DETAILS OF CONTRACTS PLACED BY OPEN TENDER


(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)
(Status for the Month : From APRIL 2011 To MARCH 2012 )
Works Awarded : APRIL 2011
Quantity Rate
(for supply (for supply
contract)/ contract)/
Contractor’s Scheduled
S. Tender Date of Description of Item/ LOA No. Estimated Tendered Cost Value of
Name and completion
N. No. opening Work and date Cost (For (For Contract
address date
Engg./Elect. / Engg./Elect.
S&T/ Mech. /S&T/Mech.
etc Works) etc Works)
1 IRCON/1029 09.03.2011 RCF-Raebareli IRCON/1029/RCF- M/s High-tech ` 7.86 Crores Schedue “A” 29.85 `10,07,52,666/- 05 Months
/RCF- Project: RBL/10/TENDER Competent Builders (Basic cost as per % above the DSR-
RBL/10/TEN Balance work of (Risk & Cost) Pvt. Ltd., G-17, DSR 2007) 2007
DER (Risk & construction of RCC Box C&R/11/3/OT/01 Dt. RIICO Industrial schedule “B”
Cost) Culverts and Cement 13/15.04.2011 Area, Phase-I, `1325/- per m3
C&R/11/3/O Concrete Roads with Bhiwadi, Distt.-
T/01 Dt. related works at Rail Alwar, Rajasthan
15.02.2011 Coach Factory, Mob:9414012550
Raebareli at Lalganj
(Risk & Cost)
2 IRCON/CC/ 25.10.2011 RSVY in Bihar: IRCON/CC/TN/RSV M/s Raghav Civcon `1279.66 Lacs `1279.66 Lacs `17,85,00,314.62 18.10.2011
TN/RSVY- Balance work for Y-BIHAR/10/613/275 Pvt. Ltd.
BIHAR/10/6 Improvement/ dated 19.04.2011 Rajkumarganj,
13 dated Upgradation of SH-50 P.O.-Lalbagh,
06.10.2010 into 2-lane road from District –
Laheriasarai (CH. – 0.000 Darbhanga (Bihar)
Km.) to Hanumannagar
(CH.–16.471 Km.) of
Darbhanga district in the
State of Bihar [Package:
1B(ii)-I(A)]
Works Awarded : MAY 2011
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Tendered Cost
Cost (For (For
Engg./Elect. / Engg./Elect.
S&T/ Mech. /S&T/Mech.
etc Works) etc Works)
1 IRCON/CC/ 17.02.2011 New BG Railway IRCON/CC/TN/JBN M/s APR-VNR `1848.59 Lakhs `1848.59 Lakhs `18,03,27,336.46 15-months from the
TN/JBNRL- Line Project in RL- (JV), Flat No.: date of issue of
2051/EMBA Nepal: Construction of 2051/EMBANK/617/ 404, 5th Floor, LOA
NK/617 Embankment, Side 7 Dtd.25.05.2011 Bhanu Enclave,
Dtd.18.01.11 Drains, Retaining Walls Sundar Nagar,
and Blanketing work, Erragadda,
construction of bridges Hyderabad –
(minor & major) and 500034 FAX No.:
other ancillary works on 040-23708788
India side of alignment
from Km 0+000 to Km
5+445 for new B.G. Rly
line from Jogbani to
Biratnagar (Nepal)
Works Awarded : JUNE 2011
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Cost Tendered Cost
(For Engg/Elect /S&T/ (For Engg./Elect.
Mech. etc Works) /S&T/Mech. etc Works)
1 IRCON/Civil 18.04.2011 RCF Raebareli IRCON/Civil/1029/R M/s Ram Kripal `5410 Lakhs 17% above `63,29,96,376/- 09-months from the
/1029/RCF- Project: Construction CF- Singh Construction date of issue of
RBL/10/Ten of shell fabrication shop RBL/10/Tender/3/OT Pvt. Ltd., Off No. LOA
der/3/OT-16 of RCF Raebareli -16/107 208 7 309, Suncity
Dt.17.03.11 including architectural, Dtd.02.06.2011 Shopping Arcade,
structural design, Sector – 54,
fabrication, supply and Gurgaon, Haryana
erection of Pre- – 122 002
Engineered Steel Ph. No.: 0124-
Buildings 2572879
2 IRCON/101 20.04.2011 J&K Rail Link IRCON/1014/J&K- M/s Ghulam `1696.431 Lakhs `1527 Lakhs `1663.56 Lacs 15-months from the
4/J&K-DQ/ Project – Dharam – DQ/ Addl. Qtrs, Mohammad & Co. date of issue of
Addl. Qtrs, Qazigund Section : GRPB, Misc-Banihal and M/s M.N. LOA
GRPB, Construction of /SQ-3/55 Dt. Enterprises,
Misc- Additional Type II & III 06.06.2011 Kralpora Chadoor,
Banihal Quarters and 111 Budgam, J&K
/SQ-3 Dt. Bedded GRP Barrack State, H.O.: Govt.
22.03.11 and other miscellaneous Colony, Baghi-e-
works at Banihal yard Mehtab, H.No.120,
(Package SQ-3) SK-19, Srinagar,
Kashmir, 190011
Mob.:9419006575
3 IRCON/Civil 18.04.2011 RCF Raebareli IRCON/Civil/1029/R M/s Gangotri `2679 Lakhs Schedule “A” `27,04,06,445.51 10-months from the
/1029/RCF- Project: Construction CF- Enterprises Ltd., 2.61% above the date of issue of
RBL/10/Ten of Flooring, civil works in RBL/10/Tender/3/OT B-158, Sector-”A” , DSR (2007) LOA
der/3/OT-17 shell fabrication shop -17/117 Mananagar, Schedule “B”
Dt.17.03.11 and traverser track at Dtd.10.06.2011 Lucknow – 226006 5.00% below
RCF, Raebareli at Ph. No.: 0522- estimate
Lalganj 2321104
Continued...../-
Works Awarded : JUNE 2011
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Tendered Cost
Cost (For (For
Engg./Elect. / Engg./Elect.
S&T/ Mech. /S&T/Mech.
etc Works) etc Works)
4 IRCON/100 18.05.2011 Construction of RPF IRCON/1008/J&K- M/s Star `506 Lakhs `506 Lakhs `5,66,67,665.99 06-months from the
8/J&K- Quarters Type-II, III and DLI/Quarters- Constructions, 1st date of issue of
DLI/Quarter IV units at Budgam Budgam/Q-7R/122 Floor, AI-Noor LOA
s- Railway Station on Dt.30.06.11 Complex,
Budgam/Q- Qazigund - Baramulla Hyderpora, Bypass
7R New BG Rail Line (West), Srinagar,
Dt.18.05.11 Project(J&K) Kashmir-190014
(Package: Q – 7R) Mob.:
09419001145,
09419006074,
FAX: 0194-
2430631

Works Awarded : JULY 2011


S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Tendered Cost
Cost (For (For
Engg./Elect. / Engg./Elect.
S&T/ Mech. /S&T/Mech.
etc Works) etc Works)
NIL

Continued...../-
Works Awarded : AUGUST 2011
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Tendered Cost
Cost (For (For
Engg./Elect. / Engg./Elect.
S&T/ Mech. /S&T/Mech.
etc Works) etc Works)
1 IRCON/CC/ 29.04.2011 Detailed Design IRCON/2046/SRRP/ M/s AECOM Asia `1428 Lakhs `1428 Lakhs USD 21,55,262 36-months from the
TN/SR/11/ Consultancy, 3D DDC/TunnelT3- Company Ltd, 9th and INR date of issue of
622 Monitoring and T4/526 Dt.26.08.11 Floor, Infinity 6,60,99,481 LOA
Dt.18.03.11 Construction supervision Tower C, DLF
of Tunnel T-3 (between Cyber City, DLF
Km 5+917 & Km 7+174) Phase-II, Gurgaon,
& Tunnel T-4 (between Haryana - 122002,
Km 7+360 & 11+326) in Tel.: 0124-
connection with 4830100,
construction of Sivok FAX: 0124-
Rangpo New single line 4830108
B.G. Railway Project

Continued...../-
Works Awarded : SEPTEMBER 2011
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Cost Tendered Cost
(For (For Engg./
Engg./Elect. / Elect.
S&T/ Mech. etc /S&T/Mech. etc
Works) Works)
1 IRCON/CC/ 21.07.2011 Construction of balance IRCON/CC/TN/ M/s BLA Projects `413.99 `413.99 `6,12,70,964.74 06-months
TN/RSVY- left over works of Box RSVY-BIHAR/11/ Pvt. Ltd.,
BIHAR/11/ Culverts between Pupri 631/579 31/1, N.S.B. Road,
631 Dtd. to Benipatti (Ch.39.65 Dtd. 12.09.2011 P.O. - Raniganj,
06.07.2011 Km to 14.72 Km) of SH- Dist. - Burdwan,
52 in Madhubani district (W.B.)PIN: 713 347
of Bihar State. Est. Cost: Phone: 0341-
`413.99 Crores 2444163,
Package: 1D(i-a) 2445194
2 IRCON/ 29.07.2011 J&K Rail Link Project – IRCON/ M/s Gypsum `10,50,45,725/- `945 Lacs `11,13,86,003.00 28.03.2012
1014/J&K- Dharam– Qazigund Section. 1014/J&K-DQ/ UG Structural India
DQ/ UG Construction of Drainage Pipe Zone Pvt. Ltd.,
Drainage underground drainage VI/ M-12R 185-A, Pocket-B,
system from collecting
pipejacking- Dtd. 27.09.2011 Mayur Vihar-II,
chambers to disposal
Zone VI/ M- Delhi – 110 091
points at various locations
12R with pipe thrusting
Dt. 29.06.11 (trenchless pipe jacking-
pipe pushing method)
and laying of pipes
(1200mm in diameter) in
open excavation and
other allied works in Zone
VI; Package - M – 12R
Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Cost Tendered Cost
(For Engg./ (For Engg./
Elect. /S&T/ Elect.
Mech. etc /S&T/Mech. etc
Works) Works)
3 IRCON/CC/ 06.06.2011 Construction of a) Station IRCON/2051/JBNRL/ M/s Jay Mata Di `1932.56 Lakhs `1930 Lakhs `18,14,30,484.31 15-months from the
TN/ Buildings, Passenger and LOA/Km0.000 to Construction, Ward date of issue of
JBNRL/11/ Goods Platform, PF 5.445/Bldg/139 No.: 7/9, Under LOA
626 Dtd. Shelter/ sheds, Foot Over Dt.30.09.11 Araria Municipality,
10.05.2011 Bridge(FOB), tea stall, Araria, Police
Goods Circulating Area/ Station – Araria,
roads works etc., b) Staff District – Araria
Quarters, Guest House, Bihar
Pump House, Duty Huts,
Over Head Water Tank,
Garages, Trolley shed,
miscellaneous ancillary
works including internal
sanitary items, pipes etc.
and any other items
required to complete the
above works in
connection “Construction
of New Broad Gauge
Railway Line From
Jogbani To Biratnagar
(Nepal) in Indian portion
from Km0.000 to
Km.5.445”
Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Tendered Cost
Cost (For (For Engg./
Engg./ Elect./ Elect.
S&T/Mech. /S&T/Mech.
etc Works) etc Works)

Works Awarded : OCTOBER 2011


1 IRCON/ 24.06.2011 Fabrication and Supply of IRCON/1014/J&K- M/s Texmaco Rail `432.8 Lacs `3,77,91,200/- `3,77,91,200/- 09.10.2012
1014/ J&K- Steel Girders (Composite DQ/Bridge/Pkg- & Engg. Ltd.,
DQ/Bridge/ Type) for Super Structures 10/597 Agarpara Works,
Pkg-10 of Bridge No: 139 & 145B Dtd. 10.10.2011 P.O. : Belgharia,
Dt.18.05.11 for USBRL Project Kolkatta – 700 056

2 IRCON/ 26.08.2009 Construction/Up-gradation IRCON/2035/ M/s Durga Pratap `590.32 Lacs `6,78,86,694/- `6,78,86,694/- 12-months from the
CC/TN/ and Maintenance of Rural PMGSY/ Singh date of issue of
PMGSY/ Road for five years under BR-13- Vill. - Korara, LOA
09/533 PMGSY from Majhwakhurd 27A/LOA/2284 PO – Bishunpura,
to Bairagitola (4.95 Km) Dtd. 12.10.2011 Mairwa,
and from Uchakagaon to District – Siwan,
Harpur (7.95 Km); i.e. Total Bihar
12.90 Km in Block:
Uchakagaon of Distt.-
GOPLAGANJ, BIHAR
PkgNo: BR/13/27A

3 IRCON/ 26.08.2009 Construction and IRCON/2035/ M/s Binod Kumar `455.12 `6,37,17,924/- `6,37,17,924/- 12-months from the
CC/TN/ Maintenance of Road for PMGSY/ Vill. - Korara, date of issue of
PMGSY/ five years under PMGSY BR-34- PO – Bishunpura, LOA
09/570 in Block Gopalganj from 44/LOA/2283 Dtd. Mairwa,
Sidhwol to Zeradai via 12.10.2011 District – Siwan,
Bhaiskenal (11.30 Km) Bihar
Block:Ziradei/ Hussainganj
in District-SIWAN, BIHAR
Package No.: BR/34/44

Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Tendered Cost
Cost (For Engg./Elect.
(For Engg/Elect /S&T/ /S&T/Mech. etc
Mech. etc Works) Works)
4 IRCON/ 26.08.2010 Construction/Up-gradation IRCON/2035/ M/s Baibhaw `1687.50 `21,09,38,419/- `21,09,38,419/- 12-months from the
CC/TN/ and Maintenance of Rural PMGSY/ Construction Pvt. date of issue of
PMGSY/ Road for five years under BR-13- Ltd., LOA
10/604 PMGSY in Block 20/LOA/2285 Dtd. Sareya,
Goplaganj from Bhityerwa 12.10.2011 Ward No. - 13,
to Mehdia (4.30 Km); in Gopalganj,
Block Barauli from Parsa Bihar
to Balaha (5.25 Km); in
Block Manjha from
Bhojpurwa to Gausia (5.15
Km); in Block Gopalganj
from Gopalganj to
Khargauli (15.00 Km); in
Block Gopalganj from
Baraipattiq to Niranjana
(3.70 Km) and in Block
Bijaypur from Bijaipur to
Bilarwa (4.58 Km) i.e.
Total Length = 37.98 Km
in District-GOPALGANJ,
BIHAR Pkg. No.: BR/13/20
5 Package- 21.04.2011 J&K Rail Link Project - IRCON/1014/J&K- M/s KMB-IVRCL `80500 Lacs `76500.00 Lacs `761,51,81,750/- 18.10.2014
74R Dharam - Quazigund DQ/Tunnel- JV
Section. Construction of 74R/185 Dtd. C/o IVRCL Ltd.,
Tunnel T-74R (between 19.10.2011 “The Corenthum”
Km 125 & 134) on Dharam A-41, Tower-B,
- Quazigund Section of 1st Floor,
Udhampur - Srinagar - Lobe No.: 4,
Baramula New BG Sector – 62,
Railway line Project NOIDA – 201 307
Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Tendered Cost
Cost (For (For
Engg/Elect Engg./Elect.
/S&T/ Mech. /S&T/Mech.
etc Works) etc Works)
6 IRCON/ 01.08.2011 Supply and Erection, LOA No.: M/s Unique 06 nos. `1,14,78,030 `6,88,68,178.80 28.03.2012
MECH/ Installation & IRCON/MECH/ Industrial Handlers
1029/RCF. Commissioning of 06 Nos. 1029/RCF-RBL- Pvt. Ltd.,206-207,
RBL-II/Skin Skin Tensioning II/Skin Nahar & Seth
Tensioning Equipments at Rail Coach Tensioning/15 dtd. Industrial
/15 Factory at Lalganj, 28.10.2011 Estate,Chakala,
Date Raebareli, UP-(INDIA) Andheri (E)
07.07.11 Mumbai-400099)
Tel No.:022-
28390071,
28352019; fax
No.:022-
28378226,
28210006
7 IRCON/ 29.07.2011 Supply and Erection, LOA No.: M/s Zagro Bahn- 01 no. `2,12,43,036/- `2,12,43,036/- 29.03.2012
MECH/ Installation & IRCON/MECH/ und
1029/RCF. Commissioning of 01 No. 1029/RCF-RBL- Baumaschinen
RBL-II/ 600 MT Rail Cum Road II/RRV/24 dtd. GmbH, MuhlstraBe
RRV/24 Vehicle at Rail Coach 29.10.2011 11-15 D-74906
Date Factory at Lalganj, Bad Rappenau-
07.07.2011 Raebareli, UP Grombach
Germany (Tel:+49
(0) 7266-9168-0

Continued...../-
Works Awarded : NOVEMBER 2011
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Cost Tendered Cost
(For (For
Engg/Elect /S&T/ Engg./Elect.
Mech. etc Works) /S&T/Mech. etc
Works)

1 IRCON/301 12.09.2011 Construction of Road IRCON/3015/TN/ M/s Singla `1844 Lacs 21.42% above `22,39,91,869.00 30.06.2013
5/TN/ROB- Over Bridges (ROB) as ROB-RAJ/ Engineers &
RAJ per specifications CHITTORGARH/ Contractors Pvt.
/CHHITAUR drawing & design, 11/07/139 Dated: Ltd.,
GARH/11/0 maintaining all quality 01.11.2011 D-98, Indusatrial
7 Dt. control standard Area, Ph-7,
11.08.2011 complete at KM 184/13- Mohali - 160055
14 on LC No. 88-B in (Punjab)
Chittaurgarh - Udaipur
section of Western
Railway near Kumbha
Nagar Chittaurgarh in
Rajasthan State

2 IRCON/ 28.07.2011 Supply and Erection, IRCON/MECH/ M/s Godrej & 52 nos. (a) 3 Ton, 25 `5,33,60,603/- 28.02.2013
MECH/ Installation and 1029/RCF- Boyce Mfg. Co. nos Forklifts cost is
1029/RCF. Commissioning of 25 nos. RBL-II/Forklift/23 Ltd., Godrej `1,75,38,844/-
RBL-II/Fork 3 Ton, 25 nos. 5 Ton & dtd. 23.11.2011 Material Handling, (@`7,01,553.77/
Lift/23 2 nos. 10 Ton Diesel Fork Pirojshanagar, Forklift)
Date Lift Trucks at Rail Coach Vikhroli, (b) 5 Ton, 25
07.07.2011 Factory at Lalganj, Mumbai-400079. nos Forklifts cost is
Raebareli, UP-(INDIA) ` 3,15,52,784/-
(@`12,62,111.36/
Forklift)
(c) 10 Ton, 2
nos Forklifts cost is
`42,68,975/-
(@`21,34,487.50/
Forklift)

Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Cost Tendered Cost
(For Engg/Elect (For Engg./Elect.
/S&T/ Mech. /S&T/Mech. etc
etc Works) Works)

3 IRCON/Civil 22.09.2011 Construction of three IRCON/Civil/ M/s ENVIRO `487 Lakhs 1a) STP-1- `540 Lakhs 28.09.2012
/1029/RCF- Sewage Treatment Plants 1029/RCF-RBL/10 INFRA Engineers `1,84,30,000/-
RBL/10/ten based on SBR technology /tender/3/ OT-18/ Pvt. Ltd., 206, IInd 1b) STP-2-
der/3/ OT- on turnkey basis at RCF- dtd.29.11.2011 Floor, RG Complex `2,18,25,000/-
18 dtd. Raebareli Community Center 1c) STP-3-
26.07.11 Sector-8, Rohini, `1,06,70,000/-
Delhi-110089

4 IRCON/Civil 01.11.2011 Construction of Wheel IRCON/Civil/1029/ M/s Era Buidsys `50.95 Crore `52.55 Crore `52.55 Crore 28.09.2012
/1029/RCF- shop, Bogie Shop, Paint RCF-RBL/10/ Ltd., C-56/41,
RBL/10/ten Shop, Garnet Blasting tender/3/ OT-19/ Sector 62, Noida-
der/3/ OT- Shop, Machine Shop, C-155 dtd. 201303
19 dtd. Transport Shop & Shell 29.11.2011 Ph.0120-4145000
20.09.2011 Store of RCF Raebareli Fax 0120-4145030

5 IRCON/Civil 02.11.2011 Construction of Officer's IRCON/Civil/1029/ M/s Era Infra `55.01Crores Sch.-A: 41.7% `58.68 Crores 28.02.2013
/1029/RCF- Club & Guest House, RCF-RBL/10/ Engineering Ltd., above and
RBL/10/ten Supervisor & Worker's tender/3/ OT-21/ C-56/41, Sector Sch.-B: 10.2%
der/3/ OT- Club & Guest House, dtd. 29.11.2011 62, Noida-201303 over basic cost
21/ Senior Sec. & Primary Fax 0120-4145030
dtd. Schools, Technical
26.07.11 Trainee & Sports Hostel,
Maintenance office
(5 nos.), Hospital and
Shopping Complex etc.,
for RCF, Raebareli at
Lalganj
Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Tendered Cost
Cost (For (For
Engg/Elect Engg./Elect.
/S&T/ Mech. /S&T/Mech.
etc Works) etc Works)

6 IRCON/ 01.09.2011 Supply and Erection, IRCON/MECH/ M/s Soitab Implant 02 nos. `8,02,00,680/- `8,02,00,680/- 02.04.2012
MECH/ Installation & 1029/RCF-RBL- s.r.l.,D-22,
1029/RCF. Commissioning of 02 Nos. II/Under Water Sector - 3, NOIDA
RBL-II/ CNC (under water) Plasma/14 (201301)
Under Plasma Profile Cutting dtd. 30.11.2011 Tel:0120-
Water Machines at Rail Coach 4545428,29
Plasma/14 Factory at Lalganj,
Date Raebareli, UP-(INDIA)
11.08.11

7 IRCON/Civil 20.10.2011 Construction of flooring, IRCON/Civil/1029/ M/s Sacred `43.24 Crores `46.95 Crores `46.95 Crores 29.09.2012
/1029/RCF- foundations and other civil RCF-RBL/10/ Construction Pvt.
RBL/10/ten works in wheel shop, tender/3/ OT-19/ Ltd., Engineers,
der/3/ OT- bogie shop, paint shop, C-156 dtd. Contractors and
20 dtd. transport shop and shell 30.11.2011 Fabricators, AN-
20.09.2011 store of RCF Raebareli 29-B, Shalimar
Bagh, Delhi-88

8 IRCON/CC/ 21.02.2011 Construction of Civil work IRCON/2050/ M/s Jai Mata Dee `813.10 Lacs `7,23,65,647.20 `7,23,65,647.20 15 Months from
TN/JBRL/11 including Embankment, BGL.JBB/Embk- Construction, the date of issue
/618 Dtd. Side Drains, Retaining Bridge-01(India)/ Chakai of LOA
31.01.2011 Walls, Blanketing, Bridges Tender/1 Jokihat,Araria,
and other ancillary works Dtd. 30.11.2011 Bihar
in Jaynagar to Osrahi PIN: 854 311
section Km 0+000 to Km Tel.: 06453 – 224 882
2+975 FAX: 06453 – 224
(Indian side Alignment portion) 883

Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply contract)/ Contract completion
contract)/ Estimated Tendered Cost (For
address Cost (For Engg./Elect./ date
Engg/Elect/ S&T/ S&T/Mech. etc
Mech. etc Works) Works)

Works Awarded : DECEMBER 2011


1 IRCON/301 12.09.2011 Construction of Road Over IRCON/3015/TN/ M/s Simplex `2006 Lacs 24.56% above `24,98,79,267.00 31.07.2013
5/TN/ROB- Bridges (ROB) as per ROB- Infrastructures Ltd.
RAJ specifications drawing & RAJ/BIKANER/11/ Vailunth, 2nd floor,
/BIKANER/ design, maintaining all 06/190 82-83, Nehru
11/06 Dt. quality control standard Dated: 01.12.2011 Place, New Delhi -
11.08.2011 complete at Km 322.30 in 110019
lieu of LC No. 139 in
Lalgarh Bikaner section of
N.W. Railway near
Choukhuti, Bikaner in
Rajasthan State

2 IRCON/301 17.10.2011 Construction of ROB IRCON/3015/TN M/s Harish `2006 Lacs 1% below `19,97,94,069.00 28.02.2013
5/TN/ROB- (excluding of Pile /ROB- Chandra (India)
RAJ Foundation) as per RAJ/KOTA/11/1 Ltd.
/KOTA / specifications, drawings & 1/194 Dated: 113-A, Kamala
11/11/194 design, maintaining all 01.12.2011 Nagar,
Dt. quality control standards Delhi - 110017
11.08.2011 complete as LC No. 108
-B at KM 918/1-2 at Kota
in Rajasthan State

3 RFP No.: 30.06.2011 Pre-feasibility study for IRCON/CC/ M/s Parsons - - `4,62,30,687/- 06-months from
IRCON/ High Speed Rail Corridors TN/HSRC- Brinckerhoff India the date of
CC/TN/ between Hyderabad - 5/HDVC/11/ Pvt. Ltd., 3rd effectiveness of
HSRC/ Doranakal - Vijayawada - 624/693 dtd. Floor, A-Wing, Contract
HDVC/11/ Chennai 02.12.2011 IFCI towers, 61, Agreement
624Date: Nehru Place,
21.04.2011 New Delhi-19
Tel.: 011-43700200
Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply contract)/ (for supply contract)/ Contract completion
Estimated Cost (For Tendered Cost (For
address date
Engg/Elect /S&T/ Engg./Elect.
Mech. etc Works) /S&T/Mech. etc Works)

4 IRCON/ 12.09.2011 Supply, Erection, Testing & LOA No.: M/s Hitech JK `1489.78 Lakhs `15,64,27,129/- `15,64,27,129/- 10 Months from
ELECT/ Commissioning of Electrical IRCON/J&K- Engineers JV, the date of issue
J&K-DQ/ Sub-stations South & North Cell/JAT/15/ 303, Pragati of LOA
1014/T-80 Portal of T-80 Tunnel 1014/D-Q/T-80 Chambers,
PSS I&II Consisting of 2x3150KVA PSS I&II/1164 Ranjit Nagar,
Date: Transformer 33KV/11KV, dtd. 03.12.2011 Commercial
19.07.2011 2x1500KVA Transformer Complex,
11KV/0.433KV, 2x250KVA New Delhi – 08
Transformer 11kV/0.433kV,
Tel:011-25702463
2X1500KVA Silent DG Set
FAX:011-25709321
along with GIS Panel,
Battery Charger and other
accessories at each Sub-
Stations, Supply of
Mandatory Spares including
Annual Comprehensive
Maintenance of the
Installation on yearly basis
after Expiry of Defects
Liability Period

5 IRCON/ 04.11.2011 Construction of IRCON/Civil/ M/s Apco Infratech `4781 Lakhs Schedule “A” `4938.14 Lakhs 06.03.2013
Civil/1029/R Administrative Building & 1029/RCF- Ltd. 35.50 % over Fifteen Months
CF-RBL/ 10/ B-9, Vibhuti Khand,
Technical Training RBL/10/ DSR rates
Tender/3/ Gomati Nagar,
OT-22 dated Centre for RCF, Tender/3/OT-22 Luknow- 226010 Schedule “B”
30.09.2011 Raebareli at Lalganj. Date:07.12.2011 Fax: 0522-2720479 17.5 % above
Email:
admin@apcoinfra.com

Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Cost Tendered Cost
(For Engg/Elect (For Engg./ Elect.
/S&T/ Mech. /S&T/Mech. etc
etc Works) Works)

6 IRCON/CC 31.05.2011 Detailed Design IRCON/2046/ M/s AECOM `1653 Lakhs - USD 27,06,762 36-months from
/TN/SR/ Consultancy, 3D SRRP/DDC/ Asia Co. Ltd., and the date of issue
11/623 Dt. Monitoring & Supervision Tunnel/ 9th Floor, Infinity INR 6,88,12,861/- of LOA
05.04.2011 of Tunnel T-5 (Between T5-T6/23/299 Tower C, DLF
Km 11+671 to Km Dtd. 09.12.2011 Cyber City, DLF
13+764) & Tunnel T-6 Phase-II,
(Between Km 14+934 to Guragon-122 002
Km18+884) in
connection with
Construction of Sivok
(West Bengal) to Rangpo
(Sikkim) new Single line
BG Railway Line Project

7 IRCON/EL 18.10.2011 Supply, Installation, IRCON/ELECT / M/s. NKG `340 Lakhs `312 Lakhs `312 Lakhs 4 months for date
ECT / Testing and 1029/RCF-RBL/ Infrastructure of LOA.
1029/RCF- Commissioning of 750KVA CSS-750/22 dtd Limited, 124,
RBL/ CSS- 11/0.433kV Compact 16.12.2011 Ground Floor,
750/22 Substations at RCF, World Trade
Raebareli (Uttar Pradesh) Centre Road,
Connaught Place,
New Delhi-01

8 IRCON/Civil 20.10.2011 Construction of Auxiliary IRCON/Civil/1029/ M/s Sacred `564.32 Lakhs Sch- A 2.95% `580.98 Lakhs 18.08.2012
/1029/RCF- Sub-Station Buildings in RCF-RBL/1040/ Constructions Pvt. above , and
RBL/Tender Factory Area in 1337 Ltd., Engineers & Sch- B 2.95%
/ASS/7000/ connection with Date: 19.12.2011 Contractors & above basic
07 Dt. construction of Rail Fabricators, AN- cost + 43%
29.09.2011 Coach Factory Raebareli, 29-B, Shalimar
Lalganj, Raebareli(UP) Bagh, Delhi-088
Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply contract)/ Contract completion
contract)/ Estimated Tendered Cost (For
address Cost (For Engg./Elect. date
Engg/Elect /S&T/ /S&T/Mech. etc
Mech. etc Works) Works)

9 IRCON/ 08.12.2011 Supply, installation, testing & ELECT/ 1029/RCF- M/s Sterling & `1748 Lakhs `1423 Lakhs `1423 Lakhs 12 months form
ELECT/1029 commissioning of electrical RBL/Shell Shop/28 Wilson Limited, the date of issue
/RCF- power distribution system dtd 21.12.11 C-56/38, of LOA
RBL/Shell including Lighting in Shell Institutional Area,
Fabrication shop at New Rail
Shop/28 Coach Factory, Rae Bareli
Sector-62, Noida,
PIN - 201307

10 IRCON/ 30.11.2011 Construction of external IRCON/Civil/1029/ M/s Envirad-Brij (JV) `3422 Lakhs Schedule “A” `3324.29 Lakhs 20.03.2013
Civil/1029/ Sewerage, Drainage and RCF-RBL/10/ Avadhpuri Road, 29.0 % over Fifteen Months
RCF-RBL/ Water supply works Tender/3/OT-23 6- Lakhanpur, DSR rates
10/Tender/3 including Overhead Date: 21.12.2011 Kanpur-208024
/OT-23 Water Tanks for the Rail Fax: 0512- Schedule “B”
dated coach Factory Raebareli 2582532,Email: “AT PAR”
contact@epplindia.net
04.11.2011 complex at Lalganj

11 IRCON/ 18.11.2011 Construction of Bituminous IRCON/Civil/102 M/s RG Buildwell `43.63 Crores Schedule A `38.34 Crores 10.01.2013
Civil/1029/R and concrete roads for the 9/RCF-RBL/10/ Engineers Ltd., 22.8 % above
CF-RBL/10/ Rail Coach Factory Tender/3/OT-23 R-13/84, the DSR (2007) 12 months
Tender/3/O Raebareli complex at Date:21.12.2011 Raj Nagar, Schedule B
T-24 Dt. Lalganj. Ghaziabad (U.P.) At the following
18.11.2011 item rates
Item no. 1 @
`1350/-per cum
Item no. 2 @
`230/- per cum
Item no. 3 @
`1580/-per cum
Item no. 4 @
`2050/-per cum
Item no. 5 @ `35/-
per sqm
Item no. 6 @
`11.5 per sqm

Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply Contract completion
address contract)/ contract)/ date
Estimated Cost Tendered Cost
(For Engg/Elect (For Engg./Elect.
/S&T/ Mech. /S&T/Mech. etc
etc Works) Works)

12 IRCON/EL 21.12.2011 Supply, Installation, IRCON/ELECT/ M/s Sudhir Power `1540 Lakhs `1248 Lakhs `1248 Lakhs 12 months form
ECT/1029/ Testing & Commissioning 1029/RCF-RBL/ Projects Limited, the date of issue
RCF-RBL/ of Electrical Power Misc Shop/35 dtd 507, International of LOA
Misc Distribution System 28.12.2012 Trade Tower,
Shop/35 including Lighting in Nehru Place, New
Bogie, Wheel, Paint, Mill Delhi-110019
Write & Transport Shops
at New Rail Coach
Factory, Rae Bareli (U.P.)

13 IRCON/ 03.10.2011 Supply and Erection, LOA No.: M/s Taikisha 01 no. `32,09,93,492/- `32,09,93,492/- 30.08.2012
MECH/ Installation & IRCON/MECH/ Engineering Pvt.
1029/RCF. Commissioning of 1029/RCF-RBL- Ltd.,404,Udyog
RBL-II/ Complete Painting System II/Paint Phase IV
Paint for Railway Passenger Plant/26/651 dtd. Gurgaon-122015
Plant/26 Coaches at Rail Coach 30.12.2011 (Haryana)
dtd. Factory at Lalganj, Ph.no.0124-
08.09.2011 Raebareli, UP-(INDIA) 2348247
Works Awarded : JANUARY 2012
S. Tender No. Date of Description of Item/ Work LOA No. Contractor’s Name Quantity Rate Value of Contract Scheduled
N. opening and date and address (for supply contract)/ (for supply contract)/ completion
Estimated Cost (For Tendered Cost date
Engg/Elect /S&T/ (For Engg./Elect.
Mech. etc Works) /S&T/Mech. etc
Works)

1 IRCON/ 20.12.2011 Construction of IRCON/Civil/1029 M/s RG Buildwell `4363.00 Lacs `3834 Lacs `3834 Lacs 10.01.2013
Civil/1029/ Bituminous and concrete /RCF-RBL/10/ Engineers Ltd.,
RCF-RBL/10/
roads for the Rail Coach Tender/3/OT-24 Ghaziabad
Tender/3/OT-
24 Factory Raebareli dtd. 11.01.2012
dtd.18.11.11 complex at Lalganj

2 IRCON/J&K 24.11.2011 Construction of IRCON/J&K Cell/ M/s M. M. Shawl, `1211.00 Lacs Schedule – 'A' 68% `11,56,86,820.03 12-months from
miscellaneous works above BOQ Rates
Cell/ JAT/ JAT/ 14/1014/ Chinar the date of issue
including rigid pavements, Commercial
14/1014/ D-Q/Misc. Works Schedule – 'B' 79% of LOA
RCC retaining/ breast walls, Complex, The above BOQ Rates
D-Q/Misc. Sewerage & water Supply M-17/199
Works System, Drainage Works, dtd.16.01.2012 Bund, Residency Schedule – 'C' 72%
M-17/199 Pathways, UG water tanks, Road, Srinagar, above BOQ Rates
dtd.02.11.11 Pump House and other Kashmir – 190004 Schedule – 'D' 40%
related works at Banihal Yard Tel.: 0194 – above BOQ Rates
in Dharma-Qazigund section 2477506, 2400153
of USBRL project (J&K) Fax: 0194 -
(Package-M-17) 2480625

3 IRCON/100 25.11.2011 Construction of 111 IRCON/1008/J&K- M/s Hi-Tech Schedule-A : +32.00% above `4,14,08,351.92 06-months from
`13103460.25 BOQ Rates
8/J&K-Cell/ Bedded GRP Barracks Cell/ JAT/ GRP Engineers, 65, the date of issue
Schedule-B : +60.00% above
JAT/ GRP and other miscellaneous Barracks- East Extension, `8681483.50 BOQ Rates
of LOA
Barracks- works such as Awantipora/GRP- M.E.T. Road, +29.00% above
Schedule-C :
Awantipura/ Compound wall, Chain 19R dtd.16.01.12 Baghat Barzulla, `513494.80 BOQ Rates
GRP-19R Link Fencing etc., at Srinagar – Schedule-D : +80.00% above
dtd.03.11.11 Awantipora Railway 190005 `100022.50 BOQ Rates
station Yard (GRP-19R) (Kashmir) Schedule-E : +20.00% above
on Quazigund – Mob.: `5678148.90 BOQ Rates
Baramulla New BG 9419067835 Schedule-F:`500000/- At Par
Railway Line Project Fax:0194- +20% above BOQ Rates
Schedule-G:`623120/-
(J&K) 2433600
Schedule-H:`1116474/- +18% above BOQ Rates

Continued...../-
S. Tender No. Date of Description of Item/ Work LOA No. Contractor’s Name and Quantity Rate Value of Contract Scheduled completion
N. opening and date address (for supply contract)/ (for supply contract)/ date
Estimated Cost (For Tendered Cost
Engg/Elect /S&T/ Mech. (For Engg./Elect.
etc Works) /S&T/Mech. etc Works)

4 IRCON/ 12.09.2011 Supply and Erection, IRCON/MECH/ M/s Unique 03 Nos. (50MT) 03 Nos. 50MT = `12,58,93,538/- 20.01.2013
MECH/1029 Installation & 1029/RCF-RBL- Industrial Handlers & `4,61,03,540/-
Pvt Ltd, 206-207, 04 Nos. (80MT)
/RCF.RBL-II Commissioning of 03 II/Traverser/007/ 04 Nos. 80MT =
Nahar & Sheth
/TRAVERS Nos. (50MT) & 04 Nos. 739 dated Industrial Estate, `7,80,60,999/-
ER/007 (80MT) Traversers 27.01.12 Chakala, Andheri(E)
dtd.11.08.11 Machines. at Rail Coach Mumbai-400099 and
Factory at Lalganj, Tel.:022-28390071,
Spares =
28352019
Raebareli, UP-(INDIA) FAX: 022-28378226, `17,29,000/-
28210006

5 IRCON/ 15.12.2011 Design, supply, installation IRCON/ELECT/ M/s Sterling & `605.00 Lacs `596 Lacs `596 Lacs 6-months from
ELECT/1029 testing and commissioning of 1029/RCF-RBL/ Wilson Powergen the date of issue
/RCF-RBL/ all electrical equipment
1010 KVA DG/34 Limited, A-7, of LOA
MRS related to 4 sets of standby
Diesel Generator Sets of dated Sector-6, Noida
ELECT/34 1010kVA, 11kV with 31.01.2012
Dt.25.11.11 Synchronising control panels,
U/ground fuel storage tank,
Civil and all associated works
at Rail Coach Factory, Rae
Bareli (U.P.)

6 IRCON/ 02.11.2011 Detailed Design IRCON/1014/J&K Ms/ Bernard `4878.00 Lacs `4878.00 Lacs EURO48,76,906.79 30.01.2016
1014/J&K. Consultancy of all structures .DQ/Consultancy Ingenieure ZT and INR
DQ/ including Tunnels, Tunnels/Km.110- GmbH, `19,17,73,050.40
Consultancy bridges /viaducts, Station 125/186 dated BahnhofstraBe
Tunnels Yards and associated works 31.01.2012 19, A-6060. Hall
Km.110- and Construction in Tirol, Austria
125/186 Supervision of Tunnels Tel:+43 (0) 5223/
dated between km 110 & km 125 5840-0
in connection with
09.09.2011 Fax:+43 (0)
Construction of Dharam-
5223/ 5840-201
Qazigund Section of
Udhampur-Srinagar-
Baramulla New BG Railway
Line Project.
Works Awarded : FEBRUARY 2012
S. Tender No. Date of Description of Item/ Work LOA No. Contractor’s Name Quantity Rate Value of Contract Scheduled
N. opening and date and address (for supply (for supply contract)/ completion
contract)/ Estimated Tendered Cost date
Cost (For (For Engg./Elect.
Engg/Elect /S&T/ /S&T/Mech. etc
Mech. etc Works) Works)

1 IRCON/ME 11.10.2011 Supply, Erection, Testing IRCON/MECH/ M/s TOS KURIM - 02 Nos. `1305.68 Lacs `2611.36 Lacs Within 180 days
CH/1029/ and Commissioning of 02 1029/ RCF.RBL- OS, a.s. `5856.00 Lacs from the date of
RCF.RBL- Nos. Bolster Machining II /Bolster Stefanikova - 41, c.p. LC
II/Bolster Centre at Rail Coach Machining Centre/ 110 602 00 Brno,
Czech Republic
Machining Factory at Lalganj, 42 dt. 16.02.2012 Ph.:+420 541 102
/42 dtd. Raebareli, UP-(INDIA) 245, Mobile: +420
08.09.11 602 582 317,
FAX: +42 541 103
266, Email:
petr.konopka@tos-
kurim.cz

2 IRCON/ 13.09.2011 Supply, Erection, Testing IRCON/MECH/ M/s Godrej & 01 No. Cost of ` 7,16,36,040/- 30.10.2012
MECH/ and Commissioning of 01 1029/ RCF.RBL- Boyce Co. Ltd., `800.00 Lacs Equipment :
1029/RCF. No. Plate Straightening II/ Plate Pirojshanagar ` 6,72,24,040/-
RBL-II/ Machine at Rail Coach Straightening/16 Vikroli, Mumbai - +
Plate Factory at Lalganj, dtd.17.02.2012 400 079 ` 44,12,000/-
Straitening/ Raebareli, UP-(INDIA) Email: for installation,
16 dtd. uvs@godrej.com/ commissioning
11.08.11 sgg@godrej.com and civil works

3 IRCON/ 15.09.2011 Supply, Erection, Testing IRCON/MECH/ M/s TOS KURIM - 01 No. ` 738.25 Lacs ` 738.25 Lacs Within 120 days
MECH/102 and Commissioning of 01 1029/ RCF.RBL- OS, a.s. `1100.00 Lacs from the date of
9/ No. CNC Edge Milling II/ Edge Milling/12 Stefanikova - 41, c.p. LC
RCF.RBL- Machine at Rail Coach dtd.17.02.2012 110 602 00 Brno,
Czech Republic
II/ Edge Factory at Lalganj, Ph.:+420 541 102
Milling/12 Raebareli, UP-(INDIA) 245, Mobile: +420
Dtd. 602 582 317
11.08.11 FAX: +42 541 103
266, Email:
petr.konopka@tos-
kurim.cz

Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply contract)/ Contract completion
contract)/ Estimated Tendered Cost
address Cost (For (For Engg./Elect. date
Engg/Elect /S&T/ /S&T/Mech. etc
Mech. etc Works) Works)

4 IRCON/ 24.01.2012 Design, Manufacture, IRCON/1014/J&K M/s Savronik `3515.00 Lacs `3515.00 Lacs `38,58,09,757.73 Completion
1014/J&K- Supply, Installation, Testing -DQ/ S&T/ Sistem India Pvt. Period: 09 months
DQ/S&T/ and Commissioning of Telecom/1677 Ltd., Terrace from the date of
Telecom complete dtd. 24.02.2012 No.:4A, 3rd Floor, issue of letter of
Dtd: Telecommunication System Vardhman Crown acceptance i.e.
29.11.2011 consisting Emergency Call Plaza, Plot No.2, 23.11.2012
& Service Telephone, Sector-19,
CCTV, Tunnel Radio & PA Dwarka,
System in Tunnel T-80 for
New Delhi – 110
Dharam- Quazigund New
075
BG Rail Line Project.(J&K)

5 IRCON/ 02.02.2012 Supply, Erection, Testing LOA No.: M/s Savronik `1055.68 Lacs - `10,55,69,843/- Completion
J&K-Cell/ & Commissioning of Tele :IRCON/J&K- Sistem India Pvt. Period: 09 months
JAT/15/ control System i.e. Cell/JAT/15/ Ltd., Terrace from the date of
1014/T-80/ SCADA system for control 1014/DQ/T- No.:4A, 3rd Floor, issue of letter of
Telecontrol & Monitoring of complete 80/Telecontrol/20 Vardhman Crown acceptance i.e.
Date: T-80 Tunnel Ventilation, 6/1675 dated Plaza, Plot No.2, 23.11.2012
24.11.2011 tunnel illumination, safety 24.2.2012 Sector-19,
system, protection Dwarka,
system, New Delhi - 110
Telecommunication 075
system, Tunnel sub
stations & Portal sub
stations etc. complete in
all respect required for
Tunnel T-80 Ventilation &
safety electro mechanical
installations on Dharam-
Qazigund section of
USBRL Project
(Package:SCADA system )

Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply contract)/ Contract completion
contract)/ Estimated Tendered Cost
address Cost (For (For Engg./Elect. date
Engg/Elect /S&T/ /S&T/Mech. etc
Mech. etc Works) Works)

6 IRCON/ 03.02.2012 Supply, Erection, Testing IRCON/J&K- M/s C.Doctor & `1777.66 - `15,29,25,203.52 Completion
J&K-Cell/ & Commissioning of Cell/JAT/15/ Co. Pvt. Ltd., Period: 09 months
JAT/ 15/ Tunnel Ventilation and 1014/T-80/ Bagati House, (6th from the date of
1014/ T-80/ Control System consisting Ventilation Floor), 34, issue of letter of
Ventilation of 1.6 M diameter Jet System / Ganesh Chandra acceptance i.e.
Date: Fans, 0.65 M diameter 2071/1174dated Avenue, Kolkata 23.11.2012
23.11.2011 Axial Fans etc. and Air 24.2.2012 PIN:700 013
Control & Ventilation Fax:033 2245
Control system and other 0554
related equipments etc.
complete for the Tunnel T-
80 Ventilation System on
Dharam- Qazigund
Section of USBRL Project
(J&K) (Package T-80,
Ventilation System)

7 IRCON/ 03.02.2012 Supply, Erection, Testing & IRCON/J&K- M/s Savronik `4450.00 Lacs - `39,88,14,561.86 Completion
J&K-Cell/ Commissioning of Electro- Cell/JAT/15/ Sistem India Pvt. Period: 09 months
JAT/15/ Mechanical (E&M) System 1014/D-Q/T- Ltd., Terrace from the date of
1014/D-Q/ consisting of LV power 80/E&M No.:4A, 3rd Floor, issue of letter of
T-80/E&M supply, emergency power System/211/676 Vardhman Crown acceptance i.e.
System supply, earthing, tunnel dtd. 24.02.2012 Plaza, Plot No.2, 23.11.2012
Date: lighting & fittings, fire Sector-19,
30.11.2011 detection, building Dwarka,
electrification, HVAC etc.
New Delhi – 110
and other related
075
equipments complete in
connection with T-80
Tunnel Ventilation & safety
system on Dharam-
Qazigund Section of
USBRL project (J&K)
(Package T-80, E&M)
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply contract)/ Contract completion
contract)/ Estimated Tendered Cost
address Cost (For (For Engg./Elect. date
Engg/Elect /S&T/ /S&T/Mech. etc
Mech. etc Works) Works)

8 IRCON/CC 09.01.2012 Balance work of IRCON/CC/TN/ M/s Broadway `1267.55 Lacs `18,94,98,834.00 Completion Period:
/TN/RSVY- Improvement / Upgradation RSVY-BIHAR/646 Link Pvt. Ltd., 06 months
BIHAR/646 of State Highways - 56 from Dtd.: 25.02.2012 Sri Krishna Nagar P.O.,
Dtd.: Shivnagar Ghat to Distt.: Begusarai
19.12.2011 Kusheshwar Asthan in PIN: 851 101
Darbhanga district of Bihar Phone: 06243-
State (PACKAGE-1C(ii) Road) 242318/242452
Fax: 06243-
247984

9 IRCON/ 02.02.2012 Supply, Erection, Testing & IRCON/ J&K- M/s ETA `2545.36 Lacs - `24,64,81,561/- Completion
J&K-Cell/ Commissioning of 11 KV Cell/JAT/15/1014/ Engineering Pvt. Period: 06 months
JAT/15/ Electro Mechanical System D-Q/T-80/11KV Ltd., ETA House, from the date of
1014/D-Q/ consisting of 5 Nos. System dtd. B-13, Sector-63, issue of letter of
T-80/11KV 11/0.433 KV, 500 KVA Sub- 25.02.2012 Noida - 201 301 acceptance i.e.
System station, switchgears with 11 (UP) 24.08.2012
Date: KV Cables etc. and other Tel.:0120 -
22.11.2011 related equipments 4007800,
complete in connection with
Fax: 0120 -
T-80 Tunnel Ventilation
4007899
system on Dharam-
Qazigund Section of
USBRL project (J&K)
(Package T-80, 11KV)

10 IRCON/ 17.01.2012 Supply, Installation, Testing & LOA No.: M/s Hitech `728.00 Lacs `711.00 Lacs `7.11 Crore 8 months from the
ELECT/ Commissioning of all the IRCON/ELECT/ Erectors Pvt. Ltd., date of LOA
Electrical Equipments related 303, Pragati
1029/RCF- 1029/RCF-RBL/
to 132/11kV Main Receiving Chambers,
RBL/MRS Substation including all 132KV MRS
Commercial
ELECT/36 associated works at New Rail ELECT/36
Complex, Rangit
Coach Factory, Rae Bareli dt.28.02.12 Nagar, New Delhi-
(U.P.). 110 008
Works Awarded : MARCH 2012
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply contract)/ Contract completion
contract)/ Estimated Tendered Cost
address Cost (For (For Engg./Elect. date
Engg/Elect /S&T/ /S&T/Mech. etc
Mech. etc Works) Works)

1 IRCON/S& 27.01.2012 Design, Supply, LOA No.: M/s Kiran Infra `10,44,57,471/- AT PAR `10,44,57,471/- Completion Period:
T/3014/RR Installation, Testing and :IRCON/S&T/301 Engineers Ltd., B- 06 months
VUNL/367 Commissioning of 4/RRVUNL.TEND 141, Road No. 9-
dated Electronic Interlocking ER/367/149 dated D, Vishwakarma
04.01.2012 System at Kalisindh 07.03.2012 Industrial Area,
Thermal Power Plant Jaipur, Rajasthan
Yard, Jhalawar, Rajasthan - 302 013, Tel.: 0141-
2330305, 2330427,
for RRVUNL Fax: 0141-2331808,
2260073

2 IRCON/ 07.02.2012 Supply, Installation, LOA No.: :IRCON/ M/s Eagle `1456 Lacs `1259 Lacs Completion Period:
ELECT/ Testing & Commissioning ELECT/ 1029/RCF- Enterprises, 30, 08 months from the
1029/RCF- date of issue of
of HT/LT Power RBL/Tonship Light & Nirala Market. I.T.
RBL/Tonship LOA
Light & Distribution Network Power/39 dated Crossing,
System including Road 09.03.2012 Lucknow (UP) –
Power/39
cum open space lighting in 226 020
Township at New Rail
Coach Factory, Rae Bareli

3 IRCON/3014 30.01.2012 Design and Construction IRCON/3014/ M/s P.S. `14,34,46,698/- `13,04,30,514/- `13,04,30,514/- 09.09.2012
/RRVUN.RS/ of Major and Minor RRVUN.RS/Bridg Infrabuild Pvt.
Tender/
Bridges along the es/Balance Ltd., Office No.
Bridges/
Balance alignment of Railway Work/393 dated 15, 1st floor, Jat
Work Track from proposed 10.03.2012 Dharamshala,
Jhalawar station to G.T. Road,
Kalisingh Thermal Power Fatehbad,
Plant in connection with Haryana-125 050.
Railway siding work of
Kalisingh Thermal Power
Project of RRVUNL.
Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
(for supply contract)/ (for supply contract)/
N. No. opening Work and date Name and Estimated Cost (For Tendered Cost
Contract completion
address Engg/Elect /S&T/ (For Engg./Elect. date
Mech. etc Works) /S&T/Mech. etc Works)

4 IRCON/ 23.01.2012 Supply, Installation, Testing & LOA No.: :IRCON/ M/s K. V. Prateek `923 Lacs `821 Lacs Completion Period:
ELECT/ Commissioning of Electrical ELECT/ 1029/RCF- Enterprises, 301, 10 months from the
1029/RCF- Equipments related to Power RBL/ASS ELECT/33 Suneja Tower - 1, date of issue of
RBL/ASS Supply Distribution for 08 Nos. dated 12.03.2012 District Centre, LOA
ELECT/33 11/0.433KV Auxiliary
Substations at New Rail Coach Janak Puri, New
Factory, Rae Bareli Delhi - 110 058

5 IRCON/MEC 23.09.2011 Supply, Erection, Testing LOA No.: M/s SIS 02 Nos. `21,51,00,000/- `43,02,00,000/- Completion Period:
H/1029/RCF. & Commissioning of 02 :IRCON/MECH/ Corporation, 683- `6964.00 Lacs 180 days after
RBL-II/ Laser 470 dalcheon- opening of LC
Nos. CNC Laser Cutting 1029/RCF.RBL-II/
Cutting & dong, Buk-GU,
Welding/05 and Welding machines at Laser Cutting &
Dtd.11.08.11 Rail Coach Factory at Welding/05 Ulsan, Korea Tel.:
052-245-5390
Lalganj, Raebareli, UP dtd. 14.03.12 Fax: 052-245-5392

6 IRCON/MEC 06.01.2012 Supply, Erection, Testing & LOA No.: M/s Legris India `313.00 Lacs `2,85,59,288/- Delivery :
H/1029/RCF. Commissioning of Pipelines :IRCON/MECH/ Pvt. Ltd., Plot No.: 10.09.2012
RBL- for Compressed Air Supply 1029/RCF. RBL- 99, Pace City-1,
II/Compresse System in finishing, II/Compressed Sector-37,
d Air/28
Dtd.17.12.11
furnishing and carpentry Air/28 Gurgaon - 122
shop at Rail Coach Factory Dtd. 14.03.2012 001 Tel.: 0124-
at Lalganj, Raebareli, UP- 4590600
(INDIA)

7 IRCON/3015 21.02.2012 Construction of Road Over LOA No.: M/s Naftogaz India `4425.00 Lacs `45,12,63,218/- 17-months from
/TN/ROB- Bridge (ROB) along with it's IRCON/3015/TN/RO Pvt. Ltd., C-125A, the date of issue
RAJ/HINDA approaches, service road & B- Sector-2, NOIDA – of LOA
UN/11/17 diversion road as per RAJ/HINDAUN/11/1 201301, (U.P.)
Dtd. 7/791 Dtd.
28.01.12
specifications, drawing & Ph.:0120-
design, maintaining all 20.03.2012 47257250
quality control standards FAX: 0120-
complete, in lieu of LC No.: 4257250
201-B at Railway Km 136/9-
10, in Hindaun City in
Rajasthan state
Continued...../-
S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled
N. No. opening Work and date Name and (for supply (for supply contract)/ Contract completion
contract)/ Estimated Tendered Cost
address Cost (For (For Engg./Elect. date
Engg/Elect /S&T/ /S&T/Mech. etc
Mech. etc Works) Works)

8 IRCON/ME 06.01.2012 Supply, Erection, Testing & LOA No.: M/s Migatronic (60+40) nos. `3,71,00,000/- Completion
CH/1029/R Commissioning of 60 nos. :IRCON/MECH/ India Pvt. Ltd., `483.00 Lacs Period : 120 days
CF. RBL- Synergie Pulse MIG/MAG 1029/RCF. RBL- No.: 22& 39/20 H, after opening of
II/C02 Co2 Welding Sets & 40 nos. II/Co2 Welding Sowri Street LC
Welding Synergie MIG/MAG Co2 Sets/69/913 dtd. Alandur, Chennai
sets/69 Welding Sets Delivery CIF 21.03.2012 - 600 016
dtd.17.12.11 (Site) at Rail Coach Factory Fax: 044-
at Lalganj, Raebareli, UP 22330064

9 IRCON/90 10.02.2012 Supply of Underground LOA No.: M/s Manoj Cables $ 14,38,848.00 (i) Basic rate: USD USD Completion
38/SLR.S& Railway Jelly Filled 6- :IRCON/9038/SL Ltd., “DAZZOLITE 3218.20 per Km 12,17,084.40 Period : 06
T/SIG.CAB Quad Cables of size 0.9 R.S&T/SIG.CABL HOUSE” BH-739, (ii) Transportation months from the
LES.PKG- mm diameter for Signaling ES.PKG- Shalimar Bagh Cost :USD 180 per date of issue of
Km
XI/19 dated & Telecom Installations as XI/19/185 dated (East), Delhi-110 LOA
(iii) Transit
18.01.2012 per RDSO specification 21.03.2012 088, Tel.: 011- Insurance : USD
No.IRS:TC-30/2005 (Ver.- 45399999, 11 per Km
1) with amend. No. 4 or 27499051-53,
latest for Sri Lanka Fax: 011-
Railway 27499055

10 RFP Notice 31.10.2011 Pre-feasibility study of LOA No.: M/s JAPAN `5,54,65,865/- Completion
No.: High Speed Rail Corridor :IRCON/CC/TN/H RAILWAY Period:07-months
IRCON/CC/ TECHNICAL
between Chennai - SRC-
TN/HSRC/C SERVICE (JARTS),
Bengaluru - Coimbatore - 6/CBCET/12/632/ Taiyokan Building,
BCE/11/632
Date:
Ernakulam - 826 dated 27-8, Hong 2-
14.07.2011 Thiruvananthapuram 30.03.2012 Chome, Bunkyo-
ku, TOKYO 113-
0033 Japan Tel.:
+81-3 5684-3175,
Fax: +81-3 5684-
3170

You might also like