.29 m2
8.50 m3 1 4.80 on axis (3B-2B),(3c-2c)
4.30
Column type C-3 20.64 m2
Total Number=1 1 4.50 on axis (3D-3E),(2D-2E)
size= 2.6*2.9 4.38
1 2.60 19.71 m2
3.27 location
(F,1 1 5.27 on axis from(3E-3F),(2E-2F)
8.50 m3 5.70
30.04 m2
1 3.90 on axis 3F Arc cantiliver
0.62

36.48 m3 Sub-total 2.2 (C) 2.42 m2


1 4.63 on axis (2A-1A),(2B-1B)
1.1 (b) Stair case 3.99
Fourth floor stair case
18.47 m2
sec 1-1 1 2.35 on axis 1A-B cantiliver
1.35
1 3.63 soffit 3.17 m2
1.50 1 6.42 on axis (2B-1B),(2c-lift)
0.16 3.55
0.87 m3 22.79 m2

11 1.50 riser 1 4.48 on axis 2c-lift, 2D-D'


0.17 6.47
0.15 28.99 m2
0.42 m3
1 1.50 landing 1 5.38 on axis 2D-D'&2D-2'c'
3.30 1.68
0.16 9.04 m2
0.79 m3 1 4.88 on axis (2D-2E, 2'c'-3'
5.89
28.74 m2
T D R Description T D R Description

1 3.58 on axis (2E-2F),3' 1 0.30 Additional beam


6.08 0.40
21.75 m2 4.80
0.58 m3
1 4.30 on axis (3'-2'c'),(3'-2')
3.82
16.43 m2

1 5.52 on axis (2'-2'c'),(A'-c')


4.24
23.40 m2 1 0.75 On axis 1b/n ,A&B
1.36
1 11.15 on axis (1''-3') cantiliver 0.30
0.90 0.31 m3

Contractor________________ Consultant___________________
10.04 m2
1 0.70 beside lift
0.30
0.10
0.02 m3

302.31 m2 Sub-total 1.1 (d) 1 0.30 On axis 3A-3F


0.20
1.1 Fourth floor Beam
27.40
On axis 3A-3F) 1.64 m3
1 0.60
0.30 1 0.30 On axis 3-1 cantiliver
26.90 0.20

4.84 m3 2.45

0.15 m3

On axis2A-2F 1 0.30 on axsis 1''-3'


1 0.60 0.20
0.30 13.80
26.90 0.83 m3
4.84 m3 1 0.20 on axsis D'
On axis(1A-1B) 0.30
1 0.40 2.25
0.30 0.14 m3
4.45 1 0.20 on axsis 1A-B
0.53 m3 0.30
4.40
On axis b/n A 0.26 m3
1 0.30 1 0.20 in front of lift
0.40 0.30
6.35 4.00
0.76 m3 0.24 m3
1 0.30 on axsis F
1 0.30 On axis B 0.30
0.60 6.00
11.45 0.54 m3
2.06 m3

1 0.60 On axis C
0.30
10.30
1.85 m3

1 0.60 On axis D
0.30
11.37 35.76 m3 Sub-total 1.1 (c)
2.05 m3

1 4.6 solid Slab


1 0.60 On axis 2C-3' 1.55 at the back of lift
0.30 0.15
4.68 1.07 m3
0.84 m3
1 6.20
1.80
1 0.60 On axis 2D-3' 0.15 1.67 m3
0.30 1 9.5
5.50 0.3
0.99 m3 0.30
1 0.60 On axisE 0.86 m3
0.30
10.16
1.83 m3

1 0.60 On axisF
0.30
5.10
0.92 m3 3.60 m3 total

1 0.30 On axis1''-2F
0.60
17.20
3.10 m3

1 0.60 On axisb/n 3'-C'


0.30
9.40
1.69 m3

1 0.60 On axisb/n 2'-D'


0.30
11.10
2.00 m3
1 0.60 On axis 1''-D'
0.30
11.15
2.01 m3

1 0.60 On axisb/n ,C'-2'c'


0.30
4.15
0.75 m3

T D R Description T D R Description
1.2) FORM WORK
1.2 (a) Elevation Columns 1 3.63 Soffit

1.50
Column type C-1 5.45 m2
Total Number=5 2 0.42 Soffit side
5 2.40 size= 0.40m*0.80m 0.20
3.27 0.17 m2
39.24 m2 location
(A,2) (A,1),(C',1'') (A',2') (A'.1'') 25.32 m2 Sub-total 1.2 (b)

Column type C-2

4 2.00 Total Number=4


1.2 (h) Lift shaft
3.27 size= 0.30m*0.70m

Contractor________________ Consultant___________________
26.16 m2 location
(A/3,B/1'',B/3,B,1 A',3' 2 4.60 sw axsis1/3
3.27
30.08 m2
Column type C-2 sw axsis1/3
2 2.60 Total Number=1
3.27 size=0.4*0.9 0.00 m2
17.00
location 6 2.00 sw axsis1/3
(C,3)' (F,A') 3.27
39.24 m2
4 1.85 sw axsis1/1
1 2.40 Column type C-2 3.27
3.27 Total Number=1 24.20 m2
7.85 size=0.4*0.8
location (C,3)
0.00 m2
1 2.30 Column type C-2 4 0.75
3.27 Total Number=1 3.27
7.52 size=0.35*0.8 9.81 m2
location (D,3) 2 1.30
3.27
8.50 m2
Column type C-3
Total Number=7
8 2.60 size= 0.40m*0.90m
3.27 111.83 m2 Sub-total 1.2 (h)
68.02 location
(B/2,D'/2',C/2,C'/2',D/2,E/3' & E/2) D/3' solid Slab
165.79 m2 Sub-total 1.2 (a) near to lift
1 4.60
1.2 (b) Stair Case
1.55
Third floor stair case
7.13 m2
1 6.20
First Flight STEPS 1.80
W=1.5m 11.16 m2

10 0.17 L=0.3m,H=0.15
1.50
2.55 m2

1 4.01 Soffit 18.29 Sub Total


1.50
6.02 m2
2 3.70 Soffit side
0.20
1.48 m2
1 3.30 Landing 1.2 (c) Fourth floor ribbed slab
1.50 1 118.00
4.95 m2 0.30 35.40 m2 Cantiliver side form work
1 1.50 437.77 m2 slab formwork
0.15
0.23 m2
2 4.20 Landing beam 473.17 m2 Sub-total 1.2 (c)
0.20
1.68 m2
1.60
Second Flight STEPS
W=1.5m
11 0.17 L=0.3m,H=0.15
1.50
2.81 m2
T D R Description T D R Description

Contractor________________ Consultant___________________
Contractor________________ Consultant___________________
No of bar

LOCATION Dia Length No bar No M. Total


A. SUPER STRUC
THIRDFLOO

1.1 Third Floor


Column
@level
C1(40X80)
On axis A'1'', C'1'', A1,
A2, & A'2'
main re-bar 24 4.40 16 5 80.00
Stirrup 8 2.50 14 5 70.00
8 2.50 14 5 70.00
8 2.50 14 5 70.00
C2(30X70)
On axis A3,
B1'',B3,C3,D3,E3,A'3'
& F4'
main re-bar 20 4.40 16 8 128.00
Stirrup 8 2.50 14 7 98.00
8 2.50 14 7 98.00
8 2.50 14 7 98.00
C3(40X90)

On axis B2, D'2', C2,


C'2', D2,E3', E2 & F3
main re-bar 20 4.40 14 8 112.00
Stirrup 8 2.50 14 7 98.00
8 2.50 14 7 98.00
8 2.50 14 7 98.00

Total caried to Re-bar summery

Contractor________________ Consultant_________________
1.2 Lift Sahft
@level

W-1/1 (4600x200)
Horizontal re-bar
3 10 4.40 9 2 18.00
10 1.16 12 2 24.00
10 1.06 12 2 24.00
10 1.18 12 2 24.00
Vertical re-bar
2 12 1.50 24 1 24.00
corner (1) 20 4.40 12 2 24.00
20 4.40 16 1 16.00
above the door 14 1.50 12 1 12.00
Stirrup
detail 1-1 10 1.40 36 4 144.00
detail 2-2 10 0.90 36 1 36.00
10 2.00 36 1 36.00
10 0.32 36 4 144.00
W-1/2 (2200x200)
Horizontal re-bar
3 10 2.40 36 6 216.00
Vertical re-bar
2 14 4.00 10 6 60.00
W-1/3(4600x200)
Horizontal re-bar
3 10 4.40 36 2 72.00
Vertical re-bar
2 14 4.00 21 2 42.00
corner (1) 20 4.40 12 2 24.00
20 4.40 16 1 16.00
Stirrup
detail 1-1 10 1.40 36 4 144.00

Contractor________________ Consultant_________________
detail 2-2 10 1.40 36 1 36.00
10 2.00 36 2 72.00
10 0.80 58 8 464.00

Total caried to Re-bar summery


1.3 Stair Case
@level
First flight
Bottom re-bar
20 6.80 12 1 12.00
20 3.80 3 1 3.00
8 1.60 13 1 13.00
Top re-bar
14 3.54 12 1 12.00
12 3.09 12 1 12.00
for riser and trade 8 1.06 6 11 66.00
8 1.60 11 1 11.00
Landing 8 1.60 13 2 26.00
Landing beam
20 4.20 5 1 5.00
20 4.20 2 1 2.00
Stirrup 8 1.50 20 1 20.00
Second flight
Bottom re-bar
20 6.80 12 1 12.00
20 3.80 3 1 3.00
8 1.60 13 1 13.00
Top re-bar
14 3.54 12 1 12.00
12 3.09 12 1 12.00
for riser and trade 8 1.06 6 11 66.00
8 1.60 11 1 11.00
Landing 8 1.60 9 2 18.00
Landing beam

Contractor________________ Consultant_________________
20 4.20 5 1 5.00
20 4.20 2 1 2.00
Stirrup 8 1.50 18 1 18.00

Total caried to Re-bar summery


2. THERD FLO
2.1 FOURTH Floor
BEAM
@level

on axis 3 (300x400)
Top re-bar 20 9.23 2 1 2.00
20 11.60 2 1 2.00
20 7.82 2 1 2.00
Negative re-bar 16 1.73 4 1 4.00
16 3.30 7 1 7.00
20 3.65 6 1 6.00
20 3.66 6 1 6.00
20 3.77 6 1 6.00
20 2.19 7 1 7.00
3.30 7 1 7.00
2.29 9 1 9.00
Bottom re-bar 20 10.15 8 1 8.00
20 5.80 8 1 8.00
20 5.80 8 1 8.00
20 6.08 8 1 8.00
11.50 2 1 2.00
5.80 2 1 2.00
Stirrup
axis a-b 8 1.70 24 1 24.00
axisb-c 8 1.70 29 1 29.00
axisc-d 8 1.70 29 1 29.00
axisd-e 8 1.70 29 1 29.00
axise-f 8 1.70 31 1 31.00

Contractor________________ Consultant_________________
on axis 2 (300x400)
Top re-bar 20 9.01 2 1 2.00
20 11.60 2 1 2.00
Negative re-bar 14 1.73 3 1 3.00
14 3.30 3 1 3.00
20 3.65 3 1 3.00
20 3.66 3 1 3.00
20 2.19 6 1 6.00
20 3.77 3 1 3.00
Bottom re-bar 20 10.15 3 1 3.00
16 10.15 2 1 2.00
20 5.80 3 1 3.00
16 5.80 2 1 2.00
20 5.80 8 1 8.00
14 5.80 1 1 1.00
20 6.08 8 1 8.00
Stirrup
axis a-b 8 1.70 49 1 49.00
axisb-c 8 1.70 38 1 38.00
axisc-d 8 1.70 40 1 40.00
axisd-e 8 1.70 40 1 40.00
axise-f 8 1.70 46 1 46.00

on axis A (400x300)
Top re-bar 20 9.32 8 1 8.00
20 11.60 8 1 8.00
Negative re-bar 20 9.23 4 1 4.00
20 2.52 4 1 4.00
20 2.80 4 1 4.00
16 3.60 2 1 2.00
16 3.30 1 1 1.00
16 2.36 2 1 2.00
Bottom re-bar 14 5.22 6 1 6.00

Contractor________________ Consultant_________________
14 5.56 6 1 6.00
Stirrup
8 1.30 53 1 53.00
8 1.30 45 1 45.00

on axis B (300x600)
Top re-bar 20 10.50 16 1 16.00
20 4.05 2 1 2.00
16 2.10 3 1 3.00
Negative re-bar 20 1.15 6 1 6.00
20 3.20 9 1 9.00
20 3.08 4 1 4.00
20 3.08 10 1 10.00
Bottom re-bar 20 7.60 11 1 11.00
16 1.60 2 1 2.00
Stirrup
8 1.70 65 1 65.00
8 1.70 38 1 38.00

on axis C (300X400)
Top re-bar 20 8.90 2 1 2.00
20 4.80 2 1 2.00
Negative re-bar 20 3.40 7 1 7.00
20 3.40 1 1 1.00
20 4.00 9 1 9.00
20 3.40 8 1 8.00
16 2.60 1 1 1.00
Bottom re-bar 20 7.20 6 1 6.00
20 6.00 6 1 6.00
16 6.00 1 4 4.00
Stirrup
8 1.30 38 1 38.00
on axis C b/n 2'-3'
(300X600)

Contractor________________ Consultant_________________
Top re-bar 20 9.42 6 2 12.00
16 6.50 4 1 4.00
Bottom re-bar 20 8.95 4 2 8.00
16 6.00 4 1 4.00
16 7.00 1 1 1.00
Stirrup
8 1.70 86 2 172.00

on axis D (300X400)
Top re-bar 20 10.52 6 1 6.00
20 4.05 3 1 3.00
Negative re-bar 10 3.40 7 1 7.00
Bottom re-bar 20 8.02 6 1 6.00
Stirrup
8 1.70 112 2 224.00

on axis E (300X400)
Top re-bar 20 10.30 4 1 4.00
20 4.30 4 1 4.00
Negative re-bar 20 4.00 7 1 7.00
20 4.00 7 1 7.00
20 3.08 5 1 5.00
Bottom re-bar 20 6.70 8 1 8.00
20 7.20 8 1 8.00
Stirrup
8 1.30 30 2 60.00

on axis F (300x400)
Top re-bar 20 6.16 3 1 3.00
Bottom re-bar 20 6.16 3 2 6.00
Stirrup
8 1.30 40 2 80.00

Contractor________________ Consultant_________________
on axis A' (300x600)
Top re-bar 20 8.10 8 1 8.00
20 5.92 8 1 8.00
Negative re-bar 20 1.92 3 1 3.00
20 2.90 3 1 3.00
20 3.79 5 1 5.00
20 2.66 7 1 7.00
Bottom re-bar 20 12.24 8 2 16.00
20 6.53 8 1 8.00
16 6.90 1 1 1.00
Stirrup
8 1.70 61 2 122.00
8 1.70 38 1 38.00

on axis 2' (300x600)


Top re-bar 20 4.00 9 1 9.00
20 9.60 9 1 9.00
Negative re-bar 20 2.34 3 1 3.00
20 3.30 2 1 2.00
14 3.30 1 1 1.00
20 1.57 4 1 4.00
Bottom re-bar 20 6.48 6 1 6.00
20 4.20 7 1 7.00
16 6.80 1 1 1.00
Stirrup
8 1.30 22 2 44.00
8 1.30 11 1 11.00
8 1.30 13 2 26.00
8 1.30 7 1 7.00

on axis C' (300x600)


Top re-bar 20 8.40 8 1 8.00
20 9.69 8 1 8.00

Contractor________________ Consultant_________________
16 3.80 3 1 3.00
Negative re-bar 20 1.92 3 1 3.00
20 2.90 3 1 3.00
20 1.58 7 1 7.00
Bottom re-bar 20 8.40 8 2 16.00
20 9.69 8 2 16.00
16 3.80 3 1 3.00
Stirrup
8 1.70 90 2 180.00

on axis 1'' (300x600)


Top re-bar 20 4.00 8 1 8.00
20 9.60 7 1 7.00
Bottom re-bar 20 9.64 7 2 14.00
20 4.93 8 1 8.00
Stirrup
8 1.70 26 2 52.00
8 1.70 46 1 46.00
8 1.70 14 2 28.00
8 1.70 33 1 33.00

on axis B' (300x600)


Top re-bar 20 5.67 8 2 16.00
Bottom re-bar 20 5.67 6 2 12.00
Stirrup 20 1.70 28 2 56.00

on axis 3' (300x400)


Top re-bar 20 4.60 4 1 4.00
Bottom re-bar 20 3.80 8 1 8.00
Stirrup 8 1.70 25 1 25.00

on axis 1 (300x400)
Top re-bar 20 5.50 3 1 3.00
Negative re-bar 20 1.73 2 1 2.00

Contractor________________ Consultant_________________
Bottom re-bar 20 5.20 3 1 3.00
Stirrup 8 1.30 46 1 46.00
on open down
additional beam -
Top re-bar 20 4.20 4 1 4.00
Bottom re-bar 20 4.20 4 1 4.00
Stirrup 8 1.70 21 1 21.00
Additiional mesh on
the open down -
12 3.80 60 1 60.00

-
Ribbed -
axis A,B on 2,3 12 5.72 9 2 18.00
Top re-bar 12 6.12 9 2 18.00
u-bar 8 2.40 116 1 116.00
axis C-D on 2,3 12 7.72 24 1 24.00
Top re-bar 12 8.12 24 1 24.00
u-bar 8 2.40 143 1 143.00
axis D-Eon 2,3 12 7.72 25 1 25.00
Top re-bar 12 8.12 25 1 25.00
u-bar 8 2.40 150 1 150.00
axis E-F on 2,3 12 7.72 25 1 25.00
Top re-bar 12 8.12 25 1 25.00
u-bar 8 2.40 150 1 150.00
axis A-B on 1,2 12 6.42 18 1 18.00
Top re-bar 12 6.82 18 1 18.00
u-bar 8 2.40 107 1 107.00
axis B-C on 1,2 12 6.42 26 1 26.00
Top re-bar 12 6.82 26 1 26.00
u-bar 8 2.40 148 1 148.00
axis D' -C' on 2' -3' 12 4.55 6 1 6.00
Top re-bar 12 4.95 6 1 6.00
u-bar 8 2.40 60 1 60.00

Contractor________________ Consultant_________________
axis C' -A' on 2' -3' 12 7.86 16 1 16.00
Top re-bar 12 8.26 16 1 16.00
u-bar 8 2.40 118 1 118.00
Edge beam on 2-3' -
Top re-bar 12 4.00 20 1 20.00
Bottom re-bar 12 4.40 20 1 20.00
Stirrup 8 2.40 78 1 78.00
Edge beam on A-F -
Top re-bar 12 12.00 2 1 2.00
12 12.00 2 1 2.00
12 5.60 2 1 2.00
Bottom re-bar 12 12.00 2 1 2.00
12 12.00 2 1 2.00
12 6.00 2 1 2.00
Stirrup 8 0.80 114 1 114.00
Edge beam on 1,2,3 -
Top re-bar 12 10.50 2 1 2.00
Bottom re-bar 12 10.95 2 1 2.00
Stirrup 8 0.80 48 1 48.00
Edge beam on 1,2,3 -
Top re-bar 12 12.00 2 1 2.00
12 4.70 2 1 2.00
Bottom re-bar 12 12.00 2 1 2.00
12 5.70 2 1 2.00
Stirrup 8 0.80 84 1 84.00
Edge beam on C' ,D'
,E' -
Top re-bar 12 11.40 2 1 2.00
Bottom re-bar 12 11.00 2 1 2.00
Stirrup 8 0.80 55 1 55.00
Total caried to Re-bar summery
2.2 FOURTH floor
Slab

Contractor________________ Consultant_________________
Additional solid Slab
for tolet ribed Slab 12 3.00 31 1 31.00
for cantiliver ribed
Slab 12 2.50 74 1 74.00
Negative bar on open
down 12 3.60 26 1 26.00
Additional bar on the
lift -
top bar 20 4.00 4 4 16.00
bottom bar 20 4.00 4 4 16.00
Stirrups 8 0.90 4 20 80.00
Beam -
Axis C on 1,2 20 6.30 8 1 8.00
Axis C' on 2',3', 20 6.75 37 1 37.00
Axis C' on ,3', 20 2.25 37 1 37.00
behaind Lift shaft -
Bottom Bar X-axis 12 4.60 15 1 15.00
Y- axis 12 5.10 28 1 28.00
Top Bar X- axis 12 4.70 15 1 15.00
12 2.70 28 1 28.00
retaining wall -
vertical bar 14 2.10 12 1 12.00
horizontal bar 14 5.10 26 1 26.00
Beam
Top Bar 14 3.30 4 3 12.00
Bottom bar 14 3.00 3 3 9.00
Stirrups 8 0.90 21 3 12.00

Contractor________________ Consultant_________________
Dia Dia Dia Dia Dia Dia

6 8 10 12 14 16
A. SUPER STRUCTURE
THIRDFLOOR

175.00
175.00
175.00

245.00
245.00
245.00

245.00
245.00
245.00

- 1,995.00 - - - -

Contractor________________ Consultant_________________
79.20
27.84
25.44
28.20

36.00

18.00

201.60
32.40
72.00
46.08

518.40

240.00

316.80

168.00

201.60

Contractor________________ Consultant_________________
50.40
144.00
371.20

- - 2,115.16 36.00 426.00 -

20.80

42.48
37.08
69.96
17.60
41.60

30.00

20.80

42.48
37.08
69.96
17.60
28.80

Contractor________________ Consultant_________________
27.00

- 344.12 - 74.16 84.96 -


2. THERD FLOOR

6.92
23.10

40.80
49.30
49.30
49.30
52.70

Contractor________________ Consultant_________________
5.19
9.90

20.30

11.60

5.80

83.30
64.60
68.00
68.00
78.20

7.20
3.30
4.72
31.32

Contractor________________ Consultant_________________
33.36

68.90
58.50

6.30

3.20

110.50
64.60

2.60

24.00

49.40

Contractor________________ Consultant_________________
26.00

24.00
7.00

292.40

23.80

380.80

78.00

104.00

Contractor________________ Consultant_________________
6.90

207.40
64.60

3.30

6.80

57.20
14.30
33.80
9.10

Contractor________________ Consultant_________________
11.40

11.40

306.00

88.40
78.20
47.60
56.10

42.50

Contractor________________ Consultant_________________
59.80

35.70

720.00

102.96
110.16
278.40
185.28
194.88
343.20
193.00
203.00
360.00
193.00
203.00
360.00
115.56
122.76
256.80
166.92
177.32
355.20
27.30
29.70
144.00

Contractor________________ Consultant_________________
125.76
132.16
283.20

80.00
88.00
187.20

24.00
24.00
11.20
24.00
24.00
12.00
91.20

21.00
21.90
38.40

24.00
9.40
24.00
11.40
67.20

22.80
22.00
44.00
- 5,720.10 23.80 3,446.46 88.87 176.72

Contractor________________ Consultant_________________
93.00

185.00

93.60

640.00

69.00
142.80
70.50
75.60

352.80
1856.40

39.60
27.00
10.80
660.00 650.80 - 729.50 2,275.80 -

Contractor________________ Consultant_________________
Dia Dia

20 24

352.00

563.20

492.80

1,056.00 352.00

Contractor________________ Consultant_________________
105.60
70.40

105.60
70.40

Contractor________________ Consultant_________________
352.00 -

81.60
11.40

21.00
8.40

81.60
11.40

Contractor________________ Consultant_________________
21.00
8.40

244.80 -

18.46
23.20
15.64

21.90
21.96
22.62
15.33

81.20
46.40
46.40
48.64

Contractor________________ Consultant_________________
18.02
23.20

10.95
10.98
13.11
11.30
30.45

17.40

46.40

48.64

74.56
92.80
36.92
10.08
11.20

Contractor________________ Consultant_________________
168.00
8.10

6.90
28.80
12.32
30.80
83.60

17.80
9.60
23.80
3.40
36.00
27.20

43.20
36.00

Contractor________________ Consultant_________________
113.04

71.60

63.12
12.15

48.12

41.20
17.20
28.00
28.00
15.40
53.60
57.60

18.48
36.96

Contractor________________ Consultant_________________
64.80
47.38
5.76
8.70
18.95
18.62
195.84
52.24

36.00
86.40
7.02
6.60

6.28
38.88
29.40

67.20
77.52

Contractor________________ Consultant_________________
5.76
8.70
11.06
134.40
155.04

32.00
67.20
134.96
39.44

90.72
68.04
95.20

18.40
30.40

16.50
3.46

Contractor________________ Consultant_________________
15.60

16.80
16.80

Contractor________________ Consultant_________________
3,685.82 -

Contractor________________ Consultant_________________
64.00
64.00

50.40
249.75
83.25

511.40 -

Contractor________________ Consultant_________________