In Concrete, Slump means A Chain is 20 m long and has 100 LINKS;
then the length of each link is
In Surveying, BM means M Sand means
Two BEAMS :: Same span; same material; One In Water Supplying, technical reason for using
is SQUARE in cross sectional shape; other is PVC pipes instead of GI Pipes
RECTANGULAR; Both shapes have SAME Cross- Concrete is made using 53 grade cement; 150
sectional area; Which beam will have higher mm size cube is made from concrete at site on
load carrying capacity? the day while the construction is done; after 28
small depression(pit) on one face of brick days, when this cube is tested,
holding the Brand Name; this pit is called
In Surveying, the process of RANGING is Choose correct statement : Fly Ash Bricks get
required only when COMPRESSIVE Strength MAINLY from
COARSE AGGREGATES ( jally ) used for concrete In Concrete lab, we use sieves like 20 mm sieve,
in Tamil Nadu comes from STONE CRUSHERS; 12 mm sieve, etc. Sieve is a CIRCULAR shaped
this is called as ( based on Source / Method of Brass / Aluminium vessel fitted with mesh
Formation ) containing many OPENINGS; SHAPE OF EACH
OPENING is
COARSE AGGREGATES ( jally ) used for concrete M 20 grade concrete means, a 150 mm size cube
in Tamil Nadu comes from STONE CRUSHERS; made from that concrete, when tested on 28th
this CA type is called as ( based on SHAPE of the day, will show a
Stone)
The Size Limit between Fine Aggregates ( You are constructing a long RCC Beam; you are
மணல)and Coarse Aggregates ( ஜலலல ) is setting up the BOTTOM surface and sides of the
FORMWORK; all the side shutters are perfectly
VERTICAL; but the BOTTOM Shuttering is NOT
Choose the ODD ONE OUT from this
set PERFECTLY HORIZONTAL ( it is set slightly
list
CURVED Upwards – CAMBER ); The reason for
இந்த பட்டியலலல பபபொருந்தபொத
this camber in bottom shuttering is
ஒன்றறக் கண்டுபபிடி
Fly Ash / Rice Husk Ash / M Sand / Steel Slag
For Compaction of Soils, choose the correct A special concrete called SCC is used nowadays
statement for RCC structures with too much of steel
reinforcements. SCC means
M 20 grade concrete means, a 150 mm size One Solid Circular ROD and One Hollow Circular
cube made from that concrete, tested in PIPE, cross sections have the same CROSS
Compression Testing Machine should show a SECTIONAL AREA; then if these two shapes are
Compressive Strength of 20 MPa ( or ) 20 N / used as VERTICAL COLUMNS with Pure Axial
mm2. This strength should be achieved in Loading, which column will have Higher load
concrete in a MINIMUM Duration / Age of carrying capacity?
In any RCC Construction, for any formwork – RCC Columns – circular cross section -- the
Steel – Timber – Plywood – they apply a black or Separate 6 or more Vertical ( MAIN )
any colour grease like oil / chemical on the Reinforcements are connected by smaller
INSIDE surfaces of the formwork where diameter reinforcements called as TIES (Rings ).
CONCRETE will touch; ( this is applied before TWO types of TIES :: Type 1 * Separate
pouring the concrete ) this oil / chemical is separate circular rings placed at regular spacing
called as one above the other for the full height of the
columns; ( called CIRCULAR TIES )
The lorry bringing the fresh mixed concrete from TYPE 2 :; NOT SEPRATE but one single
RMC factory to construction site is called as Reinforcement bar placed continuously in the
( technical name ) shape of a HELIX -- மரத்றதச சுற்றல
படரும கககொடி பபகொல – ( HELICAL TIES
The effects of INCREASING COVER Thickness Assume all other data o be same
below / above / surrounding the Steel for BOTH Columns ( as per IS 456
Reinforcements in RCC structures is / are
– 2000 )
QUESTION : which tie will give higher
load carrying capacity for the column
same OHT – OverHead Tank, two pipes carry One Solid Circular ROD and One Hollow Circular
water to streets and houses, BOTH pipes are PIPE, cross sections have the same CROSS
made of SAME material, same height, same SECTIONAL AREA; then if these two shapes are
length, same level, BUT their DIAMETERS are used as BEAMS, which beam will have Higher
NOT SAME – Different Diameters ;( i.e two pipes load carrying capacity?
have DIFFERENT AREAs of Cross-Section ( A1  Single LARGE SLAB LIKE foundation is provided
A2 ); Here, which FLOW PROPERTY, will be connecting ALL Columns of the building; used
affected in the 2 pipes when soil has very low bearing capacity; this
foundation is called
Steel Pipes / Channels / Aluminium Z shaped In the RMC factory, the slump of concrete is very
long lengthy members are placed above high – example 150 mm;
Trusses; they connect all trusses and also But when the transit mixer reaches the
support Roofing sheets; the members name is construction site, the site supervisor finds that
the slump is only 50 to 60 mm; he rejects that
Equipment used to Decrease Thickness of supply and demands a new supply; which is very
Earthfill / Road Pavement layers and to costly ; to avoid such losses and delays, a
INCREASE Density & Strength by applying chemical is added in the concrete at the RMC
Rolling Weight & Vibration forces is called as factory itself before dispatching the concrete to
site; this chemical is called as
9” ( 9 inch ) thick brick wall; 1 horizontal layer, all A new software concept BIM is used by Civil
bricks are laid as STRETCHERS; Next horizontal Engineers now; BIM means
layer, all bricks are HEADERS; this bond is correct sequence / order of occurrence in
cement reaction and processes ( RCC Structure )
metal weight dropped from ship; its pierces into IRC is the Indian Central Government agency
sea bed soil; this weight keeps the ship stable; responsible for all Highway Engg / Road /
--- loading,, unloading works can be done easily; Pavements code books, standards, designs, and
this metal weight is called other theory; IRC is
A brick is placed in wall such that its vertical Name the Hydraulic Equipment which converts
height dimension is 4 ½” (inches). This WATER / HYDRAULIC Power into MECHANICAL
arrangement is called as Power
Choose the correct order of soils based on their In RMC factories, concrete manufacturing is
PARTICLE SIZE ( DESCENDING Order ) ( starting done by MEASURING the Quantities of all raw
from BIGGEST size to SMALLEST size ) materials in terms of the material’s ( called as
BATCHING Method )
In RCC Structures, Steel Reinforcements are used Among various types of Waste Water, one type is
and their grade is expressed as Fe 415, Fe 500, called Grey Water. Grey Water means
etc. This number called GRADE of Steel is
W.H.O -- international advisory body attached to In Surveying, Contour lines mean
UN / UNO ( United Nations ); WHO publishes
recommendations, guidelines, standards for Choose the Underground Structure used for
Water Quality, etc. WHO means Storing FRESH WATER
Fresh Water ( Drinking Water ) Treatment, all Two RCC Beams; Both same SPAN; carrying
treatment processes completed; water is tested same load; One beam is designed by WORKING
& found to be fit for drinking; still after all these, STRESS Method; ( WSM ) another beam designed
again they add one chemical to water so that by Limit State Method ( LSM ); which Design
water does not get contaminated by bacteria, Method will give a lesser depth ( d ) and lesser
etc. while traveling from Treatment Plant to amount Steel Reinforcement ( Ast ) for the
Houses through pipelines; This chemical is beam? i.e. which design method will give an
Same TOTAL Area of Work:: which work item will economical deisgn ( cheaper lesser cost ) ?
have HIGHER labour rate per sq ft / m2? ( both beams --same concrete grade, same steel
Marble belongs to which classification of Rocks? grade and same WIDTH B b )

tall tower close to sea shore on beach; powerful The cross section of any highway pavement is
light on building roof rotates full circle; light NOT Horizontal but has a TRIANGULAR raised
guides ships in sea to see where the nearest slope shape; This CROSS-SLOPE of Roads is called
land is located; The tower is called
the correct equation for Continuity Equation concrete mixing:: VOLUMETRIC Batching not
w.r.t. Flow Through Pipes is preferred for the reason of
Prestressed Concrete (PSC):: special steel While constructing Bitumen / Tar roads, total
reinforcement used to Prestress the concrete; thickness of road is designed and calculated
much stronger than regular steel rebar; very based on a property of the natural soil on which
high yield strength; this special steel is called the road is laid; this soil property is called
Name the equipment shown used for testing Process of converting SEA Salt Water into
FRESH Concrete WORKABILITY Drinking Fresh Water is called as
LONG earth excavation made to bury Pipelines
below Ground Level; excavation is called

Name of item? meaning


VT -- TOP Cone Volume ;;; VM -- MIDDLE Cone of NUMBERS printed?
Volume ;; VC -- BOTTOM Cylinder Volume

In the above equipment ( Q No. *&% ) ( used for any Soil, are Empty Spaces between Soil SOLID
measuring the workability of fresh concrete ) , particles, filled with Water / Air or Both;
comment about the Volumes of the 3 vessels TECHNICAL name for these Empty Spaces is

TRAPEZIUM Centroid Point


The Father of Soil Mechanics is
Beam Type The Height of one WHITE / COLOUR BAND in a
Leveling Staff is
for Soils, Degree of Saturation (S) is called the From ROCKS, Stones are blasted, excavated, cut
ratio between Volume of Water to the Volume and taken out and sent to Crusher Factories for
of Voids; for Oven Dried Soils, S = further processes; this place is called as
PARALLEL Activities : two / more activities done
at same time by different gangs
SEQUENTIAL Activities : two / more activities
can be done only, one after the other
( technically a work can be completed only after
the completion of the previous work )
Identify which Activity do the following belong to
( a ) Foundation Pits Excavation
( b ) Fabrication of Steel Reinforcement Mats
( c ) Fabricate Timber Shutters for Footing
Contour Map shows what natural geological Formwork ( d ) Pour Concrete in Footing
feature?
The combination of Cement + Fine Aggregate is Construction Management, CPM used to
called as calculate Project Duration, start & completion
A concrete mix proportion is mentioned as 1 : 2 : times, urgent activities, not–so– urgent
4--- The 3 numbers represent activities, first acivity, next, … CPM means
Place where Ships are repaired outside the sea Bricks are wetted / immersed in water before
in an area without water presence is constructing wall. Reason for wetting is
Steel Reinforcement type TMT bar means The place where Rainfall is measured is called as
Purely COHESIONLESS Soil ( Dry River Sand), Unit of measurement for Earthwork
value of ‘c’ in Shear Strength  = c + ( EXCAVATION or FILLING ) quantity is
tan, designation SE in government department means
In Prestressed Concrete Structures, like PSC The type of Surveying where the Earth’s
Beams, Slabs, etc. ONLY the Special Steel CURVATURE is considered while measuring
Reinforcement TENDONS are used; ordinary distances, etc. is called as
steel rebars are NOT required/ NOT used. GRANITE belongs to which Rocks classification?
Rocks formed by moving water or winds or Size of soil SOLID particles, choose the CORRECT
glaciers are called Statement :: Gravel, Clay, Silt, Sand, Pebble
Planes RUN while take-off & landing on Tar or Which ARCH will have maximum STABILITY
Concrete Road; this road is ( i.e ) ZERO Horizontal Thrust Force?
In Water Resource Engineering subject, the A pile has one/ more enlarged Cross-sectional
technical name for RAINFALL is Bulb near the Pile Bottom; Pile name is
While casting concrete slabs, after pouring the This is a Crane; It cannot move from one location
concrete, spreading, leveling and compacting but can rotate full circle; its height can go higher
the concrete and finishing the surface, after and higher as the building grows taller;
some time, water starts accumulating at the ( Mathematically its X = 0; Y = 0; Z = Limited ( but
surface separately as a thin film; this is a defect variable) ;
which will lead other defects like cracks, etc. This r = 0 to R; θ = 0 to 360ᵒ ). This Crane is called as
problem of Water Separating out is called
Two brand new cars; same type; same best
condition; two drivers same skills driving it at In Staircases, the horizontal
same time on same road in 2 PARALLEL Lanes; portion where legs are placed is called ( P )
both lanes of the road brand new laid just and the vertical portion giving height for the
recently; no damage anywhere; perfect surface; staircase is called ( Q )
ONE Lane is FULLY DRY;; Another Lane is fully Airports, a large factory like shed with Column
wet by pouring water by Sprinkling water from a Free Span Trusses, the full plane can enter inside
water truck; NOW on these 2 lanes – and repairs / maintenance done; this shed is
DRY and WET; the 2 cars run at same speed for called
some distance; The 2 drivers apply sudden brake Some Burnt Clay Bricks are fully or partially black
at the same time in the same style; Choose the in colour; reason for this black colour is
correct statement