6 Recreational Facilities
6.1 Gymnasium Provide TV and data outlet for HDTV
4 Circulation
Provide house Telephone Outlet at each elevator/lift
landing within the parking garage
4.1 Lift Lobbies
6.4.1 Breakrooms
Provide a minimum of one outlet for a house telephone
Checklist for Security services for Hilton Hampton Project
Sr.No Area
FOH
1 Guestroom entry
2 Fitness Center/Gym
3 Swimming pool entry and secondary entries
4 Meeting Rooms/Ballrooms/Boardrooms
5 Executive Lounge
Each Guest Elevator with access to guest room floors
6
7 Parking Entrance/Barrier
BOH
1 Entrance to front office back areas.
2 Luggage Storage Room.
Back office areas that are accessible from guest
3 corridors.
4 Team member entrance, if not monitored.
5 Ballroom/Meeting Rooms Service Corridor.
6 Computer/Servers Room.
7 Telephone Operator's room.
8 General Cashier's office
9 Count room(s)
10 Safety deposit box rooms
11 Paymaster's office
12 Security Dispatch office
13 Exterior entrance doors.
14 IDF Rooms.
15 Linen/HK Rooms.
16 Liquor Room/Storage
17 Rooftop entrance(s).
Hampton Project
Requirement
Access Control
System
Access Control
System
Checklist for BGM for Hilton Hampton Projec
Sr.No Area
1 Porte cochere
2 Lobby
3 Public restrooms
4 All restaurants/bars
5 Meeting rooms
6 Boardroom
7 Ballrooms
8 Pre-function area
9 Pool/whirlpool area
10 Passenger Elevator/Lifts Lobbies
11 Secondary guest entry points
12 Sundries shop
13 Business center
14 Executive lounge
15 Fitness center
16 Spa
17 Ground floor corridors
18 Team Member Back of House Area
or Hilton Hampton Project
Requirement