You are on page 1of 53

Project : B-HUB (Tower-1)

Project : Phonix B-HUB (TOWER - 1 )

Client : Phoenix Spaces Pvt, Ltd.

Architect : Chapman Taylor Global Architects & Master Planners

Consultants : Designtree Service Consultants Pvt. Ltd.


Subject : Abstract (Electrical Works)
INSTALLATION
S.No. ABSTRACT (ELECTRICAL WORKS) SUPPLY AMOUNT
AMOUNT

1 HT EXTERNAL 6,125,000.00 135,000.00

2 HT INTERNAL 7,173,650.00 646,450.00

3 TRANNSFORMER 21,000,000.00 490,000.00

4 LV PANELS - -

5 BUSDUCT 27,155,700.00 4,563,500.00

6 POWER AND CONTROL CABLES - -

7 LIGHTNING PROTECTION - -

8 CEIG APPROVAL & AS BUILT 2,508,450.00 518,150.00

9 MCB DISTRIBUTION BOARDS 432,900.00 33,500.00

10 SOCKETS 110,750.00 18,500.00

11 SUBMAINS / CIRCUIT MAINS / POWER WIRING 5,290,100.00 1,324,000.00

12 POINT WIRING 1,543,888.00 305,490.00

13 INDOOR LIGHT FIXTURES WITH LAMPS 7,697,520.00 295,900.00

14 SENSORS 61,250.00 1,750.00

15 CABLE TRAYS 4,680,000.00 635,500.00

16 RACE WAYS 26,440.00 11,475.00

17 EARTHING 25,478,650.00 2,295,300.00

18 DG BOQ 88,874,638.00 4,246,690.00

19 MISCELLANEOUS ITEMS (LT SIDE) 2,508,450.00 518,150.00

166,368,736.00 14,767,905.00
EXCLUSIONS:

1 Cost of bringing Grid power to site

2 Deposit / service charges

3 Floor panels and related incoming / outgoing cabling

4 Façade Lighting, Wiring/Cabling & DB's

5 External & Landscape Lighting,wiring/Cabling & DBs

DesignTree Service Consultants Pvt Ltd Page 1 of 53


Project : B-HUB (Tower-1)
6 UPS & associated works

7 EPABX

8 Equipments & wiring for Low voltage equipments such as security system , BMS etc.,

9 Temporary power supply for construction and other activities.

10 Civil works like treches, Trafo HT foundation etc., ( To be considered under civil package)

11 Basement Ventilation Panel & Related Electrical works


12 All Light Fixtures are not included

INCLUSIONS:

1 Electrical scope for PHE works limited to providing cables up to PHE panel Incomer

2 Electrical scope for STP works limited to providing cables up to STP panel Incomer

3 Electrical scope for fire fighting works limited to providing cables up to Fire panel Incomer.

DesignTree Service Consultants Pvt Ltd Page 2 of 53


Project : B-HUB (Tower-1)

HT BOQ
SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
PREAMBLE :

Scope of Work : Whether explicitly mentioned or not, all the works listed in
this document shall be considered as : for supply, installation, testing and
1 commissioning. All the works listed in this document shall be read in
conjunction with relavant drawings, technical specifications accompanying
the tender and this preamble.

Civil works : Unless otherwise specified all major civil works such as cable
2
trench, foundation for HT works are excluded from the scope of work.

Transformers : Vendor shall consider necessary base channels and stoppers


for the wheel with necessary fabrication under Transformer installation
3
work. The wheels shall be provided with 3 mm thick rubber pad to contain
vibration getting transferred to bus ducts or cables.

Fabrication: Vendor shall consider 2 coats of primer and 2 coats of enamel


4 paint - shade and color as approved by Architect / Consultant for all the
fabrication work listed in the document.
5 Approvals.
Vendor shall consider the following under the scope of approvals.
a. Preparation of required drawings for obtaining approvals from CEIG.
b. Preparation of required drawings for obtaining approvals from
Multistoried Building Act.
c. Liasoning with authorities for obtaining power sanction.

d. Liasoning with any statutory body who is a part of clearing the approvals.

e.Obtaining Safety Certificate from CEIG.


f.Outdoor type enclosure with IP 65 rating
6 Prices
Generally the rates offered shall be inclusive of all taxes, duties. i.e.,
customs duty, excise duty, VAT, any other sales tax, entry taxes and service
taxes as applicable.

The bidder shall submit on demand the following split on the total quoted
value for each item to facilitate end user availing exemption of duty
benefits as applicable for software firms / SEZ units.
For all the Panel details refer Power Distribution Schematic Diagram

1.0 HT Works :

33 KV - Ring Main Unit - Outdoor


1.1 Ring Main Unit - 33kV, Oudoor, With Incomer 2nos.VCB of rating 1250A and No 1 2,850,000.00 2,850,000.00 50,000.00 50,000.00
out going 1no of 1250A, 26.2kA, 1000MVA rating VCB Horizontal Draw out
type Breaker.refer distribution scheme for protections and relays.

Metering Cubicle - Outdoor


Supply, Installation, Testing & Commissioning of Tri Vector Meter cubicle
1.2 made of 2mm thick CRCA sheet steel, free standing, outdoor type (IP65) No 1 425,000.00 425,000.00 35,000.00 35,000.00
degree of protection. The outdoor cubicle shall be suitable for mounting Tri
Vector Meter supplied by State Electricity Board. The cost shall also include
the pedstals required for mounting the cubicle. specification as per Local
TSSPDCL norms

33 kV - 3 Module HT Panel - Outdoor


1.3 HT Panel, 33kV, Outdoor, Comprising of One No 1 2,850,000.00 2,850,000.00 50,000.00 50,000.00
Incomer & two outgoings - 33 KV, 1250A, VCB, 26.2kA Horizontal Draw out
type Breaker. refer distribution scheme for protections and relays.

Note:

HT Panel board shall consist of DC supply itself with power pack (power
pack consist of PT which is able to convert AC to DC. This can be used to
supply DC Power to HT Panel) (Batteries shall be SMF type).
VCB and Vaccum Interrupter shall be Motor operated,Horizontal drawout &
Vertical Isolation.
All CTs in the VCB shall be dual core type.
All relays shall be Numeric type and Sutable for BMS compactability.

Total HT Works 6,125,000.00 135,000.00

DesignTree Service Consultants Pvt Ltd Page 3 of 53


Project : B-HUB (Tower-1)
HT BOQ
SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
PREAMBLE :

Scope of Work : Whether explicitly mentioned or not, all the works listed in this
1 document shall be considered as : for supply, installation, testing and commissioning.
All the works listed in this document shall be read in conjunction with relavant
drawings, technical specifications accompanying the tender and this preamble.

Civil works : Unless otherwise specified all major civil works such as cable trench,
2 foundation for HT works are excluded from the scope of work.
Transformers : Vendor shall consider necessary base channels and stoppers for the
wheel with necessary fabrication under Transformer installation work. The wheels shall
3 be provided with 3 mm thick rubber pad to contain vibration getting transferred to bus
ducts or cables.
Fabrication: Vendor shall consider 2 coats of primer and 2 coats of enamel paint -
4 shade and color as approved by Architect / Consultant for all the fabrication work listed
in the document.
5 Approvals.
Vendor shall consider the following under the scope of approvals.
a. Preparation of required drawings for obtaining approvals from CEIG.
b. Preparation of required drawings for obtaining approvals from Multistoried Building
Act.
c. Liasoning with authorities for obtaining power sanction.
d. Liasoning with any statutory body who is a part of clearing the approvals.
e.Obtaining Safety Certificate from CEIG.
f.INDOOR r type enclosure with IP 42 rating
6 Prices

Generally the rates offered shall be inclusive of all taxes, duties. i.e., customs duty,
excise duty, VAT, any other sales tax, entry taxes and service taxes as applicable.

The bidder shall submit on demand the following split on the total quoted value for
each item to facilitate end user availing exemption of duty benefits as applicable for
software firms / SEZ units.
For all the Panel details refer Power Distribution Schematic Diagram

1.0 HT Works :
33 kV - 6 Module HT Panel -Indoor
HT Panel, 33kV, Outdoor, Comprising of One Incomer with 1250A,33kV,VCB & Five
outgoings - 33 KV, 630A, VCB, 26.2kA Horizontal Draw out type Breaker. refer
1.3 distribution scheme for protections and relays. No 1 4,050,000.00 4,050,000.00 50,000.00 50,000.00
Consider All Digital meters & Protection Relays with RS 485 port.

Battery Charger
Supply, Receive, unloading at site, store, erection of 3Phase input and Single Phase
1.4 Output, 110/24V DC, 40A Battery Charger with Float & Boost charging, 100AH, 2 Volts No 1 250,000.00 250,000.00 9,500.00 9,500.00
DC Sealed Maintenance Free Batteries complete with all accessories like insulators,
clamps, bimetal connectors, M.S.support rack etc., as required. (Cable connection
between main pcc panel to battery charger to be included)
Note:
HT Panel board shall consist of DC supply itself with power pack (power pack consist of
PT which is able to convert AC to DC. This can be used to supply DC Power to HT Panel)
(Batteries shall be SMF type).
VCB and Vaccum Interrupter shall be Motor operated,Horizontal drawout & Vertical
Isolation.
All CTs in the VCB shall be dual core type.
All relays shall be Numeric type and Sutable for BMS compactability.

2.0 H.T. Cable

2.1
Supply, Unloading, storage & Laying of following sizes of 3-core, 33kV (E) HT, XLPE cable

2.1.1 33KV 3C - 400 Sq.mm XLPE, Al.(E) Rmt 800 1,675.00 1,340,000.00 340.00 272,000.00

2.1.2 33KV 3C - 300 Sq.mm XLPE, Al.(E) Rmt RO 1,350.00 220.00

2.1.3 33 kV cable route markers. Nos. 20 750.00 15,000.00 150.00 3,000.00

PVC insulated, steel armoured, Copper Conductor Cables(YFY/YRY)


2.1.3 24 C x 2.5 sq.mm Copper Cable Rmt 300 320.00 96,000.00 35.00 10,500.00

2.1.4 12 C x 2.5 sq.mm Copper Cable Rmt 320 195.00 62,400.00 35.00 11,200.00

2.1.5 7 C x 2.5 sq.mm Copper Cable Rmt RO 135.00 15.00

2.1.6 4 C x 2.5 sq.mm Copper Cable Rmt 800 95.00 76,000.00 15.00 12,000.00

2.1.7 4 C x 4.0 sq.mm Copper Cable Rmt 800 100.00 80,000.00 15.00 12,000.00
-
2.1.8 3 C x 2.5 sq.mm Copper Cable Rmt 650 75.00 48,750.00 10.00 6,500.00

2.1.9 3 C x 1.5 sq.mm Copper Sheeldeds Cable Rmt 4000 50.00 200,000.00 10.00 40,000.00
2.2 Cable Termination
Supply and erection of 33kV, E, HT, XLPE cables cable terminations with Al. / Cu. lugs,
double compression type cable glands, PVC insulation tapes and all other accessories as
required.

2.2.1 33KV 3C - 400 Sq.mm XLPE, Al.(E) (Outdoor) No 7 22,850.00 159,950.00 2,500.00 17,500.00

2.2.2 33KV 3C - 400 Sq.mm XLPE, Al.(E) (Indoor) No 11 14,550.00 160,050.00 2,500.00 27,500.00

DesignTree Service Consultants Pvt Ltd Page 4 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
PVC insulated, steel armoured, Copper Conductor Cables(YFY)
2.2.3 24 C x 2.5 sq.mm Copper Cable No 12 750.00 9,000.00 150.00 1,800.00

2.2.4 12 C x 2.5 sq.mm Copper Cable No 14 650.00 9,100.00 150.00 2,100.00

2.2.5 7 C x 2.5 sq.mm Copper Cable No 150 350.00 52,500.00 100.00 15,000.00

2.2.6 4 C x 2.5 sq.mm Copper Cable No 50 310.00 15,500.00 100.00 5,000.00

2.2.7 4 C x 4.0 sq.mm Copper Cable No 40 250.00 50.00

2.2.8 3 C x 2.5 sq.mm Copper Cable No 40 150.00 6,000.00 25.00 1,000.00

2.1.9 3 C x 1.5 sq.mm Copper Sheeldeds Cable No 40 100.00 4,000.00 25.00 1,000.00
6.0 MISCELLANEOUS ITEMS :

6.1 FENCING :
Fencing the Transformer and DG yard, 2.5Meter Height vide materials listed under :
The rates quoted shall include necessary excavation, PCC for ISMB Supports, earthing
and all other acessories.
Frame size : 2.5 M x 1.5 M
M.S.Angle : 50 x 6 mm
Chain Link : 8 SWG GI.
Supporting ISMB : 75 x 40 mm
Paint : 2 Coats of Red oxide & 2 coats of enamel paint Mtr 45 3,000.00 135,000.00 1,200.00 54,000.00
Note: Extension of the exsisting fencing.

6.2 Gate for Rmu & HT Yard (Double leaf)


Frame size : 3.0 x 2.5 M
M.S.Angle : 65 x 6 mm
Paint : 2 Coats of Red oxide & 2 coats of enamel paint No 1 12,500.00 12,500.00 2,500.00 2,500.00

6.2 Gate for Rmu & HT Yard (single leaf)


Frame size : 1.0 x 2.5 M
M.S.Angle : 65 x 6 mm
Paint : 2 Coats of Red oxide & 2 coats of enamel paint No 1 7,500.00 7,500.00 2,500.00 2,500.00

6.3 Spreading of 40 mm metal in outdoor H.T.yard - upto 100 mm - thick layer Sq.M 100 1,200.00 120,000.00 200.00 20,000.00

6.4 Danger Boards 33kV (Stove enamelled) as per power supply company standards. No 2 500.00 1,000.00 100.00 200.00

6.5 Fire Extinguisher CO2 type 4.5 Kgs. No 3 500.00 1,500.00 100.00 300.00

Fire Bucket with stand - 2 buckets. Bucket of round bottom, painted red, marked 'FIRE'
6.6 and duly filled with fire river sand. No 3 2,250.00 6,750.00 150.00

6.6 Rubber mats of 1.8 Mtrs x 0.9mts. and of 3mm thick (IS 15652) No 15 2,510.00 37,650.00 350.00 5,250.00

6.7 RCC Hume Pipe

6.7.1 600MM dia Hume Pipe Mtr 150 650.00 97,500.00 150.00 22,500.00

6.7.2 300MM dia Hume Pipe Mtr RO 350.00 120.00

6.7.3 Inspection Chamber


Quoted rate shall include necessary excavation, back filling and cementing of joints.

6.7.4 0.45mtr x 0.45mtr x 0.45 mtr Cable Inspection Chamber with Cover No RO 2,500.00 1,650.00

6.7.5 0.6mtr x 0.6mtr x 1.0 (D) mtr Cable Inspection Chamber with Cover No 8 15,000.00 120,000.00 5,200.00 41,600.00

Cable laied in ground and the prices shall include excavation of soil and refilling,
providing sand layer below the cables, providing half cut hume pipe over and above the
6.7.6 cable for necessary mechanical protection before final refilling of soil and making good Mtr RO 1,250.00 150.00
surface as required.

Total HT Works 7,173,650.00 646,450.00

DesignTree Service Consultants Pvt Ltd Page 5 of 53


Project : B-HUB (Tower-1)
TRANSFORMERS
SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
3.0 TRANSFORMER :

Transformer Consists of bi-directional roller, diagram, rating plate, winding


temperature indicator, marshalling box, lifting lugs and weather proof HT cable box,
LT bus duct disconnecting chamber minimum 8mm thick non magnetic gland plate
complete as per specification and as per IS :1180, Level 2 and fallow the ECBC norms.
(The transformer shall be subject to all test specified in specification and test
certificates shall be produced).
Copper wound Transformer - Dry Type
Capacity - 1600 KVA
Primary - 33000 Volts
Secondary - 415 Volts
Tap Change +10% & -10% with taps @ 2.5% - with ON Load tap changer with RTCC
3.1 panel No 5 4,200,000.00 21,000,000.00 98,000.00 490,000.00
HV - 72 KV
LV - 3 KV

Total HT Works 21,000,000.00 490,000.00

DesignTree Service Consultants Pvt Ltd Page 6 of 53


Project : B-HUB (Tower-1)
PANELS
SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
1.0 L.T. Switchgear
Switchgear details: In case of discrepancy between technical specification and drawings,
the details provided in drawings shall be considered as final. Short circuit levels of
switchgear shall be read from the single line diagrams. The switchgear shall be co-
ordinated for overcurrent, short circuit and fault levels.
Switchboards & bus duct - bus bar rating and conductor: Unless otherwise specifically
mentioned, vendor shall consider Neutral bus sizing @50% of phase current for all
switchboards. Vendor shall submit details of current rating acheived with supporting
calculations, spacing of bus bar, as per manufacturers recommendation. Vendor shall refer
to technical specification / power distribution scheme for current density to be considered
for copper / aluminium bus bars.
Steel supports required to install any switchboard shall form scope of installation work.The
steel supports considered shall be correctly sized to take the switchboard loads. The
vendor shall submit the details of steel section proposed for switchboard installation and
obtain approval before procurement and installation. Steel used to support switchboards
shall not be measured seperately.
MCCBs in sheet steel enclosures and push button stations whenever installed outdoor
shall be provided with necessary mounting steel pedastal and mounting bracket. The steel
pedastal used for installing the MCCBs shall not be measured separately. The enclosures
shall be of adequate size to terminate incoming and outgoing cables with gland plate.
The Switchboard shall be designed so as to receive cables suitable for bottom / top entry
and bottom / top exit. For complete technical details refer schematic drawing. The panel
shall be "Linear" or "L" or "U" shape to suit proposed electrical room. Panel shall be
powder coated with approved shade.
Rate shall include necessary sheet steel enclosure made out of 16 SWG sheet steel duly
powder coated with the same paint shade of panel board adopter box to cover the cables
and conduits above the panel to the acceptance of Consultant.
For all the Panel details refer Power Distribution Schematic Diagram
(Dwg No:PH-BHUB-T1-EL-SCH-418)
EDO ACB's are with ethernet port
Consider All Digital meters & Protection Relays with RS 485 port

1.1 Main LT panel as per SLD No 4 -


-
1.2 Stand by panel as per SLD No 1 -
-
1.3 APFC Panel as per SLD No 5 -
-
1.4 Chiller pump panel as per SLD No 1 -
-
1.5 Utility panel as per SLD No 1 -
-
1.6 Emergency Lighting panel as per SLD No 1 -
-
1.7 Lift Panels No 2 -
-
1.8 Lift panel as per SLD (LMR Room) No 16 -
-
1.9 Main Basement ventilation panel No 1 -
-
2.0 External Lighting panel as per SLD (Outdoor) No 1

2.1 Car charging panel as per SLD No 4

2.2 Terrace ATS panel (Outdoor) No 1

2.3 ACMV Panel No 1

2.4 1000A TP+NL Isolator in sheet steel enclosure.(Chiller) No RO

2.5 1250A TP+NL Isolator in sheet steel enclosure.(Chiller) No 3

2.6 MCCB Isolator in sheet steel enclosure - 500A 4P MCCB No RO

2.7 Three phase Input/Three phase Output Inverter, 25KVA with suitable batteries for 90Mins No 1 - -
backup with battery stand and Supporting accessories. - Emergency

Three phase Input/Three phase Output Inverter, 40KVA with suitable batteries for 20Mins
2.8 backup with battery stand and Supporting accessories. - BMS No 1 - -

Total C/O to Summary - -

DesignTree Service Consultants Pvt Ltd Page 7 of 53


Project : B-HUB (Tower-1)

BUSDUCT

SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
2.0 BUS DUCT

3 phase 4 wire IP 42 Sandwitch type Aluminium Busduct (Indoor) -


For Connectivity between DG Set to DG Isolator & DG Isolator to Main LT
2.1 Panel and Transformer to Main LT Panel and Main LT Panel to Main LT - -
Panels with Required accessories as per site condition and including MS
support. Make : AS per Tender specified makes.

2.1.1 Rating of bus duct 3200A Amps. (DG Set to DG Isolator) - -


a Straight Run Mtr 110 22,000.00 2,420,000.00 3,200.00 352,000.00
b Vertical/Horizontal Bend No 20 5,000.00 100,000.00 500.00 10,000.00
Terminal flange with adopter box and extention of bus bar for terminating the
c No 10 60,000.00 600,000.00 5,000.00 50,000.00
bus duct.
Accessories ( like Interconnecting bus bars rubber bellows, Flexible couplers,
d LS 1 50,000.00 50,000.00 5,000.00 5,000.00
Fixing Brackets, Al. Earthing and control wiring)

Rating of bus duct 2500A Amps. (DG Isolator to Main LT Panel and
2.1.2 - -
Transformer to Main LT Panel and Main LT Panel to Main LT Panels)
a Straight Run Mtr 825 20,000.00 16,500,000.00 3,000.00 2,475,000.00
b Vertical/Horizontal Bend No 71 4,500.00 319,500.00 500.00 35,500.00
Terminal flange with adopter box and extention of bus bar for terminating the
c No 26 50,000.00 1,300,000.00 5,000.00 130,000.00
bus duct.
Accessories ( like Interconnecting bus bars rubber bellows, Flexible couplers,
d LS 1 50,000.00 50,000.00 5,000.00 5,000.00
Fixing Brackets, Al. Earthing and control wiring)

Raising Main

Supply, Erection, testing and commissioning of raising mains with 415V, 3PN,
4W Aluminium Sandwich type Rising Main with proper aluminium earthing, 2
2.3 Plug in Provision per Floor, Spring Hangers & Rigid Hangers( IP42)(100%-N)
including MS support. As per site requirement.(Every 600mm interval plug in
provision to be made)

Rating of bus duct 1250Amps.Tap off box provision on each floor. Max plug in
2.3.1
provision shall be rated for 400Amps. (Basement-1 to 16th floor)

a Straight Run Mtr 350 12,500.00 4,375,000.00 3,200.00 1,120,000.00


b Terminal flange No 4 3,000.00 12,000.00 500.00 2,000.00
c End Cover No 4 2,000.00 8,000.00 5,000.00 20,000.00
Plug in MCCB 125A TPN with Dual source Digital Energy Meter(EM6438/ Equi.
d with RS 485 port & KVAH Data storage) in sheet steel Enclosure. With No 64 5,800.00 371,200.00 5,000.00 320,000.00
on/off/trip indication lamps.

Accessories ( including spring hangers, fixing clips, floor seal and 2Rx50x6mm Al
e LS 1 50,000.00 50,000.00 5,000.00 5,000.00
Earth strip , control wiring and 3Cx2.5 Sq.mm control cable for DSM)

1250 Amps, 4P, 50KA, ACB in sheet steel enclosure for feeding power supply to
f No 4 250,000.00 1,000,000.00 8,500.00 34,000.00
Rising main. With on/off/trip indication lamps.
Note: Vendor has to consider Measurement as per the site requirement.

Rating of bus duct 1000Amps.Tap off box provision on each floor. Max plug in
2.3.2
provision shall be rated for 400Amps. (Basement-1 to 29th floor)

a Straight Run Mtr 660 10,500.00 6,930,000.00 3,200.00 2,112,000.00


b Terminal flange No 4 2,500.00 10,000.00 500.00 2,000.00
c End Cover No 4 1,800.00 7,200.00 5,000.00 20,000.00
Plug in MCCB 125A TPN with Dual source Digital Energy Meter(EM6438/ Equi.
d with RS 485 port & KVAH Data storage) in sheet steel Enclosure. With No 52 5,000.00 260,000.00 5,000.00 260,000.00
on/off/trip indication lamps.

Accessories ( including spring hangers, fixing clips, floor seal and 2Rx50x6mm Al
e LS 1 50,000.00 50,000.00 5,000.00 5,000.00
Earth strip , control wiring and 3Cx2.5 Sq.mm control cable for DSM)

1000 Amps, 4P, 50KA, ACB in sheet steel enclosure for feeding power supply to
f No 4 200,000.00 800,000.00 7,500.00 30,000.00
Rising main. With on/off/trip indication lamps.
Note: Vendor has to consider Measurement as per the site requirement.

Total C/O to Summary 27,155,700.00 4,563,500.00

DesignTree Service Consultants Pvt Ltd Page 8 of 53


Project : B-HUB (Tower-1)

CABLES

SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
3.0 Cables and end terminations

Unless specified the voltage grade of all LT Power and Control cables shall be
rated for 1100 Volts. Grade PVC insulated XLPE Al. / Cu. Conductor, steel
armoured Power Cables (XLPE A2XFY/YWY/YFY) as per specification.
Vendor shall consider necessary clamping and tagging of cables as part of cable
laying work.The cable laying shall be in excavated trenches, built in trenches,
hume pipes and on cable trays as the case may be.

Vendor shall consider


Single compression glands - for cables of size below 25 sq.mm
Double compression glands - for cables of size 25 sq.mm and above
Double compression glands - single core cables - 400 sq.mm and above.
Terminating Lugs - Aluminium lugs for aluminium conductor cables and copper
lugs for copper conductor cables.

3.1 Cables
3.1.1 3.5 Core x 400 Sqmm Aluminium XLPE Armoured Cable Mtr 3,100.00 1,360.00 4,216,000.00 75.00 232,500.00
- -
3.1.2 3.5 Core x 300 Sqmm Aluminium XLPE Armoured Cable Mtr 2,730.00 1,150.00 75.00 204,750.00
- -
3.1.3 3.5 Core x 240 Sqmm Aluminium XLPE Armoured Cable Mtr 1,010.00 950.00 959,500.00 75.00 75,750.00

3.1.4 3.5 Core x 185 Sqmm Aluminium XLPE Armoured Cable Mtr RO 780.00 60.00

3.1.5 3.5 Core x 150 Sqmm Aluminium XLPE Armoured Cable Mtr RO 620.00 55.00

3.1.6 3.5 Core x 120 Sqmm Aluminium XLPE Armoured Cable Mtr RO 520.00 55.00

3.1.7 3.5 Core x 95 Sqmm Aluminium XLPE Armoured Cable Mtr RO 475.00 50.00

3.1.8 3.5 Core x 70 Sqmm Aluminium XLPE Armoured Cable Mtr RO 440.00 50.00

3.1.9 3.5 Core x 50 Sqmm Aluminium XLPE Armoured Cable Mtr RO

3.1.10 3.5 Core x 35 Sqmm Aluminium XLPE Armoured Cable Mtr 1,000.00 250.00 250,000.00 40.00 40,000.00

3.1.11 3.5 Core x 25 Sqmm Aluminium XLPE Armoured Cable Mtr RO 210.00 40.00

3.1.12 4 Core x 16 Sqmm Aluminium XLPE Armoured Cable Mtr 450.00 185.00 83,250.00 40.00 18,000.00

3.1.13 4.0 Core x 10 Sqmm Aluminium XLPE Armoured Cable Mtr 1,400.00 160.00 224,000.00 40.00 56,000.00

3.1.14 4.0 Core x 6 Sqmm Aluminium XLPE Armoured Cable Mtr 200.00 125.00 25,000.00 40.00 8,000.00

3.1.15 3.0 Core x 400 Sqmm Aluminium XLPE Armoured Cable Mtr 550.00

3.1.15 3.0 Core x 150 Sqmm Aluminium XLPE Armoured Cable Mtr 75.00

3.1.15 3.0 Core x 50 Sqmm Aluminium XLPE Armoured Cable Mtr 300.00

3.1.17 3.0 Core x 35 Sqmm Aluminium XLPE Armoured Cable Mtr 300.00

3.1.16 3.0 Core x 16 Sqmm Aluminium XLPE Armoured Cable Mtr 300.00

3.1.18 3.0 Core x 10 Sqmm Aluminium XLPE Armoured Cable Mtr 520.00

3.1.19 3.0 Core x 6 Sqmm Copper Cable Mtr 2,600.00

3.1.20 3.0 Core x 4 Sqmm Copper Cable Mtr 1,250.00

3.1.21 3.0 Core x 2.5 Sqmm Copper UnArmouted cable Mtr 50.00

3.1.22 3.0 Core x 2.5 Sqmm Copper PVC Armoured Cable Mtr RO

3.1.23 3.0 Core x 1.5 Sqmm Copper Shielded Armoured Cable Mtr RO

3.1.24 1 Core x 185 Sqmm Copper Flexible PVC Cable Mtr 700.00

3.1.25 1 Core x 240 Sqmm Copper Flexible PVC Cable Mtr RO

3.2.26 1 Core x 25 Sqmm Copper Flexible PVC Cable Mtr 240.00

3.1.27 1 Core x 95 Sqmm Copper Flexible PVC Cable Mtr RO

3.1.28 1 Core x 25 Sqmm Copper PVC armoured Cable Mtr RO

3.1.28 1 Core x 120 Sqmm Copper Flexible XLPE Cable Mtr RO

3.2 FIRE SURVIVAL CABLES

3.2.1 4 Core x 240 Copper XLPE Ar. Cable Mtr 160.00

DesignTree Service Consultants Pvt Ltd Page 9 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
3.2.2 4 Core x 150 Copper XLPE Ar. Cable Mtr 450.00

3.2.3 4 Core x 120 Copper XLPE Ar. Cable Mtr 600.00

3.2.4 4 Core x 95 Copper XLPE Ar. Cable Mtr 350.00

3.2.5 4 Core x 50 Copper XLPE Ar. Cable Mtr 700.00

3.2.6 4 Core x 25 Copper XLPE Ar. Cable Mtr 50.00

3.2.6 4 Core x 10 Copper XLPE Ar. Cable Mtr 400.00

3.2.7 4 Core x 4 Copper XLPE Ar.Cable Mtr 500.00

3.2.8 4 Core x 6 Copper XLPE Ar.Cable Mtr 700.00

3.2.9 1C x 25 copper XLPE Ar.Cable Mtr 1,000.00

3.3 Cable Termination


Supply and erection of 1.1 KV Grade PVC insulated cables cable terminations
with Al. / Cu. lugs, double compression type cable glands, PVC insulation tapes
and all other accessories as required.
3.3.1 3.5 Core x 400 Sqmm Aluminium XLPE Armoured Cable NO 100.00

3.3.2 3.5 Core x 300 Sqmm Aluminium XLPE Armoured Cable NO 60.00

3.3.3 3.5 Core x 240 Sqmm Aluminium XLPE Armoured Cable NO 16.00

3.3.4 3.5 Core x 185 Sqmm Aluminium XLPE Armoured Cable NO RO

3.1.5 3.5 Core x 150 Sqmm Aluminium XLPE Armoured Cable NO RO

3.3.6 3.5 Core x 120 Sqmm Aluminium XLPE Armoured Cable NO RO

3.3.7 3.5 Core x 95 Sqmm Aluminium XLPE Armoured Cable NO RO

3.3.8 3.5 Core x 70 Sqmm Aluminium XLPE Armoured Cable NO RO

3.3.9 3.5 Core x 50 Sqmm Aluminium XLPE Armoured Cable NO RO

3.3.10 3.5 Core x 35 Sqmm Aluminium XLPE Armoured Cable NO 20.00

3.3.11 3.5 Core x 25 Sqmm Aluminium XLPE Armoured Cable NO RO

3.3.12 4 Core x 16 Sqmm Aluminium XLPE Armoured Cable NO 16.00

3.3.13 4.0 Core x 10 Sqmm Aluminium XLPE Armoured Cable NO 40.00

3.3.14 4.0 Core x 6 Sqmm Aluminium XLPE Armoured Cable NO 26.00

3.3.15 3.0 Core x 400 Sqmm Aluminium XLPE Armoured Cable NO 36.00

3.3.15 3.0 Core x 150 Sqmm Aluminium XLPE Armoured Cable NO 4.00

3.3.17 3.0 Core x 50 Sqmm Aluminium XLPE Armoured Cable NO 2.00

3.3.17 3.0 Core x 35 Sqmm Aluminium XLPE Armoured Cable NO 20.00

3.3.16 3.0 Core x 16 Sqmm Aluminium XLPE Armoured Cable NO 16.00

3.3.18 3.0 Core x 10 Sqmm Aluminium XLPE Armoured Cable NO 8.00

3.3.19 3.0 Core x 6 Sqmm Copper Cable NO 100.00

3.3.20 3.0 Core x 4 Sqmm Copper Cable NO 40.00

3.3.21 3.0 Core x 2.5 Sqmm Copper PVC Armoured Cable NO RO

3.3.22 3.0 Core x 1.5 Sqmm Copper Shielded Armoured Cable NO RO

3.3.23 1 Core x 185 Sqmm Copper Flexible PVC Cable NO 50.00

3.3.24 1 Core x 240 Sqmm Copper Flexible PVC Cable NO RO

3.3.25 1 Core x 25 Sqmm Copper Flexible PVC Cable NO 20.00

3.2.26 1 Core x 95 Sqmm Copper Flexible PVC Cable NO RO

3.3.27 1 Core x 25 Sqmm Copper PVC armoured Cable NO RO

3.3.28 1 Core x 120 Sqmm Copper Flexible XLPE Cable NO RO

DesignTree Service Consultants Pvt Ltd Page 10 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
3.4 FIRE SURVIVAL CABLES

3.4.1 4 Core x 240 Copper XLPE Ar. Cable NO 4.00

3.4.2 4 Core x 150 Copper XLPE Ar. Cable NO 6.00

3.4.3 4 Core x 120 Copper XLPE Ar. Cable NO 12.00

3.4.4 4 Core x 95 Copper XLPE Ar. Cable NO 6.00

3.4.5 4 Core x 50 Copper XLPE Ar. Cable NO 32.00

3.4.6 4 Core x 25 Copper XLPE Ar. Cable NO 6.00

3.4.6 4 Core x 10 Copper XLPE Ar. Cable NO 6.00

3.4.7 4 Core x 4 Copper XLPE Ar.Cable NO 16.00

3.4.8 4 Core x 6 Copper XLPE Ar.Cable NO 20.00

3.4.9 1C x 25 copper XLPE Ar.Cable NO 18.00

Total C/O to Summary

DesignTree Service Consultants Pvt Ltd Page 11 of 53


Project : B-HUB (Tower-1)
LT BOQ

S.No. DESCRIPTION OF WORK UNIT QUANTITY

1.0 MCB Distribution boards

Unless otherwise specifically mentioned all MCB (standard) DBs shall be considered with
double door arrangement only with thickness of 1.2mm. The type of DB shall be vertical or
horizontal based on design and site conditions. The MCBs for lighting and raw power
distribution shall be considered with Curve 'C" and Curve 'D' for UPS distribution
respectively. Dummy ways to be covered with blank plates. All out going ways shall be
labeled & laminated as built drawing (SLD) shall be affixed on inside face of DB door. The
MCB's shall be rated for a mimimum short circuit level of 10 kA.

1.1 MCB DB - Vertical / horizantal double door type


Incomer - 63A, 4P, MCB
Outgoing - 40A, DP, RCCB - 30mA - 3No's with Timer
Outgoing - 10/16A, SP, MCB "C" -18 No's No 5

1.1 MCB DB - Vertical / horizantal double door type


Incomer - 63A, 4P, MCB
Outgoing - 40A, DP, RCCB - 30mA - 3No's with Timer
Outgoing - 10/16A, SP, MCB "C" -24 No's No 3

1.2 MCB DB - Vertical / horizantal double door type


Incomer - 63A, 4P, MCB
Outgoing - 40A, DP, RCCB - 30mA - 3No's
Outgoing - 10/16A, SP, MCB "C" -36 No's No 5

1.3 MCB DB - Vertical / horizantal double door type


Incomer - 63A, 4P, MCB
Outgoing - 40A, DP, RCCB - 30mA - 3No's
Outgoing - 10/16A, SP, MCB "C" -24 No's No 3

1.4 MCB DB - Vertical / horizantal double door type


Incomer - 63A, 4P, MCB
Outgoing - 40A, DP, RCCB - 100mA - 3No's
Outgoing - 10/16A, SP, MCB "C" -12 No's No 8

1.5 MCB DB - Vertical / horizantal double door type


Incomer - 63A, 4P, MCB
Outgoing - 40A, DP, RCCB - 100mA - 3No's
Outgoing - 10/16A, SP, MCB "C" -18 No's No 1

1.6 MCB DB - Vertical / horizantal double door type


Incomer - 40A, DP, RCCB 30mA
Outgoing - 10A, SP, MCB - 14No's No 7

DesignTree Service Consultants Pvt Ltd Page 12 of 53


Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

1.7 MCB DB - Vertical / horizantal double door type


Incomer - 40A, DP, RCCB 30mA
Outgoing - 10/16A, SP, MCB - 10No's No 4

1.8 MCB DB - Vertical / horizantal double door type


Incomer - 40A, DP, RCCB 30mA
Outgoing - 10/16A, SP, MCB - 6No's No 3

1.9 MCB DB - Vertical / horizantal double door type


Incomer - 40A, DP, RCCB 30mA
Outgoing - 10/16A, SP, MCB - 4No's No 2

Adoptor box suitable for 12 way DB with extension busbars to enable for termination upto
1.13 25Sq.mm cable. The adoptor box shall be fabricated with 16SWG CRCA Sheet steel and No RO
should be same shade of Distribution Board.

Adoptor box suitable for 8 way DB with extension busbars to enable for termination upto
1.10 25Sq.mm cable. The adoptor box shall be fabricated with 16SWG CRCA Sheet steel and No RO
should be same shade of Distribution Board.

1.11 MCBs 4P in sheet steel enclosure 63Amps. No 2

1.12 MCBs DP in sheet steel enclosure 25Amps. No 2

Total C/O to Summary

DesignTree Service Consultants Pvt Ltd Page 13 of 53


Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

2.0 Sockets
Supply, Erection, testing and commissioning of following switches / sockets / switch fuse
units and starters with all other accessories as required.

1No 6A Multipin socket outlet with mounting box controlled by 1 no 6A switch modular
2.1 Each 20
switch type.

1No 6A Multipin socket outlet with mounting box controlled by 1 no 6A switch modular
2.2 Each 10
switch type for UPS

1No 6A Multipin socket outlet with mounting box controlled by 1 no 6A switch modular
2.3 Each 220
switch type for UPS ( HVAC & Other Services)

1No 6/16A Multipin socket outlet with mounting box controlled by 1 no 16A switch
2.4 Each 120
modular switch type.

2.3 16A, SP MCB with Metal enclosure for Lifts Each RO

2.4 32A, TP MCB with Metal enclosure for Lifts Each RO

"AC Level 2" 240 volt single phase AC up to 80 amps industrial socket with MCB, for up to
2.5 Each RO
19.2 kiloWatt charge rate

25A Industrial type Double Pole -240V, power socket outlet with 25A MCB with Plug top
2.6 Each RO
controlled housed in polycorbonate enclosure

32A Industrial type Three -415V, power socket outlet with MCB controlled housedin
2.7 Each RO
polycorbonate enclosure

63A Industrial type Three -415V, power socket outlet with MCB controlled housedin
2.8 Each RO
polycorbonate enclosure

1No 6/16A Multipin socket outlet with mounting box controlled by 1 no 16A switch
2.9 modular switch type. (car charging sockets) Each 40

Supply, installation, testing and commissioning of clip type Lan Socket (RJ-45) along with
2.10 No 10
front plate and G.I box along with required chasing and all others complete as required.

Total C/O to Summary

3.0 Submains / Circuit mains / Power wiring

Supply and running of 1100 V grade PVC insulated copper conductor wires in 2mm thick,
Heavy Duty, FRLS, PVC conduit as per specifications. The rate shall include supply,
installation of all materials required like wires, conduit, elbow bends, clamps, saddles and
all other fixing accessories.

3.1 32 mm dia, MS conduit with all accessories Mtr RO

3.2 25 mm dia, PVC conduit with all accessories Mtr 4200

3.3 19 mm dia, PVC conduit with all accessories Mtr 1500


DesignTree Service Consultants Pvt Ltd Page 14 of 53
Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

Supply and running of 4R x 10 Sqmm and 2R x 6Sq.mm PVC insulated copper wire including
3.4 32mm dia PVC conduit, bends, junction boxes with terminations on either side and all Mtr RO
other accessories as required.

Supply and running of 4R x 6 Sqmm PVC insulated copper wire including 25mm dia PVC
3.5 conduit, bends, junction boxes with terminations on either side and all other accessories as Mtr RO
required.

Supply and running of 3R x 4.0Sq.mm PVC insulated copper wire Including 25mm dia PVC
3.6 Mtr 6000
conduit with terminations on either side and all other accessories as required.

Supply and running of 3R x 2.5 Sq.mm PVC insulated copper wire Including 19mm dia PVC
3.7 Mtr 38000
conduit with terminations on either side and all other accessories as required.

Supply and running of 3R x 2.5Sq.mm PVC insulated copper wire Including 25mm dia PVC
3.8 conduit with terminations on either side and all other accessories as required. Flexible Mtr 3500
cable- car charging

Total C/O to Summary

DesignTree Service Consultants Pvt Ltd Page 15 of 53


Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

4.0 Point Wiring for Lights, Sockets

Wiring of light points / 6A socket outlets with 2 runs of 1.5 and 1 runs of 1.5 sq.mm FRLS
1100 V grade copper wire using 2 mm thick 19 mm dia PVC, FRLS conduit, with modular
type switches with metal boxes and accessories The point wiring shall be terminated in a
terminal block.

NOTE: The wiring drawn from DB to first switch box & power points in a room shall be
measured under the heading circuit mains.

4.1 Single light point controlled by a 6A SP switch No 60

4.2 Single light point controlled by a 2way 6A SP switch No RO

4.3 Two light point controlled by a 6A SP switch No 25

4.4 Three light point controlled by a 6A SP switch No 15

4.5 Four to six light point controlled by a 6A SP switch No 80

4.6 Seven to Ten light point controlled by a 6A SP switch No 5

4.7 Eleven to Sixteen light point controlled by a 16A SP MCB No RO

4.8 One light point controlled by MCB No 5

4.8 Two light point controlled by MCB No 7

4.9 Three light point controlled by MCB No 4

4.10 Four to six light point controlled by MCB No 90

4.11 Seven to Ten light point controlled by MCB No 150

4.12 Eleven to Sixteen light point controlled by MCB No 60

Ceiling Fan point controlled by 6A switch & 5 Step Electronic regulator with Fan Box
4.13 No RO
concealed in ceiling

Stair Case lighting for landing and mid- landing for (B4 to Terrace) lights controlled from
10A MCB. 1Seperate ckt. With 2 x 2.5 + 1 X 1.5sq mm complete accessories like saddeles
4.14 Set 28
Chasing, chipping excluding 19 mm mm dia FRLS PVC conduit. Cost of MCB to Exclude.( for
Normal Lighting & Emergency Lighting) Refer the Stair case Conduit drawing.

4.15 Supply, Installation of Elevator Shaft Lighting for low rise passenger lifts.
DesignTree Service Consultants Pvt Ltd Page 16 of 53
Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

a. 23 Lights controlled from 10 A switch / MCB


b. 1 light controlled from 2 Nos 6 A 2-way switches for pit lighting.
c. Bulk Head fixture - 24 Nos with 9W LED lamp.
d. 24 Nos of 6 A 3 Pin socket outlet with mounting box controlled by 6A switch. Set 6

4.16 Supply, Installation of Elevator Shaft Lighting for High rise passenger lifts.
a. 35 Lights controlled from 6/10 A switch / MCB
b. 1 light controlled from 2 Nos 6 A 2-way switches for pit lighting.
c. Bulk Head fixture - 36Nos with 9W LED lamp.
d. 36 Nos of 6 A 3 Pin socket outlet with mounting box controlled by 6A switch. Set 8

4.17 Supply, Installation of Elevator Shaft Lighting for Jump lift.


a. 5 Lights controlled from 6/10 A switch / MCB
b. 1 light controlled from 2 Nos 6 A 2-way switches for pit lighting.
c. Bulk Head fixture - 6 Nos with 9W LED lamp.
d. 6 Nos of 6 A 3 Pin socket outlet with mounting box controlled by 6A switch. Set 2

Total C/O to Summary

5.0 Supply & Installation of Indoor Light Fixtures with Lamps

NOTE: All fittings shall be with electronic ballasts only. All the CFL fixtures shall be provided
with PF improvement condensor compulsorily. Tubes shall be of colour 84 (cool day light).
Also the rates quoted shall also include the cost of Lamps, ball & socket suitable for 25mm
dia conduits, round blocks, PVC holders, 25mm dia GI pipe drops for suspending the
fixtures, fans., all complete as required.

Supply, Erection, Testing & Commissioning of 1 x 20 W Surface / Wall Mounted LED Batten
tube Light with cover industrial type with all other fixing accessories as required. (Main
5.1 No 100
Electrical room, chiller room & pump room)

Supply, Erection, Testing & Commissioning of 40 W Surface / Wall Mounted LED Batten
5.2 tube Light with cover and all other fixing accessories as required. No 450
(Driveway)

Supply, Erection, Testing & Commissioning of 1 x 20 W Surface / Wall Mounted LED Batten
5.3 tube Light with cover and all other fixing accessories as required. No 700
(Parking & Service Rooms)

Supply, Erection, Testing & Commissioning of 1 x 40 W Recess Mounted LED Light Fixture
5.4 No 120
(Lobby double height)

Supply, Erection, Testing & Commissioning of 1 x 20 W Recess Mounted LED Light Fixture
5.5 No 1100
(Lobbies & Refuge area)

Supply, Erection, Testing & Commissioning of 1 x 22 Surface/wall Mounted LED fixture with
5.6 No 350
cover for ( Staircase)

Supply, Erection, Testing & Commissioning of 1 x 15 W Surface Mounted LED fixture -


5.7 No 325
( Basement & Fire Lobby )

DesignTree Service Consultants Pvt Ltd Page 17 of 53


Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

5.8 Supply, Erection, Testing & Commissioning of 1 X 3W Rececss mounted LED fixture No 150

Supply, Erection, Testing & Commissioning of 1x 12W LED Bulk head Light Fixture with glass
5.8 No RO
& lamp and all other fixing accessories as required. (Terrace)

5.9 Supply, Erection, Testing & Commissioning of 1 X 30W Recess Mounted LED fixture No RO

Supply, Erection, Testing & Commissioning of 12W Recess Wall Mounted Circular down LED
5.10 Light and all other fixing accessories as required. (RAMP) No 40

5.11 1200mm CG Rieveira cieling fan No RO

Supply, Erection, Testing & Commissioning of Exit lamp Fitting (with transparent acrylic
cover) with 11W CFL lamp and with EXIT / ENTRANCE / BASEMENT inscription in
5.12 No RO
RED/Green colour along complete with built-in battery, battery charger and all other
necessary accessories as required for signage lighting.

Supply, Erection, Testing & Commissioning of 60 Watts, Outdoor type LED flood light and all
5.13 No RO
other fixing accessories as required.

Supply, Erection, Testing & Commissioning of 10 Watts, Wall mounted LED light and all
5.14 No 4
other fixing accessories as required.(GF Toilet - Mirror light)

Supply,Erection, Testing & Commissioning of 15Watts Recess Mounted LED Light Fixture
5.15 No 10
and all other fixing accessories as required.(GF Toilet)

Supply,Erection, Testing & Commissioning of 9Watts Recess Mounted LED Light Fixture and
5.16 No 6
all other fixing accessories as required.(GF Toilet)

Supply,Erection, Testing & Commissioning of 3Watts Recess Mounted LED Light Fixture and
5.17 No 4
all other fixing accessories as required.(GF Toilet)

Supply, Erection, Testing & Commissioning of LED strip rigid linear continuous light line –
5.18 Wipro - ORMZ LED LS26-005-120-WW-50 5W PER METER (Cove Lighting - Toilet & Behind No RO
Mirror)
Total C/O to Summary

6.0 Sensors for common Area

Builder proposes to use automatic lighting controls for common area lighting such as
carparking areas to control/optimize the lights depending on
occupancy/movement,availability of sun light at the periphery etc.in order to conserve
energy.Thevendor shall propose a suitable system to meet the above requirement.

Micro wave presence detection sensor with a range of 20meter X 20meter at a mounting
height of 3.5meter to control lighting load of 10A,with features of delaytime10sec-
6.1 20minutes, with photocell,for semi flush mounting or surface mounting. (similar to No RO
Honeywell - MK catalog No K4032/K4033 complete with wall mounting kit K4034 or equiv)
(Parking)

DesignTree Service Consultants Pvt Ltd Page 18 of 53


Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

Micro wave presence detection sensor with arange of 30meter X 30meter at a mounting
height of 3.5- 6mtr meter to control lighting load of 10A,with features ofdelay time10sec-
6.2 20minutes, withphotocell, for semiflush mounting or surface mounting. (similar to No RO
Honeywell-MK catalog noK 4080/81/82/ or equiv)

6.3 Day Light cum Occupancy Sensor with Lux level settings No 7

Total C/O to Summary

DesignTree Service Consultants Pvt Ltd Page 19 of 53


Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

7.0 Cable Trays

Supply and Erection of Heavy duty ladder type 2mm thick Pre galvanized tray of size as
below, ceiling suspended/ wall mounted cable tray or in Cable Trench including necessary
Anchoring in the ceiling, Angle supports, cleat angle, rungs, side runner, coupler plates,
fasteners, anchor bolts, Base plate & accessories like Elbows, Bends, Tee, all complete as
7.1 per site requirement . these all elbows, Bends, Reducers, Tees should be factory made.
(upto 600mm wide Hinged type and above 150x150x6mm MS channel base plate 600mm
-25x25x5, 750mm-40x 40x5 & above 900mm -65x65x5mm angle Supports)

7.1.1 1200mm x 75mm wide Cable Tray Mtr 800

7.1.2 1000mm x 75mm wide Cable Tray Mtr 800

7.1.3 750mm x 50mm wide Cable Tray Mtr 350

7.1.4 600mm x 50mm wide Cable Tray Mtr 150

7.1.5 450 mm x 50mm wide Cable Tray Mtr 500

7.1.6 300 mm x 50mm wide Cable Tray Mtr 300

7.1.7 150 mm x 50mm wide Cable Tray Mtr 1500

7.1.8 50 mm x 50mm wide Cable Tray Mtr RO

Supply & Installation of heavy duty Pre galvanized perforated type Cable trays of following
sizes, suspended from ceiling or fixed vertically on wall / column as per including necessary
supports like anchor bolts, hangers, brackets etc. and accessories like Elbows, Bends, Tee,
requisite support / suspenders, hardware etc. as per site requirement. All supporting
7.2
structure & hardware including nuts & bolts and shall be of galvanized iron as approved.
Height of cable tray will be 50 mm. these all elbows, Bends, Reducers, Tees should be
factory made. (upto 600mm wide Hinged type and above 150x150x6mm MS channel base
plate 65x65x5mm angle Supports)
7.2.1 750 mm x 50mm wide Cable Tray Mtr 350

7.2.2 600 mm x 50mm wide Cable Tray Mtr 120

7.2.3 450 mm x 50mm wide Cable Tray Mtr 400

7.2.4 300 mm x 50mm wide Cable Tray Mtr RO

Total C/O to Summary

8.0 Race ways

DesignTree Service Consultants Pvt Ltd Page 20 of 53


Project : B-HUB (Tower-1)

S.No. DESCRIPTION OF WORK UNIT QUANTITY

Supply & Installation of following size GI raceway /MS / wire way with cover, made out of
16 SWG GI for body and 14 SWG GI for cover.
Junction boxes to be provided with enough supports inside the box.
Raceway installed above false ceiling/floor shall include necessary mounting supports,
junction boxes and accessories to fix it firmly to the ground/ ceiling.
The raceways shall be fixed to the floor with GI (25mm x 3mm) strips so that there is no
movement of the channels when civil work (pouring of cement concrete) is being done.
8.1 Rate includes necessary floor cutting and chipping with machine of minimum 50mm depth,
removal of debris out of site and neatly finished with M15 grade concrete up to the
finished floor level. Race ways to be covered with Chicken mesh before concreting. Curing
compound to be applied after initial setting of the concrete.
All edges, cut faces shall be free of burrs & shall be smooth.
The channels shall be earthed at the boxes and at the joints with 14 SWG bare copper wire
with screws so that earth is continuous.
Jointing of the race ways to be done with welding.

2 mm thick raceway / wire way made out of galvanised sheet


8.1.1 50 x 40 mm Mtr 20

8.1.2 50 x 40 mm Mtr 30

Junction boxes made out of 2 mm thick CRCA sheet duly hot dip galvanized.
8.1.3 150 x 155 x 65mm Mtr 3

8.1.4 150 x 155 x 65mm Mtr 5

Total C/O to Summary

DesignTree Service Consultants Pvt Ltd Page 21 of 53


Project : B-HUB (Tower-1)

SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

11,000.00 55,000.00 750.00 3,750.00

15,000.00 45,000.00 1,000.00 3,000.00

17,500.00 87,500.00 1,000.00 5,000.00

15,000.00 45,000.00 1,000.00 3,000.00

9,800.00 78,400.00 750.00 6,000.00

11,000.00 11,000.00 750.00 750.00

8,500.00 59,500.00 750.00 5,250.00

DesignTree Service Consultants Pvt Ltd Page 22 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

6,500.00 26,000.00 750.00 3,000.00

5,500.00 16,500.00 750.00 2,250.00

4,500.00 9,000.00 750.00 1,500.00

4,000.00 500.00

3,000.00 500.00

8,500.00 500.00

3,000.00 500.00

432,900.00 33,500.00

DesignTree Service Consultants Pvt Ltd Page 23 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

275.00 5,500.00 50.00 1,000.00

275.00 2,750.00 50.00 500.00

275.00 60,500.00 50.00 11,000.00

350.00 42,000.00 50.00 6,000.00

460.00 50.00

580.00 75.00

2,500.00 100.00

3,000.00 150.00

3,500.00 150.00

110,750.00 18,500.00

120.00 45.00

38.00 159,600.00 20.00 84,000.00

32.00 48,000.00 15.00 22,500.00


DesignTree Service Consultants Pvt Ltd Page 24 of 53
Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

516.00 80.00

250.00 50.00

190.00 1,140,000.00 30.00 180,000.00

95.00 3,610,000.00 25.00 950,000.00

95.00 332,500.00 25.00 87,500.00

5,290,100.00 1,324,000.00

DesignTree Service Consultants Pvt Ltd Page 25 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

680.00 40,800.00 180.00 10,800.00

890.00 250.00

1,012.00 25,300.00 310.00 7,750.00

1,550.00 23,250.00 350.00 5,250.00

2,110.00 168,800.00 500.00 40,000.00

2,380.00 11,900.00 1,020.00 5,100.00

2,750.00 1,300.00

780.00 3,900.00 180.00 900.00

990.00 6,930.00 250.00 1,750.00

1,112.00 4,448.00 310.00 1,240.00

1,650.00 148,500.00 350.00 31,500.00

2,250.00 337,500.00 500.00 75,000.00

2,500.00 150,000.00 1,020.00 61,200.00

1,320.00 350.00

11,520.00 322,560.00 1,500.00 42,000.00

DesignTree Service Consultants Pvt Ltd Page 26 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

20,000.00 120,000.00 1,500.00 9,000.00

20,000.00 160,000.00 1,500.00 12,000.00

10,000.00 20,000.00 1,000.00 2,000.00

1,543,888.00 305,490.00

2,250.00 225,000.00 100.00 10,000.00

2,400.00 1,080,000.00 100.00 45,000.00

1,500.00 1,050,000.00 100.00 70,000.00

3,500.00 420,000.00 100.00 12,000.00

2,700.00 2,970,000.00 75.00 82,500.00

2,900.00 1,015,000.00 75.00 26,250.00

2,200.00 715,000.00 100.00 32,500.00

DesignTree Service Consultants Pvt Ltd Page 27 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

900.00 135,000.00 75.00 11,250.00

1,200.00 75.00

3,900.00 150.00

1,260.00 50,400.00 100.00 4,000.00

1,800.00 150.00

7,000.00 350.00

8,600.00 100.00

1,260.00 5,040.00 100.00 400.00

2,200.00 22,000.00 100.00 1,000.00

1,260.00 7,560.00 100.00 600.00

630.00 2,520.00 100.00 400.00

1,890.00 75.00

7,697,520.00 295,900.00

11,000.00 250.00

DesignTree Service Consultants Pvt Ltd Page 28 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

13,270.00 250.00 -

8,750.00 61,250.00 250.00 1,750.00

61,250.00 1,750.00

DesignTree Service Consultants Pvt Ltd Page 29 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

1,540.00 1,232,000.00 200.00 160,000.00

1,210.00 968,000.00 150.00 120,000.00

900.00 315,000.00 100.00 35,000.00

800.00 120,000.00 100.00 15,000.00

670.00 335,000.00 75.00 37,500.00

595.00 178,500.00 75.00 22,500.00

380.00 570,000.00 65.00 97,500.00

355.00 50.00

1,250.00 437,500.00 200.00 70,000.00

1,050.00 126,000.00 150.00 18,000.00

995.00 398,000.00 150.00 60,000.00

720.00 100.00

4,680,000.00 635,500.00

DesignTree Service Consultants Pvt Ltd Page 30 of 53


Project : B-HUB (Tower-1)
SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

575.00 11,500.00 240.00 4,800.00

450.00 13,500.00 210.00 6,300.00

230.00 690.00 50.00 150.00

150.00 750.00 45.00 225.00

26,440.00 11,475.00

DesignTree Service Consultants Pvt Ltd Page 31 of 53


Project : B-HUB (Tower-1)

Lightning Protection System


SUPPLY INSTALLATION
Sl. No. Description Unit Quantity
RATE AMOUNT RATE AMOUNT
NOTE :

a. All the items of work shall be treated as supply, installation, testing and commissioning unless
other wise mentioned.

I Lightning Protection System

Lightning Current Conductors

A Aluminum Round conductor

Supply and installation of 8 mm Aluminum Round Conductor complete as specified in drawing &
Rm 600
shall meet the requirements of IS/IEC 62305 (Terrace)

B GI Strips
Supply and installation of 25 x 6 mm GI earth Flat clamped to basement ceiling & burried in ground
connected ring aroung the tower
a) Flat conductor shall be of Hot Dipped, Zinc coating: 500 g/m square (Approx:70 micron coating),
should be tested and used exclusively for lightning protection earthing system/ring equipotential
bonding & Cross sectional area of 150mm square mm.
b) Cost to include necessary local excavation and neccessary saddle supports flat conductor holder Rm 1200
suitable nuts and blots with necessary accessories required
c) Cost to include covering the GI strips with Plastic corrosion protection strips

C Expansion Piece
Providing and installation of expansion piece with connector: For equalising temperature related
length changes. Necessary on conductors length over 20 meters on terrace parapet wall for round Nos 30
conductor

10.2 Vertical Air terminals

Supply and installation of 16mm Vertical Air terminal rod tapered to 10 mm aluminium rod as per
IS-IEC -62305 part-3 with all neccessary clamps and accessories
a). Terminal rod shall meet the requirement of standards (IS/IEC 62305) and suitable for high wind
load
b). Cost shall include Fang Fix Junior system inclusive of Al intrception rod of 1Mtr length(10mm dia
) , quick mounting of the interception rod in the base using plug technology

a 0.7 Meter Air terminal Nos 21


b 1.0 Meter Air terminal Nos 4
c 2.0 Meter Air terminal Nos 4
d 2.5 Meter Air terminal Nos 2

10.3 Supporting Accessories


10.31 For Conductors

Supply and installation of conductor holder at Parapet with M8 female thread of diameter 7mm, M8
a Nos 800
Screw to connect the conductor holder. Conductor holder to be fixed @ 1 meter distance

Supply and installation of roof conductor holder for flat roof to meet standards. Holder shall be
b Nos 500
Closed form with bottom @ 1 meter distance

Providing & installation of cross universal connector: For T and cross connection, to route vertical
c down conductor /mesh formation made of hot dipped galvanised iron with necessary screws etc as Nos 200
required. Installed with 4 hexagonal bolts M8*25 with M8 hexagonal nuts

10.4 Other Accessories


Supply and installation of Test Joint (Folding Clamp) suitable to connect 8mm round conductor and
a Nos 12
25x6 mm GI strip as specified in drawing

Supply and installation of Lightning counter - To count no of lightning strike & it can record the date
b Nos 1
and time of the lightning incident also tested as per IEC 62561-6.

Total C/O to Summary

DesignTree Service Consultants Pvt Ltd Page 32 of 53


Project : B-HUB (Tower-1)

EARTHING

Sl. No. Description Unit

1.1 Earth Electrodes

Supply, Providing, Testing and Commissioning of Maintance free earthing


electrode type 19, Cu Bonded Steel Rod 17.2mm dia, and 3mtrs Length with
250Microns carbon based backfill compound, tin Coated Brass Clamp with
i chemicals and sealed at both ends with back fill and poly plastic pit cover heavy No
duty type and complete in all respects as per IS3043, IEC62561-2 latest revision.
The rate shall include excavation of earth, filling with WATER TIGHT back fill
compound, inclusive of earth pit marker.

The electrode connection with EXOTHERMIC WELDING and Bi metalic


connector and test link at nearest the column. The complete grounding
Electrode shall conforms to BIS 3043 & IEC standards as per enclosed technical
ii
specifications. Location of Pit in Basement 4, (Detail & location as per
Drawing)

The earth pit marker embedded type in concrete shall be provided for top of
iii
each earth pit as shown in drawings, since the all earth pits are concealed type.

Contractor to make documentation for each earth pit showing the installation,
iv connections & tapping with identification , earth resisitance test installation
date etc.. For staisfication for CEIG consultants

1.2 Earth Strips

1.2.1 COPPER EARTHING CONDUCTOR

Supply laying and termination of the following sizes of earth flats and wires laid
is excavated / preformed trenches. Cable trays drawn through pipe sleeves
along with column / panels for neutral earthing as per specifications.

100 x 6 mm Cu. Strip electrolytic grade copper strip in PVC sleeve for
i Mtr
transformer / DG neutral earthing.

50 x 10 mm Cu.strip electrolytic grade copper strip in PVC sleeve for UPS


ii Mtr
neutral / Tenant earthing

iii 75 x 6 mm Copper strip. Mtr

iv 50 x 6 mm Copper strip. Mtr

vi 25 x 6 mm Copper strip Mtr

vii 25 x 3 mm Copper strip Mtr

25 sq.mm copper conductor flexible wire for earthing including termination


viii Mtr
with lugs.

DesignTree Service Consultants Pvt Ltd Page 33 of 53


Project : B-HUB (Tower-1)

16 sq.mm stranded bare copper conductor wire for earthing including


viii Mtr
termination with lugs

10 sq.mm stranded bare copper conductor wire for earthing including


ix Mtr
termination with lugs.

6 sq.mm bare copper conductor wire for earthing including termination with
x Mtr
lugs.

Busbar of 0.6 Mtr length made out of 50 x 10 mm Cu. strip with drill holes of M8
xi Nos.
at 25mm interval mounted on insulators.

1.2.1.1 MAT EARTHING


3M x 3M Mat made out of 50 x 10 mm CU strips
Mesh at 500mm distance equal interval all associate acessories.(pits included in
Earth Electrodes) Nos.

DesignTree Service Consultants Pvt Ltd Page 34 of 53


Project : B-HUB (Tower-1)
1.2.2 GI EARTHING CONDUCTOR

Supply, laying jointing and termination of the following sizes of hot dip
galvanised earth flats and wires laid in excavated / performed trenches, Cable
trays or drawn through pipe sleeves for safety earthing as per specification. All
joints in the run of the conductor shall be welded. All welded joints below
grade level shall be protected with bitumin paint and Hessain type. All joints
above grade shall be painted with rust instibility paint. The equipment
connections shall be bolted using GI bolts & nuts.

The galvanizing coating shall be not be less than 500 gms / sq.mt.
Factory Test reports to be submitted for review

i 100 x 10 mm GI Strip for Transfomrer / DG body earthing Mtr

ii 75 x 10 mm GI Strip Mtr

iii 75 x 6 mm GI Strip (RMU & HT Panels at Yard ) Mtr

iv 50 x 6 mm GI strip for LT Panels / Raising mains Body earthing Mtr

v 25 x 6 mm GI. strip for Lifts body earthing Mtr

vi 25 x 3 mm GI. strip for communication Mtr

Busbar of 0.5 Mtr length made out of 50x6 mm GI strip with drill holes of M8 at Nos.
vii 25mm interval mounted on insulators.

Busbar of 0.5 Mtr length made out of 25x6 mm GI strip with drill holes of M8 at Nos.
viii 25mm interval mounted on insulators.

Busbar of 0.5 Mtr length made out of 25x3 mm GI strip with drill holes of M8 at Nos.
ix 25mm interval mounted on insulators.

x Earth link boxwith drill holes of M8 at 25mm interval Nos.

Supply & filling of 25 Kg Highly conductive Earth Enhancing Mineral Compound


xi kgs.
(Carbon based) as backfill compound .

1.2.2.1 MAT EARTHING


6M x 3M Mat made out of 75 x 6 mm GI strips
Mesh at 500mm distance equal interval with 6 Nos of Safe Earth pit all Nos.
associate acessories.(pits included in Earth Electrodes)

6M x 3M Mat made out of 75 x 6 mm GI strips


Mesh at 500mm distance equal interval with 6 Nos of Safe Earth pit all Nos.
associate acessories.(pits included in Earth Electrodes)

1.2.2.2 MAT EARTHING


3M x 3M Mat made out of 50 x 6mm GI strips
Mesh at 500mm distance equal interval with Nos of Safe Earth pit all associate Nos.
acessories.(pits included in Earth Electrodes)

DesignTree Service Consultants Pvt Ltd Page 35 of 53


Project : B-HUB (Tower-1)
B Cable Trays

Supply and Erection of Heavy duty ladder type 2mm thick hot dipped galvanized
tray of size as below, ceiling suspended/ wall mounted cable tray or in Cable
Trench including necessary Anchoring in the ceiling, Angle supports, cleat
angle, rungs, side runner, coupler plates, fasteners, anchor bolts, Base plate &
1
accessories like Elbows, Bends, Tee, all complete as per site requirement .
these all elbows, Bends, Reducers, Tees should be factory made.(upto 600mm
wide Hinged type and above 150x150x6mm MS channel base plate 65x65x5mm
angle Supports)

1.1 1200mm x 75mm wide Cable Tray Mtr

1.2 1000mm x 75mm wide Cable Tray Mtr

1.3 750mm x 75mm wide Cable Tray Mtr

1.4 600mm x 50mm wide Cable Tray Mtr

1.4 450mm x 50mm wide Cable Tray Mtr

1.5 300 mm x 50mm wide Cable Tray Mtr

1.6 150 mm x 50mm wide Cable Tray Mtr

Total C/O to Summary

DesignTree Service Consultants Pvt Ltd Page 36 of 53


Project : B-HUB (Tower-1)

SUPPLY INSTALLATION
Quantity
RATE AMOUNT RATE AMOUNT

130 17,250.00 2,242,500.00 3,500.00 455,000.00

4000 3,500.00 14,000,000.00 150.00 600,000.00

2600 2,200.00 5,720,000.00 100.00 260,000.00

RO 2,890.00 100.00

RO 19,200.00 100.00

700 830.00 85.00

250 550.00 75.00

RO 450.00 60.00

DesignTree Service Consultants Pvt Ltd Page 37 of 53


Project : B-HUB (Tower-1)

RO 120.00 35.00

RO 80.00 25.00

RO 80.00 20.00

25 1,200.00 30,000.00 350.00 8,750.00

4 6,500.00 26,000.00 1,200.00 4,800.00

DesignTree Service Consultants Pvt Ltd Page 38 of 53


Project : B-HUB (Tower-1)

4250 390.00 1,657,500.00 70.00 297,500.00

RO 420.00 70.00

700 296.00 207,200.00 70.00 49,000.00

6200 194.00 1,202,800.00 75.00 465,000.00

2200 105.00 231,000.00 50.00 110,000.00

1100 70.00 77,000.00 30.00 33,000.00

60 700.00 42,000.00 50.00 3,000.00

20 450.00 9,000.00 50.00 1,000.00

10 350.00 3,500.00 50.00 500.00

35 250.00 8,750.00 50.00 1,750.00

RO 120.00 50.00

1 7,500.00 7,500.00 2,000.00 2,000.00

1 7,500.00 7,500.00 2,000.00 2,000.00

2 3,200.00 6,400.00 1,000.00 2,000.00

DesignTree Service Consultants Pvt Ltd Page 39 of 53


Project : B-HUB (Tower-1)

1050 1,540.00 1,617,000.00 200.00 210,000.00

300 1,210.00 363,000.00 150.00 45,000.00

150 900.00 135,000.00 100.00 15,000.00

300 800.00 240,000.00 100.00 30,000.00

150 670.00 100,500.00 75.00 11,250.00

500 595.00 297,500.00 75.00 37,500.00

70 380.00 26,600.00 65.00 4,550.00

25,478,650.00 2,295,300.00

DesignTree Service Consultants Pvt Ltd Page 40 of 53


Project : B-HUB (Tower-1)
DG BOQ

S.No. DESCRIPTION OF WORK UNIT QTY

1.0 D.G. SET

1.1 D.G. Sets with out Accoustic enclosure :

Supply, loading, unloading, Installatin & Commissioning as desired by Project


Manager, testing and commissioning of 3 phase 415 volts 50 cycle per second,
1500 RPM Prime Rated Diesel Generator set with PCC 3.3, Radiator fan cooled
Diesel Generator Sets. The engine shall be complete with turbo charger,
flywheel to suit flexible coupling with guard, air cleaner, blower fan, fuel
pump, variable speed electronic governor, fuel filter, lub oil filter and pump,
primary water circulating pumps, battery charger, 24 volt batteries of
compatible capacity, MS battery stand and instrument panel comprising of
switch with key, lub oil pressure gauge, water temperature gauge, battery
charging voltmeter, safety control for low lub oil pressure, over speed and high
cooling water temperature with tripping. The alternator shall be self excited,
self regulated, brushless and continuously rated for kVA at 0.8 P.F., 3 phase 415
volts, 50 cycle per second, 4 wire system and shall be provided with static
excitation unit.

Alternator insulation shall be class 'H' suitable to withstand tropical conditions


and shall generally comply with latest upto date amendment to IS Code. The
overload capacity shall not be less than 110% of rated capacity for 1 hour in
every 12 hours. The DG Set shall be mounted on a fabricated rigid common base
frame with anti-vibration mountings to provide 98% vibration isolation. The DG
set shall include all accessories, fittings, instruments and standard tool kit
complete as per specification and as required including control cabling. The cost
shall include providing and fixing adaptor box for cable termination as required.

The Alternator shalll be compatible to be synchornized to the Main LT Panel


through controllers of approved make.

DG Sets shall include one day fuel tank (990 litres) for each DG set. The day fuel
tank shall be fabricated from 2 mm thick MS sheets and shall include the cost of
removable cover with locking arrangement, the cost of painting, the cost of
providing all the required appurtenances like intlet & outlet connection, float
valves, drain connection, mechanical oil level indicator and low level/high level
alarms and the cost of support arrangement. complete as per specification and
as required.

The D.G. sets shall be inclusive of but not limited to the following standard
accessories:
Radiator Fan cooling system .
Fly Wheel to suit flexible/rigid coupling.
Fly wheel housing complete with starter gear ring and coupling.
Fuel hoses.
Electronic Governor.

DesignTree Service Consultants Pvt Ltd Page 41 of 53


Project : B-HUB (Tower-1)
Air Cleaner with Vacuum Indicator.
Fuel and Lub Oil Filter.
By pass filter
Fuel Pump PT Type.
Water Pump.
Lub Oil Pump.
Electric Starter 24 Volts DC.
Battery Charging Alternator with Built-in-regulator - 24 Volts, 50 Amps. and
battery stand.
Safety Control against low lub oil pressure, over speed and high cooling water
temperature along with tripping.
Vibration Dampers.
Lub Oil Cooler.
Flue pipe of required size from DG set FLUE OUTLET upto Silencer.
Residential Silencer
Expansion bellow -( suitable size SS bellows)
Flexible Pipe joints for Silencer.
Anti Vibration Pads.
Fuel Tank of 990lits.
first fill of lube oil ( Castrol/HPL/IOCL) and coolant or qty as per engine
requirement.
Control Panel with Synchronisation and load sharing option equivalent to
Cummins PCC 3.3
Sync. Controller & Control Cabling as Standard System Integration ( b/w Dg set
on Synch controller )
Batteries with battery leads along with battery stand
2000 KVA DG SET WITH OUT ACOUSTIC ENCLOSURE Each 5

1.2 Engine Mounted ACB enclosures :


Supply of 3200A 4P ACB manual Operated fixed type isolator Panel as per sld Each 5

1.3 Fuel System :


Supply, Erection, Testing and commissioning of Fuel supply system with Class "C"
MS pipes / plates including Supports ans all accessories as per the following and
technical specifications.

(a) 40mm dia for 2000kVA DG Set (Master Day tank to DG Day tank and to DG
Mtr 240
Set )
(b) 40 mm Dia Ball Valves Each 10
1.3.1 (a) 25mm dia. for 1500kVA DG Set ( From DG Day tank to DG Set) Mtr RO
(b) 25mm Dia Ball Valves Each RO

DesignTree Service Consultants Pvt Ltd Page 42 of 53


Project : B-HUB (Tower-1)
1.4 Exhaust System :

Supply,erection, testing and commissioning of Class B MS pipe of 4.8 to 5.5mm


thick suitable for DG set cladded with 50mm thick mineral Glass wool
insulation covered with 24SWG Aluminum sheet and provided with rain cap as
per specification inclusive of all supporting accessories of wall, ceiling and bends
shall be measured double.

1.4.1 550mm dia. 5.15mm thick Exhaust Pipe for 2000kVA DG Set Mtr 1100
1.4.1 350mm dia. 5.15mm thick Exhaust Pipe for 2000kVA DG Set Mtr 160

Silencer insulation 50mm thick LRB rock wool (64 Kg/m 3 density) insulation clad
1.4.4 Nos 5
with 26 SWG aluminum sheet cladding.

2.0 Cables :

Unless specified the voltage grade of all LT Power and Control cables shall be
rated for 1100 Volts. Grade PVC insulated XLPE Al. / Cu. Conductor, steel
armoured Power Cables (XLPE A2XFY/YWY/YFY) as per specification.
Vendor shall consider necessary clamping and tagging of cables as part of cable
laying work.The cable laying shall be in excavated trenches, built in trenches,
hume pipes and on cable trays as the case may be.

2.1 PVC insulated, steel armoured, Copper Conductor Cables(YFY/YRY)


2.1.1 24 C x 1.0 sq.mm Copper Cable Rmt 120

2.1.2 12 C x 2.5 sq.mm Copper Cable Rmt 120

2.1.2 10 C x 2.5 sq.mm Copper Cable Rmt 130

2.1.3 24 C x 0.75 sq.mm Copper Shielded Cable Rmt RO

2.1.4 4 C x 2.5 sq.mm Copper Shielded Cable Rmt 100

2.1.5 4 C x 2.5 sq.mm Copper Cable Rmt 430

2.1.6 2 C x 4.0 sq.mm Copper Cable Rmt 120

2.1.7 2 C x 2.5 sq.mm Copper Cable Rmt RO

2.1.7 3 C x 2.5 sq.mm Copper Cable Rmt 100

2.1.7 6 C x 2.5 sq.mm Copper Cable Rmt 150

2.2 Cable Termination


Supply and erection of 1.1 KV Grade PVC insulated cables cable terminations
with Al. / Cu. lugs, double compression type cable glands, PVC insulation tapes
and all other accessories as required.

PVC insulated, steel armoured, Copper Conductor Cables(YFY/YRY)


2.2.1 24 C x 1.0 sq.mm Copper Cable Nos 12

2.2.2 12 C x 2.5 sq.mm Copper Cable Nos 10

DesignTree Service Consultants Pvt Ltd Page 43 of 53


Project : B-HUB (Tower-1)

2.2.3 10 C x 2.5 sq.mm Copper Cable Nos 10

2.2.4 24 C x 0.75 sq.mm Copper Shielded Cable Nos RO

2.2.5 4 C x 2.5 sq.mm Copper Shielded Cable Nos 12

2.2.6 4 C x 2.5 sq.mm Copper Cable Nos 26

2.2.7 2 C x 4.0 sq.mm Copper Cable Nos 12

2.2.8 2 C x 2.5 sq.mm Copper Cable Nos RO

2.2.9 3 C x 2.5 sq.mm Copper Cable Nos 16

2.2.10 6 C x 2.5 sq.mm Copper Cable Nos 12

DesignTree Service Consultants Pvt Ltd Page 44 of 53


Project : B-HUB (Tower-1)
3.0 Acoustic Room Treatment
3.1 The DG room with 100mm thick panels & GI angle frames, with necessary
supports, treatment for walls, ceiling, hot air chamber walls. The system shall
be designed to achieve noise level of 65 dBA at 1Mtr from the DG
room.Quantities are tentative and actual quantities to be worked out by the Sqm 750
vendor

3.2 Acousticaly treated fresh air attenuator with louvers & angle frame work with
fixing accessories, to be fixed on wall, it shall be suitable for supplying required
air in CFM for DGs.Quantities are tentative and actual quantities to/be worked
out by the vendor.

(a) Fresh Air Attenuators Sqm RO


(b) Fresh Air fins/Louvers Sqm RO

3.3 Acousticallly treated hot air attenuator with angle frame work & fixing
accessories, to be fixed on hot air chamber wall (between DG room & hot air
wall), it shall be suitable for exhausting the hot air in CFM for DGs. Quantities
are tentative and actual quantities to be worked out by the vendor. Sqm 100

3.4 Acoustically treated Exhaust hot air louvers with angle frame work & fixing
accessories, to be fixed on external wall to throw hot air from chamber, it shall
be suitable for supplying required air in CFM for 4x2000kVA DGs. Work shall be
complete with blind panels, Double layer fire retardant canvas for DG Radiator
exhaust suitable for 2000KVA DG Set, Duct transformation from canvas to the hot
air plenum for 2000kVA DG Sets fabricated out of 18G GI Sheet complete with
access door duly painted with floor supports as per specifications.

(a) Hot air Louvers Sqm 150


(b) Double Layer Canvas Cloth No 5
(d) 18SWG GI Sheet Ducting Sqm 140

3.5 Angle fabricated out of 100x50mm chanels 50x50x6 Angle with paint & supports
etc Kgs 20

3.6 Supply & errection of Double leaf Acoustic door 100mm thick with view panel-
Acoustically treated MS door with acoustic panels & angle frame- 3.7Mts (wide)
and 3.0 (Height) along with locking arrangement gaskets, Baffle, HI Tech spring No RO
supports, DG Auxiliary Panel etc.,

3.7 Supply & errection of Single leaf door with view panel Acoustically treated MS
door with acoustic panels & angle frame-for personanel entry standard size No 6
1.0Mts (wide) and 2.1 (Height).

3.8 Supply & errection of Hot air and Fresh air Baffles Sqm 25

3.9 Supply & errection of Hightech Spring Supports No RO

4.0 Miscellaneous Works :

Supply, providing & fixing the following other miscellaneous items:

DesignTree Service Consultants Pvt Ltd Page 45 of 53


Project : B-HUB (Tower-1)

4.1 Set of two 9 Ltrs capacity sand buckets with stand No 3

4.2 Rubber mats of 1.1 KV grade 1.8 Mtrs x 0.9mts. and of 5mm thick No 5

4.3 Shock treatment chart with wood frame and glass cover as required No 1

4.4 Safety Charts in English , Telugu & Hindi No 1

4.5 440V enameled Danger Board No 1

Electrical single line diagram (As Built drawing ) with teakwood frame and glass
4.6 No 1
cover and Soft copy of CD

4.7 First Aid Box. No 1

4.8 First fill of Diesel-990 ltrs /each day tank Each RO

4.9 Lightning arrestor With twin LED lamp for aviation Each 1

5.0 CEIG APPROVAL :


Professional charges towards obtaining permission for installation as well as for
5.1 running of Generator sets from Chief Electrical Inspector to State Govt. and LS 1
any other statutory body as may be required.

Professional charges towards obtaining permission for installation as well as for


5.2 running of Generator sets from Chief of State Pollution Control Board and any LS 1
other statutory body as may be .

As built drawings. Drawing made on Autocad of the total work executed


including 6 sets of hard copies and 1 set of soft Copy. With handing over
5.3 LS 1
documetns -5 sets (hard copy+ 1 soft copy in CD) & Related Document for the
Submiision of Authoritys Required.

Total C/O to Summary

This BOQ to be read in conjunction with technical specifications and Single Line Diagram.
If any discrepancy occurs that should be brought to the notice of Client/Consultant before quoting the price o
considered.
Vendor need to submit the Back pressure calculation
All civil foundation of DG sets shall be in the scope of the Civil Contractor. However, DG Set Contractor has to
foundation as desired.

DesignTree Service Consultants Pvt Ltd Page 46 of 53


Project : B-HUB (Tower-1)

SUPPLY INSTALLATION
RATE AMOUNT RATE AMOUNT

DesignTree Service Consultants Pvt Ltd Page 47 of 53


Project : B-HUB (Tower-1)

14,500,000.00 72,500,000.00 65,000.00 325,000.00

450,000.00 2,250,000.00 12,500.00 62,500.00

750.00 150.00

7,500.00 450.00
450.00 120.00
5,200.00 350.00

DesignTree Service Consultants Pvt Ltd Page 48 of 53


Project : B-HUB (Tower-1)

8,200.00 9,020,000.00 2,200.00 2,420,000.00


7,500.00 1,200,000.00 1,850.00 296,000.00
-

150,000.00 750,000.00 25,000.00 125,000.00

550.00 66,000.00 35.00 4,200.00

350.00 25.00

300.00 25.00

400.00 35.00

150.00 15,000.00 25.00 2,500.00

150.00 64,500.00 25.00 10,750.00

120.00 14,400.00 25.00 3,000.00

120.00 25.00

135.00 13,500.00 25.00 2,500.00

140.00 21,000.00 25.00 3,750.00

350.00 4,200.00 210.00 2,520.00

369.00 3,690.00 210.00 2,100.00

DesignTree Service Consultants Pvt Ltd Page 49 of 53


Project : B-HUB (Tower-1)

230.00 2,300.00 140.00 1,400.00

325.00 35.00

150.00 1,800.00 130.00 1,560.00

163.00 4,238.00 140.00 3,640.00

120.00 1,440.00 25.00 300.00

100.00 25.00

100.00 1,600.00 25.00 400.00

125.00 1,500.00 25.00 300.00

DesignTree Service Consultants Pvt Ltd Page 50 of 53


Project : B-HUB (Tower-1)

2,200.00 1,650,000.00 500.00 375,000.00

2,824.00 450.00
3,882.00 600.00

2,900.00 290,000.00 480.00 48,000.00

3,882.00 582,300.00 600.00 90,000.00


11,800.00 59,000.00 3,000.00 15,000.00
1,900.00 266,000.00 355.00 49,700.00

16,000.00 600.00

75,000.00 1,000.00

2,000.00 50,000.00 500.00 12,500.00

1,900.00 200.00

DesignTree Service Consultants Pvt Ltd Page 51 of 53


Project : B-HUB (Tower-1)

5,000.00 15,000.00 1,000.00 3,000.00

2,200.00 11,000.00 40.00 200.00

1,400.00 1,400.00 140.00 140.00

450.00 450.00 40.00 40.00

220.00 220.00 100.00 100.00

10,750.00 10,750.00 500.00 500.00

850.00 850.00 45.00 45.00

7,200.00 110.00

2,500.00 2,500.00 45.00 45.00

125,000.00 125,000.00

250,000.00 250,000.00

10,000.00 10,000.00

-
88,874,638.00 4,246,690.00

Single Line Diagram.


ent/Consultant before quoting the price otherwise stringent condition will be deemed to have been

actor. However, DG Set Contractor has to co-ordinate with Civil Contractor for erection of the

DesignTree Service Consultants Pvt Ltd Page 52 of 53


Project : B-HUB (Tower-1)

MISCELLANEOUS ITEMS (LT SIDE)

SUPPLY INSTALLATION
S.No. DESCRIPTION OF WORK UNIT QUANTITY
RATE AMOUNT RATE AMOUNT
5.0 Miscellaneous items

Supply, providing & fixing the following other miscellaneous items:

5.1 2 Fire buckets of 9 Ltrs capacity with floor stand, sand and supporting acessories. No 2 1,300.00 2,600.00 150.00 300.00

5.2 Rubber mats of 1.1 KV grade 1.8 Mtrs x 0.9mts. and of 3mm thick (IS 15652) No 15 2,510.00 37,650.00 350.00 5,250.00

5.3 Shock treatment chart with teak wood frame and glass cover as required No 1 1,500.00 1,500.00 250.00 250.00

5.4 Electrical single line diagram (As Built drawing ) with frame and glass cover No 1 5,000.00 5,000.00 500.00 500.00

5.5 First Aid Box. Set 1 1,200.00 1,200.00 250.00 250.00

5.6 First Cealent Set RO 5,660.00 150.00

Supply and Installation of 4.5kg capacity CO2 type fire extinguishers complete with
5.7 mounting brackets, spray nozzles, connecting pipes, "OPEN / CLOSE" valves with all other Each 2 5,660.00 150.00
necessary accessories complete as required.

Supply and Installation of 2.0kg capacity CO2 type fire extinguishers complete with
5.8 mounting brackets, spray nozzles, connecting pipes, "OPEN / CLOSE" valves with all other Each RO 4,500.00 200.00
necessary accessories complete as required.

Push Button Actuators with Stay put type Start Push Button and Loackable type Mush
5.9 No 6 1,500.00 9,000.00 250.00 1,500.00
Room Head type Stop Push Button in a weather Proof IP - 55 enclosure.

5.10 Supplying & Erection of Danger Boards, as per Electricity Board requirement. each 2 750.00 1,500.00 50.00 100.00

5.11 Fire Sealent for the entry and exit of the Cables wherever necessary SqM 100 18,000.00 1,800,000.00 2,000.00 200,000.00

1,500.00 150.00
5.12 Camouflaging for MCB DBs made out of 1.6mm thick CRCA sheet duly powder coated SqM 200 300,000.00 30,000.00

5.13 MS Chequered plates - 6mm thick. Sq.M RO 4,000.00 650.00

5.14 50mm Dia GI pipe Mts 200 500.00 100,000.00 250.00 50,000.00

Temporary Lighting & Power arrangement with 500Nos of 1 x 40Watts FTL & 20 No
extension power boards with required cable as per the sit condition, 8 No 240V, 1Ph., 16A
5.15 power sockets on each board shall be provided to all agencies durring execution with LS 2 125,000.00 250,000.00 2,500.00 5,000.00
required No of Industrial type FTL light fixtures & Socket outlets,Temperary Distribution
Board for above, till commissioning stage.

Total C/O to Summary

6.0 CEIG Approvals

Liasioning Authorities for getting the sanction of load and deposits. Preparation of as built
drawings as per Dy. CEIG standards for approval, Filing the completion report to the
Electrical Inspectorate authorities, getting the inspection done at site, filing the
compliance report, getting the approval from Electrical Inspectorate authorities and
getting the approval from Electricity Board for charging the line for the Electricity Board
portion of the work etc., including liason with Electricity Board. Single window agency
approval will be furnished by Client. (Note: Pls consider for all other agency i.e HVAC,Fire
PHE,LIFTS and DG's electrical equipments approval also)

6.1 As built drawings.


Preparation and Submission of as built drawings, (11Nos hard and 2 No ofsoft copy)
1. Schematic distribution diagram
LS 1 225,000.00 225,000.00
2. Floor plans
3. Reflected ceiling plans of all floors
4. Earthing

Total C/O to Summary 2,508,450.00 518,150.00

DesignTree Service Consultants Pvt Ltd Page 53 of 53