Professional Documents
Culture Documents
02 - Cable Stay Suspension Extradosed Bridges - L PDF
02 - Cable Stay Suspension Extradosed Bridges - L PDF
Bridge Services
Client
The Ministry of Interior, Construction the Tamsui River.
and Planning Agency, Taiwan; and Shoring Platform fabrication designs
Chun - Yuan Construction. The new cable stayed bridge with its and drawings will be provided.
diamond shaped pylon and four
Project cable stay configuration will become Services for the temporary supports
Taipei Ring Road Project No. 3, a new landmark for the Taipei City to the pylon and pier table segments
Cable Stayed Bridge, Taiwan. area. include the designs for the :
- fabrication shop drawings
Services The symmetric cable stayed bridge - pylon temporary struts
- Construction stage calculations has a total length of 400 m; each - tower crane & pylon connections
- Contractors consultant span being 200 m. The 135 m high
- Camber control calculations concrete diamond shaped pylon will Services for the engineering of cable
- Project planning support the 43 m wide fully welded forces provide the:
- Supervision orthotropic steel box girder deck. - stressing procedure & instructions
- Cable vibration testing - stressing forces & extensions
The construction engineering support - cable lengths & sag calculations
Services period services will include : - camber control instructions
2006 - ongoing - develop the construction method
- check stresses for each stage The responsibilities also include for
Background - prepare pylon camber at each lift cable vibration testing to assess the
The cable stayed bridge project is - determine bearings presets stability of the bridge.
a part of the new Taipei Ring Road - geometry control procedures
that is to span a canal feeding into - fabrication and erection planning
Project Reference Catalogue
Bridge Services
Client Euphrates River in south eastern lane and 3.5 m traffic lane in both
MBS Construction Company, Anatolia. directions. Two 100 m back span
Ankara, Turkish Republic. areas are cast in place concrete
Nissibi cable stayed road bridge will roadway pavement.
Project connect Adiyamen City across the
Nissibi Cable Stayed Road Bridge Euphrates River to the historic city of The steel bridge is supported by the
Project, Turkish Republic. Diyarbakir on the banks of the Tigris double splay cables from 2 inverted
River. The bridge will considerably Y shaped concrete pylons between
Services shorten the present road journey. 4.5 and 5 m wide; 5 m thick and with
- Tender design services heights of 113.6 m above the cable
- Consulting services Services are being provided for the stay bridge deck.
tender design stage of the Nissibi
Services period cable stayed bridge; which includes Two sets of 9 double splay cables
2006 the preliminary design. supporting the bridge and the back
stays are anchored in 32 m x 25 m,
Background The 620 m long cable stayed road 8 m deep concrete blocks tied down
The Nissibi cable stayed road bridge bridge comprises of a 420 m long, with prestressed ground anchors at
project is to cross the upper reaches 17.81 m wide, steel box orthotropic both ends of the bridge.
of the 817 km2 reservoir created by deck central span. With a 1.5 m
the Ataturk Dam across the walkway, and a 1.5 m emergency
Project Reference Catalogue
Bridge Services
Client Extradosed bridges incorporate the plane cable stays, the main multi cell
MOTC; Ministry of Transportation characteristics of cable stay and a concrete deck, pylons and pier forms
and Communications and Riato externally prestressed concrete box a vertical structural plane.
Construction Company. segmental structure as illustrated in
this design.
Project In a cable stayed bridge the vertical
Bei Kang Extradosed Bridge. loads are carried exclusively by the
stay cables; but in a true extradosed
Services bridge, the vertical loads are shared
- Construction stage calculations between the cables and the deck of
- Contractors consultant the bridge.
- Camber control calculations
- Prestress shop drawings Cables are arranged at the center of
- Supervision during construction the deck as double plane stays; and
the deck itself is a multi cell prestress
Services period concrete box.
2005 – 2007 The bridge is 250 m long and 27 m
in width, with equal spans of 125 m;
Background having a multi cell concrete deck
Bei Kang bridge project is part of the with varying depths between 2.5 to
development programme between 6.0 m. The pylon is a single needle
Yunlin and Chiayi countries in south type concrete structure 35 m high.
west Taiwan; crossing the Bei Kang
River in Yunlin Country. In a longitudinal direction the double
Project Reference Catalogue
Bridge Services
Client Both of the bridges are 37.4 m in The ring road project was open to
Ministry of Interior, Public Works width. The southern cable stayed road traffic in mid 2006 and now con-
Department, Thailand; and the bridge is 702 m in length, with a nects the Bangkok Port to an industrial
Contractor, Taisai Corporation. composite span of 398 m; and two development area south
prestressed concrete side spans of the river.
Project 152 m long; deck area 25,201 m².
Industrial Ring Road Contracts
1 & 2; Cable Stayed Bridges. The northern cable stayed bridge is
576 m in length, with a composite
Services span of 326 m; and two prestressed
- Construction engineering concrete side spans of 125 m long
- Specialist consultant for both and deck area of 20,678 m².
cable stayed bridges at each
construction stage Each cable stayed bridge has two
- Designs of temporary works concrete diamond shaped pylons,
structures with two cable planes. The north
bridge pylons are 176 m high and
Services period 163 m high on the south bridge.
2002 - 2006
Both bridges have a clear height
Background above the river of 51 m for ships to
The cable stayed bridges project is enter and exit Bangkok Port.
a part of the new industrial ring road
that spans the Chao Praya River.
Project Reference Catalogue
Bridge Services
Y
3D
Z X
Wind. Sensor Temp. Sensor Temp. Sensor PC with Datasoftware
Z
Z
X
X
Y
Y
Z
Z
X
X
Y
Y
Z
Z
X
X
Client
Taiwan and Costa Rica Government. The cable stayed bridge crossing
now eliminates a two hour journey
Project to cross the Tempisque River and
Tempisque Cable Stayed Bridge. is bringing tourism development to
the Nicoya Peninsula. The bridge
Services has two lanes for vehicles and two
- Construction engineering for pedestrians.
- Design of superstructure elements
- Specialist consultant for the cable The 780 m long, 13.3 m wide bridge
stayed bridge construction stage included a 260 m cable stay of two
design checks and for the as built spans of 90 and 170 m on the west
design calculations side; with a 520 m long composite
box girder bridge 2.5 to 3.0 m deep
Services period on the east side.
1998 - 2003
Tempisque cable stayed bridge has
Background a concrete H shaped pylon 65 m in
The cable stay bridge was part of the height above the deck; with 4 pairs
development programme between of asymmetrical cables. The bridge
Taiwan and Costa Rica and opened having a height clearance of 15 m
to traffic in mid 2003. over the shipping channel.
Project Reference Catalogue
Bridge Services
Client was not wide enough for future road design at the proposal stage. The
Taipei City Government, Taiwan. traffic. Hence the new Tah Chi bridge detail design included static, seismic,
was built to meet these requirements. buckling & cable sagging analysis.
Project
Tah Chi Cable Stayed Bridge. The new bridge is a landmark in the
The Tah Chi cable stay bridge has a newly created river side park; and
Services 172 m long main span and two side was opened in 2002.
- Feasibility study spans of 50 m and 23 m. The bridge
- Preliminary & final design having a deck area of 6,838 m².
- Equipment and temporary
works designs The superstructure is a fully welded
- Construction stage calculations orthotropic steel deck with a depth of
- Contractors consultant 3.2 m and suspended by 6 twin stay
- Camber control calculations and cables and 10 back stay cables from
stressing instructions a steel bow shaped pylon structure.
- Project planning
- Supervision during construction The height of the support structure
was limited to 70 m above ground
Services period due to the proximity of the Domestic
1998 – 2003 Airport flight path. Special erection
procedures were developed to lift
Background the support pylon into position.
The deck elevation of the old Tah Chi
bridge could not meet the demand for The scope of work consisted of the
the Keelung River flood control and aesthetic evaluation and preliminary
Project Reference Catalogue
Bridge Services
Services
- Feasibility study
- Preliminary & detailed design
- Wind tunnel testing
Services periods
1993 - 1996 & 1998 - 2000
Background
The Kao Ping His Bridge is located
on the border between Kaohsiung
and Pintung Counties. The Bridge
is a part of the Second North South
Freeway and was opened to traffic
in January 2004.
Client Background
The Taisei, Kawada, Raito, Pan Asia The Cable Stayed Bridge is at the
Joint Venture Contractors. border of Kaohsiung and Pintung
Counties, crossing the Kao Ping
Project River. This freeway section was
Kao Ping Hsi Cable Stayed Bridge, opened to traffic in January 2004.
Second Freeway, Contract C 381.
The 510 m asymmetric cable stayed
Services bridge is the longest in Taiwan and
- Construction engineering the second longest of its type in the
- Temporary works design world.
- JV specialist consultant
- Camber control The reinforced concrete inverted Y
- Pylon stability analysis Pylon is 183.5 m high, with a 34.5 m
- Project planning wide hybrid deck, 180 m
- Construction equipment prestressed concrete side span and
- Site supervision a 330 m fully welded orthotropic
main span. The bridge deck is
- Wind tunnel testing
17,787 m² in area.
Services period
Service responsibilities included:
1996 - 2000
- all technical issues
- construction design calculations
- camber control
- construction equipment design
- design of temporary works
- wind tunnel testing during each
Project Reference Catalogue
Bridge Services
Services period
1995 – 1997
Background
Services included the preliminary and
the detail design for the Shin Dong
Cable Stayed Bridge.
Project
Tai 8 Cable Stayed Bridge is located
in the Taroko Gorge on the east side
of Taiwan.
Services
- Preliminary design
- Detail design
- Construction consulting services
- Project planning
Services period
1991 – 1993
Background
Taroko Gorge is one of Taiwan’s
famous scenic areas where the
marble deposits have been eroded
over time by the Liwa River creating
lofty mountains, impressive canyons,
sheer precipices and waterfalls and
rapids.