Statement No.

RELAY SETTINGS FOR SIFANG MAKE CSC150 TYPE MAIN BUSBAR


PROTECTION SCHEME AT 220/11KV MUPKAL SUBSTATION

====================================================================
S.NO. DESCRIPTION RECOMMENDED SETTINGS

====================================================================

1) MODEL : Model 1

2) Main menu settings

i) CT rated current 1A /5A : 1


ii) CT _ ratio base : 800/1 A
iii) CT ratio on 220kV Nirmal feeder : 800/1 A
iv) CT ratio on 220kV Renjal feeder : 800/1 A
v) CT ratio on 220kV Metering bay : 800/1 A

3) Protection Control Word

i) Differential Protection
Diff Protec ON : 1
CT fail Alaram ON : 1
CT fail Block On : 1

ii) Circuit breaker failure protection


CBF Protec ON : 1

4) Protection settings

i) Differential protection

a) I_diff : 0.20 A
b) K_diff : 0.50
c) I_CT fail alarm : 0.07 A
d) I_CT fail Block : 0.10 A

ii) Circuit breaker failure protection

a) T_CBF Stage-I : 100 msec.


b) T_CBF Stage-II : 200msec.
c) 3I0_CBF : 0.15 A
d) Ip_CBF : 0.15 A

Note: The external LBB relays on 220kV feeders and 60MVA Power
Transformers should be disabled. Only internal LBB of busbar
protection scheme should be used.

=====================================================================

CHIEF ENGINEER/
POWER SYSTEMS