NCR-C&P-001
Name of the Project: BAREQ 132/33KV S/S Date: 12/08/2016
IDENTIFICATION
Contractor/Supplier:
4400005899
Contract No:
In-process inspection
Final inspection
As per SEC General instruction Point no.13 VT & CT Wires should be color coded but in actual VT& CT Wires in 132KV
LCC & 13.8KV SWGR & Control-Protection Panels not color coded
R-Phase should be RED Color & Y-Phase should be YELLOW Color & B-Phase should be BLUE Color
DISPOSITION
Use-as-is Return to supplier Technical Leader
Repair Scrap Name:
Rework Missing Signature:
Approval of disposition
Rev. 01
CONTINUATION PAGE
Enclosed Pictures:-